[2026] NSWSC 837
Supreme Court of NSW
2026-07-15
Richmond J
Original judgment source is linked above.
Source: NSW Caselaw (www.caselaw.nsw.gov.au). Converted to plain text by ZoeLaw. Not the official version.
Medium Neutral Citation: Chong v Tasman 61 BH Pty Ltd [2026] NSWSC 837
Hearing dates: 23 June 2026
Date of orders: 15 July 2026
Decision date: 15 July 2026
Jurisdiction: Equity
Before: Richmond J
Decision: Orders for specific performance made: see paragraph [124].
Catchwords: LAND LAW — Conveyancing — Contract for sale — Off-the-plan purchase of strata lot including car parking space — Whether removal of car parking space in registered strata plan a breach by vendor — Whether lodgment of caveat by purchaser a breach or repudiation entitling vendor to terminate — Specific performance where restrictive use condition on utility lot — Relief against forfeiture
Legislation Cited: Conveyancing Act 1919 (NSW) s 55(2A)
Real Property Act 1900 (NSW) ss 42, 74J
Strata Schemes Development Act 2015 (NSW) ss 4(1), 63, 63(1), 63(2), 64, 124
Strata Schemes Management Act 2015 (NSW) s 4(1)
Cases Cited: Akrawe v Culjak [2023] NSWCA 171
Australian Broadcasting Commission v Australasian Performing Right Association Ltd (1973) 129 CLR 99; [1973] HCA 36
Australian Property & Management Pty Ltd v Devefi Pty Ltd (1997) 7 BPR 15,255
Betlehem v Keytown Constructions Pty Ltd [2007] WASC 38
Blatch v Archer (1774) 1 Cowp 63; (1774) 98 ER 969
BP Refinery (Westernport) Pty Ltd v Shire of Hastings (1977) 180 CLR 266
Chapmans Ltd v Australian Stock Exchange Ltd (1996) 67 FCR 402
Cromarty Resources Pty Ltd v Thalanga Copper Mines Pty Ltd [2021] NSWCA 284
Electricity Generation Corporation v Woodside Energy Ltd (2014) 251 CLR 640; [2014] HCA 7
Gall v Mitchell (1924) 35 CLR 222; [1924] HCA 48
Gustin v Taajamba Pty Ltd (1988) 4 BPR 9373
Havyn Pty Ltd v Webster (2005) 12 BPR 22,837; [2005] NSWCA 182
Hongkong Fir Shipping Co Ltd v Kawasaki Kisen Kaisha Ltd [1962] 2 QB 26
Hume Steel Ltd v Attorney-General (Vic) (1927) 39 CLR 455; [1927] HCA 24
Ilkerler Otomotiv v Perkins Engines Co Ltd [2017] EWCA Civ 183; [2017] 4 WLR 144
Koompahtoo Local Aboriginal Land Council v Sanpine Pty Ltd (2007) 233 CLR 115; [2007] HCA 61
Lee v Lee [2022] NSWSC 181
Louinder v Leis (1982) 149 CLR 509; [1982] HCA 28
McNally v Waitzer [1981] 1 NSWLR 294
Pearce v Hall (1989) 52 SASR 568
PNC Lifestyle Investments Pty Ltd v REW08 Projects Pty Ltd (No 2) [2017] NSWSC 993
Provincial Insurance Australia Pty Ltd v Consolidated Wood Products Pty Ltd (1991) 25 NSWLR 541
R (Save Britain’s Heritage) v Secretary of State for Communities and Local Government [2010] EWHC 979 (Admin)
Simic v New South Wales Land and Housing Corporation (2016) 260 CLR 85; [2016] HCA 47
The Trust Company (Nominees) Ltd v Banksia Securities Ltd [2016] VSCA 324
Tramways Advertising Pty Ltd v Luna Park (NSW) Ltd (1938) 38 SR (NSW) 632
Xu v Lindsay Bennelong Developments Pty Ltd [2020] NSWSC 1692
Zagarella v Roads Corporation (Vic) (1990) 13 MVR 334
Zhang v ROC Services (NSW) Pty Ltd (2016) 93 NSWLR 561; [2016] NSWCA 370
Texts Cited: A Ilkin, Strata Legislation Handbook NSW 2016–2017 (2017, Thomson Reuters)
Baalman & Wells Land Titles Office Practice New South Wales (online at 13 July 2026, Thomson Reuters)
JD Heydon, MJ Lemming and PG Turner, Meagher, Gummow & Lehane’s Equity Doctrines & Remedies (5th ed, 2015, LexisNexis Butterworths)
JW Carter, Carter’s Breach of Contract (3rd ed, 2024)
P Herzfeld and T Prince, Interpretation (3rd ed, 2024, Thomson Reuters)
The Macquarie Dictionary, 3rd ed (1997)
Category: Principal judgment
Parties: May Shuan Chin Chong (First Plaintiff)
Houzhong Yu (Second Plaintiff)
Tasman 61 BH Pty Ltd (Defendant)
Representation: Counsel:
D S Weinberger SC (Plaintiffs)
D A Smallbone (Defendant)
Solicitors:
Dentons (Plaintiffs)
Accuro Maxwell (Defendant)
File Number(s): 2025/00458230
Publication restriction: Nil
These proceedings concern an ‘off the plan’ purchase of a proposed lot in a draft strata plan, being Lot 20. The lot was to consist of a townhouse, garage and car space. Lot 20 in the registered strata plan consists of a townhouse and garage. The car space that had been assigned to Lot 20 in the draft strata plan has been assigned to a different ‘utility lot’ in the registered strata plan, being Lot 34.
The plaintiffs seek specific performance of the contract for sale and, if that does not include the car space in Lot 34 in the registered strata plan, then also damages for the absence of the car space. The defendant asserts that it has validly terminated the contract. If that is so (which is denied), the plaintiffs seek an order for the return of the deposit paid under the contract.
On 26 March 2021, the contract for sale was entered into between the first plaintiff, May Shuan Chin Chong, and second plaintiff, Houzhong Yu, as purchasers, and the defendant, Tasman 61 BH Pty Ltd, as vendor (the Contract). It took the form of the Law Society/Real Estate Institute standard form (2019 Edition), as amended and supplemented by a number of special conditions.
On the front page of the Contract the land the subject of the Contract is described as ‘Lot 20, 61 Windsor Road, Norwest NSW 2153’ and ‘Unregistered Plan: Lot 20 in the Draft Strata Plan which is part of Lot 1 in Deposited Plan 566580’ (Lot 20), and the improvements are relevantly noted as follows:
The draft strata plan forming Annexure 3 to the Contract describes lot 20 as comprising a lot with a total area of 273 m² including a separate car space located a short distance from the townhouse with an area of 13m².
The purchase price was $1,160,000, with a deposit of $116,000 (d****eposit). The plaintiffs paid the deposit on 18 June 2021, in accordance with the Contract. The plaintiffs paid stamp duty on the Contract of $48,825 by the due date for payment.
By special condition 44.1, the completion date was to be the later of: (a) 42 days after the date of the Contract, (b) 14 days after the vendor serves a copy of the Occupation Certificate on the purchaser or (c) 21 days after the vendor serves a written notice on the purchaser informing that the strata plan has been registered.
On 6 June 2023, pursuant to special condition 45 of the Contract, the defendant extended the ‘sunset date’ under the Contract from 31 December 2023 to 31 December 2024, by a notice stating that completion of the construction works had been delayed by causes beyond the control of the vendor, including delays due to inclement weather and ‘anything that is beyond the vendor’s control’. The significance of the sunset date appears to be that either party would be entitled, in certain circumstances, to rescind the Contract under special condition 44.2 read with cl 19 of the standard form at any time after the sunset date and before the date for completion arising under cl 44.1. As I understood the parties’ submissions, nothing turns on the extension of the sunset date, and this is presumably because neither party elected to rescind under cl 44.2. Had the defendant done so, the plaintiffs would have been entitled to the return of the deposit.
On 27 March 2025, the defendant’s solicitor, Accuro Maxwell (Accuro), sent an email to the plaintiffs’ conveyancers, R & R Lawyers (R & R) stating:
Our client is in a process of lodging the strata plan for registration. We are instructed that it has come to vendor’s attention that the total area of lot 20 is now recorded as 248 square meters, which represents a reduction of more than 5% compared to the total area of 273 square meters as stated in the draft plan attached to the Contract. A copy of the strata plan to be lodged is attached herewith for your reference.
ln light of this change, our client is prepared to enter into a deed of rescission with your client and refund the deposit paid.
If your client is agreeable, we will prepare and forward the deed for the purchaser’s consideration.
While the email attached a copy of the draft strata plan, that document is not in evidence and it is not clear on what basis the email asserted that the area of Lot 20 was reduced to 248m². In fact, the strata plan as registered reduced Lot 20 from 273m² to 263m² rather than 248 m².
After a follow-up email from Accuro to R & R on 15 April 2025 stating again that the defendant was ‘prepared to enter into a deed of rescission with your client and refund the deposit’, R & R replied by email the same day stating:
I note that the reduction proposed by your client appear to have derived primarily from the removal of the carspace of 13sqm. Prior to considering the vendor’s proposal below, we require a copy of the Development Consent indicating the change of approval from the original proposed Lot 20 with an area of 273sqm to now proposed Lot 20 with an area of 248sqm, as well as the vendor’s application to the consent authority providing the reason for such change.
