[2024] VCAT 1207
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2024-12-19
Original judgment source is linked above.
Figure 5 - Table from Julia Bell evidence of building comparisons. Note we have included a correction noted by Ms Bell in oral evidence that the new building height is 24.45 metres to the top of the parapet on Marine Parade.
Figure 6 - East elevation showing comparison of previous proposal, current proposal and the previous approval at 1E Marine Parade.
They promote use and development and economic growth in this nominated employment area with mid-rise development that is required to respond to its strategic and physical contexts while transitioning to adjoining low rise neighbourhoods and minimising off-site impacts. The Yarra River and its corridor remains as a feature identified as having strategic importance.[16]
WHAT ARE THE CURRENT SCHEME PROVISIONS APPLYING TO THE LAND?
Figure 7 -Zone plan from VicPlan. Land marked in blue outline.
[34] Both a use and development for office require a permit in the IN3Z and no limitation on the amount of leasable floor area is specified in the schedule to this zone. The purposes of the IN3Z are:
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To provide for industries and associated uses in specific areas where special consideration of the nature and impacts of industrial uses is required or to avoid inter-industry conflict
To provide a buffer between the Industrial 1 Zone or Industrial 2 Zone and local communities, which allows for industries and associated uses compatible with the nearby community.
To allow limited retail opportunities including convenience shops, small scale supermarkets and associated shops in appropriate locations.
To ensure that uses do not affect the safety and amenity of adjacent, more sensitive land uses. [Tribunal's underlining]
[35] Decision guidelines are separately specified for uses and buildings and works under clauses 33.03-2 and 33.03-4 respectively. The former includes the effects of the use on nearby residential areas, nearby industries and traffic.
[36] Decision guidelines for buildings and works relevantly refer to the following:
[37] Residential land on the opposite side of Marine Parade is in the NRZ1. Except on sloping sites, building height must not exceed 9 metres or two storeys at any point.[20]
[39] In terms of the surrounding context, various overlay controls apply, including:
[40] The south-east corner of the review site is approximately 8m from land at 13 Harper Street subject to DDO1-D (and 61m west of 3A Marine Parade) in which a maximum (mandatory) 11m height control applies.
Figure 9 - SLO1 boundary as referred to in Shouman.
What is the current planning policy context applying to the Land?
Commercial and industrial land outside of activity centres and major employment precincts, such as CUB in Abbotsford and Botanicca Corporate Park in Richmond as shown in clause 02.04 (Strategic Framework Plan). These areas support employment uses on individual sites or within broader precincts, where employment uses have been maintained through commercial or industrial zoning.
In parts of Yarra, there is a strong composition of mid-rise and some taller buildings, notably concentrated in pockets within activity centres, along main roads and in areas transitioning from industrial to commercial or mixed uses. These mid-rise and taller buildings comprise modern apartments and offices.
Reinforce Yarra's low-rise neighbourhoods by directing mid-rise buildings to appropriate locations, within major and neighbourhood activity centres, employment areas (as identified in clause 02.01), major regeneration areas (as shown on the Strategic Framework Plan in clause 02.04), and along boulevards (Hoddle St, Alexandra Parade, Victoria Parade and the south end of Queens Parade).
Employment land: Commercial and industrial land outside of activity centres and major employment precincts, such as CUB in Abbotsford and Botanicca Corporate Park in Richmond as shown in clause 02.04 (Strategic Framework Plan). These areas support employment uses on individual sites or within broader precincts, where employment uses have been maintained through commercial or industrial zoning.[21]

