Figure 1: Extract of the Ground Floor plan from the decision plans. Those parts of the Ground Floor with a FFL of 17.73m to AHD are coloured blue. The balance of the Ground Floor, coloured white, has a FFL of 18.18m to AHD.
Figure 2: Extract of Section CC from the decision plans, with the Tribunal's yellow highlight of the minimum proposed FFL (17.73m to AHD) and the proposed roof level (27.73m to AHD).
Maximum building height requirement for a dwelling, small second dwelling or residential building
A building must not be constructed for use as a dwelling, small second dwelling or a residential building that:
If no maximum building height or maximum number of storeys is specified in a schedule to this zone:
Maximum building height requirement for a dwelling, small second dwelling or residential building
A building used as a dwelling, small second dwelling or a residential building must not exceed 9 metres unless the slope of the natural ground level at any cross section wider than 8 metres of the site of the building is 2.5 degrees or more, in which case the height of the building must not exceed 10 metres. This does not apply to:
A lift overrun may exceed the abovementioned mandatory height requirements by no more than 1.2 metres.
In areas subject to the Special Building Overlay or the Land Subject to Inundation Overlay, the maximum building height may be exceeded by no more than the minimum additional building height required by the overlay provisions.
Unless otherwise agreed in writing by Melbourne Water:
a) ground level floor finished floor levels must be constructed no lower than shown on Architectural Plans: Project No. 22054; Revision D; 22.03.2024. This is no lower than 300 mm above the applicable flood level.
b) the building-boundary setbacks must not be reduced.
(Emphasis in bold added by the Tribunal)
Advice
The property is subject to overland flooding from Melbourne Water's Prahran Main Drain. The 1% AEP flood level grades from 17.88m AHD at eastern boundary, down to 16.65m AHD at western boundary.
Advice
In response to the letter from Urbis Pty Ltd. On behalf of the applicant Coda One Pty Ltd. Dated 21 August 2024, Melbourne Water provides the following comments:
WHAT DO THE DECISIONS SAY ABOUT NATURAL GROUND LEVEL?
An issue arises in this case as to the meaning of the term "alteration to the natural conditions or the topography". Does the topography mean the configuration of the land prior to European settlement? And what of the effect or alterations to that natural configuration brought about by mining, or other forms of industry which might have changed the shape of the land? In this case much of the ground surface has been altered by industrial intervention to which I have already referred. Much of the sub-soil was brought to the surface by shaft goldmining and then stored in mullock heaps, some of which appears to have spread over the ground surface in a form of slurry in the intervening century. Other segments of the land have been cut by deep clefts as a result of slate mining and yet other portions have been altered by tracks presumably constructed and used to extract timber and provide access to the various mines. The question is of relevance because King contends that he was doing nothing more than either renovating or rehabilitating existing tracks or levelling pre-existing mullock heaps. In one part of the borrow area (ibid) he contended he removed overburden from previous mining activity in order to display the "natural" surface of the land, that is, that level which pre-dated European intervention. To my mind the term "alteration to the natural conditions or topography" means that the surface or topography which must not be disturbed is that which immediately pre-dates the making of the application. That is, the configuration of the land, whether disturbed or otherwise as a result of prior European industrial, pastoral or mining activities, but being that which exists at the time an application is made. This conclusion bears the merit of commonsense. There will be many applications to rectify the results of extractive industries or neglect, so as to either restore the land to its pre-European shape or render it productive in some other way.
Second approach - pre-development ground level
Does the height of the proposed building comply with the maximum building height under clause 3.0 of schedule 1 to the General Residential Zone in the Boroondara Planning Scheme?
23 The first qualification is an evidentiary one.
28 The purpose of clause 55.03-2 is:
To ensure that the height of buildings respects the existing or preferred neighbourhood character.
... the fact-finder may need to rely on incomplete evidence and on inferences, interpolations or extrapolations.
(a) The existing surface level of land when an application is lodged does not respond to the ordinary meaning of a 'natural' level. > > (b) Not all Tribunal decisions after the second proceeding have followed the first line of authority. There remains divergent authority. > > (c) To the extent that the Council's preference and the later Tribunal decisions have both relied on the Supreme Court's decision in Shire of Gisborne v King, I adopt my reasons in Faversham Mews about why Shire of Gisborne v King is not binding authority for present purposes.
(a) Permission may not be required for earthworks to fill relevant land so I do not understand how pre-application filling of the land could form part of an application. > > (b) Instead of providing certainty about the relevant level, it adds uncertainty if the filling was potentially undertaken many years before the making of the application.
Figure 6: Extract of respondent's annotated sections
Figure 7: Extract of the Existing Levels Survey Plan
Evidence about natural or pre-development ground level
Figure 8: Extract of the Natural Ground Levels Survey Plan.
Supplementary witness statement[18]
Figure 9: Extract of Appendix L in the supplementary evidence statement of Andrew Smith.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] Melbourne Water section 55 referral response to the Council, dated 15 May 2024.
[6] (Includes Summary) (Red Dot) [2015] VCAT 1731.
[10] See page 6 of the submissions of the respondent.
[11] See appendix 4 of the submissions of the respondent. The land is identified as Lot 22.
[12] See page 7 of the submissions of the respondent.
[13] See applicant's submission [41].
[15] Full details of the documents are at pages 3-4 of Andrew Smith's statement dated 11 September 2024.
[19] See submissions of respondent [27] and appendix 6 of that submission.
[21] See Appendix 7 of the submissions of the respondent.