In relation to the proposed removal of the carspace to a renumbered Lot 34, we are instructed that my client rejects the vendor’s proposed action as there appears to be no basis for the vendor to do so except for personal commercial gain. We are instructed that the purchaser will prosecute their rights under the Contract and under law should the vendor not be able to show reasonable cause why the purchaser is being denied the carspace as promised by the vendor under the Contract; and the vendor is put on notice that the purchaser will seek their costs on an indemnity basis from the date of this correspondence.
Notwithstanding, I am instructed that it is the purchaser’s intention to proceed with completion of the Contract and asks for a timeframe for an update of the building works, an anticipated date when bank valuations can commence, and when the vendor anticipates settlement to occur.
I look forward to the vendor’s prompt response prior to registration of the Plan.
R & R lawyers followed up its email on 23 April 2025 and 5 May 2025 after not having received a response.
On 23 May 2025, Accuro emailed R & R stating:
Your client’s rejection of the proposed modification is respectfully without merit. Pursuant to Clause 46 of the Contract for Sale, our client is contractually entitled to apply for modifications to the development, including adjustments to lot configuration.
ln accordance with this entitlement, our client has taken substantial and considered steps to pursue a modification which replaces truck-based waste collection with a dedicated waste collection room. This change significantly implemented in the interest of improving operational safety and mitigating potential risks to residents of the development.
With regard to the timeframe, we are instructed that the draft strata plan for the development is currently under examination by NSW Land Registry.
…I am instructed that my client rejects the vendor’s assertions regarding the reasons or basis for the purported variations. My client again requests the vendor provide sufficient evidence of the need for such variation aside from the vendor’s discretion; otherwise it is my client’s position that the vendor is not acting in good faith in relation to this issue and my client will seek to rely on any such bad faith conduct in any subsequent claim.
In the absence of such supporting documentation, I am instructed that my client requires that the vendor to immediately confirm:
- That vendor will substantially revert to the draft strata plan provided in the Contract in relation to the lot being purchased by my client – to include the car space as promised under the Contract of sale; or
- Offer reasonable financial compensation, to my client’s satisfaction, for the removal of the car space improvement.
My client continues to reserve all rights in relation to this matter.
Noting that it took one month for your firm to acknowledge our previous communications, we request that you please immediately acknowledge this email and seek to provide us with the vendor’s response within seven days. Should we not receive the vendor’s written response by 5pm on 3 June 2025, and in the absence of any other written confirmation from the vendor, our client will assume that the vendor is not proceeding to press this issue and has no interest in providing our client with a formal notice under the Contract. Should our client be required to press this issue in court, our client reserves their right to indemnity costs.
No response to this email, including the offer by the plaintiffs to accept compensation for the removal of the car space contained in it, was forthcoming.
On 1 August 2025, the strata plan (SP104532) was registered (the Strata Plan), under which Lot 20 consists of a lot with a total area of 263m2 and the car space that was allotted to Lot 20 in the draft strata plan (the c****ar s****pace) has been allotted to Lot 34 (comprising 13m²). The certificate by the registered certifier appearing on the Strata Plan states that:
This certificate is given on the condition contained in the relevant planning approval that lot(s) ^…… 33 & 34 …… will be created as utility lots and restricted in accordance with section 63 Strata Schemes Development Act 2015.
...
Relevant Planning Approval No: CDC1631
On 6 August 2025, the occupation certificate was issued in respect of the development comprised in the Strata Plan.
The defendant did not at any time serve on the plaintiffs a copy of either the occupation certificate or the Strata Plan and consequently the completion date under special condition 44 has not been fixed. Had the defendant given such a notice at the earliest opportunity, the completion date would have been 22 August 2025.
After R & R sent a number of follow up emails to which no response was received, on 7 August 2025 R & R sent the following email to Accuro:
I write to you as Principal of Accuro Maxwell to seek a response in relation to my correspondence below. You will note that I have been corresponding with your Firm since March in relation to a contentious issue with your client Tasman 61 BH Pty Ltd in its development at Norwest NSW but unfortunately have not had the courtesy of a response to my email of 26 May 2025 despite my numerous requests in the intervening period.
I note that the property has now registered and I am instructed the Occupation Certificate has been issued. I am also instructed that your client has issued Registration Notices to some purchasers but not my client.
As you can appreciate the issue of the carspace for Lot 20 needs to be resolved, especially with the vendor’s registration of Lot 34 in lieu of allocating the carspace to Lot 20 as contracted.
I request that you please acknowledge receipt of this email and respond in a timely manner in relation to my client’s queries below. Notwithstanding, my client looks forward to settlement in due course, and reserves their rights in relation to this matter.
On 7 August 2025, Accuro responded: ‘We refer to your email correspondence below, we will seek instructions and revert accordingly’. Accuro provided no further response to R & R.
On 28 August 2025, the plaintiffs lodged a caveat over Lots 20 and 34 (Caveat). The interest claimed under the Caveat is an estate in fee simple virtue of a contract for sale of land dated 1 August 2025 (that date being the date of creation of the lots in the Strata Plan rather than the actual date of the Contract). The Caveat states that the actions prohibited by it are:
- The recording in the Register of any dealing other than a plan affecting the estate or interest claimed by the Caveator.
- The granting of any possessory application with respect to the land in the Torrens Title referred to above.
- The recording in the Register of a Writ affecting the estate or interest claimed by the Caveator.
The Vendor has indicated that it is unable to complete the Contract and/or deliver the Property (with all inclusions being both the townhouse with garage and the Car Space). The Vendor is in breach of the Contract as it has indicated that it is unable to fulfill its contractual obligations. This conduct amounts to repudiation of the Contract and our clients reserve their rights in this regard.
Accordingly, our clients demands that by 5pm on 17 October 2025 the Vendor takes steps to complete the Contract by:
(a) confirming in writing that it intends to complete the Contract (in the form as executed by the parties); and
(b) in circumstances where it does intend to complete the Contract, provide a copy of the Occupation Certificate for the Property in order to prompt settlement.
In circumstances where the Vendor fails to comply with the demand by the time stipulated above or the Vendor’s response is not satisfactory to our clients, our clients intend to, without further notice to the Vendor, file an application in the Supreme Court of NSW seeking specific performance of the Contract or in the alternative, commence proceedings against the Vendor’s breach of the Contract and ACL.
…
- BREACH
The Purchasers have failed to comply with the obligation to:
(a) Not lodge or procure or cause to be lodged a caveat on the title to the Property which shall have the effect of preventing the implementation of or giving effect to any provision or condition of the Contract or preventing registration of any document or dealing relating to the title of Property.
- REMEDY BREACH
Within fourteen (14) days of service of this notice, the Vendor hereby requires the Purchasers to remedy the above breaches by withdrawing the caveat AV373930.
- FAILURE TO COMPLY
The Vendor gives notice to the Purchasers that if this notice is not complied with fourteen (14) days of service of this notice, the Vendor may exercise its right of termination pursuant to the Contract without further notice.
In the event of termination, we will seek to enforce any relevant termination clauses of the Contract including but not limited to clause 9 of the Contract and seek damages pursuant to clauses 9.3.
(a) special condition 55 is not an essential term of the Contract; (b) the plaintiffs are not in breach of special condition 55 because the Caveat does not prevent giving effect to any provision of the Contract or prevent registration of any document or dealing relating to the title of the property; and (c) the plaintiffs therefore challenge the validity of the purported Notice of Breach.
Regrettably, our client is not in a position to settle the sale as required due to your client’s actions. As you are aware, the title of the land is currently mortgaged to a lender, known as Zagga Investments Pty Ltd and the apportionment to this lot is about $1.5 million dollars. Lot 20 was sold to your client at the price of $1,160,000.00 dollars and there is a shortfall between the proceeds of sale, and the funds required to discharge the mortgage to allow for settlement.
The Vendor is currently not in funds to settle the sale and is therefore unable to settle.
(i) providing your client with 14 days from Monday, 27 October 2025 to re-finance and discharge the mortgage (or whatever other time is reasonable);
(ii) inviting our clients to participate in PEXA to allow a discharge of the mortgage and the new mortgagee to be registered on title:
(iii) no other dealing will be allowed on title other than registration of the new mortgagee (once the re-finance of the Property has occurred); and
(iv) your client undertakes to make arrangements to settle and complete the Contract (with the car space) within a further 14 days from the re-finance occurring and the dealing registered on PEXA.
- Your client agree to a variation of price, covering the shortfall between the proceeds of sale and the mortgage balance as indicated in our correspondence of 24 October 2025.
- The parties enter into a variation deed within fourteen (14) days of the date of acceptance.
- The parties proceed to settle the sale within twenty-eight (28) days of the date of the deed.
- Breach and failure to comply with Notice of Breach
2.1 By lodging and maintaining caveat AV373930 over the title to the Property, you have failed to comply with your obligation under clause 55 (Caveat) of the Contract not to lodge or procure or cause to be lodged a caveat on the title to the land or property having the effect referred to in that clause.
2.2 By failing and/or refusing to withdraw caveat AV373930 within fourteen (14) days of service of the Notice of Breach, you have failed to comply with the Notice of Breach and remain in breach of the Contract.