Figure 10 - Extract of Strategic Framework Plan at clause 02.04.
DOES THE PROPOSED BUILDING PROVIDE A SUITABLE TRANSITION TO THE RESIDENTIAL AREA NORTH OF MARINE PARADE?
[166] I consider that the street wall height in Marine Parade and the architectural expression of the front façade more generally is acceptable in front-on views from the street and private domain. > > [167] In oblique views, particularly from the west, I find that the height, scale and mass of the building of nearly 30m will have an unacceptably dominating visual impact that would not be suitably mediated by the width of Marine Parade. > > [168] This proposal's visual reach would be experienced in the surrounding residential street network to the north in a way that would be uncharacteristic and jarring in this particular setting. This area is also within the NRZ1 where a finer grain, low scale urban form predominates. > > [169] From the SPOS to the east side of the dwelling at No. 40 Marine Parade, I expect that existing vegetation in this space will offer a suitable level of softening and screening of the built form for this particular context at an interface with land in the IN3Z.
Figure 11 - photomontage of building viewed from the east. Green line is outline of building proposed in Shouman.
WILL THE PROPOSAL HAVE AN UNREASONABLE ADVERSE IMPACT ON THE YARRA RIVER CORRIDOR?
From an Urban Design perspective, there is no policy directive or contextual reference upon which to require non-visibility of built form in the River corridor context. The previous VCAT decision for the review site strongly addressed visibility of the proposed development, on the basis that the site is within the River corridor.
Therefore, based on my assessments above, I do not consider the proposed building height to be excessive or unacceptable from an Urban Design perspective, but I defer to planning considerations for the River corridor, given the limited built form change since the previous proposal, and the visibility of the proposal in some views from the River corridor.[37]
Figure 12 - Extract of 'Key Viewing Locations' - Page 35: Lower Yarra River Corridor Study. Purple bridges are pedestrian bridges. Red are road bridges.
The pedestrian bridges offer exemplary views of the river from a close-range and elevated perspective. This allows panoramic views of the waterway itself, the riverside parklands or the adjoining built up areas where views through the tree canopy over rooftops are afforded.
The pedestrian bridges can provide a sense of momentary immersion in the naturalistic environment of the river corridor, as a distinctive contrast with the surrounding activity of the study area.
Figure 13 - Photomontage from Collins Bridge. Green outline is the previous proposal before the Tribunal in Shouman.
Figure 14 -Image from figure 13, zoomed in to the proposed building.
[162] Overall, I concur with Mr Martin's analysis and the submissions put by Ms Lucas that the scale of the building will be readily appreciable from this distance. I also agree with Mr Martin's submissions that the proposal's visual impacts can be helpfully understood in relative terms to the surrounding topography. At the eastern termination of Gipps Street where it meets Collins Bridge, the ground level datum is approximately RL15.0m. The proposed height of the building ranges from RL43.1m to RL45.8m at the rear. A building of this scale would present as an unusually high built form aberration above the surrounding valued and naturalistic landscape from at least these two visually sensitive locations in the public realm.
Figure 15 - photo viewing west over Collins Bridge - Mr Crowder's evidence statement.
[156] I find that the proposed building will be highly exposed above the otherwise uninterrupted tree canopy in this part of the river corridor. With a height approaching 30m at its highest point before reducing to 26.6m at its southern side, I find that this building will be a highly dominant built form element and visually intrusive in a landscape setting otherwise devoid of such built form in northerly and north-westerly views from Collins Bridge.
enable the proposed building to maintain a subordination to the Yarra River corridor.
DOES THE PROPOSAL RESULT IN ANY UNREASONABLE AMENITY IMPACTS?
All internal lighting within the offices and basement car parking areas on the Subject Land that result in light spill to the public realm or adjoining residential areas must operate on a timer or sensor so that all internal lighting is switched off when those areas are not in use, to the satisfaction of the responsible authority.
DOES THE PROPOSAL PROVIDE APPROPRIATE ON-SITE CAR PARKING AND BICYCLE PARKING?
[171] I accept Ms Dunstan's evidence as to the acceptability of car parking, traffic volumes, access arrangements and queuing. > > [172] However I have considerable reservations about the acceptability of the access arrangements to bicycle parking areas that are located inside the building. This is due to the large number of bicycles proposed to be accommodated (78) and the shared reliance on either the main vehicle access ramp or the sole lift serving the entire building from within the ground level foyer.
Whether clauses 12.03-1S and 12.03-1R of the Yarra Planning Scheme are relevant to the assessment of a proposal when overlay controls for the protection of the Yarra River corridor do not apply to land affected by the proposal, and if so, the weight to be given to these clauses.
river corridor means the land over which the waters of a river flow and the river banks on either side of the main channel that rise to the crestline at which the topography flattens to that of the adjacent land; and
Yarra River corridor means the land over which the waters of the Yarra River flow and the river banks on either side of the main channel that rise to the crestline at which the topography flattens to that of the adjacent land;
Clauses 12.03-1S and 12.03-1R of the Yarra Planning Scheme (Scheme) are relevant to the assessment of the proposal the subject of this proceeding even though the Land is not within the Design and Development Overlay - Schedule 1 (DDO1) or the Significant Landscape Overlay - Schedule 1 (SLO1). This is because clauses 12.03-1S and 12.03-1R of the Scheme are relevant to the permissions sought under the Industrial 3 Zone (IN3Z). The weight to be given to clauses 12.03-1S and 12.03-1R of the Scheme is influenced by the facts and circumstances of the case, which include the distance of the Land from the Yarra River corridor, the height and mass of the proposed development, and the extent to which the proposed development is expected to be visible from the Yarra River corridor.
Clause 12.03: river corridor planning policies





To implement the Municipal Planning Strategy and the Planning Policy Framework.
To identify areas which are affected by specific requirements relating to the design and built form of new development.
To ensure new buildings, tennis courts, swimming pools and other structures are appropriately set back from the banks of the Yarra River and adjacent public open space.
To ensure buildings are presented at a variety of heights, avoid visual bulk, are stepped back from the frontage of the Yarra River and adjacent public open space and use colours and finishes which do not contrast with the natural landscape setting.
To avoid additional light spill and overshadowing from buildings on the banks and water of the Yarra River, its adjacent public open space, pedestrian and bicycle paths.
To ensure sufficient space is provided between buildings to maintain views to the Yarra River and allow for the planting and growth of vegetation, including large canopy trees.
To minimise impervious surfaces to allow for the filtration of water and retention and establishment of vegetation and canopy trees.

Figure 1 - extracts of the DDO1 proximate to the Land

Requirements that cannot be varied by a planning permit
The following requirements must be met:
Requirements that can be varied by a planning permit
The following requirements should be met:
Before deciding on an application, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:
Before deciding on an application, the responsible authority must consider:
Before deciding on an application, the responsible authority must consider as appropriate:
Landscape protection
SLO1: Yarra (Birrarung) River Corridor Environs
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To identify significant landscapes.
To conserve and enhance the character of significant landscapes.
The Yarra River has metropolitan significance as an environmental, aesthetic, cultural, recreation and tourism asset. The river corridor links parklands and reserves into a near continuous vegetated landscape experience that provides a highly valued, secluded natural environment, enjoyed by local and metropolitan communities.
The Yarra River corridor contains some of the most valued flora, fauna, geological and geomorphological assets in metropolitan Melbourne. Indigenous vegetation and remnant riparian vegetation provide habitat and contribute to the protection of water quality and flow regimes.
This segment of the Yarra River flows through the traditional land of the Wurundjeri Woi Wurrung people. The waterway, its natural landscape and key features have social, cultural and spiritual significance, with areas such as the river flats and billabongs being important gathering spots.
To retain vegetation that contributes to landscape character, heritage values or neighbourhood character.
To maintain and protect linear public open space and provide for secluded areas of public open space with access to the river where appropriate.
To encourage the co-location or clustering of buildings, jetties and mooring facilities on public land.
To encourage bicycle and shared paths that are safe, well located and require minimal earthworks and vegetation removal.
To ensure fencing within close proximity to the Yarra River is low in scale, visually permeable and does not contrast with the natural landscape character.

