"Having regard to the information provided in the original decision and internal review submission, I have determined that refusal of the application in accordance with:
· section 20(1A) of the HBA is incorrect as there is no specific ground for refusal under this section
· section 20(1)(a) of the HBA is correct as Mr Iyaz has not assuredly demonstrated that he is a fit and proper person to hold a contractor licence under the HBA at this time
· sections 33C(1)(b)(i) and 33D(1)(b) of the HBA is also correct as Mr Iyaz has not assuredly demonstrated that he has attained two years' acceptable relevant industry experience in a wide range of building construction work for the issue of a contractor licence in the category of general building work to meet the requirements of the Instrument at this time.
Therefore, I conclude the current application by Muhammad Rohail Iyaz for a contractor licence must be refused in accordance with sections 20(1)(a), 33C(1)(b)(i) and 33D(1)(b) of the HBA."
(1) whether the Applicant has sufficient acceptable relevant industry experience in a wide range of building construction work; and
(2) whether the Applicant relied upon a fraudulent reference.
(1) Miranda Road, Miranda ("the Miranda site") where the Applicant was said to have worked from April 2018 to July 2020; and
(2) Harriette Street, Neutral Bay ("the Neutral Bay site") where the Applicant was said to have worked from January 2020 to March 2022.
An applicant for the issue, alteration, renewal or restoration of an authority aggrieved by any decision of the Secretary relating to the application may apply to the Tribunal for an administrative review under the Administrative Decisions Review Act 1997 of the decision.
"[the] duty of the Tribunal is to satisfy itself whether a decision in respect of which an application for review is duly instituted is a decision which in its view was objectively the right one to be made."
... However, a practical or "forensic" burden can arise from the material presented. A party who asserts a fact has a responsibility to prove that fact: Re Eckersley and Minister for Capital Territory [1979] AATA 59; (1979) 2 ALD 303; Holbrook and Australian Postal Commission [1983] AATA 40; (1983) 5 ALN N46.
33D Additional requirements for obtaining supervisor and tradesperson certificates
(1) A supervisor or tradesperson certificate must not be issued unless the Secretary is satisfied that the applicant -
(a) has such qualifications or has passed such examinations or practical tests, or both, as the Secretary determines to be necessary to enable the applicant to do, or to supervise, the work for which the certificate is required, and
(b) has had experience of such a kind and for such a period as the Secretary considers would enable the applicant to do, or to supervise, the work for which the certificate is required, and
(c) is capable of doing or supervising work for which the certificate is required.
(a) the specification of qualifications and experience, or additional standards or other requirements under subsection (2), or
(b) the setting of standards or selecting of examinations or tests under subsection (3),
cannot be reviewed by the Tribunal in an application for an administrative review made under this or any other Act.
"Experience" means experience gained by the applicant as:
(b) a holder of a qualified supervisor certificate and as a nominated supervisor for the contractor licence held by; or
(c) a holder of an endorsed contractor licence contracted to; or
(d) a holder of a qualified supervisor certificate in the capacity of a nominated supervisor for a contractor licence held by an individual, partnership or corporation contracted to; or
the holder of a contractor licence authorising the holder to do the class of residential building work in which the experience was gained ("the Work"), where the applicant, during the relevant period, was:
(e) a holder of a qualified supervisor certificate in the category of full general building work or an endorsed contractor licence in the category of full general building work, held continuously for a minimum period of 2 years within 10 years from the date the application is made;
[T]he Tribunal draws an inference from the objects of the Act that the aim of the supervision is to ensure that Mr Briggs was instructed in what to do; that he was observed to do it and corrected if necessary.
12 The phrase "a wide range of building construction work" is not defined in the Act, the 2004 Regulations or the 2013 Instrument. In interpreting that phrase the Tribunal was required to take into account the subject matter, scope or purpose of the Instrument and the relevant legislation.
13 The decision the subject of the appeal was given orally and ex tempore and must be read with that in mind. In our opinion, a fair reading of the decision does not support the proposition that the Tribunal interpreted the Instrument as in effect mandating that the relevant construction industry experience must include the construction of new buildings. We think that this misinterprets the gravamen of the decision.
