[2025] QCAT 371
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2025-09-26
Original judgment source is linked above.
ADMINISTRATIVE LAW - ADMINISTRATIVE TRIBUNALS - QUEENSLAND CIVIL AND ADMINISTRATIVE TRIBUNAL - general administrative review - where homeowner made complaint about alleged defective residential building work - where complaint included complaints about water ingress in relation to main bedroom window and stairwell window - where Queensland Building and Construction Commission ('QBCC') decided to give a direction to rectify to the builder - where the builder carried out rectification in accordance with the direction - where homeowner made subsequent complaint about the same windows - where QBCC decided to give a second direction to rectify to the builder - where builder applied to QBCC for internal review of that decision - where QBCC decided to give a direction to rectify in the same terms - where builder applied to the Tribunal for external review of decision - whether defective building work - whether unfair, in the circumstances, to issue the direction to rectify
Acts Interpretation Act 1954 (Qld), s 38
Murphy v Queensland Building and Construction Commission [2024] QCATA 27
N. Congram instructed by First Respondent's legal department
(1) In a proceeding for a review of a reviewable decision, the tribunal may -
(a) confirm or amend the decision; or
(b) set aside the decision and substitute its own decision; or
(c) set aside the decision and return the matter for reconsideration to the decision-maker for the decision, with the directions the tribunal considers appropriate.
(2) The tribunal's decision under subsection (1)(a) or (b) for a reviewable decision -
(a) is taken to be a decision of the decision-maker for the reviewable decision except for the tribunal's review jurisdiction or an appeal under part 8; and
(b) subject to any contrary order of the tribunal, has effect from when the reviewable decision takes or took effect.
(a) Item 35: Master Bedroom: Windows are leaking in rainy weather: Date first noticed: 11 December 2019;
(b) Item 46: Stairwell landing: Windows are leaking in rainy weather: Date first noticed: 11 December 2019.
(a) 'The inspection found that the Bed 1 window has not been installed in accordance to [sic] the minimum requirements of the BCA and Manufacturers [sic] recommendations, in that a head flashing has not been installed to prevent water ingress, resulting in damage to internal linings and unhealthy conditions.'[5]
(b) 'The inspection found that the stairwell window has not been installed in accordance to [sic] the minimum requirements of the BCA and Manufacturers [sic] recommendations, in that a head flashing has not been installed to prevent water ingress, resulting in damage to internal linings and unhealthy conditions.'[6]
(a) Main bedroom window:
(i) Findings/Comments:
- A head flashing had been installed at the time of the inspection.
- No evidence of damage or unhealthy conditions was present.
(ii) Conclusion:
This complaint item is determined not to fall within the meaning of defective building work under the QBCC Act and Board Policy.
(b) Stairwell window (relevantly):
(i) Findings/Comments:
- A head flashing had been installed at the time of the inspection.
Head flashing installed as per Direction Wording and damage to plasterboard rectified by [Mr Kotis].
This complaint item is determined not to fall within the meaning of defective building work under the QBCC Act and Board Policy.
I have decided to give a direction to rectify (DTR) for items 1 & 4 of the affected party's complaint of 31 May 2022.
(a) the installation of the windows was 'building work' within the meaning of the QBCC Act;[7]
(b) if there was defective building work, Mr Buglar is the person responsible for the that work (noting that this finding is only in relation to the installation of the respective windows).
(a) whether the second complaint was made within 12 months after Mr Kotis became aware of, relevantly, the building work Mr Kotis considered to be defective or incomplete (see s 71J(4) of the QBCC Act);
(b) if the second complaint was made outside the 12 month period, whether the QBCC has power to issue a direction to rectify;
(c) subject to (a) and (b) above, whether the building work comprising the installation of the main bedroom window and the stairwell window constituted defective building work and, if so, whether it was structural or non-structural;
(d) whether the discretion under s 72 of the QBCC Act should be exercised in favour of giving the direction to rectify including, in particular, whether, in the circumstances, it would be unfair to Mr Buglar to give the direction to rectify (see s 72(5) of the QBCC Act).
