[2012] VCAT 1149
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2012-08-02
Original judgment source is linked above.
2. If the provision is ineffective in law, should it be severed from the minimum area requirement of one hectare?
A schedule to an overlay is subordinate to the overlay itself and may only provide for what is authorised by the overlay itself. The schedule cannot impose controls or require things that go beyond what are provided for in the overlay. It cannot exceed the power of the overlay_._
That is, the scope of the power of the zone is that any restriction must relate to area.
It states the minimum area for a lot must 'be' the area specified in the schedule. A lot cannot 'be' more than one 'minimum' area.
If the provision is effective in law, does clause 35.03-3 of the planning scheme nevertheless provide discretion for the grant of a permit in respect of this permit application?
A permit may be granted to create smaller lots if any of the following apply:
GREATER GEELONG CITY COUNCIL Respondent/Responsible Authority
Each lot must be at least the area specified for the land in a schedule to this zone. If no area is specified each lot must be at least 8 hectares.
1 hectare, with the average area of lots in a subdivision being at least 1.5 hectares. For the purpose of calculating average area, all lots exceeding 3.0 hectares must be considered as 3.0 hectares, and the balance of a staged subdivision should be excluded.
Each lot must be at least the area specified for the land in a schedule to this zone.
1 hectare, with the average area of lots in a subdivision being at least 1.5 hectares. For the purpose of calculating average area, all lots exceeding 3.0 hectares must be considered as 3.0 hectares, and the balance of a staged subdivision should be excluded.
A schedule to a zone, overlay or other provision in the Victoria Planning Provisions does not operate as an independent control. It provides optional additional provisions for the zone, overlay or other provision.
A schedule to an overlay is subordinate to the overlay itself and may only provide for what is authorised by the overlay itself. The schedule cannot impose controls or require things that go beyond what are provided for in the overlay. It cannot exceed the power of the overlay.
What is authorised by the RLZ subdivision provision? In my opinion, it authorises a minimum area to be specified in a schedule that a lot 'must be' in a subdivision. This is confirmed by the third sentence of the provision. It provides that '[i]f no area is specified, each lot must be at least 8 hectares'. Therefore, the RLZ subdivision provision only authorises a mandatory minimum area for a lot to be specified in a schedule.
It states the minimum area for a lot must 'be' the area specified in the schedule. A lot cannot 'be' more than one 'minimum' area.
22. Subordinate instruments to be construed subject to legislative power of the State and to empowering Act
(1) Every subordinate instrument shall be construed as operating to the full extent of, but so as not to exceed-
(a) the legislative power of the State of Victoria; or
(b) the power to make the subordinate instrument conferred by the Act under or pursuant to which it is made-
to the intent that where a provision of a subordinate instrument, or the application of any such provision to any person, subject-matter or circumstance, would, but for this section, have been construed as being in excess of that power, it shall nevertheless be a valid provision to the extent to which it is not in excess of that power and the remainder of the subordinate instrument and the application of that provision to other persons, subject-matters or circumstances shall not be affected.
(2) The Victoria Planning Provisions may contain any matter which may be included in a planning scheme under section 6.
(a) must seek to further the objectives of planning in Victoria within the area covered by the scheme; and
(aa) must contain a municipal strategic statement, if the scheme applies to the whole or part of a municipal district; and
(b) may make any provision which relates to the use, development, protection or conservation of any land in the area.
(1) A planning scheme for an area must include and must specify separately-
(i) a municipal strategic statement, if the area of the planning scheme includes the whole or part of a municipal district; and
(ii) any other provision which the Minister directs to be included in the planning scheme; and
(b) may include any other provision which applies only to the area of the planning scheme.
In the absence of such a provision the rule is that legislation which by a general collective expression covers objects some of which are and some of which are not within the scope of the power of the legislature, the whole must be considered bad. For although the test is one of intention, it cannot be presumed that Parliament gave its assent to a partial operation of its enactment. Thus unless Parliament has said otherwise, a uniform general rule including persons or matters some of which are outside the competence of the legislature must fall as a whole because there is no warrant for the introduction of unexpressed exceptions and limitations and only thus could the provision be given the more restricted operation. Further, if the invalid portion consists in or contains provisos, qualifications, exceptions or conditions affecting the operation of the other provisions severance is impossible. ... It was not to be assumed that connected or associated provisions were enacted as separate expressions of the will of the legislature. No severance could lie effected unless an inference that the provisions are not to be interdependent can be positively drawn from the nature of the provisions, from the manner in which they are expressed or from the fact that they independently affect the persons or things within power in the same way and with the same results as if the full intended operation of the legislation had been valid. (Our emphasis)
From the foregoing authorities and as a matter of general principle the following propositions that are relevant to the present case would seem to emerge as to the limits on the severability of invalid legislation. ...
(1) In the absence of such a provision as s22, where legislation by general language covers objects some of which are and some not within power, then the whole must be considered bad: Bank of New South Wales v The Commonwealth.