14 In our view, the concerns that the Member expressed were reasonable and were not related exclusively to new buildings as such but construction work generally. The adjective "new" was in some respects superfluous. Interpreting the decision in its context, we think that the Member meant to convey that building contractors must have relevant experience that included not only the exercise of basic construction skills but the relevant administrative skills required in the construction industry.
15 In deciding whether Mr Lovich had demonstrated experience in "a wide range of building construction work" the Tribunal was required to have regard to the nature and type of construction work undertaken by Mr Lovich. ...
However, as discussed at [21] to [26] of Issa v Commissioner for Fair Trading [2022] NSWCATOD 159 there is nothing limiting the Tribunal's consideration of what exactly the criteria of "a wide range of building construction work" means in the context of an applicant's past work experience. It is not a requirement that an applicant should have constructed a house from start to finish: Vitogiannis v Commissioner for Fair Trading, Department of Customer Service [2020] NSWCATOD 157 at [45]; Wilmot v Commissioner for Fair Trading [2021] NSWCATOD 43 at [90]; Tange v New South Wales Fair Trading [2013] NSWADT 201. Nor is it a requirement that an applicant has experience in all aspects of building work, provided the experience is sufficiently wide: Price v Commissioner for Fair Trading [2020] NSWCATOD 93; Locking v Department of Finance and Services [2013] NSWADT 239; Sollazzo v Commissioner of Fair Trading [2015] NSWCATOD 20.
17. This experience in carpentry and joinery work is not the equivalent of "a wide range of building construction work" as required by the Instrument. Carpentry and joinery work is a sub-category of building. It is only one aspect of the work required to be done in order to complete the construction of a residential dwelling.
18. A building contractor has the overall responsibility for a site and must be able to supervise all of the trades required to complete any type of dwelling. Additionally, a builder must be able to determine that all trades have complied with all standards and requirements. There are many gaps in Mr Locking's trade supervisory experience and therefore his understanding of certain trades. Those trades include flooring, bricklaying, stonemasonry, wet plastering, painting, decorating, general concreting, tiling, demolishing, fencing, glazing and waterproofing.
19. A building contractor is also able to contract with the public, and must therefore be able to negotiate a contract, quote for a project and co-ordinate the trades to be able to complete the project on time and within budget. He or she must also be able to negotiate and discuss the jobs with council and private certifiers to ensure that the work is passed fit when appropriate.
70 Mr Price argued that his 37 years in the building industry provided sufficient experience for him to obtain a builders licence. He held a builders licence between 2002 to 2009 and has held other licences in the building industry. He argued that he is familiar with the building code and the standards. He contended that a carpenter is able to supervise all of the trades and is experienced in all the fundamental structural principles. He stated that he had supervised other tradespersons. Mr Buttigieg stated that this occurred when he himself left a site to pick something up. Mr Price argued that the principles attached to building or renovating a bathroom or kitchen are the same as those in relation to other aspects of building a house. However, the Tribunal notes that the Instrument focuses on demonstration of the Applicant's experience in work. That is the evidence needs to show that the Applicant has had experience in undertaking the kind of work expected of the contractor. This is not the same as understanding the principles. In this respect, the Tribunal notes there are different principles that apply in the areas of plumbing, tiling, waterproofing, carpentry and painting. Each of these callings has its own applicable skills.
59 I accept that the Applicant undertook off site tasks for various construction projects after he had finished working on the site. However, the instrument focuses on demonstration of the Applicant's experience in work and the evidence needs to show that the Applicant had experience in undertaking the kind of work expected of the contractor: Price [at 70]. As the Applicant was not on site conducting works beyond the initial stages of the various projects, he cannot be said to have experience in undertaking the kind of on site work expected of the contractor in the later stages of building construction work.
36. The experience of project management work on a single project is not a demonstration of a "wide range of building construction work" as required by the Instrument, even though project management itself can be broad ranging. Mr Keenan was required to have contact with a wide range of tradespersons, architects, certifiers and other building construction workers. He was required to have discussions and negotiations with them including the co-ordination of the trades and the identification and rectification of defects.
