The application drawings state that the existing dwelling has a maximum height to the ridge on the generally flat roof of RL 16.20 metres. The ridge is oriented northwest to southeast across the midpoint of the roof.
The land is occupied by a detached two-storey dwelling that is located two metres from the rear boundary of the land and about 43 metres from the street. The ground floor footprint of the dwelling is about 11 metres by nine metres. It includes a northeast-facing full-width (ie about 11 metres long) deck that is about 1.6 metres deep.
On 21 December 2022, I carried out an inspection of the subject land, 11 Jaanda Court and 16 Spencer Street, Blairgowrie, unaccompanied by the parties. I record that, at the inspection and as I directed, the earth covering the septic system was removed for my inspection of that system and the height poles for the extension were still in place.
Larsson v Mornington Peninsula SC [2017] VCAT 444
Benjamin v Mornington Peninsula SC [2019] VCAT 997
Sprut v Stonnington CC [2012] VCAT 1675
Faversham Mews Pty Ltd v Boroondara CC [2016] VCAT 1954
Wu v Maribyrnong CC [2019] VCAT 1519
Chincilla Mountain Pty Ltd v Minister for Planning [2019] VCAT 190
Ostoljic v Greater Geelong CC [2020] VCAT 333
McDonald v Surf Coast SC [2021] VCAT 1123
SB&G - 40 Upper Heidelberg Road (Ivanhoe) Pty Ltd v Banyule CC [2018] VCAT 769
Zumpano v Banyule City Council [2016] VSC 420
Source Written submissions on behalf of the Council, p 3
The outlook of the dwelling is to the north and northeast across to Port Phillip Bay (the Bay). The Bay foreshore is about 400 metres distant.[2]
(a) Should a permit be refused because it is a 'classic repeat appeal'? > > (b) Is the extension prohibited because it exceeds the mandatory maximum building height in the planning scheme? > > (c) Does the development fail to protect shared viewlines? > > (d) Is the extension visually obtrusive or otherwise have an unreasonable amenity impact on dwellings in the area and, in particular, the dwelling at 11 Jaanda Court?
(a) There were no significant changes in the application itself. > > (b) There were no changes in the circumstances of the land and its surrounds. > > (c) There were no changes in planning policy. > > (d) There were no changes in the interpretation of the facts or law relevant to the Tribunal's consideration.
Figure 2 Floor plans of the extension in second proceeding
Figure 3 Elevations of the extension in second proceeding
Figure 4 Floor plans of the extension in this proceeding
Figure 5 Elevations of the extension in this proceeding
(a) On the evidence of Gary Martin, a land surveyor called by the Benjamins, I found that the natural ground level (the NGL) was below the existing surface of the land and that the building height exceeded the mandatory maximum building height of eight metres at the northernmost and easternmost points of the extension's roof by 1,100 mm and 300 mm, respectively.[10] > > (b) Accordingly, the affected (ie non-compliant) part of the footprint of the extension was not de minimis and was material. If the 'overall design and location of the roof of the extension' was retained, the building height of the extension would need to be lowered by a material amount in some locations and/or its northerly extent would need to be reduced.[11] > > (c) The limitations of Mr Martin's evidence meant that it was difficult to determine the extent of the footprint of the extension over which the mandatory maximum building height was not met. A fresh application would need to include 'more detail about [NGL] beneath the extension than [Mr Martin's] two cross-sections' so that the Council 'could be satisfied the [mandatory maximum building height] is met under all points of the roof of the extension'.[12]
(a) The maximum building height was reduced to 17.65 metres AHD, from 18.29 metres AHD in the first proceeding and from 17.94 metres AHD in the second proceeding. > > (b) The finished floor level of the upper floor was reduced to 14.45 metres AHD, from 14.70 metres AHD in the second proceeding. The finished floor level of the deck was also reduced to 14.45 metres AHD from 14.80 metres AHD in the second proceeding. The deck in its northernmost corner was cut back to include a one metre splay, although the depth of the deck was increased to 5.5 metres from 3.4 metres.
in determining the natural ground level of the relevant part of the subject land, whether the date for assessment of natural ground level is the date the permit application was lodged.
