[2011] VCAT 1866
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2011-09-26
Original judgment source is linked above.
Mr Peter Merrigan, town planner, of Millar and Merrigan Pty Ltd
Except as provided for in the scheduled Clause 53, a minimum lot size of 18 hectares with an average lot yield not exceeding one lot to each 25 hectares of site area and a maximum lot size of 44 hectares.
Any requirement in this scheme relating to the subdivision of land does not apply to:
A permit must not be granted to subdivide land in a Green Wedge Zone, Rural Conservation Zone, Green Wedge A Zone, Farming Zone, or a Rural Living Zone, unless each lot created comprises land which has at least 40 percent of its area that is not:
The responsible authority may vary any of these requirements if it is satisfied that the land can be reasonably and safely developed for appropriate uses.
Does the plan of subdivision realign a common boundary between two lots?
However, the duty of a Court is to give the words of the statutory provision the meaning that the legislature is taken to have intended them to have. Ordinarily, that meaning (the legal meaning) will correspond with the grammatical meaning of the provision. But not always. The context of the words, the consequences of a literal or grammatical construction, the purpose of a statute or the canons of construction may require the words of the legislative provision to be read in a way that does not correspond with the literal or grammatical meaning.
Moreover, the modern approach to statutory interpretation
(a) insists that the context be considered in the first instance, not merely at some later stage when ambiguity might be thought to arise, and
(b) uses "context" in its widest sense to include such things as the existing state of the law and the mischief which, by legitimate means such as those just mentioned, one may discern the statute was intended to remedy. Examples of general words in a statute being so constrained by their context are numerous ... [1]f the apparently plan words of a provision are read in the light of the mischief which the statute was designed to overcome and of the objects of the legislation, they may wear a very different appearance. Further, inconvenience or improbability of result may assist the court in preferring to the literal meaning an alternative construction which, by the steps identified above, is reasonably open and more closely conforms to the legislative intent.
[32] ... Clause 62.04 is an exception and it is intended to apply to the realignment of common boundaries not to the re-subdivision of lots. In my view, the realignment of a common boundary means that the existing boundary is moved. It does not mean that the common boundary is significantly altered in dimension or direction. In each case it will be a question of fact as to whether a proposal can be characterised as realignment of the common boundary between two lots or whether it is a re-subdivision of lots. The outcome must be assessed in the context of the existing situation.
Because a permit can be granted does not imply that a permit should or will be granted. The responsible authority must decide whether the proposal will produce acceptable outcomes in terms of the decision guidelines of this clause.
[15] Column 1 has no heading but specifies a number of different items, the first of which is 'Minimum subdivision area (hectares)'.
[16] Column 2 is headed 'Land' and, for the first item, states 'All land'. Hence, the first item in the schedule applies to the subject land.
[17] Column 3 is headed 'Area/Dimensions/Distance' and, for the first item, states:
1 hectare with the average area of lots in a subdivision being at least 1.5 hectares. For the purpose of calculating average area, all lots exceeding 3.0 hectares must be considered as 3.0 hectares (and the balance of a staged subdivision should be excluded). Each lot must also be capable of containing a rectangle of 0.8 hectares with minimum dimensions of 70 metres
[18] A schedule to a zone, overlay or other provision in the Victoria Planning Provisions does not operate as an independent control. It provides optional additional provisions for the zone, overlay or other provision. The Tribunal has accordingly held, when considering a schedule to a development plan overlay, that:
A schedule to an overlay is subordinate to the overlay itself and may only provide for what is authorised by the overlay itself. The schedule cannot impose controls or require things that go beyond what are provided for in the overlay. It cannot exceed the power of the overlay. [Cameron Manor Pty Ltd v Mornington Peninsula SC [2007] VCAT 1822 AT [46]]
[19] These observations are consistent with the effect of section 22 of the Interpretation of Legislation Act 1984.
[20] What is authorised by the RLZ subdivision provision? In my opinion, it authorises a minimum area to be specified in a schedule that a lot 'must be' in a subdivision. This is confirmed by the third sentence of the provision. It provides that '[i]f no area is specified, each lot must be at least 8 hectares'. Therefore, the RLZ subdivision provision only authorises a mandatory minimum area for a lot to be specified in a schedule.
[24] ... A requirement that a lot contain a rectangle of a minimum area and a minimum side dimension does not directly relate to the minimum area of the lot. Rather, it directly relates to a requirement for the 'shape' of the lot. In effect, it is a requirement that a rectangle or shape of at least 70 m by 114 m must be able to fit inside the lot.
Subdivision must occur in accordance with any lot size or other requirement specified in a schedule to this overlay.[10]
Each lot must be at least the area specified for the land in a schedule to this zone. If no area is specified each lot must be at least 40 hectares.[11]
To facilitate consistency between the Yarra Ranges Planning Scheme and the Upper Yarra Valley and Dandenong Ranges Regional Strategy Plan in accordance with Section 46F of the Planning and Environment Act 1987.
Is the area of proposed Lot 1 'limited by a provision of the scheme'?
[1] Lots 10 and 11 LP4955 Certificate of Title Volume 06521 Folio 035. Lot 10 has an area of approximately 75 hectares (186 acres) and Lot 11 has an area of approximately 72 hectares (179 acres).
[2] Melbourne City Council v Popular Pastimes Pty Ltd & Anor [2006] VSC 355 at [27]
[5] [2007] VSC 126 at [7] - [9]
[6] (1997) 187 CLR 834 at 408
Mooney
Yarra Ranges SC [2011] VCAT 1866
(1998) 194 CLR 355
(1997) 187 CLR 834