[2018] VCAT 2053
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2018-12-20
Original judgment source is linked above.
Sections 149 & 149A Planning and Environment Act 1987; Glen Eira Planning Scheme; Commercial 1 Zone; Design & Development Overlay (DDO); Secondary consent application; Declaration application; DDO introduced after permit issued and before construction of buildings started; Whether permission required under DDO
Jezmac Pty Ltd v Glen Eira CC [2018] VCAT 2053
TP-200 Rev 3 (3 September 2018), TP-201 Rev 5 (6 December 2018), TP-202 Rev 5 (6 December 2018), TP-203 - TP-210 (inc) all Rev 3 (3 September 2018), TP-300 - TP-302 (inc) all Rev 3 (3 September 2018), TP-400 Rev 4 (3 September 2018) & TP-117 Rev 3 (3 September 2017)
He tendered an affidavit sworn by Dean Priester on 3 December 2018
Application under section 149(1)(a) of the Planning and Environment Act 1987 to review the failure to grant a secondary consent to endorse amended plans under condition 2 of permit GE/PP-29399/2016 within the prescribed time.[1]
Application under section 149A(1)(a) of the Planning and Environment Act 1987 for two declarations regarding the interpretation or effect of permit GE/PP-29399/2016
The subject land is on the north side of Glen Huntly Road, about 15 metres west of Orrong Road. It is rectangular in shape with a frontage of about 17 metres, a depth of about 38 metres and an area of about 640 square metres. It comprises 3 lots. It is now vacant but recently contained 3 buildings (one single storey and two double storey). The land is located in the Elsternwick activity centre.
Demolition of existing building [sic[3]] at 415 Glen Huntly Road on land affected by the Heritage Overlay, partial demolition of buildings at 411 and 413 Glen Huntly Road on land affected by the Heritage Overlay, construction of an eight storey building with basements, comprising 37 dwellings and 2 shops on land within a Commercial 1 Zone and affected by a Heritage Overlay ...
The layout of the site and size, design and location of buildings and works as shown on the endorsed plans must not be altered without the prior written consent of the Responsible Authority. Note: This does not obviate the need for a permit where one is required.[8]
The Permit confers accrued rights to, inter alia, construct a building in accordance with the endorsed plans without a new permit or an amendment to the Permit to include permission under DDO10.
The development of the land by the construction of seventeen (17) dwellings, including sixteen (16) double-storey dwellings and one (1) single-storey dwelling with associated car parking and landscaping in accordance with the endorsed plans.
An application was made to amend the permit so that all the dwellings were of single-storey construction. Plans had been endorsed, which showed a front setback of 9 metres. Subsequent to the grant of the permit, the planning scheme was amended to introduce a Design and Development Overlay (DDO9) with a mandatory front setback of 20 metres. No substantive change to the location or footprint of the dwellings was proposed under the permit amendment but it meant that the front setback was now prohibited under the planning scheme. The question was whether additional permission was now required under the [DDO] and whether the permit could be amended given the development was now prohibited (in terms of its setbacks).[22]
Demolition of buildings in a Heritage Overlay, construction of buildings and works for an aged care facility in a Residential 1 Zone, Heritage Overlay and Design and Development Overlay (Schedule 3) ... in accordance with the endorsed plans ... .
... [if] permissions [in a permit are] given under named controls, the non-inclusion of permissions under other controls means that no permissions for them exists. The permit would need to be amended to give the required permissions. Because they are new permissions, they must comply with the current provisions of the planning scheme. Such amendments could not authorise a development which is prohibited.[27]
The permit is inconsistent with a number of these requirements, including maximum building height and street setbacks.
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] When the permit was granted there was more than one building on the subject land.
[4] Mr Priester's evidence is that on 22 August 2018 Jezmac Pty Ltd entered into a contract with AG Construction Group Pty Ltd to construct the building, with construction to start and finish around February 2019 and May 2020 respectively.
[5] Strictly speaking, no permission is required under DDO10. Permission is required under the DDO 'head' clause ie clause 43.02. In these reasons, reference to permission under DDO10 means a reference to permission under clause 43.02.
[6] Glen Eira Planning Scheme cl 43.02 sch 10 cl 2.0.