What is natural ground level for purposes of this application?
(a) A number of Tribunal decisions since my decision in the second proceeding that have followed the first line of authority.[23] > > (b) The lack of evidence of any disturbance to existing surface levels since around 1980 when the existing dwelling and its septic tank system was constructed. > > (c) The design objectives of the clause of the planning scheme in which the requirement is located relating to ensuring development is responsive to 'landform [and] site conditions'.[24]
(a) The existing surface level of land when an application is lodged does not respond to the ordinary meaning of a 'natural' level. > > (b) Not all Tribunal decisions after the second proceeding have followed the first line of authority.[26] There remains divergent authority. > > (c) To the extent that the Council's preference and the later Tribunal decisions have both relied on the Supreme Court's decision in Shire of Gisborne v King,[27] I adopt my reasons in Faversham Mews about why Shire of Gisborne v King is not binding authority for present purposes.[28]
(a) Permission may not be required for earthworks to fill relevant land so I do not understand how pre-application filling of the land could form part of an application. > > (b) Instead of providing certainty about the relevant level, it adds uncertainty if the filling was potentially undertaken many years before the making of the application.
Ground Science were originally engaged to only identify inferred fill and inferred 'natural ground' within the boreholes performed to assist in the determination of natural ground level. The term 'natural ground' refers to naturally recurring materials and soils within the subsurface profile and should not be mistaken with the 'natural ground level', or the level at which the natural form of the landscape existed prior to disturbance from manmade construction or earthworks.[29]
Figure 6 Location of Ground Science boreholes 1 to 8
Source: Chris Connelly, statement of evidence dated 21 October 2022 - Appendix A, Geotechnical classification report dated 10 March 2020 (in these reasons, the 'Ground Science report')
Note: Existing dwelling footprint shown in pink; existing tree cover shown in green; lawn & hard surface area in extension footprint shown in purple
Source: Charlton Degg cross-sections p 1 (Tribunal Book p 482)
Figure 10 Borehole locations (Civiltest in green and Ground Science in red). This figure also shows locations of additional boreholes recommended by Mr Holt shown in yellow within a rectangular part of extension footprint bordered in red dashed line.
Source: Mr Holt, peer review report (2 July 2021), p 5
Note: In oral evidence, Mr Holt conceded an error in identifying Civiltest boreholes 1 & 2 (shown in green) and they should be reversed.
NGL is a 'uniform' 40 cm below the existing surface
Borehole 5 is not at the septic tank infrastructure
Figure 11 One of the views to height poles from the rear deck at 16 Spencer Street
Figure 12 Extent of built form in the extension shown in red from a viewing point at a standing position on the rear deck of 16 Spencer Street, being the same viewing point as shown in figure 11
Source: Written submissions on behalf of the Council, p 26
No further building and works or services normal to a dwelling, except those specifically required under the Building Act 1993, may exceed the building heights shown on the endorsed plans without the further permission of the Responsible Authority.
(a) Part of the existing upper floor living area is converted as a bedroom with a southeast-facing window towards 11 Jaanda Court. The objective is met for this window because it has a sill no less than 1.7 metres above the floor. > > (b) The southeast-facing window in the upper floor rear bedroom is an existing situation and is not part of the application. > > (c) The extension's upper floor living room has no southeast facing window. > > (d) The new deck has a 1.7 metres high balcony screen on its southeast-facing edge. The objective is met having regard to its height and its proposed maximum 25% transparency.
The development of dwelling additions and alterations and associated works in accordance with the endorsed plans
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Jaanda Court runs approximately southeast from the corner with Revell Street. The subject land is rectangular and on the southwest (or inland) side of the street. It therefore faces northeast. In these reasons, its street frontage is referred to as the northeast boundary, the rear boundary as the southwest boundary and the two sides boundaries as the northwest and southeast boundaries.
[3] This dimension includes a 5.5 metres deep balcony.