(2) No severance can be effected in respect of connected provisions unless an inference that the provisions are not to be interdependent can be positively drawn from the nature and manner of expression of the provisions, or from the fact that they independently affect persons or things within power with the same effect as if the full operation of the legislation was valid: Bank of New South Wales v The Commonwealth_._
(3) No severance can be effected when the enactment is single and indivisible: Strickland v Rocla Concrete Pipes Ltd (1971) 124 CLR 468.
(4) There is no severance if the enactment with the invalid portion omitted is so radically or substantially different at law as to the subject matter from the original enactment as to warrant a belief that the legislative body intended it as a whole only: Olsen v City of Camberwell [1926] VicLawRp 9; [1926] VLR 58.
(5) Severance may be more readily made where separable words or expressions are used; where general words are used then an intention as to partial operation of the law may be inferred, based upon some standard or criterion or test to be discovered from the law itself: Pidoto v State of Victoria [1943] HCA 37; (1943) 68 CLR 87.
(6) The reduced form of enactment must operate upon the persons and things affected by it in the same manner and with the same consequences as would have the original enactment: Bank of New South Wales v The Commonwealth and Strickland v Rocla Concrete Pipes Ltd.
(7) The reduced form of legislation must result in a consistent workable and effective body of provisions: Strickland v Rocla Concrete Pipes Ltd.
(8) The reading down must not have the effect of altering the policy of the legislation with respect to cases remaining within its operation: Pidoto v State of Victoria.
Each lot must be at least the area specified for the land in a schedule to this zone. If no area is specified, each lot must be at least 8 hectares. (Our emphasis)
(4) If there appears to be an inconsistency between different provisions of a planning scheme-
(a) the scheme must, so far as practicable, be read so as to resolve the inconsistency; and
(i) the State standard provisions prevail over the local provisions; and
(ii) a specific control over land prevails over a municipal strategic statement or any strategic plan, policy statement, code or guideline in the planning scheme.
If no area is specified, each lot must be at least 8 hectares.
A permit may be granted to create smaller lots if any of the following apply:
"1 hectare with the average area of lots in a subdivision being at least 1.5 hectares. For the purposes of calculating average area, all lots exceeding 3.0 hectares must be considered as 3.0 hectares (and the balance of a staged subdivision should be excluded). Each lot must also be capable of containing a rectangle of 0.8 hectares with minimum dimensions of 70 metres".
"The application does not meet the requirement contained in the schedule to the Rural Living Zone for all lots in a subdivision to have an average lot size of at least 1.5 hectares in area".
"It is considered that the application accords with the Planning Policy Framework and the purpose of the zone".
"The Planning Scheme is a subordinate instrument under the Planning and Environment Act 1987. Thus Section 22 of the Interpretation of Legislation Act 1984 requires that it be construed in a way that does not exceed the power under the Planning and Environment Act 1987 to make a Planning Scheme".
"Second, Schedule 11 is a subordinate instrument under the Planning Scheme. Schedules to overlays under the Planning Scheme can only make provision for those matters allowed by the overlay. Thus a schedule cannot exceed the power conferred by the overlay. It cannot introduce new planning controls or requirements not authorised by the primary provisions of the overlay". (emphasis added)
"...... a schedule to an overlay is subordinate to the overlay and may only provide for what is authorised by the overlay itself. The schedule cannot impose controls or require things that go beyond what are provided for in the overlay. It cannot exceed the power of the overlay".
"13 What is authorised by the RLZ subdivision provisions? In my opinion, it authorises a minimum area to be specified in a schedule that a lot 'must be' in a subdivision. This is confirmed by the third sentence of the provision. It provides that:'[i]f no area is specified each lot must be at least 8 hectares'. Therefore, the RLZ subdivision provisions only authorises a mandatory minimum area for a lot to be specified in a schedule." (emphasis added)
"14...... this principle applies unless the contrary intention appears.
15 In my opinion there is a contrary intention evident in the drafting of the RLZ subdivision provisions. It states the minimum area for a lot must 'be' the area specified in the schedule. A lot cannot 'be' more than one 'minimum' area.
18 Other provisions of the scheme confirm my conclusion. The subdivision provision in the Design and Development Overlay (DDO) relevantly provides:
This does not apply if a schedule to the overlay specifically states that a permit is not required.
Subdivision must occur in accordance with any lot size or other requirement specified in a schedule to the overlay". (emphasis added).
'In the present context, the role of the schedule is to specify an area that each lot in a proposed subdivision must be if a permit is to be granted for the subdivision. If the schedule purports to specify more than this, to the extent it does so, it is inoperative'. (emphasis added)
"If the enactment, with the invalid portion omitted, is so radically or substantially different a law as to the subject - matter dealt with by what remains from what it would be with the omitted portions forming part of it as to warrant a belief that the legislative body intended it as a whole only, or, in other words, to warrant a belief that if all could not be carried into effect the legislative body would not have enacted the remainder independently, then the whole must fail".
Kelberg
Greater Geelong CC [2012] VCAT 1149
(1948) 76 CLR 1
(1971) 124 CLR 468
(1943) 68 CLR 87