2.3 Your continuing failure to withdraw the caveat is a continuing breach of clause 55 and of the Contract in an essential respect.
2.4 In the alternative, the Purchasers’ failure and refusal to withdraw the Caveat, in the circumstances, is a fundamental breach or repudiation of the Contract.
- Termination of Contract
3.1 Pursuant to clause 9 (Purchaser’s default) of the Contract, where the Purchaser does not comply with the Contract (or a notice under or relating to it) in an essential respect, the Vendor may terminate the Contract by serving a notice.
3.2 By this Notice, the Vendor terminates the Contract with immediate effect for your essential default, fundamental breach or repudiation, effective upon service of this Notice.
- Consequences of termination and Vendor’s election
4.1 Following termination and in accordance with clause 9 of the Contract, the Vendor elects to:
4.1.1 Keep and recover the deposit (to a maximum of 10% of the price), including any interest earned on the deposit, pursuant to clause 9.1 as amended by the special conditions;
4.1.2 Hold any other money paid by you under the Contract as security for anything recoverable by the Vendor under clause 9, for the period there specified; and
4.1.3 Sue you for damages for breach of contract, including, where applicable, any deficiency on resale together with the Vendor’s reasonable costs and expenses arising out of your non-compliance with the Contract or the Notice of Breach, and of resale and any attempted resale, pursuant to clause 9.3. Please be advised that damages may include substantial losses arising from the impediment to refinancing the mortgage loan secured against the property.
4.2 The Vendor expressly reserves all of its rights against you at law and in equity, including but not limited to the right to claim damages, interest and costs.
- Withdrawal of caveat AV373930
5.1 Without prejudice to the termination of the Contract and the Vendor’s rights as set out above, the Vendor requires that you:
5.2 Immediately withdraw caveat AV373930 from the titles to 20/SP104532 and 34/SP104532; and
5.3 Provide to the Vendor’s solicitors written confirmation and evidence of lodgment of the necessary withdrawal(s) within [3] business days of service of this Notice.
The Contract provides in the standard form section that ‘the vendor sells and the purchaser buys the property for the price…’ being $1,160,000. The term ‘property’ is defined in cl 1 to mean ‘the land, the improvements, all fixtures and the inclusions, but not the exclusions’. The ‘land’ and ‘improvements’ are stated on the first page of the Contract as noted earlier at [4].
Clause 9 in the standard form provides that: ‘If the purchaser does not comply with this contract (or a notice under or relating to it) in an essential respect, the vendor or can terminate by serving a notice...’. Clause 9.1 provides (as amended by special condition 35(1)(s)) that: ‘After termination the vendor can keep or recover the deposit (to a maximum of 10% of the price) including interest earned on it’. The expression ‘terminate’ is defined in cl 1 to mean ‘terminate this contract for breach’.
Clause 16.3 in standard form provides that: ‘Normally, on completion the vendor must cause the legal title to the property (being the estate in fee simple) to pass to the purchaser free from any mortgage or other interest, subject to any necessary registration’. Clause 1 in the standard form defines ‘normally’ to mean ‘subject to any other provision of this contract’.
Clause 33 of the special conditions contains a number of definitions including relevantly:
In this sales contract words have the meaning given as follows:
…
Development means the development to be constructed at the Development site.
Development Activities means:
a) Any form of demolition work, excavation work or landscaping work;
b) Any form of building work; defects rectification or work ancillary to or associated with building including the installation of services;
c) Any form of work other than the forms of work referred to in paragraphs (a) and (b) of this definition which is considered necessary or desirable by the Vendor;
d) the consolidation of land forming part of the Development Site.
Development Approval means the approval for the development application to be obtained from the Council or from any other relevant authority including al variations, alterations and modifications and if applicable any other development approval or approvals obtained by the Vendor for the purpose of completing the Development, including all variations, alterations and modifications, and Development Consent in this contract has the same meaning as Development Approval.
Development Site means the lands identified in the Deposited Plan 1/566580 as being described in the Annexure 5.
…
Property means the apartment sold under this contract and comprising part of the property.
…
Strata Parcel means the land comprising the lots of the Strata Scheme and the common property.
Strata Plan means the strata plan registered in respect of the Strata Parcel.
Strata Scheme means the strata scheme constituted on registration of the Strata Plan.
The printed Clauses of this Contract are to be read subject to the Special Clauses provided herein and in the case of any inconsistency, the Special Clauses shall prevail.
If there is any inconsistency between the printed provisions of this contract and these additional clauses, these additional clauses prevail.
The completion date of this sales contract shall be deemed to be the later of:
(a) Forty-two (42) days after the date of this contract; or
(b) Fourteen (14) days after the Vendor or its legal representative serves a copy of the Occupation Certificate on the Purchaser or on its legal representative; or
(c) Twenty-one (21) days after the Vendors or its legal representative serves a written notice on the Purchaser or on its legal representative informing that the Strata Plan has been registered with the Land Registry Services NSW.
46. ALTERATION TO THE PLAN
46.1 Notwithstanding anything else herein contained in this contract, all measurement and lot numbers shown on the draft plan are provisional only and are to be used only as approximate and indicative measurements. The Vendor reserves its right to, for the purpose of this Development, make any alteration, variation or modification to the Draft Strata Plan if it is necessary or desirable in the Vendor’s own absolute discretion, provided that such alteration must not detrimentally affect the property to a substantial extent as being defined in Clause 46.3. The Vendor’s alteration to the plan may include but not limited to:
a) Altering the total number of lots;
b) Altering the numbering of any lot;
c) Altering measurement, dimensions, storey or area of any lot;
d) Altering lot entitlement;
e) Altering internal or external layout or configuration of any lot.
46.2 If such alteration or variation detrimentally affects the property to a substantial extent then the Purchaser may by notice in writing to the Vendor within 5 business days of receiving notification of registration of the Strata Plan rescind this contract whereupon the provisions of Clause 19 of the contract shall apply to the parties. The Purchaser’s right to rescind shall be deemed to lapse if the notice provided under this clause was not served on the Vendor before the said time.
46.3 In this clause, the alteration that detrimentally affects the property to a substantial extent only occurs when a variation or alternation (sic) does or would result in a reduction of area of the lot sold under this contract by more than 5%.
46.4 Subject to clauses 46.2 & 46.3, the Purchaser cannot and must not make any claim, objection or requisition or terminate or rescind this contract or delay the completion for any issue in connection to or arising out of alterations, variations or modifications referred to under clause 46.1.
46.5 In addition, the Purchaser cannot and must not make any claim, objection or requisition or terminate or rescind this contract or delay the completion for anything in connection to or arising from: (a) the position of any building or other part of development upon the land or upon the adjourning (sic) land; or (b) The distance of any building or other part of the development from any boundary; or (c) Any encroachment by or upon the land; or (d) Variation or redefinition of boundaries of Development site; or (e) Minor road realignment and/or dedication.
72. CAR SPACE & STORAGE
72.1 If a car space or storage is included in this contract, notwithstanding those indicated or stipulated in the draft Strata Plan the Purchaser acknowledges and agrees that the Vendor is entitled to in its own absolute discretion to make a change or modification or alteration to car space or storage room, including but not limited to its numbering, area, location , etc. The Purchaser cannot make any claim, or object, or requisition or rescind or terminate or delay the completion for any issue in connection to this clause.
55. CAVEAT
55.1 Prior to completion, the Purchaser is not entitled to and must not lodge or procure or cause to be lodged a caveat on the title to the land or property which shall have the effect of preventing the implementation of or giving effect to any provision or condition of this contract or preventing registration of any document or dealing relating to the title of this land or this property.
7 A declaration that the plaintiffs are entitled to have a contract for the sale of land known as 3/45 Stone Mason Dr, Norwest 2153 contained in Folio Identifier 20/SP104532 made between the defendant as vendor and the plaintiffs as purchasers and dated 26 March 2021 specifically performed.
8 An order that the defendant specifically perform the said contract.
…
8B A declaration that the contract ought to be specifically performed and carried into execution.
8C Directions as to the implementation of order 8.
8D Liberty to apply.
8E In the alternative to Orders 8B to 8D, an order that the deposit of $116,000 paid by the plaintiffs to the defendant under the contract be repaid to the plaintiffs with interest thereon pursuant to section 55(2A) of the Conveyancing Act 1919 (NSW).
9 In default of the defendant complying with the order referred to in paragraph 4 above, an order that the Registrar of the Court be empowered to execute all such instruments and do all such things in the name and on behalf of the defendant as may be necessary in order to specifically perform the said contract and directions appointing the Registrar to so act.
10 Damages.
Paragraphs 8B, 8C, 8D and 8E were new prayers introduced by the amendment, ultimately without opposition from the defendant.
The parties identified the issues arising for determination as follows:
(a) Whether the defendant breached the Contract by registering the Strata Plan which removed the car space from Lot 20. (b) Whether by the Notice of Termination the defendant terminated the Contract for breach of special condition 55 and is entitled to retain the deposit. (c) Whether the plaintiffs are entitled to specific performance of the Contract and/or damages. (d) If the defendant validly terminated the Contract, whether the plaintiffs are entitled to relief against forfeiture of the deposit under s 55(2A) of the Conveyancing Act 1919 (NSW).
