[2019] QCAT 408
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2019-11-28
Original judgment source is linked above.
This matter was heard and determined on the papers pursuant to s 32 of the Queensland Civil and Administrative Tribunal Act 2009 (Qld)
(a) Peter John MacFarlane is the owner of a house on the Gold Coast, having contracted to purchase it on about 15 September 2015 while it was being built by A B Hill Constructions Pty Ltd.
(b) The owner took possession of the house in December 2015 before it was finished.
(c) On 15 March 2016 the owner noticed rain water ingress in the main bedroom, master ensuite, master walk in robe, and second bedroom after heavy rain.
(d) On 20 March 2016 the owner informed the contractor about the problem. The contractor attended site and did some repairs, claiming that this had solved the problem.
(e) The house was completed, and the purchase of the house was settled in June 2016.
(g) About October 2017 on the contractor's advice, the owner engaged other contractors to assess the source of the problem and to rectify it.[3]
(h) The owner was advised by two separate contractors that to rectify the problem the entire top deck would have to be lifted, the waterproof membrane repaired or replaced and then the top deck would have to be retiled.[4] The date of this advice has not been given, but the owner knew this at least from 22 November 2017.[5]
(i) There was further water ingress in November 2017, December 2017, January 2018 and February 2018.
(j) On 6 December 2017 the owner registered as a 'user' on the QBCC's website and he started to complete a complaint form to the QBCC. The owner had some technical difficulties in completing the online form and did not successfully complete it until February 2018.[6]
(k) The complaint was received by the QBCC on about 25 February 2018 which described 'rain water leaks, main bedroom, master ensuite, master walk-in robe, second bedroom'.
(l) All the leaks had one cause: the failure of the waterproofing membrane to the deck and other associated defects. This was structural defective building work.
(m) On 16 May 2018 liquidators were appointed for the contractor following insolvent liquidation.
(n) On 6 June 2018 the QBCC decided not to give a direction to rectify. The owner sought an internal review of the decision.
(o) On 19 July 2018, following a second inspection for an internal review, an inspector engaged by the QBCC reported that there had been rain water ingress in the areas of the complaint and that it had been caused by structural defective building work.
(p) On 30 July 2018 the QBCC decided that although there had been structural defective building work, because of the delay in reporting the problem to QBCC it would be unfair to the contractor to give a direction to rectify.
In deciding whether to give the direction, the commission may take into consideration all the circumstances it considers are reasonably relevant and, in particular, is not limited to a consideration of the terms of the contract for carrying out the building work (including the terms of any warranties included in the contract).
The commission is not required to give the direction if the commission is satisfied that, in the circumstances, it would be unfair to the person to give the direction.
Example for subsection (5) -
The commission might decide not to give a direction for the rectification of building work because an owner refuses to allow a building contractor to return to the owner's home or because an owner's failure to properly maintain a home has exacerbated the extent of defective building work carried out on the home.
The objects of this Act are -
(a) to regulate the building industry -
(i) to ensure the maintenance of proper standards in the industry; and
(ii) to achieve a reasonable balance between the interests of building contractors and consumers;
and
(b) to provide remedies for defective building work; and
...
(f) to provide for the proper, efficient and effective management of the commission in the performance of its functions.
It is a policy of the Board that if a consumer is seeking the assistance of the Queensland Building and Construction Commission (QBCC) to issue a direction to a building contractor to rectify defective building work, the consumer must lodge a formal complaint with the QBCC of defective building work as soon as possible but no later than within 12 months of becoming aware of the defects.
(a) there may be a valid complaint or request made within the 12-month time limit in section 71J(4); or
(b) there may be a complaint or request made outside the 12-month time limit in section 71J(4); or
(c) irrespective of the length of time which has passed, circumstances may come to the attention of the QBCC which may cause it to decide whether or not to give a direction to rectify.
I honestly believe that I reported the defect to the QBCC within a time frame that is fair and practical once trying to work with the builder to rectify the fault and seeing that the rectification attempts were unsuccessful.
In fact I contacted QBCC within 12 months of the initial 'fixed' leak becoming serious enough to warrant further action.
If all initial building defects were reported to QBCC just in case they may reoccur the QBCC would be swamped with thousands upon thousands of defect reports, it is impractical.
[1] The complaint of 20 February 2018 says this happened in March 2017, but the submissions say it happened in April 2017.
[3] In the complaint, the owner says that this happened 'at that stage', which is presumed to be in about October 2017. There is an email of 21 December 2017 in which the owner sought reimbursement of $6,957. The email says that other contractors had completed the works, which would be tested in the next rains, but that it was hoped the problems were solved (page 52 of the documents in the Statement of Reasons).
[5] Page 62 of the exhibits to Ms Tyler's statement; there is also an email on 1 December 2017, page 75.
[6] This appears from the owner's submissions of 26 September 2019.
[7] Section 20 of the Queensland Civil and Administrative Tribunal Act 2009 (Qld) ('QCAT Act').
[9] Submissions in email of 26 September 2019.
[10] [2017] QCAT 416, [25].
[12] Although section 19 was repealed on 10 November 2017, by transitional provisions inserted at that time into section 76 of the QBCC Act by the Building Industry Fairness (Security of Payment) Act 2017 (Qld), the policy continued in force.
[13] This is by amendment made by the Building Industry Fairness (Security of Payment) Act 2017 (Qld) coming into force on that day, which was the date of its assent.
MacFarlane
Queensland Building and Construction Commission [2019] QCAT 408