[2018] NSWSC 326
Supreme Court of NSW
2017-12-12
Stevenson J
Original judgment source is linked above.
Segenhoe Pty Ltd v Akins (1990) 29 NSWLR 569 Siegwerk Australia Pty Ltd (in liq) v Nuplex Industries (Aust) Pty Ltd [2013] FCAFC 130 SMA Solar Technology AG v Beyond Building Systems Pty Ltd (No 5) [2012] FCA 1483 Tesco Stores Ltd v Constable [2008] EWCA Civ 362 Texts Cited: H McGregor, McGregor on Damages (14th ed 1980) J Powell, R Stewart, M Cannon, D Turner, Jackson & Powell on Professional Liability (6th ed 2007) Category: Principal judgment Parties: In proceedings 2015/120806: Downer EDI Rail Pty Ltd (First Plaintiff) EDI Rail PPP Maintenance Pty Ltd (Second Plaintiff) John Holland Pty Ltd (First Defendant/Cross-Claimant) Kellogg Brown & Root Pty Ltd (Second Defendant) Atlantis Corporation Pty Ltd (Third Defendant) QBE Insurance (Australia) Limited (Fourth Defendant/Cross-Defendant)
In proceedings 2017/69950: Kellogg Brown & Root Pty Ltd (Plaintiff) John Holland Pty Ltd (Defendant) Representation: Counsel: In proceedings 2015/120806: S J Rushton SC with B McManus (Plaintiffs) P S Braham SC with S Gray (First Defendant/Cross-Claimant) D T Miller SC with M J Smith (Second Defendant) M T McCulloch SC with T Marskell (Fourth Defendant/Cross-Defendant)
In proceedings 2017/69950: D T Miller SC with M J Smith (Plaintiff) P S Braham SC with S Gray (Defendant)
Solicitors: In proceedings 2015/120806: Colin Biggers & Paisley (Plaintiffs) HWL Ebsworth Lawyers (First Defendant) Squire Patton Boggs (Second Defendant) Gillis Delaney Lawyers (Fourth Defendant)
In proceedings 2017/69950: Squire Patton Boggs (Plaintiff) HWL Ebsworth Lawyers (Defendant) File Number(s): SC 2015/120806; SC 2017/69950
table of contents Judgment Decision The contractual framework The RailCorp/Reliance Rail Contract The Reliance Rail/Downer contract The Reliance Rail/EDI Rail contract The Downer/John Holland contract John Holland/KBR contract KBR/Atlantis contract The contractual hierarchy What complaint about John Holland is open to Downer on the pleadings? What is said to have gone wrong? The carpark Depressions in the rail area Water and sand Collapsed cells The design life of the Detention System Did, and/or will, the cells fail during their design life? The testing by Dr Scheirs Loss of strength over time The TRL testing The short term testing The long term "creep" testing Conclusion as to the Detention System in the rail area The collapse of the carpark Conclusion thus far The competing claims Downer's claim in contract against John Holland Clause 34.3 Clause 34.5 Clause 35 Has there been a "claim" for the purposes of cl 35? The limitation in cl 35.2 The "no loss" point The design of the Detention System The 10 April 2007 "Agreement for Engagement of Consultant for Design and Documentation" The process leading to the KBR design The final design - KBR's Critical Design Review The meaning of the design drawing The KBR report was not prepared in a manner that accorded with widely held peer opinion at the time as competent professional practice KBR's failure to take account of creep The counterfactual KBR's failure to specify strength testing Downer's retainer of Cardno The Cardno report The nature of John Holland's obligations concerning the Cardno recommendations John Holland's "implementation" of the Cardno recommendations Information to back up a design life of 50 years Testing before and during installation Construction loading: crane point loads The Loffel revelation Misleading or deceptive conduct The cross-claims QBE issues Would the policies have responded? Quantum Carpark Rail area - investigation costs Rail area - cost to replace the Detention System Rail area - "zone of influence" Rail area - additional costs Downer overhead recovery Conclusion
Judgment
Decision
The contractual framework
The RailCorp/Reliance Rail Contract
The Reliance Rail/Downer contract
The Reliance Rail/EDI Rail contract
The Downer/John Holland contract
John Holland/KBR contract
KBR/Atlantis contract
The contractual hierarchy
What complaint about John Holland is open to Downer on the pleadings?
The carpark
Depressions in the rail area
Water and sand
Collapsed cells
The design life of the Detention System
Did, and/or will, the cells fail during their design life?
The testing by Dr Scheirs
Loss of strength over time
The TRL testing
The short term testing
The long term "creep" testing
Conclusion as to the Detention System in the rail area
The collapse of the carpark
Conclusion thus far
The competing claims
Downer's claim in contract against John Holland
Clause 34.3
Clause 34.5
Clause 35
Has there been a "claim" for the purposes of cl 35?
The limitation in cl 35.2
The "no loss" point
The design of the Detention System
The 10 April 2007 "Agreement for Engagement of Consultant for Design and Documentation"
The process leading to the KBR design
The final design - KBR's Critical Design Review
The meaning of the design drawing
The KBR design report was not prepared in a manner that accorded with widely held peer opinion at the time as competent professional practice
KBR's failure to take account of creep
The counterfactual
KBR's failure to specify strength testing
Downer's retainer of Cardno
The Cardno report
The nature of John Holland's obligations concerning the Cardno recommendations
John Holland's "implementation" of the Cardno recommendations
Information to back up a design life of 50 years
Testing before and during installation
Construction loading: crane point loads
The Loffel revelation
Misleading or deceptive conduct
The cross-claims
QBE issues
Would the policies have responded?
Quantum
Carpark
Rail area - investigation costs
Rail area - cost to replace the Detention System
Rail area - "zone of influence"
Rail area - additional costs
Downer overhead recovery
Conclusion
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated. Decision last updated: 20 March 2018
[1986] HCA 3
[2016] VSCA 223
[2014] VSCA 338
(2014) 224 FCR 1
(2004) 62 IPR 184
(1986) 160 CLR 1
(2001) 206 CLR 459
(2008) 73 NSWLR 653
(1992) 37 FCR 526
(1959) 101 CLR 298
(1998) 196 CLR 494
(2004) 216 CLR 388
(1990) 29 NSWLR 569