Figure 3 - extracts of the SLO1 proximate to the Land

Before deciding on an application, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To provide for industries and associated uses in specific areas where special consideration of the nature and impacts of industrial uses is required or to avoid inter-industry conflict.
To provide a buffer between the Industrial 1 Zone or Industrial 2 Zone and local communities, which allows for industries and associated uses compatible with the nearby community.
To allow limited retail opportunities including convenience shops, small scale supermarkets and associated shops in appropriate locations.
To ensure that uses do not affect the safety and amenity of adjacent, more sensitive land uses.
Before deciding on an application, in addition to the decision guidelines in Clause 65, the responsible authority must consider, as appropriate:
To ensure that car parking is provided in accordance with the Municipal Planning Strategy and the Planning Policy Framework.
To ensure the provision of an appropriate number of car parking spaces having regard to the demand likely to be generated, the activities on the land and the nature of the locality.
To support sustainable transport alternatives to the motor car.
To promote the efficient use of car parking spaces through the consolidation of car parking facilities.
To ensure that car parking does not adversely affect the amenity of the locality.
To ensure that the design and location of car parking is of a high standard, creates a safe environment for users and enables easy and efficient use.
Reduce (including reduce to zero) the number of car parking spaces required under Clause 52.06-5 or in a schedule to the Parking Overlay.
Provide some or all of the car parking spaces required under Clause 52.06-5 or in a schedule to the Parking Overlay on another site.
Provide more than the maximum parking provision specified in a schedule to the Parking Overlay
Before deciding that a plan prepared under Clause 52.06-8 is satisfactory the responsible authority must consider, as appropriate:






...the permit trigger in the IN3Z to construct a building, in the context of land which is clearly part of the Yarra River corridor, means that the objectives and strategies of clauses 12.03-1S and 12.03-1R are relevant to an integrated decision making exercise. This is not to construe the permission under the IN3Z so broadly that every conceivable consideration in the PPF is open. This is a targeted approach to parts of the PPF that are called into play by an examination of the words of the policy itself. Council's submission is that those clauses are relevant to the Tribunal's consideration of the Permit Application because they specifically refer to the Yarra River corridor, in which the Subject Land is located, and therefore the policy it is seeking to invoke is applicable by the words of the policy itself.
What do the terms river corridor and Yarra River corridor mean for the purposes of clauses 12.03-1S and 12.03-1R, respectively?
Statutory interpretation of subordinate legislation

Figure 5 - Yarra River as shown in the Register of Geographic Names
noun 1. a defined watercourse of considerable size and length, whether flowing or dry according to the seasons, and whether a single channel or a number of diverging or converging channels.
2. such a watercourse, especially when flowing.
noun
1. a gallery or passage connecting parts of a building.
2. a passage into which several rooms or apartments open.
3. a passageway on one side of a railway carriage into which the compartments open.
4. a narrow tract of land forming a passageway, as one belonging to an inland country and affording an outlet to the sea: the Polish Corridor.
**Context of Yarra River corridor and a river corridor in relevant provisions
Conserve waterway systems and the landscapes and environmental values surrounding them by protecting ecological values, indigenous vegetation, terrestrial and aquatic habitats and encouraging biodiversity.
Sensitively design and site development to maintain and enhance the waterway system and the surrounding landscape setting, environmental assets, and ecological and hydrological systems.
Address the impacts of use and development on drought and flooding events at a catchment and site scale to protect the health and natural function of waterway systems and their surrounding landscape and environment.
...
Retain and enhance the recreation and amenity values along waterway systems by:
...
Design and site development to maintain and enhance the natural environment of waterway systems by:
Strengthen the Yarra River's natural environment, heritage and overall health by:
...
Promote a sense of place and landscape identity by:
Retain and enhance people's enjoyment of the river and its environment by:
Ensure that development is designed and sited to maintain and enhance the river's secluded and natural environment by:
Why the 2016 Study does not define the terms Yarra River corridor and river corridor
...to better understand and assess the need for new or amended planning controls and design guidelines for land in proximity to the Yarra River between Punt Road and Bulleen.
The objective of this study is to achieve consistent development outcomes along the Lower Yarra River to ensure that further development does not encroach on the river's landscape, environmental, aesthetic, cultural and recreational values. Importantly, the study focusses on management of the interface between public and private land along the corridor.[82]

2016 Study is a policy document and is not part of the Scheme
Policy guidelines
A planning policy may include policy guidelines. Policy guidelines indicate how objectives can be met and how strategies can be implemented.
A responsible authority must take a relevant policy guideline into account when it makes a decision under this planning scheme, but is not required to give effect to it. If the responsible authority is satisfied that an alternative approach meets the objective, the alternative may be considered.
Policy documents
A planning policy may include reference to a policy document. A policy document may be an incorporated, background and other document.
A background document listed in the table or the schedule to Clause 72.08 that applies to Clauses 10 to 19 is a policy document for applicable planning policies.
[Tribunal emphasis]
Have informed the preparation of, or an amendment to, this planning scheme.
Provide information to explain the context within which a provision has been framed.
Assist the understanding of this planning scheme.