The evidence relied on by the plaintiff comprised affidavits of the first plaintiff, May Shuan Chin Chong, and the second plaintiff, Houzhong Yu, each affirmed on 16 June 2026, and a valuation report prepared by Mr Edward Wong, an expert valuer, dated 12 June 2026.
The evidence relied on by the defendant comprised two affidavits Yihao Zhang, a director of the defendant, affirmed on 15 December 2025 and 9 June 2026, and a valuation report of Kieren Naicker dated 22 June 2026.
None of the witnesses were cross-examined and essentially the only factual dispute relates to the value to be attributed to the car space now forming Lot 34 in the Strata Plan. The two expert reports assessed the difference in value of Lot 20 if it is sold with or without Lot 34. Mr Wong’s opinion is that the value of Lot 20 including the car space is $1,500,000 and its value will be reduced by $65,000 without the car space, whereas Mr Naicker’s opinion is that the value of Lot 20 including the car space is $1,450,000 and its value without it is reduced by $50,000.
Under the Contract, Lot 20 was to consist of a townhouse, garage and car space and was to have a total area of 273m2. However, under the Strata Plan as registered by the vendor, Lot 20 was created without the car space and a reduced size of 263m2. The plaintiffs’ complaint relates to the omission of the car space rather than the reduction in the size of the lot.
Paragraph 10 of the Statement of Claim alleges that the creation of Lot 20 in the Strata Plan without the car space was in breach of the Contract. In paragraph 11 of the Defence, the defendant pleads that:
... notwithstanding the variation to the area of lot 20 and removal of the car space, the Plaintiffs are forever barred by special condition 46.4 of the Contract from making the objection and from alleging the breach alleged by paragraph 10 of the Statement of Claim, and from claiming damages therefor.
The plaintiff submitted that special condition 46 does not permit the defendant to remove the car space from Lot 20 with the consequence that this was a breach of contract, for three reasons:
Whether the defendant was permitted by special condition 46 to remove the car space from Lot 20 is a question of construction of the Contract. Where there are general provisions in a contract and specific provisions, the general provisions will give way to the specific provisions under the principle generalia specialibus non derogant: Chapmans Ltd v Australian Stock Exchange Ltd (1996) 67 FCR 402 at 411. In the present case, special condition 42 is the general provision and special condition 72 is the more specific provision applicable to a car space, and the former must give way to the latter or be read down so that they can operate harmoniously together. However, special condition 72 did not authorise the removal of the car space from Lot 20 because it merely permits the ‘change or modification or alteration to’, the car space and not its entire removal.
Clause 16.3 of the Contract provides that on completion the defendant must cause the legal title to the ‘property’ to pass to the plaintiff. The term ‘property’ is defined to mean ‘the land, the improvements, all fixtures and the inclusions, but not the exclusions’. In the Contract, ‘the improvements’ are expressed as ‘townhouse’, ‘garage’ and ‘carspace’. Hence, even if special conditions 46 and 72 permitted the defendant to eliminate a car space entirely, cl 16.3 would still require the defendant to transfer legal title to the car space to the plaintiffs on completion.
On the defendant’s construction of special condition 46, the defendant would have the ‘absolute discretion’ to exclude entire rooms (e.g. the bathroom and toilet) from the plaintiff’s lot or renumber the lot so that the plaintiff’s lot comprised entirely of car spaces and no townhouse, which would be an absurd result in plainly not the objective intention of the parties.
The defendant submitted that there was no breach of contract by the non-inclusion of the car space in Lot 20 for essentially the following reasons:
The generalia specialibus non derogant principle will not apply where each of the provisions can be said to be specific, rather than one general and one specific: Ilkerler Otomotiv v Perkins Engines Co Ltd [2017] EWCA Civ 183; [2017] 4 WLR 144 at [14]. This is not a case where there is a general provision which would entirely negate the special provision unless the special provision is to prevail; rather, there are two distinct powers, each of which is given to the vendor and each of which is capable of being exercised according to its own terms and in its own field.
Further, special conditions 46 and 72 operate harmoniously together because, if a car space is eliminated under special condition 46, the precondition to the operation of special condition 72 (‘if a car space … is included in this contract’) is not satisfied and hence that special edition does not apply.
Contrary to the plaintiff’s submission, cl 16.3 does not require the defendant to transfer legal title to the car space to the plaintiffs on completion because cl 16.3 begins with the word ‘normally’ and hence gives way to special condition 46 (as confirmed by special condition 34.6). Further, the definition of ‘property’ in special condition 33 (‘the apartment sold under this contract…’) gives that word an ambulatory meaning for the purposes of cl 16.3 so that it picks up the various provisions for altering the lot and the development in the special conditions (including special condition 46).
The Contract is of a kind commonly known as an ‘off the plan’ contract for the sale of a lot in the draft strata plan for a building which had not been constructed when the Contract was entered into. The Contract describes the property agreed to be sold as Lot 20 in the draft strata plan annexed to the Contract together with the ‘improvements’ identified on the first page (being the garage, car space and townhouse), and all fixtures and the inclusions identified on the first page (being a dishwasher, stove, built-in wardrobes, fixed floor coverings and range hood).
Reflecting the fact that the development had not yet been constructed when the Contract was signed, the Contract contains two provisions conferring power on the vendor to make alterations to the subject matter of the sale: special conditions 46 and 72. Each is set out earlier, but of particular relevance to the present issue is the statement in each clause as to what the vendor is permitted to do (emphasis added):
46.1 Notwithstanding anything else herein contained in this contract, all measurement and lot numbers shown on the draft plan are provisional only and are to be used only as approximate and indicative measurements. The Vendor reserves its right to, for the purpose of this Development, make any alteration, variation or modification to the Draft Strata Plan if it is necessary or desirable in the Vendor’s own absolute discretion, provided that such alteration must not detrimentally affect the property to a substantial extent as being defined in Clause 46. The Vendor’s alteration to the plan may include but not limited to:
(a) Altering the total number of lots;
(b) Altering the numbering of any lot;
(c) Altering measurement, dimensions, storey or area of any lot;
(d) Altering lot entitlement;
(e) Altering internal or external layout or configuration of any lot.
...
72.1 If a car space or storage [room] is included in this contract, notwithstanding those indicated or stipulated in the draft Strata Plan the Purchaser acknowledges and agrees that the Vendor is entitled to in its own absolute discretion to make a change or modification or alteration to car space or storage room, including but not limited to its numbering area location, etc. The Purchaser cannot make any claim, or object, or requisition or rescind or terminate or delay the completion for any issue in connection to this clause.
In summary:
Special condition 46.1 permits the vendor to make any ‘alteration, variation or modification to the Draft Strata Plan if it is necessary or desirable in the Vendor’s own absolute discretion’, but subject to the purchasers’ limited right to rescind if the alteration or variation ‘does or would result in a reduction of area of the lot sold under this contract by more than 5%’ (special conditions 46.2 and 46.3).
Special condition 72 permits the vendor in its absolute discretion to make ‘a change or modification or alteration to car space or storage room’ if a car space or storage room is included in the Contract notwithstanding what appears in the draft strata plan, and precludes the purchaser from making any claim or rescinding the Contract for such action by the vendor.
Special conditions 46 and 72 serve the commercial purpose of allowing the vendor some latitude in the amendment of the draft strata plan to deal with problems which might arise in completing the development (including construction of the building) which could not be anticipated at the time the off the plan contract was signed: Xu v Lindsay Bennelong Developments Pty Ltd [2020] NSWSC 1692 at [254].
The resolution of the present issue involves ultimately the determination of what the vendor agreed to sell to the purchasers under the Contract given the powers conferred on the vendor by special conditions 46 and 72. This involves the application of the well-established principles for the construction of commercial contracts.
The proper construction of a contract is to be determined objectively by reference to its text, context and purpose: Simic v New South Wales Land and Housing Corporation (2016) 260 CLR 85; [2016] HCA 47 at [78]. In Electricity Generation Corporation v Woodside Energy Ltd (2014) 251 CLR 640; [2014] HCA 7 at [35], French CJ, Hayne, Crennan and Kiefel JJ summarised the core principles as follows:
(1) The meaning of the terms of a commercial contract is to be determined by what a reasonable businessperson would have understood those terms to mean.
(2) That requires consideration of the language used by the parties, the surrounding circumstances known to them and the commercial purpose or objects to be secured by the contract. That, in turn, is facilitated by an understanding of the genesis of the transaction, the background, the context and the market in which the parties are operating.
(3) Unless a contrary intention is indicated, a court is entitled to approach the task of giving a commercial contract a businesslike interpretation on the assumption that the parties intended to produce a commercial result. The contract is to be construed so as to avoid it making commercial nonsense or working commercial inconvenience.
…if the language is open to two constructions, that will be preferred which will avoid consequences which appear to be capricious, unreasonable, inconvenient or unjust, “even though the construction adopted is not the most obvious, or the most grammatically accurate” … Further, it will be permissible to depart from the ordinary meaning of the words of one provision so far as is necessary to avoid an inconsistency between that provision and the rest of the instrument.