Was the second complaint made within the 12 month period?
(1) A consumer may ask the commission to give a direction to rectify building work the consumer considers is defective or incomplete.
(2) The owner or occupier of a residential property adjacent to a building site may ask the commission to give a direction to remedy any consequential damage to the property.
(3) A person making a request under subsection (1) or (2) must give the commission -
(a) details of -
(i) for a request under subsection (1) - the building work the consumer considers is defective or incomplete; or
(ii) for a request under subsection (2) - the consequential damage to the property; and
(b) other details the commission reasonably requires to consider the request; and
(c) the fee prescribed by regulation.
(4) Also, a request under subsection (1) or (2) must be made within 12 months after the person becomes aware of -
(a) for a request under subsection (1) - the building work the person considers is defective or incomplete; or
(b) for a request under subsection (2) - the consequential damage to the property.
(1) This section applies if the commission is of the opinion that -
(a) building work is defective or incomplete; or
(b) consequential damage has been caused by, or as a consequence of, carrying out building work.
(2) The commission may direct the person who carried out the building work to do the following within the period stated in the direction -
(a) for building work that is defective or incomplete - rectify the building work;
(b) for consequential damage - remedy the damage.
(2AA)A regulation may prescribe a period within which the commission must make the direction.
(2A) If a period is prescribed under subsection (2AA), the commission must make the direction during the prescribed period.
(3) In deciding whether to give the direction, the commission may take into consideration all the circumstances it considers are reasonably relevant and, in particular, is not limited to a consideration of the terms of the contract for carrying out the building work (including the terms of any warranties included in the contract)).
(4) The period stated in the direction must be the period prescribed by regulation unless the commission is satisfied that, if the direction is not required to be complied with within a shorter period -
(a) a substantial loss will be incurred by, or a significant hazard will be caused to the health or safety of, a person because of the defective or incomplete building work or consequential damage; or
(b) the defective or incomplete building work, or consequential damage, will cause a significant hazard to public safety or the environment generally.
(5) The commission is not required to give the direction if the commission is satisfied that, in the circumstances, it would be unfair to the person to give the direction.
Example for subsection (5) -
The commission might decide not to give a direction for the rectification of building work because an owner refuses to allow a building contractor to return to the owner's home or because an owner's failure to properly maintain a home has exacerbated the extent of defective building work carried out on the home.
(6) The commission may, before it considers whether building work is defective or incomplete, require the consumer for the building work comply with a process established by the commission to attempt to resolve the matter with the person who carried out the work.
(7) In subsection (3), a reference to a contract for carrying out building work includes a reference to a domestic building contract for managing the carrying out of building work.
(8) To remove any doubt, it is declared that the commission may act under this section in relation to consequential damage whether or not an owner or occupier has made a request under section 71J.
WATER ENTERING WINDOW - Original date noticed 11/12/2019 when water entered. [Mr Buglar] rectified back in August 2020 after QBCC ordered a ratification [sic] work as he failed to install flashing. Since then more water has come through the same window.
(emphasis added)
Original date noticed 11/12/2019 when water entered. [Mr Buglar] rectified back in August 2020 after QBCC ordered a ratification [sic] work as he failed to install flashing. Since then more water has come through the same window causing damage to the window frame
(emphasis added)
Does non-compliance with s 71J(4) preclude the issue of a second direction to rectify in relation to the same alleged defective building work?
Did the installation of the two windows constitute defective building work and if so, was it structural or non-structural?
defective, in relation to building work, includes faulty or unsatisfactory.
(a) does not comply with the Building Act 1975, Building Code of Australia or an applicable Australian Standard;
(b) involves the use of a manufactured product, and that product has been used, constructed or installed in a way that does not comply with the product manufacturer's instructions.
