[2025] VCAT 450
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-05-22
Original judgment source is linked above.
Use of the land for the purpose of a child care centre
Construct or carry out buildings and works associated with a Section 2 use of Clause 32.03-1.
(a) The movement of the bin enclosure in accordance with the recommendation detailed in the evidence statement of Mr Andrea Pagliaro of Urbis dated March 2025.
(b) All services normal to the proposed building (electricity, heating and cooling, etc) and similar (fire hydrant and telecommunications etc) shown on the relevant plans. The structure to accommodate services must be integrated into the development, must be easily accessible to service authorities, and must not be sited in a standalone location or 'stacked'.
(c) The driveway straightened, with an associated movement of the proposed crossover to the east to reduce the encroachment of the Tree 1 TPZ (street tree).
(d) Details of construction materials of pedestrian footpath to be annotated on plan.
(e) Details of construction materials of car park area to be annotated on plan.
(f) Details of all fences nominated as acoustically treated on the endorsed plans must be constructed to a minimum density of 15kg per m2 with no gaps.
(g) Deletion of one signage panel.
(h) Dimensioned elevations of the shade sail structures.
All to the satisfaction of the responsible authority.
(a) A survey (including botanical names, trunk location, trunk diameter and canopy spread) of all existing vegetation. The survey must clearly mark existing vegetation to be retained and removed. The survey must also include any street trees.
(b) Buildings and trees (including botanical names, trunk location, trunk diameter and canopy spread) on neighbouring properties where the Tree Protection Zones of such trees fall within the subject site as calculated in accordance with Australian Standard 4970-2009 or its successor.
(c) Details of surface finishes of pathways and driveways.
(d) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant. All species selected must be to the satisfaction of the Responsible Authority.
(e) Landscaping and planting within all open areas of the site including:
- An evergreen hedge with an estimated mature height of 2 metres, interspaced with planting of trees, on the northern side of the fence that presents to Hillsmeade Drive.
- An evergreen hedge with an estimated mature height of 2 metres along the east, south and west boundaries of the land, interspaced with trees.
- Low level planting on both sides of the pedestrian path from Hillsmeade Drive to the building entrance.
- Garden beds in the front setback generally consistent with the style and form found in Hillsmeade Drive.
(f) Landscaped areas must be planted with shrub and groundcover species capable of achieving a minimum density of at least 85 per cent coverage 12 months after planting.
(g) Landscaping must demonstrate the use of sustainable practices and if irrigation is to be provided it must not use potable water.
(h) Any planting within an easement must utilise species suitable for planting within easements and must have a natural growing height of no more than 5 metres.
(i) All garden beds adjoining turf or gravel surfaces must have hard garden edging.
(j) Trees in the following locations:
- A minimum of two (2) canopy trees reaching a minimum mature height of 10 metres within the Hillsmeade Drive frontage.
- A minimum of two (2) canopy trees reaching a minimum mature height of 6 metres within the Hillsmeade Drive frontage.
- A minimum of five (5) canopy trees reaching a minimum mature height of 7 metres within open play areas (of a species that is compatible with the safety and function of the play areas) and the south-east corner of the land.
(k) 1200mm organic mulch diameter around any retained or proposed trees in lawn areas.
(l) The provision of notes regarding site preparation, including the removal of all weeds, proposed mulch, soil types and thickness, subsoil preparation and any specific maintenance requirements.
(m) The location of any tree protection zones and protection measures including for street trees accurately drawn to scale, labelled and notations referring to any endorsed Tree Management and Protection Plan, or Arboricultural Report.
All to the satisfaction of the responsible authority.
(a) The waste management plan to include food waste collection (FOGO) and future glass collection and the bins must have sufficient space to accommodate these services; and
(b) Confirmation that waste will only be collected outside peak drop off and collection times,
The operator of the use must comply with the endorsed waste management plan. The waste management plan may only be amended with the written consent of the Responsible Authority.
(a) The provision of sufficient on-site stormwater detention to limit the rate of stormwater discharge to the predevelopment rate.
(b) The drainage computations must be calculated in accordance with the guidance provided in the current Australian Rainfall and Runoff.
(a) Transportation of materials, goods or commodities to or from the land.
(b) Appearance of any building, works or materials.
(c) Emission of noise, artificial light, smell, fumes, smoke, vapour, steam, soot, ash, dust, water, waste products, grit or oil.
(d) Presence of vermin.
all to the satisfaction of the responsible authority.
(a) Monday to Friday: 6.30am to 6.30pm.
(b) Saturday, Sunday and public holidays: Closed.
(a) The premises are connected to reticulated water supply, sewerage, drainage and underground electricity to the requirements of the relevant servicing authority.
(b) The areas set aside for car parking and access lanes on the endorsed plan have been:
- Constructed with an all-weather seal coat.
- Properly formed to such levels that they can be used in accordance with the plans.
- Drained.
- Linemarked to indicate each car space and all access lanes.
(c) The footpath in the road reserve as shown on the endorsed plans has been constructed.