2016 Study does not define the river corridor or the Yarra River corridor
Strategies in a former version of Clause 12.03-1R pre-date the 2016 Study
Maintain and enhance the natural landscape character of the Yarra River corridor in which the topography, waterway, banks and tree canopy are dominant features providing a highly valued, secluded, natural environment for the enjoyment of the public.
...the Yarra River corridor and its study area had, by that stage, already been defined in earlier strategic work. Importantly, the breadth of the corridor, at least as it now appears in the 2016 River Corridor Study around Abbotsford, is consistent with earlier studies referenced in the planning scheme under clause 12.01-1R at the time. Commenting on Amendment VC121, the 2016 River Corridor Study observes that the 'new "Yarra River Protection" policy provides a strengthened basis and rationale for the protection of the whole of the Yarra River corridor to inform decision making'.
[footnotes omitted]
2016 Study seeks to protect Yarra River corridor through management of land surrounding the Yarra River corridor
Section 2 'Values of the Lower Yarra River Corridor'
Urban & Landscape Character
The general value ascribed to the Yarra's 'natural' landscape character, despite the obvious presence of buildings, rebuilt river banks, power lines, and so on, relies heavily on indigenous vegetation. According to the 2003 City of Yarra Built Form Review:
Most people ... experience the river corridor not from the river and its banks, but from vantage points outside the corridor, or as they drive across the river on a bridge. What they see (or expect to see) is a line of trees, a heavily vegetated river corridor. They will rarely see the water itself, except perhaps as a glimpse amongst the trees. The expression of the river corridor as a corridor of vegetation, particularly of canopy trees, is most important.
This heavily vegetated river corridor underpins the distinctive character of surrounding suburbs including Kew, Hawthorn, Toorak and South Yarra. Even in areas where the river corridor has been subject to greater modification such as Richmond, Abbotsford and Cremorne, the presence of vegetation underpins the character of the river.[90]
[Tribunal emphasis]
Increasing investment in public facilities, including recreation facilities continues to progressively improve the range of facilities and access options within the river corridor.
...
Key open space and recreation features along the river corridor are shown on the map on the following page. This includes the river's parklands, walking trails, key public recreation nodes and facilities, and main access points. This network of features offers a wide range of economic, health and wellbeing, and social benefits for a broad cross-section of the community.[91]
[Tribunal emphasis]
Built form that is highly visible along the ridgeline/skyline and surrounding hillslopes, as viewed from the Yarra River corridor and areas of public open space.[92]
[Tribunal emphasis]
Section 3 'River Interface Character Types Analysis'


Figure 7 - River Interface Character Types of 2016 Study
The 2005 'Review of Policy and Controls for the Yarra River Corridor: Punt Road to Burke Road' identified residential neighbourhoods adjoining the river in Toorak, Hawthorn, Kew and Alphington as 'Leafy Suburban'.
These neighbourhoods have a distinctively well-treed character, which complements the landscape character of the river corridor.
[Tribunal emphasis]
Established residential neighbourhoods, either adjoining the river directly or located immediately beyond the parklands and recreation areas along the river corridor.[94]
[Tribunal emphasis]
Key Features
...
Established industrial, commercial and residential buildings, mostly located on the crestline of the Yarra River corridor.
...
Land Use & Built Form
...
Buildings in this area are a mix of heights, ranging from one storey to over twelve storeys, and are generally built up to the crestline of the river corridor, adding to their visual prominence on the skyline. A high level of vegetation cover on the river banks screens views to buildings from the river in many locations.
Pattern of Viewing
This character type is mostly experienced via the Capital City Trail, the Yarra Boulevard and the extensive network of open spaces along this part of the river corridor, particularly Yarra Bend Park on the opposite side of the river.
[Tribunal emphasis]
At Gipps Street and Walmer Street, commercial, residential and other zoned land are in close proximity to the river corridor, and development is visible from the bridge, despite the heavy screen of riverside vegetation in these locations.[95]
[Tribunal emphasis]
The pedestrian bridges can provide a sense of momentary immersion in the naturalistic environment of the river corridor, as a distinctive contrast with the surrounding activity of the study area.[96]
Areas recommended for strengthened planning control management within the Lower Yarra River corridor have been determined based on an assessment of their relationship to the river corridor segments of the Waterway Corridor, River Experience Corridor or Landscape Setting Corridor, shown in Figure 1, below.
Detailed cross-sectional diagrams (Chapter 6) have been prepared in different locations to explore the relationship of the topography, existing development, vegetation cover and other characteristics within the river's immediate and wider landscape to inform the application of planning controls.
This analysis helps to understand how the river and its surrounding landscape vary along its course, at different distances from the river, and what management strategies might be required to achieve the vision and objectives for the study area.
[Tribunal emphasis]

Figure 8 - River Corridor Areas figure in 2016 Study
The Waterway Corridor comprises the river itself, its banks and the immediate environment.
The direct river frontage is dominated by a naturalistic vegetation cover appropriate to a riverine environment, whether or not it is strictly 'natural' in the sense of being indigenous and self-seeded. The riverbanks, with their tree cover and understorey vegetation, frame and enclose the waterway to the extent that, when canoeing down the river, a sense of remoteness from urban activities can be achieved. Maintaining this vegetated corridor has been, and should remain, a prime objective of land management throughout the corridor.
For the length of the Waterway Corridor, State policy requires a vegetated buffer zone of 30 metres to be provided along each side of the river, which is outlined in Clause 12.05 'Yarra River Protection' and Clause 14.02-1 'Catchment planning & management' of the State Planning Policy Framework. Other policies and controls are also in place to protect the river's landscape and environmental values, discussed further in Section 5.4. A coordinated approach to the management of the Waterway Corridor is required in the future, including the setting of mandatory building setback and height controls.
[Tribunal emphasis]
The River Experience Corridor comprises the fore- and middle-ground landscape that is viewed or experienced from the river, the Main Yarra trail and the adjoining parklands.
The viewsheds of the Main Yarra and Capital City Trails is particularly important because of the popularity of walking or cycling along the river. It differs from the waterway view shed to the extent that the trail is located at varying distances from the river with the river itself often not visible from the trail.
Because the experience of moving along the river and the trail is dynamic, the viewshed also is dynamic. At some locations on the trail, foreground vegetation obscures the horizon; at others there are open views. Even where this wider landscape is mostly obscured by foreground vegetation, progressive and intermittent glimpses of the wider landscape can be obtained from the trail. A photograph from a static viewpoint 'proving' that something is not visible behind the trees can be misleading in this respect.
When walking or cycling along the trail, or visiting the many areas of parkland, the experience is generally one of a naturalistically vegetated corridor. The success of this experience rests on the extent to which one feels enveloped in a continuous corridor of vegetation, a retreat from the hard surfaces and bustle of urban life. In reality, urban activity and development are often closer than one might expect, and urban reality breaks into the experience from time-to-time, such as when a major road crosses the corridor along its journey.
Clause 12.05, 'Yarra River Protection', acknowledges the need to protect the intrinsic value of the river's naturalistic setting, the importance of this environment in preserving the river's sense of place and landscape identity, and its recreational and environmental values. The Policy requires visual intrusion of built form within the river's environment to be minimised.
A key challenge of this study has been to document the qualities of the River Experience Corridor, and to propose measures that will protect and strengthen them. A number of management measures, such as setback lines, maximum building heights, vegetation protection, and siting and design guidance are needed to achieve this.
Currently, a range of discretionary or mandatory statutory controls relate to the River Experience Corridor, or in some locations, none at all. A coordinated consistent approach to planning control management across the River Experience Corridor is required, which should also include mandatory controls elements.
[Tribunal emphasis]
Foreground: Begins at the viewer, assuming location at the river edge, and extends to approximately 30m. Detail in the landscape such as individual leaves, flowers etc. and the colour and texture of the landscape and structures are evident within this view plane.
For the Yarra River corridor the foreground of views should be dominated by vegetation, views of the river bank and views of the river itself.
Middleground: Within the Yarra River corridor context, the middleground view plane has been determined as beyond 30m, and extending to 50m. Colour and textures are still visible, but secondary to those within the foreground of views.
It is within this view plane that the majority of front walls of buildings would be located. Front walls of buildings up to a height of 11m would be clearly visible within this plane, but would be in proportion to the river and its banks, and would therefore not diminish or 'visually overwhelm' the topography of the corridor. This is aided by the fact that views within this plane are often screened by vegetation and topographical rises.
However, any visible built form elements above 11m in height have the potential to visually dominate, and overwhelm the topography of the river and its banks. As such, any building elements above 11m should be designed and sited to be visually recessive, with a substantial upper level setback being the most effective solution.
Background: Alterations in the background (beyond 50m) are less distinctive. Detail can be seen, but increasingly, colour and texture variation is seen as grouped into mass elements and secondary in nature.
Built form beyond 50m of the viewer, while still visible, has less visual impact on the immediate river environs, and the viewer's experience of the river corridor.


