[2013] VCAT 2113
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2013-12-12
For P
Original judgment source is linked above.
Bayside Planning Scheme; Application under Section 79 of Planning and Environment Act 1987 against failure to grant a permit; Commercial 1 Zone; Mixed use development; Five storey development above two basement levels; Site in Neighbourhood Activity Centre; Building height; Parking and Traffic.
I S Qubrosi; P Steele; N & R Tonkin; R & R Lingard; J Phillips;M & B Hutson; L Hattam; D Loney & J Le Page; J & J Scott; P Osbourne; P Loft; D Forge; P Kent
M & A Brighton Pty Ltd v Bayside CC [2013] VCAT 2113
TP0.00, TP1.01, TP1.02, TP1.03, TP1.04, TP1.05, TP1.06, TP2.01, TP2.02, TP2.03, TP2.04, TP2.05, TP2.06, TP2.07, TP2.08, TP3.01, TP3.02, TP3.03, TP3.04, TP4.01, TP4.02, TP4.03, TP5.01, TP5.02, TP5.03, TP6.01 Project No. 1214, Revision B.
in accordance with the endorsed plans and subject to the conditions contained in Appendix A.
Mr Chris Wren SC, instructed by Mr Mark Naughton of Planning & Property Partners. The following witnesses were called to give evidence:
Mr Darren Wong, solicitor of Maddocks. He called the following witness to give evidence:
For I S Qubrosi; N & R Tonkin; R & R Lingard; J Phillips; L Hattam; D Loney & J Le Page; J & J Scott; P Osbourne; P Kent.
The four residential levels are configured around a central courtyard/light court. External materials include pre-cast concrete and metal cladding to walls, obscure and clear glass to balconies and black powder coated window/door frames.
Located on the south-west corner of Martin and Asling Streets, the site is a rectangular shaped parcel of 1570sq.m comprising two lots with frontages of 33.6m and 45.6m to Asling and Martin Streets respectively.
The land is developed with two single-storey commercial buildings with at-grade carparks to each street. The site has an abuttal with a Right of Way (ROW) on its west side.
The site is located at the western edge of the Martin Street Activity Centre and is about 170m from the Gardenvale train station. Land immediately surrounding the site is used and developed primarily for commercial purposes while land further south and east is residential.
An accompanied inspection of the site and locality was carried out on the afternoon of Thursday 31 October 2013.
Glenhill Pty Ltd v Stonnington CC [2013] VCAT 488.
Rowcliffe Pty Ltd v Stonnnington CC [2004] VCAT 46
... is designed to fit the context and enhances the character of the area while providing a variety of housing options for different types of households.
To create a vibrant shopping centre which recognises and builds on the character and streetscape features of the centre.
Would a 5-storey building undermine the activity centre hierarchy?
Would a 5-storey building materially alter the centre's scale?
What about the proposal's response to the 'village' feel and focus?
Does the proposal respond in an acceptable way to its strategic and physical context?
Are the proposed access and carparking arrangements acceptable?
The total floor area of all floors of all buildings on a site. It includes half the width of any party wall and the full width of all other walls. It does not include the area of stairs, loading bays, accessways, or car parking areas, or any area occupied by machinery required for air conditioning, heating, power supply, or lifts.
Are there are any other matters that warrant refusal of the proposal?
The CMP must be implemented to the satisfaction of the Responsible Authority.
The plans must be accompanied by a report in accordance with an industry accepted performance measurement tool which details the treatment performance achieved and demonstrates the level of compliance with the Urban Stormwater - Best Practice Environmental Management Guidelines, CSIRO 1999.
The water sensitive urban design stormwater treatment system as shown on the endorsed plans must be retained and maintained at all times in accordance with the Urban Stormwater - Best Practice Environmental Management Guidelines, CSIRO 1999, to the satisfaction of the Responsible Authority.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within six months afterwards, or within 12 months afterwards if the development commenced lawfully before the permit expired.
[1] An additional 8 visitor bicycle parking spaces are proposed at the ground level entry to Asling Street.
[2] See Clauses 11.01-1 and 11.01-2 of all Victorian Planning Schemes.
[4] See for example Clause 21.06 and 21.07.
[5] See Rowcliffe Pty Ltd v Stonnington CC [2004] VCAT 46 at paragraph 54.
[7] See for example Objectives 3.2 and 3.5 in Guidelines for Higher Density Residential Development.
[8] I would also expect a similar pattern in the opposite direction when students walk to school in the morning.
[9] Based on the rate specified in Clause 52.06 of 3.5 spaces per 100sq.m of NFA.
[10] See for example policy at Clause 19 and the Car parking purposes at Clause 52.06.
[11] Based on the assessment contained in the Waste Management Plan prepared by Leigh Design dated 8 May 2013 prepared for the permit applicant.
M & A Brighton Pty Ltd
Bayside CC [2013] VCAT 2113