[5] [2019] VCAT 997 (Code SM).
[6] 'Great weight' was the expression used in Sprut v Stonnington CC [2012] VCAT 1675 [18] (Dwyer DP); approved in Zumpano v Banyule City Council [2016] VSC 420.
[7] Sprut v Stonnington CC [2012] VCAT 1675 [12]-[18].
[8] It is unnecessary to include plans and elevations of the additions relating to the first proceeding.
[9] Zumpano v Banyule City Council [2016] VSC 420 [24] (Garde J).
[10] Benjamin v Mornington Peninsula SC [2019] VCAT 997 [22], [71], [75] ('Benjamin').
[13] Written submissions on behalf of the Benjamins [25], [38].
[15] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 2.0.
[16] Mornington Peninsula Planning Scheme cl 72.01.
[17] Mornington Peninsula Planning Scheme cl 73.01.
[18] See eg Faversham Mews Pty Ltd v Boroondara CC [2016] VCAT 1954 [14].
[19] [2016] VCAT 1954 ('Faversham Mews').
[23] Wu v Maribyrnong CC [2019] VCAT 1519 [36]; Chincilla Mountain Pty Ltd v Minister for Planning [2019] VCAT 190 [47]-[48]; Ostoljic v Greater Geelong CC [2020] VCAT 333 [10]; McDonald v Surf Coast SC [2021] VCAT 1123 [34]-[35].
[24] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 1.0.
[25] Written submissions on behalf of the Council [96]-[97].
[26] SB&G - 40 Upper Heidelberg Road (Ivanhoe) Pty Ltd v Banyule CC [2018] VCAT 769 [24].
[28] Faversham Mews (n 19) [44]. The Benjamins made detailed and persuasive submissions about why Shire of Gisborne v King is not binding authority, which were broadly consistent with my reasons in Faversham Mews.
[29] Chris Connelly, statement of evidence, p 3-4.
[30] Chris Connelly, statement of evidence, p 5.
[31] Extrapolation of NGL must be approached with care. Extrapolation over longer distances between boreholes carries more risks. The Charlton Degg cross-sections are generally over shorter distances that the Martin cross-sections.
[32] Timothy Holt, A S James Pty Ltd, Peer Review - Existing Ground Level v Natural Ground Level 13 Jaanda Court, Blairgowrie, dated 2 July 2021.
[33] Benjamin v Mornington Peninsula SC [2019] VCAT 997 [79].
[34] Timothy Holt, A S James Pty Ltd, Peer Review - Existing Ground Level v Natural Ground Level 13 Jaanda Court, Blairgowrie, dated 2 July 2021, p 4.
[36] I have specified the actual heights earlier in these reasons.
[37] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 1.0, fifth objective.
[38] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 1.0, sixth objective.
[39] The dwelling at 11 Jaanda Court has a viewline to the Bay but it is not shared with the subject land.
[40] See eg Charlton v Mornington Peninsula SC [2017] VCAT 1770 [27]-[28].
[41] Larsson v Mornington Peninsula SC [2017] VCAT 444 [28].
[42] Benjamin v Mornington Peninsula SC [2019] VCAT 997 [85]-[90].
[43] The height poles respond the inadequacies in the height poles erected in the second proceeding to which I referred to the reasons in the second proceeding.
[44] Tribunal Book pages 649-683. The assessment included 71 photographs, most of which were of the viewline from the rear deck of 16 Spencer Street.
[45] Mornington Peninsula Planning Scheme cl 43.02-6 dot point 4 & cl 43.02 sch 2 cl 6.0, fourth objective.
[46] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 2.0, General requirements.
[47] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 2.0, Permit required.
[48] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 2.0, General requirements.
[49] Matthew Chapman, statement of evidence [40].
[50] Mornington Peninsula Planning Scheme cl 43.02 sch 2 cl 2.0, Permit required, third dot point.
[51] Mornington Peninsula Planning Scheme cl 54.04-6.
Degenhardt
Mornington Peninsula SC [2023] VCAT 31