Section 79 of the Planning & Environment Act 1987; Bayside Planning Scheme; scale of built form within a neighbourhood activity centre; scale and built form visible from residential properties; provision of car parking in a mixed use development.
Double Yellow Dot Pty Ltd v Bayside CC [2014] VCAT 309
Jeremy Gobbo, QC and Jennifer Trewhella, Barristers instructed by Best Hooper Solicitors.
Mr Gobbo and Ms Trewhella called expert evidence from Mark Sheppard (urban designer) of David Lock and Associates, Catherine Heggen (town planner) of Message Consultants and John Kiriakidis (traffic engineer) of GTA Consultants.
Mr Gobbo and Ms Trewhella also circulated but did not call expert evidence from Samantha Slicer (visualisation) of Flood Slicer.
Jason Kane, Barrister by direct brief, assisted by Joanna Cuscaden, Principal Planner of Bayside City Council.
Mr N Tonkin appeared in person and read a submission prepared by John Scott.
Construction of a five storey building comprising a café and offices on the ground floor, and 51 apartments on an additional four floors above the ground floor. Car parking is to be provided in two basement levels. Permissions are sought to reduce the standard car parking requirement, and to waive the loading bay requirement associated with the café.
Application under Section 79 of the Planning and Environment Act 1987.
Clause 34.01-4 to construct a building or construct or carry out works on land within the Commercial 1 Zone.
Clause 52.06-3 to reduce the standard car parking requirement set out under that Clause.
Clause 52.07 to waive the requirement for a loading bay.
Clause 52.34 to reduce the standard bicycle facilities requirement set out under that Clause.
Clauses 10, 11, 15, 16, 17, 18, 21, 34.01, 52.06, 52.07, 52.34 and 65.
The land is the combination of two allotments which combine to produce a rectangular shaped parcel with a frontage to Martin Street of 25.62 metres, a sideage to a laneway of 59.48 metres (plus a splay) and an overall area of 1596 square metres. The land is presently occupied by a two storey brick building and a single storey shop. The land sits within the Martin Street Neighbourhood Activity Centre.
The Tribunal inspected the site and surrounding area on 18 March 2014.
M & A Brighton Pty Ltd v Bayside CC [2013] VCAT 2113; Glenhill Pty Ltd v Stonnington CC & Ors [2013] VCAT 488; Buckerfield Architects v Boroondara CC [2004] VCAT 659.
Is a building of this scale supported by the Bayside Planning Scheme?
Encourage higher density housing in and around Neighbourhood Activity Centres that is designed to fit the context and enhances the character of the area while providing a variety of housing options for different types of households.[2]
Increase the proportion of housing in Metropolitan Melbourne to be developed within the established urban area, particularly at activity centres, employment corridors and at other strategic sites, and reduce the share of new dwellings in greenfield and dispersed development areas.[3]
At the last Census in 2006 Bayside had a population of 87,939 people. Forecast population increases and a trend towards smaller household sizes and an ageing population is increasing the demand for a greater variety of housing types and more affordable housing. To meet the forecast population increases and demographic changes, additional dwellings will be required.
In addition to this expected population growth, Bayside is a municipality where people choose to spend their whole lives. It will therefore be essential to ensure that a range of accommodation options are provided to meet the needs of the existing and future populations throughout the various life stages.
Activity Centres will play an increasingly important role in providing for future housing needs, particularly as opportunities diminish elsewhere due to neighbourhood character, heritage and environmental constraints.
The redevelopment potential within and around selected Activity Centres provides opportunities for medium density housing, resort style accommodation and shop top housing.
Direct new medium density housing to Major Activity Centres, residential opportunity areas, particularly those with good access to public transport routes as identified in the Strategic Land Use Framework Plan.[4]
Add to or replace single storey buildings with new multi-storey buildings to provide additional housing opportunities in business precincts and zones.
Encourage redevelopment of larger sites for higher density residential dwellings.
Encourage the more efficient use of built form through the consolidation of sites and construction of basement car parks.[5]
Our analysis of State policy is that higher density housing is specifically contemplated and encouraged not only within, but also around, a NAC. The notion of higher density housing within a NAC, particularly one where land is underutilised, comprising a centre which contains redevelopment opportunities, is well served by public transport and has a high level of accessibility given its proximity to Melbourne's arterial road network is clearly in line with State policy.
The MSS, as its stands, notes there is a need to 'cater the diverse housing needs of the municipality's existing and future population' and that 'population projections indicate a continuing need for accommodation for smaller households'. It also directs residential development to large redevelopment sites where the infrastructure capacity can be optimised.