Figure 10 - Waterway Corridor and River Experience corridor as compared with building setbacks and heights
The Landscape Setting Corridor comprises the wider setting of the river corridor, defined by the ridgelines or skyline at the extremity of the viewshed and beyond.
In simple terms this refers to the horizon visible from the Main Yarra and Capital City trails, adjoining parklands or the Yarra River itself. Where the horizon is close in (up to 300-500m), it is likely also to be the edge of the River Experience Corridor. In some areas the horizon is part of Melbourne's developed suburban area, in others it is public land.
Within the Lower Yarra context, the Landscape Setting Corridor varies significantly. In some locations it is defined by well vegetated parklands or leafy suburban areas with a strong presence of tree cover. This includes areas such as Fairfield, Kew, Hawthorn and Toorak.
In other locations, the river's wider Landscape Setting Corridor is defined by the dense urban form of inner Melbourne. Long range views from elevated locations on the eastern and southern side of the river are afforded across the densely urbanised context of Richmond and Cremorne, through to the Melbourne CBD on the horizon. South Yarra on the southern banks is also a densely urbansied [sic] context for the river, within a strongly vegetated setting.
[Tribunal emphasis]
This study proposes the introduction of targeted mandatory controls to ensure that the highly valued natural landscape and environment features of the Yarra River corridor are retained for the benefit of all Melbournians, now and into the future. It is proposed that the following built form aspects be set as mandatory provisions:
The above mandatory requirements should be consistently represented and applied throughout the corridor. These will be complemented by discretionary requirements that relate to the appearance of buildings and works within the viewshed of the Yarra River. This will provide clarity and certainty at the river's edge, while allowing for a performance based approach for built form outcomes in its broader landscape setting.
These aspects, in addition to protecting vegetation, and other matters such as careful management of the impacts of landscaping or earthworks, are key to ensuring the long term protection of today's landscape values within the Yarra River corridor.
[Tribunal emphasis]
Protect and enhance the vegetation dominated views of the Yarra River corridor, particularly from public areas such as roads, paths, bridge crossings and open space reserves.
Retain native vegetation, particularly established vegetation, mature vegetation and canopy trees on both public and private land along the Yarra River corridor.
Site and design development so that it responds sensitively to the topographical and landscape character of the Yarra River corridor.
Protect natural landforms, natural stream geomorphology and geological formations of the Yarra River corridor, where practical.
Maintain and enhance public access to and throughout the Yarra River corridor including access to the river itself and shared use of water access locations.
Maintain and improve linear public open space and pathways along the Yarra River corridor, connecting existing and proposed open space areas upstream and downstream of the Yarra River.
[Tribunal emphasis]
- The river's natural flood and watercourse characteristics is not impacted.
- The topography of the river and its banks are maintained as the dominant feature in the public views of the river corridor',
which suggests that the views of the river corridor involve views of the topography of the river and its banks, as opposed to views of built form.
... This area features established industrial, commercial and residential buildings, some of which are located within close proximity to the Yarra River corridor.
[Tribunal emphasis]