37. Mr Keenan submitted that he did have experience in "carpentry, masonry, roofing, plumbing, joinery and plastering" however this experience was of project managing the sub-contractors that carried out this work rather than any knowledge or experience of undertaking any of these trades.
38. The respondent submitted that the issuance of a builder contracting licence represents to the public that a licence holder is qualified, experienced, and capable of contracting, doing and supervising such residential building work.
39. I agree with most of this submission. I do not agree that the issuance of a builder contracting licence represents to the public that a licence holder is capable themselves of constructing a residential building work or that the person has a qualification in a particular trade or trades. There was no dispute between the parties that there was no pre-requisite trade requirement for the issuance of an endorsed contractor licence.
40. It may be that project managing a diverse range of building construction works may amount to "relevant industry experience in a wide range of building construction work". I do not consider that an applicant must demonstrate experience in a particular trade as a pre-requisite to being issued with an endorsed contractor licence.
41. I do not consider that Mr Keenan has demonstrated that he has a wide breadth of experience. Mr Keenan's experience is confined to being involved in a single project managing a single building site. Project management work is an important category of building construction work, particularly in the construction of large residential units such as the Lidcombe project, however it is just one type of building construction experience.
42. I am not satisfied that Mr Keenan has established that he has relevant industry experience in a wide range of building construction works. ...
73. Whilst a number of the roles and responsibilities referred to above suggest that the Applicant was possibly supervised in carrying out some rectification and construction work at the various Building Sites, the Applicant's primary roles and responsibilities were related to project management including design and site co-ordination. The Applicant stated that he was also involved in document control, which he stated was a very important part of building. In evidence, the Applicant said that a builder is not required to do all of the physical work on a project and that the supervision of a build is more important than banging a nail into a wall. He stated that he had completed his degree in 2017 and his Certificate IV in 2021 and that his role was to add value to a project and to ensure that it was delivered on time and within budget. The Applicant stated that he was not here to punch nails and that to gain his licence he needed two years of supervision but was not required to do physical work.
74. The Instrument refers to Experience in a "wide range of building construction work". As the HBA allows the holder of a contractor licence in general building to contract with the public, it is clear that the licence holder is required to have the skills to negotiate a contract, quote for a project and co-ordinate the trades to complete a project on time and within budget. However, this is not all that is required of a licence holder and I agree with the Tribunal's comments in Price, that the Instrument focuses on demonstration of the Applicant's experience in work and that the evidence needs to show that the Applicant has had experience in undertaking the kind of work expected of the contractor and that displaying an understanding of the relevant principles is not the same as having the relevant experience in carrying out the work.
75. Whilst I accept that the criteria of "a wide range of building construction work" does not require that an applicant should have constructed a house from start to finish: Vitogiannis v Commissioner for Fair Trading, Department of Customer Service [2020] NSWCATOD 157 at [45], it is clear that a breadth of experience is required, including experience in undertaking the kind of work expected of the contractor. A building contractor has overall responsibility for a site and must be able to supervise all of the trades required to complete any type of dwelling and to determine that all trades have complied with all standards and requirements.
76. Whilst I accept that the Applicant has obtained the necessary qualifications and states that he understands the principles relating to general building work, there is no evidence that he has previously held any type of licence or certificate and it is not clear if he has ever carried out any physical trade or building work on any commercial or residential project. His evidence suggested that he had perhaps not even banged "a nail into a wall" as he said that that the supervision of a build was much more important and that his role was to add value to a project and to ensure that it was delivered on time and within budget. Even if I was to draw an inference that the Applicant has some practical building or trades experience, I am unable to be satisfied that such experience is in a wide range of building construction.
During my employment with Australex, I had gained a variety of experience in the construction industry which included, but was not limited to:
a. Monitoring, observing and maintaining subcontractor performance, quality assurance and user compliance and reliability;
d. Ensuring compliance under relevant legislation and codes for both safety and quality of works;
e. Controlled and maintained outgoings for pricing;
g. Preparing and updating financial spreadsheets to present to clients;
h. Update building reports for on-site and office, as well as providing to clients monthly;
i. Overseeing contract administrators and document controls for drawings and consultants;
j. Conducting site inspections for Defects and oversight of workmanship;
k. Coordinating Stakeholders including communications with architects, engineers, clients, and authorities to keep the project on track and quickly resolve any issues that may arise on site;
I. Managing site safety, conducting inspections, and enforcing safety protocols
m. Preparing construction methodology and resolving on-site issues and conflicts to keep project on track.