[7] [2018] VCAT 1120 (Gibson DP & Sibonis M, 16 July 2018) (Alkero)
[8] The note at the end of this condition is of interest in this proceeding. However, because it is a note it has no operative function.
[9] Jezmac also sought a second declaration that '[t]he endorsed plans may be lawfully amended pursuant to condition 2 of the Permit, including variations to setbacks, provided that the variations are generally in accordance with the plans specified in condition 1 of the Permit'. It is unnecessary to consider that requested declaration because the matter is more conveniently addressed in the secondary consent application (Application P2175/2018). Jezmac also applied under section 87A of the Planning and Environment Act 1987 to amend the permit to include permission under the DDO and to allow the development in accordance with the amended plans but that application is not before me. Jezmac intends to pursue that application subject to the outcome of this proceeding.
[10] Jezmac is a specified person - _Planning and Environment Act 198_7 s 148.
[12] State Transport Authority v City of Wodonga (1989) 2 AATR 175, 184; and many subsequent cases such as Hill v Campaspe SC [2005] VCAT 1128 [11] & Egan v Glenelg SC [2005] VCAT 2700 [94].
[13] See eg Elwick 9 Pty Ltd v Freeman [2018] VSC 234 [92]-[102] (Quigley J).
[14] The Planning and Environment Act 1987 contains no provision of a general nature consisting of a contrary intention relating to the right under a permit being affected by an amendment to a scheme. Section 6(2)(ke) of that Act provides that, subject to the existing use provisions in section 6(3), a planning scheme may specify the effect it has on a use or development of land for which a permit has been granted. In relation to existing uses, each planning scheme protects or confirms the right (as an 'existing use' right) in a permit to use land if the use starts before or (as long the permit has not expired) after any amendment of the scheme (see eg Glen Eira Planning Scheme cl 63.01 dot points 1 & 2).
[15] The PE Act provides that any permit may be cancelled or amended in particular circumstances and provides for the expiry of any permit, but these are not 'express contrary intentions'.
[16] See eg Seventh Colombo Pty Ltd v Melbourne City Council [1998] VSC 7 [33]; Gembrook Pines Pty Ltd v Glen Eira CC [2016] VCAT 537 [22].
[17] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [44].
[18] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [51]-[52].
[19] It is relevant to add here that there are established limits to this power. They include the need for the permit to contain a condition that empowers the granting of secondary consents and the need for the plans to not be a transformation of what the permit allows. This latter limit is part of a series of principles often called Westpoint principles, named after a case bearing that name and developed in later cases. I will return to the application of these principles later in these reasons.
[20] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [44]-[45].
[21] [2014] VCAT 466 (Callea).
[22] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [48].
[23] Callea Property Development Pty Ltd v Wyndham CC [2014] VCAT 466 [36].
[24] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [3].
[25] For a list of all the changes - see Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [6].
[26] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [7].
[27] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [62].
[28] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [60].
[29] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [65].
[30] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [61], [64].
[31] Planning and Environment Act 1987 ss 63, 64, 64A & 86; Planning and Environment Regulations 2015 sch 1 form 4.
[32] See eg Brimbank CC v LS Planning Pty Ltd [2006] VCAT 2218.
[33] Sweetvale Pty Ltd v Victorian Civil and Administrative Tribunal [2003] VSCA 83 [17].
[34] Boroondara City Council v 1045 Burke Road Pty Ltd [2015] VSCA 27 [23], [29], [30], [37] & [48].
[35] Jezmac Pty Ltd v Glen Eira CC [2015] VCAT 1074 & Jezmac Pty Ltd v Glen Eira CC [2017] VCAT 810.
[36] Jezmac Pty Ltd v Glen Eira CC [2015] VCAT 1074 [28].
[37] Jezmac Pty Ltd v Glen Eira CC [2017] VCAT 810 [19], [24]-[26] & [30].
[38] Westpoint Corporation Ltd v Moreland CC [2005] VCAT 1049.
[39] Zuzek v Boroondara CC [2007] VCAT 2174.
[40] Detour Investments Pty Ltd v Boroondara CC [2007] VCAT 2254.
[41] Cook v Mornington Peninsula SC [2017] VCAT 1129.
[42] Alkero Development Pty Ltd v Stonnington CC [2018] VCAT 1120 [56].
Jezmac Pty Ltd
Glen Eira CC [2018] VCAT 2053