Figure 11 - Marine Parade and Harper Street cross-sectional analysis
Neither the DDO1 nor the SLO1 define the Yarra River Corridor
plural noun immediate neighbourhood; surrounding parts or districts, as of a city; outskirts; suburbs: *I resented more tensely than ever that so much of my life had been cramped into the ugly environs of 'Possum Gully. -MILES FRANKLIN, 1946.
Areas recommended for strengthened planning control management are based on a detailed assessment of land within close proximity to the Yarra River corridor. To determine their extent, the following approach was taken which defines the corridor (see figure 1) as one of three segments:
Is the Land within the Yarra River corridor or a river corridor?
Are clauses 12.03-1S and 12.03-1R of the Scheme relevant to the permissions before us in this proceeding?
Clauses 12.03-1S and 12.03-1R do not only apply to the Yarra River corridor or to a river corridor
To maintain and enhance the natural landscape character of the Yarra River corridor.
Clauses 12.03-1S and 12.03-1R are relevant to the permissions sought under the IN3Z
To provide for industries and associated uses in specific areas where special consideration of the nature and impacts of industrial uses is required or to avoid inter-industry conflict.
...
To ensure that uses do not affect the safety and amenity of adjacent, more sensitive land uses.
1. a surface regarded as the common boundary to two bodies or spaces.
...
5. the point or area at which any two systems interact.
Built form beyond 50m of the viewer, while still visible, has less visual impact on the immediate river environs, and the viewer's experience of the river corridor.
Clauses 12.03-1S and 12.03-1R are not relevant to the permission under clause 52.06
Clauses 12.03-1S and 12.03-1R do not only apply to DDO1 and SLO1
Relevance of the YRP Act and Yarra Strategic Plan
(a) to provide for the declaration of the Yarra River and certain public land in its vicinity for the purpose of protecting it as one living and integrated natural entity; and
(b) to provide for the development and implementation of a Yarra Strategic Plan as an overarching policy and planning framework in relation to the Yarra River and certain land in its vicinity; and
(c) to establish the Birrarung Council to provide advice to the Minister in relation to Yarra River land and other land, the use or development of which may affect Yarra River land, and other matters, and to report annually to the Minister on the implementation of a Yarra Strategic Plan by responsible public entities; and
(d) to set out principles to which responsible public entities must have regard when performing functions or duties or exercising powers in relation to Yarra River land or other land mentioned in paragraph (c).
[Tribunal emphasis]
Where required, directions will be translated into the Victoria Planning Provisions and become part of municipal planning schemes - meaning that relevant decision making on land use and development is consistent with the land use framework.
...
A framework with a regional approach
The directions for future land use and development are broad and purposefully high level and, where necessary, will be translated into specific planning provisions to:
Development of the land use framework has drawn on the experience of developing and implementing the many existing planning studies, strategies and projects in the Yarra corridor. The framework is designed to operate at a regional level, however it also informs planning policies, provisions and controls at local levels (see Figure 4). The framework does not take the place of other strategies, frameworks and policies, but operates in conjunction with existing statutory protections to ensure that the Yarra is managed as one living and integrated natural entity
Implementation of the framework
The land use framework will be given effect in planning schemes through a state-led planning scheme amendment process in consultation with councils and the broader Yarra Collaboration Committee. This will occur through a staged delivery process.
Stage 1 - Giving initial effect to the Yarra Strategic Plan
Clause 12.03-1R 'Yarra River Protection' of the Victoria Planning Provisions will be updated, relevant land use directions translated into planning schemes, and the Yarra Strategic Plan referenced as a background document. This will occur following approval of the plan.
Stage 2 - Whole-of-river actions and reach-based directions
Future stages of implementation will deliver the whole-of-river actions and reach-based directions for land use and development, giving place-based effect to the land use framework, ensuring the values of the river are protected and the 50 Year Community Vision can be realised. Delivery will be multi-staged and occur iteratively across the life of the plan through state-local government joint projects.
Where implementation of the framework requires additional strategic work to be undertaken, it will be completed prior to further planning scheme amendments being progressed.
Clauses 12.03-1S and 12.03-1R of the Yarra Planning Scheme (Scheme) are relevant to the assessment of the proposal the subject of this proceeding even though the Land is not within the Design and Development Overlay - Schedule 1 (DDO1) or the Significant Landscape Overlay - Schedule 1 (SLO1). This is because clauses 12.03-1S and 12.03-1R of the Scheme are relevant to the permissions sought under the Industrial 3 Zone (IN3Z). The weight to be given to clauses 12.03-1S and 12.03-1R of the Scheme is influenced by the facts and circumstances of the case, which include the distance of the Land from the Yarra River corridor, the height and mass of the proposed development, and the extent to which the proposed development is expected to be visible from the Yarra River corridor.
Paragraphs [72]-[119] of Shouman Pty Ltd v Yarra CC (Red Dot) [2022] VCAT 313






