As Leeming JA observed in Zhang v ROC Services (NSW) Pty Ltd (2016) 93 NSWLR 561; [2016] NSWCA 370 at [53], contractual construction involves a three-step process: the first is to determine the literal or grammatical meaning or meanings of the clause; second, one determines the legal meaning of the clause; and third, one applies that legal meaning to the facts of the case. In relation to the second step, where there is more than one available legal meaning, it is necessary to have regard to the text, context and purpose to determine which potential meaning is the legal meaning. This requires ‘an iterative process…checking each of the rival meanings against the other provisions of the document and investigating its commercial consequences’, which is designed to enable the court to ‘assess whether either party’s preferred legal meaning gives rise to a result that is more or less internally consistent and avoids commercial absurdity’: Zhang v ROC at [86].
Where, as here, there are several clauses of the agreement to be construed, it is clear that every provision must be read together, and in light of the terms of the contract read as a whole, so as to render, as far as possible, the provisions harmonious with each other: see P Herzfeld and T Prince, Interpretation (3rd ed, 2024, Thomson Reuters) at [22.30].
Consistently with the last proposition, where two or more provisions of a contract are apparently inconsistent, the Court must seek where possible to reconcile the apparent inconsistency. One of the principal methods of doing so is to apply the generalia specialibus non derogant principle (that general things do not derogate from special things) which is based on ‘sound common sense’: Hume Steel Ltd v Attorney-General (Vic) (1927) 39 CLR 455 at 466; [1927] HCA 24. In Chapmans Ltd v Australian Stock Exchange Ltd (1996) 67 FCR 402 at 411, Lockhart and Hill JJ said:
It is an elementary proposition that a contract will be read as a whole giving weight to all clauses of it, where possible, in an endeavour to give effect to the intention of the parties as reflected in the language which they have used. A court will strain against interpreting a contract so that a particular clause in it is nugatory or ineffective, particularly if a meaning can be given to it consonant with other provisions in a contract. Likewise where there are general provisions in a contract and specific provisions, both will be given effect, the specific provisions being applicable to the circumstances which fall within them.
The principle traditionally called generalibus specialia derogant, or its obverse generalia specialibus non derogant, by either of which specific provisions will be given effect in preference to general provisions, or specific provisions are given greater weight than general provisions applying to the same subject matter, has been described as reflecting ‘sound common sense’. On the other hand, when it is open to debate which provision is the more general and which the more specific, the utility of the principle is correspondingly limited. Hoffman LJ made the converse point in William Sindall plc v Cambridgeshire County Council, that the ‘rule is particularly apposite if the effect of general words would otherwise be to nullify what the parties appear to have contemplated as an important element in the transaction’.
In working out which provision is the more general or specific, it is necessary to bear in mind the object of the contract and to adopt an objective and purposive analysis, rather than one which approaches the general/specific distinction in purely linguistic terms: Banksia Securities at [45], [51].
In my view, there is a conflict between special conditions 46 and 72 which is to be resolved on the basis that special condition 46 is the general provision and special condition 72 is the specific provision, and the former must give way in order for the two provisions to operate harmoniously together.
The starting point is to identify what each provision is directed at. Special condition 46.1 permits the vendor to make, for the purpose of the development, ‘any alteration, variation or modification’ to the draft strata plan which the vendor considers to be necessary or desirable, including altering (a) the total number or numbering of lots, (b) the measurement, dimensions, storey or area of any lot, (c) the lot entitlement of any lot, or (d) the internal or external layout or configuration of any lot.
The draft strata plan shows the location of each of the 32 lots in the development (described as two and three storey townhouses) and their size (including the area of each level), together with the location and size of the areas marked as common property, disabled parking, car space, shared zone, courtyard, enclosed area under stairs, visitor parking, patio and balcony. When a lot includes a car space, this is shown on the draft strata plan (by marking a particular area as ‘CS’ and showing the lot number and size of the area). The draft strata plan does not indicate whether a particular lot has a garage, and that is a matter dealt with by the Contract itself (through including it as an ‘improvement’). Nor does it contain the unit entitlement of each lot.
Turning now to special condition 72, it only operates where ‘a car space or storage [room] is included in this contract*’*. In my view, the words ‘is included in this contract’, direct attention to the description on the first page of the Contract of the ‘improvements’ forming party of the property agreed to be sold, which contains boxes for both ‘carspace’ and ‘storage space’. This is because those words are in the present tense and therefore operate at the date the Contract is entered into. As an ‘x’ appears in the box for ‘carspace’ (but not ‘storage space’), special condition 72 applies in respect of the car space included in the Contract as an improvement and shown in the draft strata plan as part of Lot 20. What special condition 72 then does is permit the vendor ‘to make a change or modification or alteration to [the] car space…including but not limited to its numbering, area, location etc’ (and precludes the purchaser from making any claim for such action).
Both provisions can deal with the same subject matter. As the car space included in Lot 20 is designated on the draft strata plan, the power conferred on the vendor by special condition 46.1 to make any alteration, variation or modification to the draft strata plan would include a power to make an alteration of the draft strata plan relating to the car space. This would, if made, be a change or modification or alteration of the car space within special condition 72. Special condition 46.1 is the more general provision because it permits changes, modifications or alterations to the draft strata plan generally, whereas special condition 72 deals with those relating to the car space only.
It is necessary to apply the generalia specialibus non derogant principle to give special condition 72 precedence over special condition 46.1 because otherwise special condition 72 would be nullified. This cannot have been the parties’ intention given that special condition 72 reflects an important part of the transaction which is the making of a change to part of the property agreed to be sold.
The importance of special condition 72 is reflected in the limitation to its scope arising from the words ‘a change or modification or alteration to [the] car space’. The ordinary meaning, as a verb, of ‘change’ is ‘to make different; alter in condition, appearance’; of ‘alter’ is ‘to make different in some particular; modify’; and of ‘modify’ is ‘to change somewhat the form or qualities of; alter somewhat’: The Macquarie Dictionary, 3rd ed (1997). The words ‘alter’ and ‘modify’ each contemplate that the thing being altered or modified in some way continues to exist: Provincial Insurance Australia Pty Ltd v Consolidated Wood Products Pty Ltd (1991) 25 NSWLR 541 at 551 (‘alteration’); Zagarella v Roads Corporation (Vic) (1990) 13 MVR 334 at 337 (‘alter’); Pearce v Hall (1989) 52 SASR 568 at 570 (‘modify’). In my view, the same can be said of the word ‘change’: see R (Save Britain*’*s Heritage) v Secretary of State for Communities and Local Government [2010] EWHC 979 (Admin) at [23]. This view is supported by the examples given in special condition 72 which, although expressed to be without limitation, relate only to the numbering, area and location of the car space.
Accordingly, what the specific provision in relation to the car space (special condition 72) contemplates is that the vendor can make a change, alteration or modification to the car space included in the Contract but not remove it entirely. If special condition 46.1 was to permit a change, alteration or modification to the draft strata plan which removed the car space entirely, that would enable the vendor to remove the car space from the property agreed to be sold without the purchaser necessarily having any right to rescind or other claim against the vendor because the car space alone is less than 5% of the area of Lot 20 as shown in the draft strata plan, so that special condition 46.2 would not be engaged. Such a construction of special condition 46.1 would nullify special condition 72. Further, it would be an odd result if special condition 46.1 permitted the removal of part of the property agreed to be sold without any recourse for the purchaser.
Similarly, if special condition 46.1 and special condition 72 both permit a change, alteration or modification to the draft strata plan which reduced the size of Lot 20, including a reduction to the size of the car space, there would be a conflict between them because, under special condition 46.2, the purchaser would have a right to rescind the Contract if the total change to the area of Lot 20 (including the car space) was more than 5%, whereas special condition 72 would deny that right in respect of the change to the area of the car space.
In my view, special condition 46.1 was not intended to apply to the specific topic dealt with by special condition 72, particularly given the central importance of special condition 72 (being to address a change/alteration/modification to part of the property agreed to be sold).
For these reasons, special condition 46.1 does not apply to permit a change, alteration or modification of the draft strata plan to remove the car space included in Lot 20. And as concluded at [70] above, nor does special condition 72 permit the vendor to amend the draft strata plan in that way. It follows that the defendant was in breach of contract by registering the Strata Plan in a form which failed to provide the car space included in Lot 20 of the draft strata plan.
In addition, the defendant was in breach of the Contract in another respect. The giving of notice to the purchasers in a timely fashion of the registration of the Strata Plan and of the issuance of the occupancy certificate for the development was part of the framework for the determination of the completion date under special condition 44.1. While the Contract does not expressly require the vendor to give such notice to the purchasers, a Court will imply a term that the vendor will give such notice within a reasonable time because that is necessary to give business efficacy to a contract in accordance with the accepted principles stated in BP Refinery (Westernport) Pty Ltd v Shire of Hastings (1977) 180 CLR 266 at 282–283; PNC Lifestyle Investments Pty Ltd v REW08 Projects Pty Ltd (No 2) [2017] NSWSC 993 at [46].
In my view, a term should be implied in the Contract that the defendant was required to provide notice of the registration of the Strata Plan and the issuance of the occupancy certificate within a reasonable time after the later of those events occurring. In all the circumstances, seven days was a reasonable time for the giving of that notice. It is apparent that the defendant gave such a notice to other purchasers but not to the plaintiffs (see [19] above).
