[2024] QCAT 451
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2024-10-18
Original judgment source is linked above.
ADMINISTRATIVE LAW - ADMINISTRATIVE TRIBUNALS - QUEENSLAND CIVIL AND ADMINISTRATIVE TRIBUNAL - general administrative review - where the applicant seeks to review a decision of the Queensland Building and Construction Commission (QBCC) - where the QBCC made an internal review decision to not give a direction to rectify to the builder -alleged defects in stormwater drainage system - whether there is defective building work - whether the builder is responsible for defective building work in relation to a stormwater drainage system - whether it is fair to give a direction to rectify to the builder
S Seefeld of Counsel instructed by Holding Redlich Lawyers
"...
1.3 Provide Stormwater Drainage lines (100mm Dia) to street connection point
...
1.9 Provide field gully traps 5No as positioned on site plan ..."
"(1) The tribunal's review jurisdiction is the jurisdiction conferred on the tribunal by an enabling Act to review a decision made or taken to have been made by another entity under the Act.
(2) For this Act, a decision mentioned in subsection (1) is a reviewable decision and the entity that made or is taken to have made the decision is the decision-maker for the reviewable decision."
(a) confirm or amend the Internal Review Decision;
(b) set aside the Internal Review Decision and substitute its own decision; or
(c) set aside the Internal Review Decision and return the matter for reconsideration to the decision-maker for the decision, with the directions the Tribunal considers appropriate.
(a) regulation of the building industry;
(i) to ensure the maintenance of proper standards in the industry; and
(ii) to achieve a reasonable balance between the interests of building contractors and consumers;
(b) to provide remedies for defective building work;
(c) to regulate domestic building contracts to achieve a reasonable balance between the interests of building contractors and building owners; and
(d) to provide for the proper, efficient and effective management of the QBCC in the performance of its functions.
Stormwater has backfall; grass always damp; rising damp on brickwork; floods into pool; 100mm pipe down to 90mm pipe as per contract; incorrectly installed; enough fall over land to get fall.
No floorwaste; Plumbing not in accordance with AS3500.
Tiles behind the mirror are not all the way to ceiling as per the contract.
Entire house brickwork terribly laid causing shadows day and night.
" 1 The stormwater system on the left and right hand sides of the dwelling is not installed in accordance with AS3500:3:2018 sections 5.5 and 6.3.4, as the pipe size is reduced, the stormwater line is not installed and laid with even gradients and straight runs, and the lines are punctured (damaged) at multiple locations, posing a health and safety hazard to the dwelling's occupants. Pertains to item number 1 of the QBCC complaint form."
(a) building work has been carried out;
(b) the building work is defective;
(c) the person responsible for the defective 'building work' is the second respondent;
(d) it is fair, in all the circumstances, to issue a direction to rectify; and
(e) a direction to rectify will be given within 6 years and 6 months after the building work was carried out unless the Tribunal is satisfied that there is, in the circumstances, sufficient reason for extending the time for giving the direction.
(a) defective building work means building work that is faulty or unsatisfactory, and includes, for example, work that does not comply with ... an applicable Australian Standard;
(b) non-structural defective building work means defective building work (other than structural defective building work or residential construction work causing subsidence) that is faulty or unsatisfactory because:
(i) it does not meet a reasonable standard of construction or finish expected of a competent holder of a contractor's licence of the relevant class; or
(ii) it has caused a settling in period defect in a new building.
**The 21 February 2022 Internal Review Decision concludes that the works undertaken by Clarendon were "not defective building works", that is, the review officer was not satisfied that Clarendon was responsible for any damage to the stormwater system.
Is Clarendon responsible for the defective 'building work'?**
The owner expressed concerns regarding the pipe sizing and backfall in the pipework. As noted above, the pipework has areas of full pipe depth backfall. In regard to pipe sizing, AS3500.3 2018 section 5.5 notes that the Nominal Method, which is when pipe design is determined according to local practise and experience (without design calculations) can only be used on urban allotments with less than 1000m2 in area. RP data shows this property is 4460m2 which would require design calculations on pipe sizing. A site plan including house measurements would be required to ascertain the exact pipe sizing requirements needed. However, the reductions in pipe sizing at the kerb and the sections of drain holding water would slow the flow of water out of the system and may contribute to the alleged temporary flooding around the outside of the house.
The stormwater system on the left and right sides of the dwelling is not installed in accordance with AS3500:3:2018 sections 5.5 and 6.3.4, as the pipe size is reduced , the stormwater line is not installed and laid with even gradients and straight runs, and the lines are punctured (damaged) at multiple locations, posing a health and safety hazard to the dwelling's occupants. Pertain to item number 1 of the QBCC complaint form.
Conclusions - who is responsible for the defective building work?
(a) Three punctures through the top of the pipe were noted on the left side of the house, in the garden bed near the entry to the house.
(b) The main pipe reduces in size near the kerb from 100mm to 90mm pipe with a small amount of tree roots evident in the pipe.
(c) The pipe is crushed on the left side outlet, at the kerb adaptor.
(d) A joint in the pipe is split and is leaching ground water into the pipe at the front of the house near the front right corner.
(e) The pipe is holding water for a large percentage of the stormwater service, to varying depths, up to full pipe depth in some locations, noticeably the front left corner of the house.
(f) A junction for the downpipe on the rear right corner of the house, near the pool has a large amount of staining or mould in the junction, consistent with a leak on the branch line. Further investigation by removing this downpipe is required to determine the cause.
The internal review decision of the Queensland Building and Construction Commission dated 21 February 2024 to not issue a direction to rectify is confirmed.
[3] Cowen & Anor v Queensland Building and Construction Commission & Anor [2017] QCAT 416, [18] citing Kehl v Board of Professional Engineers of Queensland [2010] QCATA 58, [9].
[13] Internal Review Decision Notice, [34].
[31] Hearing Book, 269, email from N Cristiano to the QBCC dated 26 July 2021.
[40] T2-50, lines 41-46; T2-51, line 1.
Cristiano
Queensland Building and Construction Commission & Anor [2024] QCAT 451