austlii:cth/APO/2026/4
General information, not legal advice.
APO
2026-01-28
Original judgment source is linked above.
The request under s191A(2) of Patents Act 1990 is successful. Pursuant to s191A(2) of the Patents Act 1990, I hereby declare that Amir Moezzi and Romolo Lorenzo Bertani are entitled to the patent. The Commissioner will accordingly rectify the Register, pursuant to s191A(3) of the Patents Act 1990.
Costs are hereby awarded against Romolo Lorenzo Bertani according to Schedule 8 of the Patent Regulations 1991.
Handwritten design and process notes by Dr Moezzi concerning the patent
An email sent on 30 November 2016 by Dr Moezzi to Mr Dower and cc'ed to Mr Bertani on
An email chain between Dr Moezzi, Mr Bertani and Mr Dower on 10 April 2017
Emails between Dr Moezzi and Mr Peter Chin, cc'ing Mr Bertani, on 30 November 2016
The assignment deed, but with some annotations added by Dr Moezzi for this matter.
A US patent assignment cover sheet and deed of assignment
The US cover sheet, but with some annotations added by Dr Moezzi for this matter.
A tax invoice from Dr Moezzi's company, Avocado Engineering Pty Ltd ("Avocado Engineering"), to Mr Bertani's company, Annsca Energy Pty Ltd ("Annsca")
A letter sent on behalf of Annsca and Mr Bertani by LCI Legal to Dr Moezzi.
A letter sent on behalf of Annsca and Mr Bertani by LCI Legal to Dr Moezzi in his capacity as managing director of Avocado Engineering, an email (in Italian and with a translation) from Mr Gian Droli to Mr Bertani and an email from Mr Droli to Mr Bertani, Dr Moezzi and Mr Roger Black.
6 March 2025 (for the email from Mr Droli to Mr Bertani)
3 August 2018 (for the email from Mr Droli to Mr Bertani, Dr Moezzi and Mr Black.)
An email chain between Mr John Dower of FPA and Dr Moezzi
A letter from Dr Moezzi to the US firm Morgan, Lewis & Bockius LLP
An email chain between Dr Moezzi and Mr Dower comprising, amongst other things, the sending of Exhibit F6 to Mr Dower and Mr Dower's response
The email chain of(?) Exhibit F8, but with an additional response by Dr Moezzi on 6 March 2025.
A letter from Dr Moezzi to LCI Legal and Mr Bertani. This letter responds to the letter of (?) Exhibit F2.
An agreement between Dr Moezzi and Annsca concerning an exchange of shares in Annsca for Dr Moezzi's time and stating that Annsca's intellectual property remains its own.
A request for correction of inventorship with respect to US 16/607052.
A video comparing electronic signatures of Exhibits E1 and E2 to the signature on the assignment deed.
"It is desirable to reduce or minimise contamination of a water permeable layer. It is also desirable to capture these stray greenhouse gases to reduce or minimise the amount of greenhouse gases released into the atmosphere from the wellbore[6]."

"The filter modules 109 may also alleviate issues with sealing the production casing 106 and the surrounding rock wall of the borehole 107 in the regions around the boundary of the production zone 114, whereby a poor seal may result in fluid (e.g. tracking fluids, geothermal fluids or hydrocarbons) or gaseous contaminants leaking from the production zone 114 along or around the production casing 106. > > The filter assembly 108 also captures contaminants that may have leaked within or around the portion of the borehole 107 located below the filter assembly 108. Such leakage may include instances where the outer casing 105, the production casing 106, the cement 120 or rock wall of the borehole 107 located below the filter assembly 108 have deteriorated or failed causing a leak of contaminants. > > In the illustrated embodiment of Figure 1A part of the filter assembly 108 is located below the water permeable layer 102. This configuration may reduce or minimise contamination of the water permeable layer 102 and possible resultant contamination of water supplies. > > The filter assembly 108 also reduces or minimises the release of gaseous contaminants into the atmosphere by capturing these contaminants before they are released at the surface 101 and into the atmosphere."