Accordingly, the defendant was also in breach of the Contract by 13 August 2025 due to its failure to provide notice of the registration of the Strata Plan and the issuance of the occupancy certificate.
By the Notice of Termination, the defendant purported to terminate the Contract, pursuant to clause 9.1 as amended by the special conditions, for the plaintiffs’ alleged breach of special condition 55 of the Contract.
Clause 9.1 in the standard form relevantly provides that:
If the purchaser does not comply with this contract (or a notice under or relating to it) in an essential respect, the vendor can terminate by serving a notice.
Prior to completion, the Purchaser is not entitled to and must not lodge or procure or cause to be lodged a caveat on the title to the land or property which shall have the effect of preventing the implementation of or giving effect to any provision or condition of this contract or preventing registration of any document or dealing relating to the title of this land or this property.
The plaintiffs submitted that the Notice of Termination was ineffective for two reasons. First, special condition 55 is not an essential term (i.e., a condition) and consequently the defendant is not entitled to terminate the Contract for breach of it under cl 9. The mere fact that the defendant had issued the Notice to Perform did not make that term essential. Second, the plaintiffs are not in breach of special condition 55 because the Caveat does not have the effect of preventing the implementation or giving effect to any provision or condition of the Contract or preventing registration of any document or dealing relating to the title to the land or the property.
The defendant supported the Notice of Termination on three grounds. First, it submitted that special condition 55 is a condition of the Contract and was breached when the plaintiffs lodged the Caveat. It is a condition because it is expressed in emphatic language (‘is not entitled to’ and ‘must not’), and the subject matter and purpose objectively ascertained from the text of special condition 55 and its setting in the Contract as a whole shows that it was designed to protect the vendor’s commercial interest in an ongoing property development comprising many lots which required the availability of the development land as security for funds raised for the purpose of the development, which would be impeded by the existence of a caveat lodged by any purchaser. Second, if notice of the breach was required to make timely performance of special condition 55 essential, then the Notice to Perform did so. Third, in the alternative, the refusal to remove the Caveat when required to do so by the Notice to Perform was a repudiation entitling the defendant to terminate the Contract.
At the heart of the dispute between the parties is the question whether the purported termination of the Contract by the defendant by service of the Notice of Termination was effective. The following is a summary of the relevant principles on this issue.
A promisee has a right to terminate a contract if an express term permits termination (usually on the giving of notice to the promisor) or a right to terminate arises at general law. Clause 9.1 of the Contract is a term of the former kind, which applies where the purchaser breaches a term of the Contract which is essential (i.e., a condition) or a notice under or relating to the Contract in an essential respect.
A right to terminate a contract at general law arises where either: (a) the promisor has breached a term of the contract which is a ‘condition’ of the contract or, alternatively, an ‘intermediate-term’ and the consequences of the breach of that intermediate-term are sufficiently serious: Koompahtoo Local Aboriginal Land Council v Sanpine Pty Ltd (2007) 233 CLR 115; [2007] HCA 61 at [47]–[49]; or (b) the promisor has repudiated the contract, which refers to conduct of the promisor which evinces a lack of readiness, willingness or ability to render substantial performance of the contract: Koompahtoo at [44].
In relation to the first category, the parties relied on the generally accepted test to determine whether a term is a condition stated by Jordan CJ in Tramways Advertising Pty Ltd v Luna Park (NSW) Ltd (1938) 38 SR (NSW) 632 at 641 (emphasis added):
The question whether a term in a contract is a condition or a warranty, i.e., an essential or a non-essential promise, depends upon the intention of the parties as appearing in or from the contract. The test of essentiality is whether it appears from the general nature of the contract considered as a whole, or from some particular term or terms, that the promise is of such importance to the promisee that he would not have entered into the contract unless he had been assured of a strict or a substantial performance of the promise, as the case may be, and that this ought to have been apparent to the promisor: ... If the innocent party would not have entered into the contract unless assured of a strict and literal performance of the promise, he may in general treat himself as discharged upon any breach of the promise, however slight. If he contracted in reliance upon a substantial performance of the promise, any substantial breach will ordinarily justify a discharge. In some cases it is expressly provided that a particular promise is essential to the contract, e.g., by a stipulation that it is the basis or of the essence of the contract… but in the absence of express provision the question is one of construction for the Court, when once the terms of contract have been ascertained … In general, Courts of common law have been more ready than Courts of Equity to regard promises as essential. This is in part due to the fact that Courts of common law are in the main concerned with ordinary commercial contracts in which it is common to find provisions which are intended to be strictly and literally performed. It is now provided by s13 of the Conveyancing Act 1919 (taken from the Judicature Act, 1873, 36 and 37 Victoria, Chap 66, s25 (7)) that stipulations in contracts, as to time or otherwise, which would not before the commencement of the Act have been deemed to be or to have become of the essence of such contracts in a Court of Equity shall receive in all Courts the same construction and effect as they would have heretofore received in such Court. This serves to make equitable liberality of construction supersede common law strictness, so far as is consistent with apparent intention, in fields where equity and common law overlap; but it does not affect the principle that effect must be given to the apparent intention of the parties as disclosed in the contract...
In approving these observations in Koompahtoo at [47]–[48], the plurality (Gleeson CJ, Gummow, Heydon and Crennan JJ) noted that ‘what Jordan CJ said as to substantial performance, and substantial breach, is now to be read in the light of later developments in the law’. In other words, the question is whether the term is of such a nature that the parties would not have entered into the contract unless the term was to be strictly complied with, for that is the effect of the conclusion that the term is a condition.
Importantly, the question whether the term is a condition (or alternatively to be classified as a warranty or an intermediate term) is one of construction of the contract as a whole, and absent express agreement in the contract that the term is a condition, a variety of matters may be taken into account including whether damages would be an adequate remedy for breach: JW Carter, Carter***’***s Breach of Contract (3rd ed, 2024) at [5‑14].
If the relevant term is not a condition, it will be classified as either a warranty or an intermediate term, which again is a matter of construction of the contract. The term will be an intermediate term unless it is clear that it is intended to be a warranty: Cromarty Resources Pty Ltd v Thalanga Copper Mines Pty Ltd [2021] NSWCA 284 at [44]. A warranty is a term no breach of which entitles the promisee to terminate performance of the contract: Carter*’*s Breach of Contract at [4‑13].
Where a party to a contract breaches a term which stipulates a time for the performance of an obligation under the contract and that term is not a condition, the promisee, if not itself in default, may give a notice to perform to the promisor to allow further time for the performance of the obligation and to make performance within that time essential: Louinder v Leis (1982) 149 CLR 509 at 526–527 per Mason J; [1982] HCA 28. In Gustin v Taajamba Pty Ltd (1988) 4 BPR 9373 at 9376, Mahoney JA, after discussing the principles stated in Louinder v Leis, summarised the position as follows:
It appears now settled that a distinction is to be drawn between, as I have described them, a notice to perform and a notice to complete. Where a party does not in due time perform an obligation prior to the obligation to complete, the other party may, by a notice, fix the time for the performance of that obligation. The effect of such a notice to perform, properly given, is twofold: it fixes a further time for the performance of the obligation; and it makes the obligation an essential obligation of the contract, in the sense that failure to perform it by the new time is a ground for termination of the contract for breach.
This ‘notice to perform’ procedure is contemplated by cl 9.1 of the Contract set out earlier at [78]. However, it is clear the notice to perform procedure is only available to a party who is not in breach of the contract: McNally v Waitzer [1981] 1 NSWLR 294 at 302–303; Louinder v Leis at 523 per Mason J and 529 per Deane J; Carter*’*s Breach of Contract at [5‑57].
In the case of an intermediate term, there are various ways of putting the test to determine whether a breach is sufficiently serious to justify termination of the contract, but it is common to apply that stated by Diplock LJ in Hongkong Fir Shipping Co Ltd v Kawasaki Kisen Kaisha Ltd [1962] 2 QB 26, which is that the breach must give rise to an event which will deprive the party not in default of substantially the whole benefit which it was intended that he should obtain from the contract: Koompahtoo at [49]. The adequacy of damages as a remedy for the breach is relevant to that question, and a judgment as to the seriousness of the breach and the adequacy of damages as a remedy is made after considering the benefit to which the promisee is entitled under the contract: Koompahtoo at [54]–[55].
As to repudiation, the test to be applied to determine whether the promisor has evinced a lack of readiness, willingness or ability to perform is whether the conduct of the promisor is such as to convey to a reasonable person, in the situation of the promisee, renunciation either of the contract as a whole or of a fundamental obligation under it: Koompahtoo at [44]. The usual form of repudiation is a refusal to perform a contract in accordance with its terms, but it may also occur where the promisor indicates before the date for performance of its obligation that it will not on that date be ready, willing or able to perform (referred to as ‘anticipatory breach of contract’): Carter*’*s Breach of Contract at [7‑08]. A promisee may then validly elect to terminate the performance of the contract.
