[2013] VCAT 1908
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2013-11-21
Original judgment source is linked above.
The practice of VCAT is to designate cases of interest as 'Red Dot Decisions'. A summary is published and the reasons why the decision is of interest or significance are identified. The full text of the decision follows. This Red Dot Summary does not form part of the decision or reasons for decision.
Kain v Yarra Ranges SC (includes Summary) (Red Dot) [2013] VCAT 1908
Subdivision controls in Green Wedge A Zone and schedule - whether schedule exceeds enabling zone control
REASONS WHY DECISION IS OF INTEREST OR SIGNIFICANCE
PLANNING SCHEME - interpretation or consideration of VPP provision
VPP clause 35.05-3 - Green Wedge A Zone, and schedule; whether VCAT has power to declare a planning scheme provision invalid; construction of provision to attempt to resolve any apparent inconsistency between zone and schedule and to avoid any excess of power.
ANALYSIS - exposition of how to asses an issue or matters to consider
Principles of construction in interpreting subdivision controls in the Green Wedge A zone and schedule.
CHANGE TO LEGISLATION OR VPPS - whether change to VPPs or statutory provisions is required or desirable
Given conflicting Tribunal decisions and uncertainty as to whether schedules to zones or overlays exceed the power of the empowering control, a clarifying amendment is warranted.
The subdivision controls in the Green Wedge A Zone require that 'each lot must be the area specified for the land in a schedule to this zone'. In the Yarra Ranges Planning Scheme, Schedule 1 to that zone purports to apply 'a minimum lot size of 1 hectare with an average yield not exceeding 1 lot to each 2 hectares of site area and a maximum lot size of 3 hectares'.
The permit applicant contends that the average lot size and maximum lot size provisions in the schedule exceed the power of the empowering zone control and are invalid or legally ineffective. It contends that the zone control only allows for a minimum lot size to be specified in the schedule.
There are four relatively recent decisions of the Tribunal that have considered whether a schedule to a zone sets lot size requirements beyond the scope of the enabling zone provision, and attempted to address the consequences if it does so. Unfortunately, the decisions in these four cases are not entirely consistent in their language, reasoning or outcomes.
The parties raised two preliminary questions of law. The Tribunal considered that it did not have jurisdiction to declare that the provisions in the Schedule to the Green Wedge A Zone relating to subdivision are invalid. Even if it had jurisdiction, it would not ordinarily be appropriate to exercise discretion to make a declaration of invalidity in relation to planning scheme provision of wide application. The Tribunal departed from decisions that had expressed or implied a contrary view, including BMF Pty Ltd v Greater Geelong City Council [2011] VCAT 1666 and Davidson v Yarra Ranges Shire Council [2013] VCAT 1966, and generally supported the principles in Cameron Manor Pty Ltd v Mornington Peninsula Shire Council (Red Dot) [2007] VCAT 1822.
The Tribunal considered the issue should be more properly approached as one of statutory interpretation, rather than one of invalidity. In properly interpreting and applying the Schedule to the Green Wedge A Zone, the Tribunal should endeavour to construe the Schedule in such a way to resolve any apparent inconsistency with the empowering provision in the zone control (and so as not to exceed that power) under which the Schedule is made. The decision sets out relevant principles that assist with that interpretative task, including reference to s 7 of the Planning and Environment Act 1987, and to a less-quoted passage in Project Blue Sky Inc. v ABA [1998] HCA 28. Applying a purposive approach, it may possible to resolve an inconsistency. However, where there is a direct inconsistency, it may sometimes become necessary to 'read down' a subordinate control in a schedule in order to give effect to the intent and purpose of the leading or parent provision.
Ultimately, in interpreting the relevant provisions, the Tribunal found no apparent inconsistency between the subdivision control in the zone and schedule. The proper interpretation of the requirements relating to the subdivision of land in the Schedule to the Green Wedge A Zone is that there is a minimum lot size of 1 hectare allowed subject to an overall average lot size of 2 hectares. The average lot size requirement is not a separate stand-alone requirement that might arguably exceed the power under the zone control, but rather a qualification to that minimum lot size requirement. It forms part of the control for the minimum subdivision area for the land authorised by the zone control.
The decision has implications for other schedules to zone and overlay controls. Although the Tribunal found no inconsistency in the circumstances of this case, the Tribunal reiterated a view that the uncertainty occasioned by the differing Tribunal decisions to date warrants a clarifying amendment to the relevant planning controls to put the issue beyond doubt.