"In a fourth embodiment, a system for contaminant extraction may have a structure similar to that shown in Figures 1A, 10A-10D and 11A-11C comprising a filter assembly 108 having a lower filtering stage and primary upper filtering stage located within the borehole 107 and a secondary upper filtering stage located externally of the borehole 107. Within the borehole, the lower filtering stage includes a plurality of perforated filter modules 127a, 127b for filtering solid contaminants and a primary upper filtering stage includes a plurality of non-perforated filter modules 128a for filtering fluid contaminants, including liquid and gaseous contaminants. The fluids and gases are then extracted from the borehole 107 for further filtering by a secondary upper filtering stage including a plurality of serially connected non-perforated gas or fluid filter modules 128b located externally of the borehole 107."
1. A system for contaminant extraction in a borehole extending from a surface of the Earth through a water permeable layer and into an underlying production zone, the system comprising: > > an outer casing located within the borehole and extending through the water permeable layer; > > a production pipe located within the casing and extending towards the production zone; > > a filter assembly, at least part of which occupies at least part of an intermediate zone between the outer casing and the production pipe, wherein the filter assembly is configured to capture contaminants before they enter the water permeable layer and/or before they are released into the atmosphere, the filter assembly comprising: > > a lower filtering stage configured to filter solid contaminants; and > > an upper filtering stage including a series of non-perforated filter modules located externally of the borehole and configured to filter fluid contaminants migrating from the production zone through the lower filtering stage; > > lowering and raising means for lowering and raising the lower filtering stage which occupies the intermediate zone; and > > sealing means for preventing the uncontrolled leakage of contaminants from the intermediate zone, wherein the lower filtering stage comprises a perforated housing arrangement, the perforated housing arrangement comprising one or more perforated filter modules configured to filter solid contaminants and permit entry of fluid contaminants migrating from the production zone into the upper filtering stage of the filter assembly. > > 12. A system for contaminant extraction in a borehole extending from a surface of the Earth through a water permeable layer and into an underlying production zone, the system comprising: > > an outer casing located within the borehole and extending through the water permeable layer; > > a production pipe located within the casing and extending towards the production zone; > > a filter assembly, at least part of which occupies at least part of an intermediate zone between the outer casing and the production pipe, wherein the filter assembly is configured to capture contaminants before they enter the water permeable layer and/or before they are released into the atmosphere, the filter assembly comprising: > > a lower filtering stage configured to filter solid contaminants, including at least one solids filtering module; and > > an upper filtering stage including a series of non-perforated filter modules located externally of the borehole and configured to filter fluid contaminants migrating from the production zone through the lower filtering stage; > > lowering means for lowering the at least one upper filtering module down the borehole on a plurality of cables towards the production zone; and > > sealing means for preventing the uncontrolled leakage of contaminants from the intermediate zone, > > wherein the lower filtering stage comprises a perforated housing arrangement, the perforated housing arrangement comprising one or more perforated filter modules configured to filter solid contaminants and permit entry of fluid contaminants migrating from the production zone into the upper fluids filtering stage of the filter assembly. > > 13. A method for contaminant extraction in a borehole extending from a surface of the Earth through a water permeable layer and into an underlying production zone, the borehole including an outer casing cemented within the borehole and extending through the water permeable layer, and a production pipe within the casing and extending towards the production zone, the method including; > > providing a filter assembly, at least part of which occupies at least part of an intermediate zone between the outer casing and the production pipe, to capture contaminants before they enter the water permeable layer or before they are released into the atmosphere, the filter assembly including: > > a lower filtering stage configured to filter solid contaminants, including at least one solids filtering module; and > > a fluids filtering stage including a series of non-perforated filter modules located externally of the borehole and configured to filter fluid contaminants migrating from the production zone through the lower filtering stage; > > fitting the at least one solids filtering module between the outer casing and the production pipe; > > lowering the at least one solids filtering module down the borehole on a plurality of cables towards the production zone; > > sealing the intermediate zone at an uppermost portion of the outer casing to prevent the uncontrolled leakage of contaminants from the intermediate zone; and > > extracting filtered gas though the upper filtering stage for collection and storage, > > wherein the lower filtering stage comprises a perforated housing arrangement, the perforated housing arrangement comprising one or more perforated filter modules configured to filter solid contaminants and permit entry of fluid contaminants migrating from the production zone into the upper fluids filtering stage of the filter assembly.