The first question is whether special condition 55 is a condition. In my view it is not, because when the terms of that special condition are considered in light of the contract as a whole, they are not of such a nature that the parties would not have entered into the Contract unless the term was to be strictly complied with. My reasons are as follows:
The use of the words ‘is not entitled to and must not lodge’ in the clause does not, of itself, indicate an intention that the clause is a condition rather than an intermediate term. Of more significance is that a number of the special conditions in the Contract expressly state that they are in essential terms, the breach of which would entitle the vendor to terminate the Contract: see special conditions 42.4, 42.8, 43.3, 43.6, 44.4, 59.4 and 65.3. The absence of such a statement in special condition 55 is a strong indication that it was not intended to be essential. It was not suggested, correctly, that merely describing special condition 55 in the heading as a ‘condition’ is sufficient to constitute an express agreement that it is a condition at law: Carter*’*s Breach of Contract at [5‑06].
If the clause is breached, the vendor has a readily available procedure to have the caveat removed by applying to the Registrar General for the issue of a lapsing notice under s 74J of the Real Property Act 1900 (NSW) or by making an application to this Court for an injunction that the caveat be withdrawn. While the existence of a clause such as special condition 55 would not disentitle the holder of an equitable interest in the land from lodging a caveat, it would be a discretionary consideration which would be taken into account by the Court in considering whether to extend the caveat or issue an injunction, in order to permit legitimate bona fide transactions by the registered proprietor: Australian Property & Management Pty Ltd v Devefi Pty Ltd (1997) 7 BPR 15,255 at 15,257; Betlehem v Keytown Constructions Pty Ltd [2007] WASC 38 at [19].
At the very least, the vendor would be entitled to damages for breach of contract. There is nothing in the evidence to suggest that damages for breach of the clause would not be an adequate remedy in the present case.
While it may be accepted that special condition 55 was a standard provision in all the contracts for this development and that the vendor proposed to borrow to fund the development which would require the giving of registered mortgages over the land, it is not self-evident given what is said at (1)–(3) above, that the presence of a caveat lodged by a purchaser to protect that purchaser’s interest in the land under its contract would be sufficiently prejudicial to the vendor such that the parties would not have entered into the contract unless the term was strictly complied with. Indeed, the matters in (1)–(3) suggest the contrary.
For these reasons, special condition 55 is an intermediate term. I accept that it is arguable that by lodging the Caveat the plaintiffs breached special condition 55. However, that breach was not sufficiently serious to justify the purported termination of the Contract by the defendant. It did not deprive the defendant of substantially the whole benefit which it was intended that it should obtain from the Contract, particularly as damages would be an adequate remedy and the plaintiffs were (and are) ready and willing to perform the Contract and have consistently maintained that they will do so.
The defendant submitted that it was entitled to issue the Notice to Perform to make time of the essence in the performance by the plaintiffs of the obligation to comply with special condition 55, and that this permitted the issue of the Notice of Termination when the Caveat was not withdrawn within the time specified in the Notice to Perform. I reject this submission because, even if special condition 55 involves a time stipulation of the kind which allows the vendor to invoke the notice to perform procedure, at the time the Notice to Perform was given, the defendant was in breach of the Contract in either of the two respects identified at [73]–[76] above and that renders both the Notice to Perform and the Notice of Termination invalid.
Nor can it be said that Notice of Termination was justified on the basis that the lodgment of the Caveat was a repudiation of the Contract by the plaintiffs. In my view, the plaintiffs have not, by lodging the Caveat or other conduct, evinced a lack of readiness, willingness or ability to perform their obligations under the Contract. To the contrary, the plaintiffs have throughout indicated that they wish to complete the Contract in accordance with its terms.
For the reasons given above, the Contract remains on foot, and while the defendant’s purported termination of the Contract is a repudiation, the plaintiffs have not accepted that repudiation. They seek specific performance of the Contract in respect of Lots 20 and 34 in the registered Strata Plan, or alternatively, if the plaintiffs are not entitled to the car space for whatever reason, then specific performance of the Contract in respect of Lot 20 and damages for the absence of the car space.
Specific performance is an equitable remedy requiring a contracting party to perform that party’s obligations under the contract according to its terms: JD Heydon, MJ Lemming and PG Turner, Meagher, Gummow & Lehane*’*s Equity Doctrines & Remedies (5th ed, 2015, LexisNexis Butterworths) at [20‑005]. What it would require in the present case is for the defendant to perform its obligation to transfer the property agreed to be sold under the Contract in exchange for payment of the balance of the purchase price. It is well-established that specific performance is available in relation to contracts for the sale of land where damages are regarded as an inadequate remedy for a purchaser if the vendor fails to complete.
The property agreed to be sold under the Contract is the ‘property’ which, for this purpose, has the meaning in cl 1 of ‘the land, the improvements, all fixtures and the inclusions, but not the exclusions’. The ‘land’ is Lot 20 in the draft strata plan annexed to the Contract and the improvements comprise a townhouse, garage and car space. Lot 20 in the draft strata plan identifies the property as including a particular car space, consistently with the definition of ‘improvements’ on the first page. In my view, the property agreed to be sold is not Lot 20 in the Strata Plan as registered but rather is the property identified in the Contract by reference to Lot 20 in the draft strata plan (subject to valid alterations, modifications or changes to the draft strata plan by the vendor), and this includes the car space that now forms Lot 34 in the Strata Plan as registered. Lot 20 in the Strata Plan as registered contains the townhouse and garage. Accordingly, the vendor’s obligation on completion is to deliver a transfer of Lots 20 and 34 in the Strata Plan in exchange for the balance of the purchase price.
A question arises as to the significance of Lot 34 being a ‘utility lot’.
Section 4(1) of the Strata Schemes Development Act 2015 (NSW) (the SSD Act) defines ‘utility lot’ by reference to the meaning it has in the Strata Schemes Management Act 2015 (NSW), which in turn provides at s 4(1) that:
utility lot means a lot designed to be used primarily for storage or accommodation of boats, motor vehicles or goods and not for human occupation as a residence, office, shop or the like.
(1) If the registration of a plan for which a strata certificate is sought from a local council would result in the creation of a utility lot, the council may impose a condition (a restrictive use condition) on the strata certificate restricting the use of the utility lot to use by an owner or occupier of a lot or proposed lot (other than a utility lot) in the strata scheme to which the plan relates.
(2) If-
(a) the registration of a plan for which a strata certificate is sought from a registered certifier would result in the creation of a utility lot, and
(b) the relevant planning approval contains a condition (also a restrictive use condition) restricting the use of the utility lot to use by an owner or occupier of a lot or proposed lot (other than a utility lot),
the certifier must note the restriction on the strata certificate.
Under s 64 of the SSD Act, upon application to the local council by the owner or a registered mortgagee of the utility lot, the restrictive use condition may be released.
Section 124 of the SSD Act then provides that the restrictive use condition must be recorded on the title for the lot, and a condition so recorded is an ‘interest’ for the purposes of s 42 of the Real Property Act:
(1) If a strata certificate issued by a local council is subject to a restrictive use condition, or a strata certificate issued by a registered certifier has a notation of a restrictive use condition, the Registrar-General must, on creating a folio for the lot, record the condition in the folio.
(2) A condition recorded under subsection (1) is an interest for the purposes of section 42 of the Real Property Act 1900.
It is apparent from the registered Strata Plan that Lot 34 is subject to a restrictive use condition arsing under the second of these mechanisms in s 63(2). The certificate by the registered certifier on the plan states that it is given ‘on the condition contained in the relevant planning approval’ that Lot 34 will be created as a utility lot and restricted in accordance with s 63 of the SSD Act. The relevant planning approval is identified as ‘CDC1631’. However, CDC1631 is not in evidence, nor is any other development approval for the land other than a ‘section 4.55(2) modification’ to the original development approval dated 31 May 2023 which makes no mention of the restrictive use condition on Lot 34.
The title search (dated 11 December 2025) for lot 34 records the restriction as ‘restriction on the use of utility lots (see s 63 of the Strata Schemes Development Act 2015)’ and gives the dealing reference as the registered Strata Plan. The registered proprietor of Lot 34 is the defendant.
Section 63 only allows for a restriction on the use of a utility lot to use by an owner or occupier of a lot or proposed lot (other than a utility lot). Baalman & Wells Land Titles Office Practice N**ew South Wales (online at 13 July 2026, Thomson Reuters) states at [545.710] (Restrictive use conditions on utility lots):
The net effect of the restrictive use condition is to ensure that only an owner or occupier of a lot in the strata scheme is permitted to use a utility lot, and prohibits the use of the lot by any person who is not a strata lot owner or occupier. It is important to distinguish that a restrictive use condition does not operate to prohibit the transfer of a utility lot to a person who is not a strata lot owner. Any person may acquire a utility lot, but if that person does not also own or occupy a strata lot in the strata scheme, they may not use the utility lot. However, they may permit some other owner or occupier of a strata lot to use the utility lot. Thus, use of the utility lot must be tied to an owner or occupier of a strata lot in the strata scheme.
The aim is to stop owners selling or leasing the utility lot to persons outside the strata scheme whereby if the lot owner or tenant one day needs to have a car space lot, he or she will otherwise have to park the vehicle on the street causing a build up of and possible congestion of on-street parking.