Kain v Yarra Ranges SC (includes Summary) (Red Dot) [2013] VCAT 1908
Ms Tania Cincotta, solicitor, of Best Hooper Lawyers
Each lot must be at least the area specified for the land in a schedule to this zone. If no area is specified, each lot must be at least 8 hectares. ...
Except as provided for in the schedule to Clause 53, a minimum lot size of 1 hectare with an average lot yield not exceeding 1 lot to each 2 hectares of site area and a maximum lot size of 3 hectares.
Question 1 - Does the Tribunal have jurisdiction to determine or declare that the provisions in the Schedule to the Green Wedge A Zone relating to subdivision are invalid?
[30] The Tribunal has no power under the Planning and Environment Act 1987 to amend or alter a planning scheme or to make declarations about the validity of planning schemes. The proper place to challenge the validity of a planning scheme is in the Supreme Court.
[46] The planning scheme draws a clear distinction between conditions and requirements specified in schedules to overlays. A schedule to an overlay is subordinate to the overlay and may only provide for what is authorised by the overlay itself. The schedule cannot impose controls or require things that go beyond what are provided for in the overlay. It cannot exceed the power of the overlay.
Relevance (if any) of s 22 of the Interpretation of Legislation Act 1984
22(1) Every subordinate instrument shall be construed as operating to the full extent of, but so as not to exceed -
(a) the legislative power of the State of Victoria; or
(b) the power to make the subordinate instrument conferred by the Act under or pursuant to which it is made -
to the intent that where a provision of a subordinate instrument, or the application of any such provision to any person, subject-matter or circumstance, would, but for this section, have been construed as being in excess of that power, it shall nevertheless be a valid provision to the extent to which it is not in excess of that power and the remainder of the subordinate instrument and the application of that provision to other persons, subject-matters or circumstances shall not be affected.
Relevance of s 7 of the Planning and Environment Act 1987
7(4) If there appears to be an inconsistency between different provisions of a planning scheme -
(a) the scheme must, so far as practicable, be read so as to resolve the inconsistency; and
(i) the State standard provisions prevail over the local provisions; and
(ii) a specific control over land prevails over a municipal strategic statement or any strategic plan, policy statement, code or guideline in the planning scheme.
(5) The Minister may issue directions or guidelines as to the form and content of any planning scheme or planning schemes.
[79] The questions of law involved in this case are complex. I am mindful of the limits on the Tribunal's powers to question the validity of planning schemes. At the same time, when called upon to interpret the meaning of a particular provision of a schedule to the planning scheme or the validity of a condition proposed as a consequence of the planning scheme provision, I must construe them in such a way as not to exceed the power under which the schedule is made or the Act allows.
[70] Where conflict appears to arise from the language of particular provisions, the conflict must be alleviated, so far as possible, by adjusting the meaning of the competing provisions to achieve that result which will best give effect to the purpose and language of those provisions while maintaining the unity of all the statutory provisions. Reconciling conflicting provisions will often require the court "to determine which is the leading provision and which the subordinate provision, and which must give way to the other"[8]. Only by determining the hierarchy of the provisions will it be possible in many cases to give each provision the meaning which best gives effect to its purpose and language while maintaining the unity of the statutory scheme.
Possible clarification through amendment to provisions
Question 2 - What is the proper interpretation of the requirements relating to the subdivision of land in the Schedule to the Green Wedge A Zone?
[1] [2011] VCAT 1666 per Code M
[2] [2011] VCAT 1866 per Gibson DP
[3] [2012] VCAT 1149 per Martin M
[4] [2013] VCAT 1966 per Deidun M
[5] [2007] VCAT 1822 per Gibson DP
[6] See also Joseph v Melbourne Water Corporation [2010] VCAT 1414 at [11] per Dwyer DP.
[7] [1998] HCA 28 (High Court)
[8] following Institute of Patent Agents v Lockwood [1894] AC 347 at 360 per Lord Herschell LC.
[9] generally following Coleman v Power [2004] HCA 39 at [243] per Kirby J; Accident Towing & Advisory Committee v Combined Motor Industries Pty Ltd [1987] VicRp 48; [1987] VR 529 at 547 per McGarvie J.
Kain
Yarra Ranges SC