Do you understand that [the manufacturer] does not supply or install any flashings to your windows/doors?
[The manufacturer] does not undertake caulking between the edge of any side of the frames in the surrounding fabric of the building.
The QBCC acknowledges that [Mr Buglar] has installed the windows in accordance to Manufacturers [sic] recommendations, however the QBCC considers that a competent Licensed Class Holder would have referred to the minimum requirements of the BCA for residential timber framed construction, and consulted with the Manufacturer for compliance methods of installation.
The power to give a direction to rectify conferred by s 72 of the QBCC Act is discretionary. Section 72(3) sets out what the commission may take into consideration in deciding whether to give a direction. The discretion is a broad one, permitting the commission to consider all the circumstances it considers are reasonably relevant. Specifically, the commission is not limited to a consideration of the terms of the contract for carrying out the building work. The commission may decide to give a direction to rectify or not give a direction to rectify. Each are reviewable decisions.
Would it be unfair to Mr Buglar to give the direction?
(a) in paragraph 18: 'By Complaint Item 1, [Mr Kotis] identified that water was leaking through the window of the main bedroom at the Property';
(b) in paragraph 19: 'By Complaint Item 4, [Mr Kotis] identified that water was leaking through the window located in the stairwell of the Property'.
So at paragraph 18, you say that water was leaking through the window of the main bedroom?‑‑‑Yes.
Could I just ask you to explain where you identified water was leaking through?‑‑‑Um - damage to the plasterboard - um - down the bottom.
I - sorry - my question was more directed to, was the water leaking through the window itself, or through the flexible sealant that ‑ ‑ ‑?‑‑‑The - when investigating leaks - um - there's essentially a product that's been purchased. Um - a lot of the times, the product is certified, so, as a builder, I would purchase that product, say, an aluminium for argument sake. I fit that window in accordance to manufacturer's recommendations - um - and then, you know, follow the manufacturer's recommendations for cladding, rah - rah - rah, build the whole thing. Is the window product defective? So the assembly of the window, the design of the window, is that defective? I have had cases where I have found that the assembly as actually defective, which was why the window - um - why, at the end of the day, the Commission found that that was not defective building work by the builder but a ‑ ‑ ‑
Okay. So I'm ‑ ‑ ‑?‑‑‑ ‑ ‑ ‑ product issue.
‑ ‑ ‑ just - if I could ask you just to think about these specific windows ‑ ‑ ‑?‑‑‑Yeah.
‑ ‑ ‑ and my question is whether, what you observed indicated that the leaking water was as a result of the window itself or ‑ ‑ ‑?‑‑‑Yeah.
‑ ‑ ‑ as a result of the use of flexible sealant?‑‑‑Well, that's what I mean. I - when I was hosing the window, I'm looking to see if the window frame itself is leaking in places to result in water ingress.
And did you see any water ingress?‑‑‑No.
Okay?‑‑‑Only inside the wall.
Okay. And, so, just to confirm, you didn't see any water leaking through the frame of the window?‑‑‑No.
It was through the wall?‑‑‑Yes.
And what does that indicate to you?‑‑‑A flashing issue.
Okay. And so does that indicate - does that - is that relevant to whether you think that the issue could be due to defective building work or a manufacturer's warranty issue?‑‑‑That's what I had to establish, yes.
So you turned your mind to that?‑‑‑Yes.
And what did you conclude?‑‑‑Uh - I didn't really have a problem with the product itself.
(emphasis added)
Did you run any testing on the windows?‑‑‑Did water testing on the windows. Um - I started to notice a little bit of water coming in - uh - inside where the - the timber frame was in the steel window. This time, I had a - a hole that I could see in, so I - that's when I started questioning how these windows have been flashed. Um ‑ ‑ ‑
(emphasis added)
A water test was conducted on the window which noted water entering via the horizontal bars between the frames, which tracked sideways behind plasterboard sheeting and damaging the plasterboard at the base of the wall.