On the evidence before the Court, the restrictive use condition attaching to Lot 34 is simply that it must only be used by an owner or occupier of a lot in the Strata Plan. This would not prevent its transfer to the plaintiffs. The defendant did not submit to the contrary and I note that, while the development approval identifying that Lot 34 is subject to the restrictive use condition is not in evidence, it is appropriate to draw these inferences on the basis of the evidence before the Court because it was in the power of the defendant (not the plaintiff) to have produced the relevant development approval and it chose not to do so: Blatch v Archer (1774) 1 Cowp 63 at 65; (1774) 98 ER 969.
If specific performance is ordered of the Contract on terms requiring the defendant to transfer Lot 34 to the plaintiffs, it would only be capable of being used by them or an occupier of Lot 20, and it could not be sold or leased by them to a person who is not an owner or occupier of a lot in the Strata Plan. However, no objection was taken by the plaintiffs to that restriction.
The only basis put forward by the defendant as a bar to specific performance in the event that the Contract has not been terminated is that, in the Defence, it denies that the plaintiffs are and were at all material times ready and willing to perform the Contract. I note that the defendant did not submit that an order for specific performance should be refused on the basis that it would be highly unreasonable: cf Gall v Mitchell (1924) 35 CLR 222 at 228; [1924] HCA 48.
The plaintiffs gave evidence that they have had a conditional approval for a home loan from National Australia Bank to purchase the property since April 2025 (which is prior to registration of the Strata Plan). The most recent approval was issued by the Bank on 9 June 2026 and is for a loan of $1,350,000. The conditions which each of these approvals are subject to are of the usual kind for a home loan of this nature. Their evidence was not challenged. I note also that the valuation evidence before the court indicates that the property has a value considerably greater than the purchase price and that the plaintiffs have at all times in their correspondence with the defendant maintained their intention to purchase the property (as described in the Contract). I am satisfied that the plaintiffs are ready and willing to perform the Contract.
The Court will therefore make an order for specific performance of the Contract on terms which require the defendant to transfer Lots 20 and 34 in the Strata Plan to the plaintiffs.
If I had not accepted the plaintiffs’ primary submission and instead concluded that they are entitled to specific performance of the Contract on terms requiring the transfer of Lot 20 only, I would have accepted the plaintiffs’ alternative submission that they were entitled to the transfer of Lot 20 together with compensation for the failure to transfer Lot 34: see cl 6.1 of the standard form, and P Butt, The Standard Contract for Sale of Land in New South Wales (2nd ed, 1998), [6.56]–[6.58]. I would have assessed damages at the midpoint of the two valuations, being $57,500.
By the amended summons, the plaintiffs seek alternative relief against forfeiture of the deposit under s 55(2A) of the Conveyancing Act in the event that the defendant validly terminated the Contract. As I have found that it did not, this issue does not arise but in case the matter goes further I will make the following brief observations on it.
Section 55(2A) of the Conveyancing Act provides:
In every case where the court refuses to grant specific performance of a contract, or in any proceeding for the return of a deposit, the court may, if it thinks fit, order the repayment of any deposit with or without interest thereon.
This power, and its relationship with contractual damages, was considered by this Court in Stokes v Toyne [2023] NSWCA 59 at [99]-[106]. It is well settled that this provision creates a power to relieve against the forfeiture of a deposit which is broader than that available in equity: Havyn Pty Ltd v Webster [2005] NSWCA 182; (2005) 12 BPR 22,837 at [137]; Luu v Sovereign Developments Pty Ltd [2006] NSWCA 40; (2006) 12 BPR 23,629. But the discretion is not unconfined. In Lucas & Tait (Investments) Pty Ltd v Victoria Securities Ltd [1973] 2 NSWLR 268, Street CJ in Eq said at 272 that the provision does not give to a court an “overall discretionary supervision of monetary adjustments between parties to a contract under which a deposit was paid but which has been terminated”. Instead, “[A] vendor who forfeits a deposit in strict enforcement of his legal rights is not to be deprived of it under s 55(2A) unless it is unjust and inequitable to permit him to retain it”. That has been confirmed by what was said in Romanos v Pentagold Investments Pty Ltd (2003) 217 CLR 367; [2003] HCA 58 at [27], although what is “unjust and inequitable” may be a contestable conclusion in any particular case.
However, it is well-settled that in the exercise of that discretion, the court should not weaken the proper function of a deposit as an earnest of performance: Havyn at [150]-[151], [155]; Nassif v Caminer (2009) 74 NSWLR 276; [2009] NSWCA 45 at [67], [91]. As Arden LJ said in Omar v El-Wakil [2001] EWCA Civ 1090; [2002] P & CR 36 at [35], in a passage approved in Havyn at [151], “the court must bear in mind that the payment in question was a ‘deposit’, that is an earnest for performance and that accordingly there should not be relief simply because the ...contract never took place”.
For these reasons, I do not consider that there is anything controversial in the submission of the vendor that the grounds in support of an application to repay the deposit must be sufficient to warrant a departure from holding the purchaser to its obligations under the contract. Indeed, this goes to the “justice and equity” of the case, drawing on the observations of Street CJ in Eq in Lucas & Tait. That conclusion must be correct, if the notions of justice and equity conditioning the discretion are to have some meaning drawn from the purpose of a deposit and the circumstances in which it is forfeited. The purchaser must therefore do more than merely show that the deposit has been forfeited, and that it will thus result in a “windfall” to the vendor as will usually be the case. The court should not take an approach to ordering the return of deposits under s 55(2A) which weakens the proper function of a deposit in providing a sanction so that purchasers treat the making and completing of contracts with due seriousness: Wilson v Kingsgate Mining Industries Pty Ltd [1973] 2 NSWLR 713 at 735; Fraser v L O’Malley & Sons Pty Ltd (1975) 2 BPR 9133 at 9139–40. In so saying, I am not to be understood as putting a gloss upon the plain words of s 55(2A), but merely highlighting the critical importance of a judge exercising the wide discretion according to its plainly beneficial purpose to consider “justice” and “fairness” in their proper context.
The plaintiffs submitted that the Court should exercise the discretion under s 55(2A) because it would be unjust for the defendant to rely on any strict legal right for two reasons. First, termination of the Contract came about because the plaintiffs lodged the Caveat but that was a direct result of the defendant’s own conduct in registering the Strata Plan without the car space originally allotted to Lot 20. Had the defendant done so, the Notice of Termination would not have come into existence. Second, the defendant has profited from the taking the car space out of the hands of the plaintiffs.
The defendant submitted that the plaintiffs had not made out a case for relief under s 55(2A) because it had failed to show that it would be unjust and inequitable for the defendant to retain the deposit. First, the plaintiffs cannot blame the defendant for their breach of contract, as it was the result of their own decision to lodge the Caveat: cf Lee v Lee [2022] NSWSC 181 at [25]. Second, the defendant had not profited by taking the car space for, on the hypothesis on which the claim under s 55(2A) is made, the plaintiffs are not entitled to specific performance and the Contract has been validly terminated.
Had this issue arisen because the defendant had validly terminated the Contract for breach of special condition 55, I would have found that the plaintiffs were entitled to repayment of the deposit under s 55(2A). This is because: (a) the breach of special condition 55 was clearly a response by the plaintiffs to the failure of the defendant to register a strata plan which would transfer to the plaintiffs the property agreed to be sold under the Contract due to the absence of the car space; (b) the defendant consistently failed to engage with the plaintiffs as to the reason for excluding the car space from Lot 20 in the Strata Plan as registered, or with the invitation made on 26 May 2025 for reasonable compensation for the removal of the car space; and (c) based on the valuation evidence, the defendant would be able to sell Lots 20 and 34 for between $290,000 and $340,000 more than the purchase price under the Contract which would be a very significant benefit to the defendant arising from termination. While the Court will not lightly be moved to order a return of the deposit paid as an earnest of performance, in my view, these matters taken together would have been sufficient to invoke the operation of s 55(2A) in the present case if the Contract had been terminated.
The plaintiffs having been successful, there is no reason why costs should not follow the event.
The Court will make the following orders:
DECLARE that the Notice of Termination of Contract dated 12 December 2025 given by the defendant to the plaintiffs in respect of the contract for the sale of land entered into on or about 26 March 2021 (“Contract”) is invalid and of no effect.
DECLARE that the plaintiffs are entitled to the specific performance of the Contract in respect of the property comprising Lots 20 and 34 in Strata Plan SP 104532.
ORDER that the defendant specifically perform the Contract in respect of the property identified in Order 2 above within 28 days of the date of these orders.
In default of the defendant complying with Order 3 above, ORDER that the Registrar of this Court be empowered to execute all such instruments and do all such things in the name and on behalf of the defendant as may be necessary in order to specifically perform the Contract, and DIRECT that the Registrar and Deputy Registrars are appointed to so act.
The defendant to pay the plaintiffs’ costs of the proceedings.
Liberty to apply on 3 days’ notice specifying the relief sought.
**********
Chong
Tasman 61 BH Pty Ltd
(1973) 129 CLR 99
(1977) 180 CLR 266
(1996) 67 FCR 402
(2014) 251 CLR 640
(1924) 35 CLR 222
(1927) 39 CLR 455
(2007) 233 CLR 115
(1982) 149 CLR 509
(1989) 52 SASR 568
(1991) 25 NSWLR 541
(2016) 260 CLR 85
(1990) 13 MVR 334
(2016) 93 NSWLR 561
(2003) 217 CLR 367
(2009) 74 NSWLR 276