There is clear direction given by broad strategic policy that increased housing densities are specifically contemplated in this type of location. Development expectations are, however, tempered by the qualification that such development must fit the context and 'respect the character of adjoining residential areas'.
We have reviewed the policies at Clauses 22.02, 22.05 and 22.06 and find that they do not conflict with the general strategic intent set out above. Those policies do not work against increased housing in NACs, rather, they express a position, consistent with state policy and the MSS, that new development should fit the context, respect the character of residential areas and not have adverse or unreasonable impacts on amenity. We accept that these policy requirements are important in assessing this proposal. Provided these matters are satisfied, we do not accept that a 7 storey building is inappropriate having regard to the strategic context
The Council argues that the level of development is too much for a NAC at the lower end of the hierarchy. It argues that the centre's location at the bottom end of the hierarchy brings with it an expectation of lower scale development compared to that found in higher order centres such as PACs or MACs.
In principle, we do not disagree with the general proposition that the most intensive forms of development should be concentrated in higher order centres. However, in cases like this, where there is no specific direction given with respect to height either through policy or an overlay, an assessment that relates specifically to the context at hand must be made. We agree with Glenhill that it is not as simple as saying that to respect the Activity Centre hierarchy, buildings within NACs must be lower than those in higher order centres.
Local policies[10] variously refer to the 'village feel' of activity centres in Bayside as a strength and the desirability of enhancing the 'village focus'.
The absence of any clear definition of what is meant by the term 'village' in the context of planning scheme policies, poses some difficulties in understanding what is intended by these references.
It is also relevant, as pointed out by Mr McGurn, that the vision for this activity centre at Clause 21.11-7 makes no reference to the term 'village' nor is it expressed anywhere in this policy. Moreover, this term is used to describe the Sandringham Village - a major activity centre where buildings at a height of 5 storeys are envisaged.
Therefore, in relation to at least the question of height, I do not think that policy references to the term 'village' are particularly helpful and nor can they be relied upon to conclude that a 5-storey building would be unacceptable in the Martin Street Activity Centre.
I refer back to my earlier comments about the appropriateness of using this site for a commercial building and the inevitability of such an outcome given the zoning of the land and the strategic direction in the MSS. I agree with Mr Bisset that in an interface situation such as this there are competing objectives on either side of the residential / commercial divide and that a proper planning outcome is one which balances those competing objectives taking into account all of the opportunities and constraints of the site and its neighbours. Inevitably compromises will have to be made to reach an acceptable outcome which satisfies those competing objectives. The commercial site cannot ignore that they have a residential abuttal; nor can a residential property expect the sort of residential amenity one would anticipate in an area wholly zoned for residential purposes.
I approach the task therefore of the interface issue not with a view to achieving a perfect residential amenity outcome; nor a perfect commercial outcome. If it were that simple I could favour one over the other and (say) allow a box like office building on the boundary with extensive windows as might be found in a wholly commercial area. Or I could favour a one storey commercial building well offset from the boundary with a "forest" as a buffer in deference to residential amenity. Rather, I must look for a balance which satisfies the "reasonable expectations" of all parties.
Will there be any unreasonable off-site amenity impacts?
Is an appropriate level of internal amenity achieved?
Does the proposal appropriately provide for car parking and traffic movements?
The construction of buildings and works associated with a mixed use building, reduction of the standard car parking requirement and waiver of the loading bay requirement in accordance with the endorsed plans.
A cross section must be provided to demonstrate the height clearance above the ramp between the lower and upper basement levels.
The CMP must be implemented to the satisfaction of the Responsible Authority.
All species selected must be to the satisfaction of the Responsible Authority.
These plans must be accompanied by a report from an industry accepted performance measurement tool, which details the treatment performance achieved and demonstrates the level of compliance with the Urban Stormwater Best Practice Environmental Management Guidelines, CSIRO 1999. The water sensitive urban design stormwater treatment system as shown on the endorsed plan must be retained and maintained at all times in accordance with the Urban Stormwater - Best Practice Environmental Management Guidelines, CSIRO 1999, to the satisfaction of the Responsible Authority.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within six months afterwards, or within 12 months afterwards if the development commenced lawfully before the permit expired.
[1] We have considered all submissions presented by the parties although we do not recite all of the contents in these reasons.
[2] Clause 11.04-2 of the Bayside Planning Scheme.
[10] See for example Clause 21.06 and 21.07.
[12] Taking into account also the loss of one existing on street car space to provide for the new accessway.