"(2) The Commissioner must, on application, make a declaration as to a person's entitlement to a patent, or a share in a patent, if the Commissioner is satisfied, on the balance of probabilities, that the Register does not properly record a person's entitlement to a patent, or a share in a patent:
(a) because the patent, or a share in the patent, was granted to a person who was not entitled to it; or
(b) because the patent, or a share in the patent, was not granted to a person who was entitled to it; or
(3) If the Commissioner makes a declaration under subsection (2), the Commissioner must rectify the Register accordingly.
(4) The Commissioner must not make a declaration under subsection (2), or rectify the Register under subsection (3), without first giving the following persons a reasonable opportunity to be heard:
(a) the person whose entitlement is not properly recorded by the Register;
(b) any person whose entitlement to the patent, or a share in the patent, is recorded in the Register."
"Subject to this Act, a patent for an invention may only be granted to a person who:
(a) is the inventor; or
(b) would, on the grant of a patent for the invention, be entitled to have the patent assigned to the person; or
(c) derives title to the invention from the inventor or a person mentioned in paragraph (b); or
(d) is the legal representative of a deceased person mentioned in paragraph (a), (b) or (c)."
That is a patent may be granted to the inventor of an invention or someone who derives title to the invention from an inventor, and it is these "entitled" persons for the purposes of s15 who are recorded as patentees in the Register.
"The law is well settled upon the position of an officer or employee who makes an invention affecting the business of his or her employer. It is an implied term of employment that any invention or discovery made in the course of the employment of the employee in doing that which he is engaged and instructed to do during the time of his employment, and during working hours, and using the materials of his employers, is the property of the employer and not of the employee. Having made a discovery or invention in course of such work, the employee becomes a trustee for the employer of that invention or discovery, and he is therefore as a trustee bound to give the benefit of any such discovery or invention to his employer. But the mere existence of the employer/employee relationship will not give the employer ownership of inventions made by the employee during the term of the relationship. And that is so even if the invention is germane to and useful for the employer's business, and even though the employee may have made use of the employer's time and resources in bringing the invention to completion. Certainly, all the circumstances must be considered in each case, but unless the contract of employment expressly so provides, or an invention is the product of work which the employee was paid to perform, it is unlikely that any invention made by the employee will be held to belong to the employer.[12]"
"Unsurprisingly, express contractual stipulation apart, with the employer's entitlement turning on that which it was the employee's 'duty' to do - and for which the employee was paid - the recurrent preoccupation in the case law has been in each instance with the actual subject matter and purpose of the employee's engagement itself and with the question: '[w]hat is it that he is employed to do?'; cf LIFFE Administration & Management v Pinkava [2007] 4 All ER 981 (LIFFE) at [97]. The end of this inquiry is to ascertain whether, if at all, it was part of an employee's engagement with his or her employer to utilise his or her 'inventive faculty' (cf Sterling Engineering at 544; Vokes at 136) in an agreed way or for an agreed purpose for the benefit of, or to further the purposes of, the employer. To use the shorthand of Electrolux Ltd v Hudson [1977] FSR 312 at 326, was the employee 'employed to make or discover inventions at all?', or, as French J put it, did the employee have 'a duty to invent?' > > If the employee's invention is the, or a, product of what he or she was employed to do, and did do, it will belong to the employer unless otherwise agreed: see eg British Reinforced