(d) All landscaping works have been completed generally in accordance with the endorsed plan.
(e) A letter box has been provided to the satisfaction of the Responsible Authority.
(f) The land must be cleared of all excess, unused building materials or debris.
(g) The redundant crossover has been removed and landscaped in accordance with the endorsed plans, and the section that is within the road reserve must be sown with grass consistent with the adjoining nature strip.
(a) The fencing is to be a 1.8-metre-high temporary fence constructed using steel or timber posts fixed to a concrete pad, with the fence's side panels to be constructed of cyclone mesh wire or similar strong metal mesh or netting.
(b) The fencing is to encompass the entire nature strip area (between any footpath and kerb and channel) and must extend to the identified tree protection radial distance.
(c) The fencing can be moved to the edge of any existing crossover(s) for site access.
(d) The fencing may only be moved to construct any approved crossover.
(e) Prior to any excavation occurring for the Concrete Footpath, a trench must be dug by hand or by other non-destructive means (pneumatic, or hydro-excavation) along the north edge of the Concrete Footpath within the TPZ of Tree 1 to the same depth as the Concrete Footpath sub-base. During the works:
- Excavation must be supervised by the Project Arborist.
- No roots greater than 20mm diameter are to be cut without prior approval from Council's Parks Department.
- Any roots found must be pruned at the edge of the trench closest to the tree using sharp saw or secateurs. Any machinery not specifically designed to prune roots must not be used.
- Any exposed roots must not be allowed to desiccate. Exposed roots must be covered with premoistened thick hessian or jute matting and pinned. The covering must be kept moist until such a time as the roots are permanently covered.
(f) Prior to any excavation occurring for the crossover, a trench must be dug by hand or by other non-destructive means (pneumatic, or hydro-excavation) along the west edge of the crossover within the TPZ of Tree 1 to the same depth as the crossover sub-base. During the works:
- Excavation must be supervised by the Project Arborist.
- No roots greater than 20mm diameter are to be cut without prior approval from Council's Parks Department.
- Any roots found must be pruned at the edge of the trench closest to the tree using sharp saw or secateurs. Any machinery not specifically designed to prune roots must not be used.
- Any exposed roots must not be allowed to desiccate. Exposed roots must be covered with premoistened thick hessian or jute matting and pinned. The covering must be kept moist until such a time as the roots are permanently covered.
(g) Prior to any excavation occurring for the Concrete Footpath, a trench must be dug by hand or by other non-destructive means (pneumatic, or hydro-excavation) along the south edge of the Concrete Footpath within the TPZ of Tree 2 to the same depth as the Concrete Footpath sub-base. During the works:
- Excavation must be supervised by the Project Arborist.
- No roots greater than 20mm diameter are to be cut without prior approval from Council's Parks Department.
- Any roots found must be pruned at the edge of the trench closest to the tree using sharp saw or secateurs. Any machinery not specifically designed to prune roots must not be used.
- Any exposed roots must not be allowed to desiccate. Exposed roots must be covered with premoistened thick hessian or jute matting and pinned. The covering must be kept moist until such a time as the roots are permanently covered.
(h) Recommendations arising from the non-destructive root investigations and the conduct of the above tree protection measures must be implemented to the satisfaction of the responsible authority.
(a) The development is not started within two years of the date of this permit, or
(b) The development is not completed within four years of the date of this permit, or
(c) The use does not start within one year of the completion of the development, or
(d) The use is discontinued for a period of two years.
The responsible authority may extend the periods referred to if a request is made in writing before the permit expires, or within six months of expiry of permit. An extension of time to complete the development or a stage of the development may be requested if:
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[3] Andrew Ferris Drafting and Design v Casey CC [2018] VCAT 1745.
[7] Reichart v Banyule City Council [1996] VCAT 44.
[8] At [3] of the Council's C284 submission (undated).
[9] Submission put forward on behalf of Dorothy O'Neill, Milan Jovic, John Potts, Arvils Grikis, Laimdota Grikis, Philip Young, Sladan Stankic, Robert O'Neill, Andrina Young, Serena Nicholson, Aaron Nicholson, Mickayla Nicholson, Rachelle Stankic, Michelle Everett, Dean Baker, Kirra Sprake, Paul Boothman, Pamela Boothman (undated).
[10] At [45] of the applicant's C284 reply submission, dated 2 May 2025.
[12] At [30] of the applicant's C284 reply submission, dated 2 May 2025.
[14] Including at clauses 11.01, 11.02, 11.03, 13, 15, 17, 18, 19 and 21.
[17] At 1A Wrap Court and 22 Hillsmeade Drive.
[18] Krampitz v City of Footscray in 1978.
[20] We were not advised of any planning or building approvals for 3 Hillsmeade Drive.
[21] [2021] VCAT 1191 at [68] and [69].
[22] Clause 22.02-3 (Community benefit) and cl 21.25-2 (Narre Warren South, Objectives), respectively.
Bonanni Construction Group Pty Ltd
Casey CC [2025] VCAT 450