(a) MEMBER: But, Mr Barrett, have you assumed that the water entry has resulted from a lack of a physical flashing or is there something you saw on your second inspection that - based upon which you conclude that it was the absence of a physical flashing that has caused the water entry?‑‑‑I can't accept silicone as a long-term flashing.
I'm dealing just with the water ingress at this ‑ ‑ ‑?‑‑‑Water ingress. Yes. Yep. And going out there and pumping - pumping more silicone in before I get there, yeah, I'm not going to rep - replicate that leak. But through hosing this, the water - the - I think the window came in two pieces. The water tracked along there and came down inside the wall. It shouldn't be seen inside the wall. The window frames - the flashings go from the window out.
So are you saying that the - what you've shown at the top-left photograph on page 1045, even if there's water entry there, the flashing would have stopped the water entering into the ‑ ‑ ‑?‑‑‑That's where your flashing would be. Yeah.
All right. Thank you?‑‑‑That's m --- yeah.[22]
(b) Mr Buglar put a series of propositions to Mr Barrett but the essence of them was that, first, the window itself leaked and that the water would be behind the flashing and, second you cannot flash a window that sits on top of another window and with the design of two windows on top of each other, there are no flashing guidelines.[23]
(c) MEMBER: That's all right. Let's just take it step by step.
Mr Barrett, just starting with that photograph that ‑ ‑ ‑?‑‑‑Yes.
And this photo is taken after the windows were hosed from the outside?‑‑‑Yes.
And as a result of doing the hosing, your note seems to indicate that water was coming through - entering between the frames of the windows themselves; is that correct?
WITNESS: I think the - by memory, the frames, being steel, being heavy, I think they came in two pieces and were screwed together. I imagine screwed together on-site. I don't know whether the manufacturer said to put silicone through there before they were screwed together. I don't know. Uh - what - uh - flashing should go on this window? I don't know. I haven't looked at the windows out - out of - uh - in front of me. So where am I going to flash this? I don't know. I know where they put flashings on aluminium windows, 'cause they make them specifically for that, but these are a one-off window. I've got no idea how the manufacturer wanted these windows to be flashed.[24]
(d) [MR BUGLAR]: Would you accept the fact that if we had multiple flashings there, the water leaking between the windows was never going to change the fact that a flashing would do anything at that point, because it's not in line with where a flashing would be?‑‑‑Well, I don't know how I can answer that, but if - if I was looking at how it was flashed and it failed, we could talk about it, but there's no flashing. I can't argue - I'm not here to tell you how to flash a window. Like I said, I have not seen these windows out of the opening and how you would attach a flashing to it. I don't know. You know, you know with aluminium windows there's a - a big, long fin that comes out. That's where the flashing goes.
Yep?‑‑‑Um - but yeah, when there's no flashings whatsoever - um ‑ ‑ ‑
WITNESS: Yeah, well that's what I - that's about it, really. There's no flashing there whatsoever apart from a bead of silicone, which I do not accept as a flashing. [25]
(a) as noted above, the description of the defect in relation to the first complaint was: 'Windows leaking in rainy weather';
(b) the 2020 inspection report noted: '[Mr Kotis] expressed concerns that during a rain event water entered the window and ran down the wall;[27]
(c) the description of the defect in the second complaint included a reference to the original date the defect was noticed (in 2019) of 'when water entered' and that since then 'more water has come through the same window ...';
(d) in cross-examination, Mr Barrett stated that he did not remember hosing the stairwell window.[28] However, earlier in examination-in-chief, Mr Barrett stated that there was water testing of both windows.[29] In the evidence extracted at paragraph [66] above, Mr Barrett was asked about both windows but referred to the hosing of 'the window'. It is unclear whether, at the second inspection, Mr Barrett hosed the stairwell window and, if he did, what was the particular result of hosing the stairwell window.