Concrete Engineering Co Ltd v Lind (1917) 34 RPC 101 (British Reinforced Concrete); Adamson v Kenworthy (1932) 49 RPC 57; Triplex Safety Glass Co v Scorah [1938] 1 Ch 211 (Triplex Safety Glass); and see also Electrolux Ltd, at [97]. In such a case, it would be 'inconsistent with [the employee's] duty to appropriate to himself an invention of this kind': Edisonia Ltd v Forse (1908) 25 RPC 546 at 552. > > By way of contrast, if (a) the employee was not engaged to use his or her inventive capacity at all (cf Re Charles Selz Ltd's Patent Application (1954) 71 RPC 158); or (b) was so engaged only by way of additional duties to use his or her inventive capacity as and when asked (Spencer Industries Pty Ltd v Collins [2003] FCA 542; (2003) 58 IPR 425) or only for an agreed purpose, the employer would have in case (a) no claim on the employee's invention at all and in case (b) such a claim only if the invention resulted from a task the employee was asked to perform by way of additional duty or if the invention was related to the effectuation of the agreed purpose. > > We note in passing that it can, on occasion, be factually difficult to define the subject matter over which a particular employee's inventive responsibility to the employer extends. This may be, for example, because (a) the employee's engagement gives him or her considerable discretion in determining the area of inventive inquiry he or she will pursue for the employer's benefit; or (b) the employee's managerial and inventive responsibilities combined are such that he or she, as a fiduciary, is obliged to give the employer the benefit of any invention developed in the course of his or her employment that is germane to the employer's business (see eg Fine Industrial Commodities Ltd v Powling (1954) 71 RPC 253; see also British Syphon Co Ltd v Homewood (No 2) [1956] All ER 897 which is probably better explained as a breach of fiduciary duty case); or (c) the employee's inventive responsibilities evolve over the course of the employment as a result, for example, of the employment tasks changing: see eg British Reinforced Concrete, at 109."
"The ordinary standard of proof required of a party who bears the onus in civil litigation in this country is proof on the balance of probabilities. That remains so even where the matter to be proved involves criminal conduct or fraud_.._. On the other hand, the strength of the evidence necessary to establish a fact or facts on the balance of probabilities may vary according to the nature of what it is sought to prove. Thus, authoritative statements have often been made to the effect that clear...or strict...proof is necessary 'where so serious a matter as fraud is to be found'...Statements to that effect should not, however, be understood as directed to the standard of proof. Rather, they should be understood as merely reflecting a conventional perception that members of our society do not ordinarily engage in fraudulent or criminal conduct...and a judicial approach that a court should not lightly make a finding that, on the balance of probabilities, a party to civil litigation has been guilty of such conduct. As Dixon J. commented in...: > > 'The seriousness of an allegation made, the inherent unlikelihood of an occurrence of a given description, or the gravity of the consequences flowing from a particular finding are considerations which must affect the answer to the question whether the issue has been proved ...'."
Is Dr Moezzi entitled to a share of the patent?
Was Dr Moezzi an employee of Mr Bertani at the relevant time?
Is the entitlement deed effective in transferring Dr Moezzi's rights in the patent?
"The Requestor did not obtain confirmation of the forged deed's details until March 2025[25], following direct correspondence with the patent attorney (FPA) who had advised Mr Bertani, and only after completing a thorough due diligence review of all available evidence. Until that point, the Requestor was not fully aware of his legal rights or the full extent of the misrepresentation. Once the position became clear and sufficient documentary proof was obtained, the Requestor acted promptly - filing the present section 191A request in April 2025 and submitting supporting evidence accordingly."