Reduce the number of car parking spaces required under Clause 52.06-5.
(a) A dedicated bicycle lift between the basement and ground floor levels designed generally in accordance with plan sheets TP104 and TP105 both marked revision D and both dated 13 August 2024.
(b) Increased prominence and legibility of the main entrance, such as through a light extended canopy, soffit/wall lining or other device.
(c) A simplified articulation of the solid side walls, using textured concrete areas in a pattern that is more rectilinear and coordinated with the articulation of the front and rear facades.
(d) Correction of the misalignment between the ground floor frontage columns with the walls and piers behind.
(e) Details of any services cupboards or infrastructure at the ground floor street frontage demonstrating a high quality appearance.
(f) A vehicle crossing ground clearance check at a scale of 1:20 for a B99 design vehicle in accordance with Council's 'Vehicle Crossing - Cross Section' information sheet, demonstrating access into and out of the development and including the following spot levels:
- the reduced level 2.0 metres inside the property;
- the property boundary level;
- the bottom of kerb (invert) level;
- the lip of the channel level; and
- a few levels on the road pavement for Marine Parade.
(g) Dimension the passing area at the base of the vehicle access ramp.
(h) Demonstration that internal floor levels will be DDA compliant in relation to the footpath.
(i) Any relevant changes required by the endorsed Sustainable Management Plan at Condition 7.
(j) Any relevant changes required by the endorsed Wind Report at Condition 14.
(a) The transport of materials, goods or commodities to or from land.
(b) The appearance of any buildings, works or materials.
(c) The emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil.
(d) The presence of vermin.
(a) The 15kW capacity of the solar panel system increased to reflect the increased number of solar panels;
(b) Confirmation that enabling infrastructure (e.g. conduits etc) will be installed to all car parking spaces to allow for the future installation of electric vehicle charging stations;
(c) Clarification if a commitment to a Building Systems Water Use Reduction is proposed;
(d) Consistency between the SMP initiatives annotated on the plans and the commitments detailed in the SMP, including detail of electric vehicle charging and clarify that the parking space with dedicated electric vehicle charging station has shared access between occupants;
(e) A JV3 modelling report showing a minimum 10% improvement over NCC 2016 and exceeding the requirements of NCC 2019;
(f) Clarification that improvement over NCC 2019 is for building fabric only (not reliant on services);
(g) Include calculations within JV3 modelling report to support GHG reduction claims;
(h) Include within JV3, details of how the proposed building design (and services) reduces peak energy demand;
(i) Confirmation whether the occupancy level of 25 persons in the basements, ground and level 1 stated in the submitted STORM report is accurate, with the rainwater tank capacity and STORM report updated should the occupancy level be amended (as applicable);
(j) Detail stormwater diversion ongoing maintenance details;
(k) The Buildings Materials section updated to remove non-committal language such as "wherever possible" and provide measurable percentage commitments to recycled and reused products and include additional components with recycled content (such as insulation);
(l) Detail if 80% construction waste target includes waste generated through demolition;
(m) Details of how organic waste management are communicated to each tenancy;
(n) Commit to producing a Building Users Guide explaining optimal usage of building services to minimise energy and water consumption;
(o) Clarify inclusion of demolition waste in recycling target;
(p) Confirm the depth of external shading projections on north facing glazing on L3, L4 and L5, and clarify whether the development satisfies criteria for BESS external shading credit, ensuring consistency between the plans and SMP;
(q) Include that pipes, cabling, flooring to do not contain PVC or meeting best practice guidelines for PVC;
(r) Consider ISO 14001 principles as applicable; and
(s) An energy efficient electric heat pump hot water system.
(a) Detail drawings for elements such as furniture and planters - showing dimensions, drainage, lining, materials and growing media. Volumes of growing media need to be adequate for the plant species proposed and well as cultivation depth;
(b) Provide information on proposed irrigation, light well detail, growing structure detail, and drainage detail for planters;
(c) Provide a maintenance schedule, including task details and frequency, maintenance and access;
(d) A notation that load bearing weights for the building structure will be checked and confirmed by a suitably qualified structural engineer against the saturated bulk density of soil media, planter box and plant mass being proposed; and
(e) Provide a planting plan(s) showing the location of proposed planting and plant numbers and species, as well as a legend containing key features, materials and surfaces.
(a) Description of the location in the context of alternative modes of transport;
(b) Employee welcome packs (e.g. provision of Myki/transport ticketing);
(c) Sustainable transport goals linked to measurable targets, performance indicators and monitoring timeframes;
(d) A designated 'manager' or 'champion' responsible for co-ordination and implementation;
(e) Details of bicycle parking and bicycle routes;
(f) Details of GTP funding and management responsibilities;
(g) The types of bicycle storage devices proposed to be used for employee and visitor spaces (i.e. hanging or floor mounted spaces);
(h) Security arrangements to access the employee bicycle storage spaces;
(i) Signage and wayfinding information for bicycle facilities and pedestrians pursuant to Australian Standard AS2890.3; and
(j) Provisions for the GTP to be updated not less than every five years.
(a) All terraces achieve the necessary amenity for sitting.
(b) The main pedestrian entrances achieve the necessary standard of comfort for standing.
(c) The laneway network to the south to achieve the necessary standard for walking.
(a) located;
(b) directed;
(c) shielded; and
(d) of limited intensity to the satisfaction of the Responsible Authority.
(a) Constructed and available for use in accordance with the endorsed plans;
(b) Formed to such levels and drained so that they can be used in accordance with the endorsed plans; and
(c) Line-marked or provided with some adequate means of showing the car parking spaces,
(a) in accordance with any requirements or conditions imposed by Council; and
(b) at the permit holder's cost; and
(c) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) at the permit holder's cost; and
(b) to the satisfaction of the Responsible Authority.
(a) a pre-conditions survey (dilapidation report) of the land and all adjacent Council roads frontages and nearby road infrastructure;
(b) works necessary to protect road and other infrastructure;
(c) remediation of any damage to road and other infrastructure;
(d) containment of dust, dirt and mud within the land and method and frequency of clean up procedures to prevent the accumulation of dust, dirt and mud outside the land;
(e) facilities for vehicle washing, which must be located on the land;
(f) the location of loading zones, site sheds, materials, cranes and crane/hoisting zones, gantries and any other construction related items or equipment to be located in any street;
(g) site security;
(h) management of any environmental hazards including, but not limited to:
- contaminated soil;
- materials and waste;
- dust;