Further to the above, I would regularly be involved with the following works on an everyday basis:
a. Applying building codes and standards to the construction process in accordance with the Build;
b. Dealing effectively with Sub-contractors, consumers and other parties
c. Reading and interpreting plans and specifications;
d. Planning building or construction projects and work;
e. Organising site surveys and set-out procedures to building and construction projects;
f. Applying structural principals to residential constructions;
g. Conducting on-site supervision of building and construction projects;
h. Applying legal requirements to building and construction projects; and
i. Managing occupational health and safety in a building and construction workplace.
During my time at Australex I had a relationship with Mahmoud Mearbany (Mahmoud), which extended beyond a professional relationship.
I considered Mahmoud to be a friend outside of work.
This is evident by reason of Mahmoud providing the reference for my building licence, the subject of these proceedings.
Regrettably, Mahmoud has recanted from his position of providing a reference for my application for a building certificate.
This is contrary to what I understood to be an amicable relationship.
Most of the projects that I worked on at Australex were with Muhammad Rohail lyaz (Rohail).
Rohail would work as the project manager on the jobs I worked on, which meant I would have constant dealings with Rohail.
Some of the tasks that Rohail would attend to included:
Monitoring, observing and maintaining subcontractor performance, quality
b. Ensuring compliance under relevant legislation for both safety and quality of works;
c. Controlled and maintained outgoings for pricing;
e. Preparing and updating financial spreadsheets to present to clients;
f. Update building reports for on-site and office, as well as providing to clients monthly; and
g. Oversaw contract administrators and document controls for drawings and consultants.
Given my close involvement with the project managers, I was aware that the project managers, especially Rohail, were involved in all aspects of the project lifecycle, from procurement to completion.
During my time working with Rohail, he demonstrated his ability to effectively manage projects through all stages from procurement to completion, and always demonstrated an understanding of the industry and practise which assisted in the successful delivery of projects that I worked alongside with Rohail.
(1) The Applicant did not observe and maintain subcontractor performance onsite, quality assurance and user compliance and reliability. This was the job of the Construction Manager. Once contracted the Applicant would inform Mr Knight of the scope of their work.
(2) Co-ordinating delivery of materials.
(3) Maintaining workflow and programming works. This was the job of the Construction Manager and Site Manager, not the Applicant.
(4) Ensuring compliance under relevant legislation and codes for both safety and quality of work. This was performed by the Site Manager and not the Applicant.
(5) Controlled and maintaining outgoings for pricing. Mr Mearbany would do all the negotiating with respect to pricing as General Manager of Australex and once negotiated would pass information on to the Applicant.
(6) Maintaining and monitoring budgets. The Applicant was only monitoring expenses.
(7) Preparing and updating financial spreadsheets to present to clients. The Applicant would do monthly Project Control Group updates on milestones achieved, subcontractor payments and escalations.
(8) Update building reports for on-site and office, as well as providing to clients monthly.
(9) Overseeing contract administrators and document controls for drawings and consultants. A Design Manager was employed to do that.
(10) Conducting site inspections for defects and oversight of workmanship. The Applicant, in conjunction with Mr Knight, did prepare a defects list which was given to the site team to action. The oversight of workmanship was the job of the Construction Manager and the Site Manager.
(11) Coordinating Stakeholders including communications with Architects, engineers, clients and authorities to keep the project on tract and quickly resolve any issues that may arise on site. This was done by Mr Mearbany, Construction Manager, Project Manager and the Site Manager.
(12) Managing site safety, conducting inspections and enforcing protocols. The Applicant did not do this. This was done by Mr Mearbany, Construction Manager, Project Manager and the Site Manager.
(13) Preparing construction methodology and resolving on-site issues and conflicts. The Applicant was not on site and did none of this. This work was done by Mr Mearbany and the Construction Manager.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
Iyaz
Secretary, Department of Customer Service [2025] NSWCATOD 52
(1984) 1 FCR 354