"On 20 June 2022, I discovered for the first time the existence of an assignment deed dated 26 April 2018 for Australian patent application 2018255486, which had been submitted to a patent attorney and bore a signature purporting to be mine. > > That same day, I confronted Mr. Romolo Bertani via WhatsApp, shown in Exhibit A, by sending a copy of the document, with a red-marked circle around the forged signature, and asked: > > 'Who signed here with my name?' > > Mr. Bertani denied any knowledge of the document and responded: > > 'Don't know what do you talking about mate... All document I have is the original document you signed at the beginning...' > > This statement appears to refer to the agreement dated 10 April 2014 between myself and Annsca Energy Pty Ltd (Exhibit G1), which Mr. Bertani and his lawyer have since repeatedly tried to invoke to claim that I transferred all intellectual property rights to Annsca Energy or to him personally. This claim is false." (emphasis in original)
"A visual comparison between my handwriting in Exhibit B and the handwritten name and date entries in the purported assignment deed shows clear inconsistencies. For example, the style of the numerals '2,' '4,' and '8,' and the lowercase letters 'm' and 'r' are noticeably different from my handwriting. I also do not use dashes ('-') to separate day, month, and year in date formats - I consistently use slashes ('/') - whereas the deed shows dashes in all date entries throughout the document. > > Notably, the date '26' appears below each of the three handwritten names (my own, Mr Bertani's, and the witness's), and the numeral '2' in each instance is written in an identical and distinctive style, suggesting that all handwritten entries were completed by the same individual. This strongly supports my position that I did not execute this document and that it was improperly completed and submitted without my consent." (emphasis in original)
"The assignment deed contains an electronic signature matching my digital signature and a handwritten name and date beneath it, which I did not write or sign. The handwriting is not my own. The combination of electronic and handwritten elements is inconsistent and illogical, especially given the claim that the deed was witnessed by Cristina Bertani. There is no record of any meeting or correspondence where this assignment was discussed or agreed. > > Combination of an electronic signature and handwritten name and date, which is not done by me, is completely against the witnessing process where signature and handwriting must be performed in the presence of a witness at the same time so the witnessing become valid. There is no reason or possibility that signature is electronically transferred to the document in the presence of a witness and handwriting takes place at the same time. The fact that the witnessing process itself is completely invalid supports the fabricated nature of the assignment deed subject to this application here. > > Hereby, I also ATTACH A VIDEO (file is uploaded and titled: electronic signature matching the signature on assignment deed-video to show) as the analysis of electronic signature overlay to show the exact match of my electronic signature which is extracted in this video from one of my invoices that Mr Bertani had access to and used to show that the signature on the assignment deed is a 100% match with my electronic signature. I attach two invoices pre-dating the date of the assignment deed for your reference for separate procurement-related matters (See Exhibit E1 and E2)." (emphasis in original)
on balance I consider that Dr Moezzi did not in fact sign the assignment deed. It follows that the assignment deed is not effective in transferring Dr Moezzi's rights to the patent, and that the Register should be rectified to reflect Dr Moezzi as a patentee.
[1] Comments filed by Mr Bertani's legal representatives on 17 November 2025 were concerned only with some matters raised by Dr Moezzi against the same, and do not represent or provide any response by Mr Bertani to Dr Moezzi's request.
[2] Patent page 1, line 4 to page 2 line 4.
[7] Patent page 2, line 5 to page 8a, line 29.
[8] Patent page 9, line 5 to page 11, line 25.
[9] Patent page 12, line 1 to page 34, line 26.
[12] Victoria University of Technology v Wilson [2004] VSC 33; 60 IPR 392 at [104]. References to footnotes removed.
[15] Submissions at C[5], E[1], F[5], F[6] and G[3]; statement1 at [4] and statement2 at sections 4, 7 to 9, 11, 13 and 14. Dr Moezzi's denials regarding employment are also apparent in Exhibits F4 and F7. Statement1 at section 5 indicates that Dr Moezzi and Mr Bertani were in a "business relationship".
[17] Submissions at E[5]; Statement2 at sections 4, 5 and 7 Exhibit F4; Exhibit F11; Exhibit I1
[18] Exhibit F4 at sections A and B and Exhibit F7, page 2.
[19] Submissions at C[5], C[6], D[2], E[3], G[2], H[2]; statement1 at [2]; statement2 at [3]; Exhibit F4 at section A; Exhibit F7 and Exhibit F9.
[20] Submissions at C[6]a), E[3] and G[3]; statement1 at [2]; statement2 at section 3and Exhibit F4 at section A.
[21] Submissions at C[6]b); statement1 at [2]; Exhibit F3; Exhibit F7 and Exhibit F9.
[22] Submissions at E[1] to [6] and H[3]; statement2 at sections 4 and 7; Exhibit A and Exhibit F3.
[25] See also Exhibit F7, page 1, where Dr Moezzi indicates that he discovered the statement of entitlement for the patent "recently" with recent being with respect to 5 March 2025.
[26] At section 7. See also the submissions at E[5].
[27] See Exhibit G2; statement2 at section 5; Exhibit F4 at section B and Exhibit F5
[32] For example, at statement1 section 6.
Amir Moezzi
Romolo Lorenzo Bertani [2026] APO 4
(2003) 58 IPR 425