- stormwater contamination from run-off and wash-waters;
- sediment from the land on roads;
- washing of concrete trucks and other vehicles and machinery; and
- spillage from refuelling cranes and other vehicles and machinery;
(i) the construction program;
(j) preferred arrangements for trucks delivering to the land, including delivery and unloading points and expected duration and frequency;
(k) parking facilities for construction workers;
(l) measures to ensure that all work on the land will be carried out in accordance with the Construction Management Plan;
(m) an outline of requests to occupy public footpaths or roads, or anticipated disruptions to local services;
(n) an emergency contact that is available for 24 hours per day for residents and the Responsible Authority in the event of relevant queries or problems experienced;
(o) the provision of a Traffic Management Plan to comply with provisions of AS 1742.3-2002 Manual of uniform traffic control devices - Part 3: Traffic control devices for works on roads;
(p) a Noise and Vibration Management Plan showing methods to minimise noise and vibration impacts on nearby properties and to demonstrate compliance with Noise Control Guideline 12 for Construction (Publication 1254) as issued by the Environment Protection Authority in October 2008. The Noise and Vibration Management Plan must be prepared to the satisfaction of the Responsible Authority. In preparing the Noise and Vibration Management Plan, consideration must be given to:
- using lower noise work practice and equipment;
- the suitability of the land for the use of an electric crane;
- silencing all mechanical plant by the best practical means using current technology;
- fitting pneumatic tools with an effective silencer;
- other relevant considerations; and
- any site-specific requirements.
(q) any stormwater discharged into the stormwater drainage system must be in compliance with Environment Protection Authority guidelines;
(r) stormwater drainage system protection measures must be installed as required to ensure that no solid waste, sediment, sand, soil, clay or stones from the land enters the stormwater drainage system;
(s) vehicle borne material must not accumulate on the roads abutting the land;
(t) the cleaning of machinery and equipment must take place on the land and not on adjacent footpaths or roads; and
(u) all litter (including items such as cement bags, food packaging and plastic strapping) must be disposed of responsibly.
If required, the Construction Management Plan may be approved in stages. Construction of each stage must not commence until a Construction Management Plan has been endorsed for that stage, to the satisfaction of the Responsible Authority.
(a) Monday to Friday (excluding public holidays) before 7:00am or after 6:00pm.
(b) Saturdays and public holidays (other than ANZAC Day, Christmas Day and Good Friday) before 9:00am or after 3:00pm.
(c) Sundays, ANZAC Day, Christmas Day and Good Friday at any time.
(a) the development is not commenced within two years of the date of this permit;
(b) the development is not completed within four years of the date of this permit; or
(c) the use is not commenced within five years of the date of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within six months afterwards for commencement or within twelve months afterwards for completion.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] The building is seven storeys facing Marine Parade. To the rear, the site slopes down, exposing what is a basement level at the street edge, so that to the rear the building is an effective eight storeys.
[3] This was formalised in an order we made on 15 August 2024 that also directed one additional day of hearing to complete the hearing of the proceeding.
[4] (Red Dot) [2022] VCAT 313.
[5] The hearing was held in 2021 with findings delivered in early 2022.
[17] Pertile v Yarra CC [2019] VCAT 851.
[19] Other than for minor elements, such as the consideration of small second dwellings in NRZ1, that do not impact on our decision making.
[23] Panel report to Amendment C269 Yarra Planning Scheme, Page 33.
[24] Panel report to Amendment C269 Yarra Planning Scheme, Page 36.
[25] Panel report to Amendment C269 Yarra Planning Scheme, Page 38.
[29] Applicant written submissions, [72].
[30] Global South urban design report to the council, pages 26 and 27. A copy of this report was provided to the Tribunal.
[31] The Applicant referring to findings in Graham v Stonnington CC (includes Summary) (Red Dot) [2010] VCAT 1224 and QPQ Pty Ltd v Moreland CC [2019] VCAT 2020 [119] - [124].
[32] Macquarie Dictionary online edition, Pan Macmillan Australia, 2024.
[34] DDO1 applies to 3A Marine Parade and properties to its east.
[35] Council written submissions [202], with reference to Shouman, [152] - [162].
[36] Council written submission, [207].
[37] Global South - Independent Urban Design Review - 24 November 2023, Page 26.
[38] 2016 Lower Yarra River Corridor Study, Page 35.
[40] Council written submission, [207].
[42] Such as nine metres separation that applies for applications for residential development in accordance with clause 54 and 55 of the Scheme.
[43] In Shouman the proposal included 49 car parking spaces for 3,967.3 square metres of office area.
[44] For example, Salta Properties Pty Ltd v Yarra CC [2019] VCAT 718 [91].
[45] Department Transport and Planning: Writing planning permits - Appendix 2 - Model conditions, May 2023.
[46] (Red Dot) [2022] VCAT 313.
[49] Tribunal's order dated 5 October 2021 in VCAT Application P372/2021.
[53] Outline of Submission on behalf of the Responsible Authority, 29 July 2024, [117].
[54] Clause 43.02-2 of the Scheme. Another exception to the need for a permit under the DDO is where a small second dwelling is constructed to a height not exceeding 5 metres.
[56] Clause 1.0 of Schedule 1 to the SLO.
[57] Clause 2.0 of Schedule 1 to the SLO.
[59] Outline of Submission on behalf of the Responsible Authority, 29 July 2024, [117].
[61] Clause 3.0 of Schedule 1 to the SLO.
[63] Clause 5.0 of Schedule 1 to the SLO.
[65] Citing Prahran Orrong Park Developments Pty Ltd v Stonnington CC [2017] VCAT 1021, [20].
[66] Ibid, [21] and also citing Melbourne CC v Minister for Planning (Includes Summary) (Red Dot) [2015] VCAT 370 at [34].
[67] Submissions on behalf of the Applicant for Review, 29 July 2024, [43].
[68] Department of Environment, Land, Water and Planning, February 2017.
[72] Outline of Submission on behalf of the Responsible Authority, 29 July 2024, [149].
[75] Outline of Submission on behalf of the Responsible Authority, 29 July 2024, [159].
[76] Established under section 9 of the Geographic Place Names Act 1998 (Vic).
[77] Produced by the Victorian Department of Transport and Planning.
[78] Macquarie Dictionary online edition, Pan Macmillan Australia, 2024.
[79] Macquarie Dictionary online edition, Pan Macmillan Australia, 2024.
[80] Macquarie Dictionary online edition, Pan Macmillan Australia, 2024.
[81] Shouman, [72]-[73], [107], [109].
[84] 2016 Study,1.3, Study Area map, page 8.
[86] Having regard to clause 72.04 of the Scheme and its associated Schedule.
[87] Submissions on behalf of the Applicant for Review, 29 July 2024, [41].
[89] 2005 Study, section 1.2, page 6.
[107] Macquarie Dictionary online edition, Pan Macmillan Australia, 2024
[113] Macquarie Dictionary online edition, Pan Macmillan Australia, 2024.
[115] Macquarie Dictionary online edition, Pan Macmillan Australia, 2024.
[117] For the purposes of Brunswick Investment.
Scoventure Pty Ltd
Yarra CC
This decision considers a proposal for use and development of a seven to eight storey office building on an industrially zoned parcel of land in Abbotsford that was also the subject of a previous decision of the Tribunal in Shouman Pty Ltd v Yarra CC (Red Dot) [2022] VCAT 313 ('Shouman').