(e) I have had regard to the photographic evidence provided by Mr Kotis of the stairwell wall frame.[30] The location and extent of the damage suggests that a lack of flashing on the bottom sill (and perhaps the side sills) has possibly led to or at least contributed to the ingress of water and consequential damage shown.
And so is your evidence that the three remaining sides of these windows are - or needed to be flashed?‑‑‑Yes.
And is your evidence that, during the first inspection, you did not become aware that the remaining three sides of the window were flashed using silicone?‑‑‑The - the top head flashing is physical. You can see it.
Yes?‑‑‑You - you know whether it's there or not.
Yes?‑‑‑The rest are inside the wall. I can't see them.
Right?‑‑‑I don't know if they're there or not.
No. Okay?‑‑‑I just assume they are.[31]
(a) the windows were custom made, steel framed windows supplied by the manufacturer at the request of the Kotis';
(b) Mr Buglar complied with manufacturer's instruction for installation by applying silicone in accordance with the instruction (as was accepted by the QBCC);
(c) the Policy requires that where building work involves the use of a manufactured product, the product must be, relevantly, installed in a way that complies with the product manufacturer's instructions;
(d) despite this, the method of installation adopted (insofar as it involved weatherproofing) did not comply with the Building Code of Australia and this rendered it unsatisfactory and, therefore, defective building work;
(e) in February 2020, Mr Kotis made a complaint to the QBCC in relation to various items including water entry in relation to the two windows in question, which was said to have been first noticed in December 2019;
(f) the QBCC issued a direction to rectify in June 2020 which expressly directed rectification by way of installation of head flashing to each window;
(g) it was through no fault of Mr Kotis that the direction to rectify, requiring installation of head flashings only, was (on the QBCC's case) inadequate to remedy the identified defect;
(h) however, Mr Buglar rectified each window by installing a head flashing above each one and the QBCC found that he had complied with the direction and that each complaint item was determined not to fall within the meaning of 'defective building work';
(i) the first complaint was within the 12 month provided for by s 71J(4) of the QBCC Act, but the second complaint was made well outside that period[33] (although this does not preclude the issue of a direction to rectify);
(j) the second complaint concerned the same defective work the subject of the first direction to rectify;
(k) there would necessarily be an additional cost to Mr Buglar in having to rectify the windows a second time, having complied with the QBCC's previous direction to rectify.
The decision made by the First Respondent on 2 June 2023 to give a direction to rectify Items 1 and 4 of the Second Respondent's complaint of 31 May 2022 is set aside and is substituted with a decision not to give a direction to rectify Items 1 and 4 of the Second Respondent's complaint of 31 May 2022.
[1] This was the position taken by the QBCC at the hearing: T1-6 lines 10-41.
[2] See QBCC Act ss 86E(b), 86(1)(e), 86B, 86C, 86D.
[8] QBCC's outline of submissions dated 19 May 2025, [30].
[9] See e.g. MacFarlane v Queensland Building and Construction Commission [2019] QCAT 408, [21]; Rosecove Pty Ltd v Queensland Building and Construction Commission & Anor [2023] QCAT 101, [37]-[38]; Cristiano v Queensland Building and Construction Commission & Anor [2024] QCAT 451, [24].
[10] QBCC's outline of submissions dated 19 May 2025, [31].
[12] [2024] QCATA 27, [28].
[20] T1-52 lines 23-36; T1-53 lines 36-43; T1-53 line 45 - T1-54 line 20; T1-56 line 22 - T1-57 line 3.
[33] The second complaint was made approximately 2 years 5½ months after the water ingress was first noticed, and approximately 1 year 9 months after the QBCC found that the first direction to rectify had been complied with (although I note that the 6 years 6 months' time limit in s 72A(4) of the QBCC Act has not yet elapsed).
Buglar
Queensland Building and Construction Commission & Anor [2025] QCAT 371