Cole v Commissioner for Fair Trading
[2024] NSWCATOD 65
At a glance
Source factsCourt
NCAT Occupational
Decision date
2024-02-09
Source
Original judgment source is linked above.
Judgment (20 paragraphs)
The Application
- In section 6 of his Application, the Applicant relied on experience gained from his employment as a "Building Supervisor" with "Ivan Zhang (Dinkum Exporting and Importing P/L)". Under the heading "period of employment", there is a response indicating "3/7/20" to "30/6/22" with the numbers being handwritten. The Application produced in the s 58 bundle (exhibit R1) included a one page Referee's Statement from Mr Zhang together with an undated Applicant's On Site Building Experience form (Building Experience form) relating to the Applicant that was signed by Mr Zhang.
- The Referee's Statement from Mr Zhang indicated that the Applicant's term of employment was full time and, in the box below, the following handwritten response was provided, "Two years (3/7/2020 30/6/2022 (sic)". In response to "Nature of Employment", the box next to "Employee" has been ticked. In the Building Experience form completed by Mr Zhang it was stated that the Applicant had carried out work at two building sites under his supervision. The first building site was in Lily Pilly Place in Orange (Lily Pilly Place). It was stated that this work started on 15 January 2020 and finished in December 2020, being a period of ten months and 15 days. Mr Zhang indicated that the approved DA/CDC at this site was "Construction of new multi-dwelling housing or residential flat buildings" but no type was specified. The Applicant's roles and responsibilities were said to have been to "organise surveyors, structural engineers and relevant trades".
- The second building site was stated to be a property in Gardiner Road, Orange (Gardiner Road). It was stated that this work started on 1 December 2020 and finished on 10 January 2022, being a period of thirteen months and 9 days. Mr Zhang indicated that the approved DA/CDC at this site was "Construction of new multi-dwelling housing or residential flat buildings" but again, no type was specified. The Applicant's roles and responsibilities were said to have been "organising structural engineers, surveyors, civil engineers and relevant trades to assist builder".