[2009] VCAT 1903
Victorian Civil and Administrative Tribunal
2009-09-14
Original judgment source is linked above.
Section 77 Planning and Environment Act 1987, review of refusal to grant a permit, Stonnington City Council, Residential 1 Zone, proposed apartment building, policy support for medium density housing and higher rise development, interface with residential properties of single storey scale, amenity, traffic, self-sufficiency of parking
A Bogaars, G Waters, K Alexander, A Psarras and VicRoads
Aivatoglou v Stonnington CC & Ors [2009] VCAT 1903
Mr Chris Canavan QC appearing with Ms Emily Porter of Counsel, instructed by Deacons Lawyers
Mr Canavan and Ms Porter called the following expert witnesses:
Mr Peter English, Town Planner, Peter English & Associates
Mr Geoffrey Waters in person and on behalf of Kerryn Anderson
Development of nineteen units within a part five storey building
Section 77, Planning and Environment Act 1987
Clause 32.01-4 construction of two or more dwellings on a lot
Clause 52.27 alteration of access to Road Zone Category 1 (removal of crossover to High Street)
Clause 52.06 reduction in provision of on-site car parking
The subject land is located on the south east corner of High Street and John Street, Windsor. It has a frontage of approximately 21 square metres and a sideage of 32 square metres, giving a total site area of approximately 585 square metres.
Land to the east contains a number of older, single storey dwellings. These properties ajoin a substantial redevelopment site on the south east corner of High Street and Thomas Street. A new five storey residential hotel, convenience shop and licensed premises has been approved on this corner. Land further east contains Swinburne TAFE, leading into the Chapel Street Principal Activity Centre and surrounds.
The subject land is approximately 300 metres from the Chapel Street intersection.
Land over High Street to the north is used and developed for a mix of uses, most commonly offices, service and commercial uses. Built form contains a mix of one to four storeys, with wide variations in building styles and dates of construction.
Land to the immediate south in John Street (with the exception of the double storey dwelling on the subject land) presents as a consistent streetscape of single storey attached cottages with verandas and compact front setbacks with picket style fencing. These properties are not covered by a Heritage Overlay.
A railway line runs to the east of the subject land, over St John Street, with the Windsor Station approximately 250 metres to the north.
I inspected the subject land and surrounds following the hearing, including within the dwelling and private open space of 106 High Street.
Asian Pacific Building Corporation v Stonnington City Council & Ors [2007] VCAT 1914
High Street Investment Partners Pty Ltd v Stonnington City Council & Ors [2009] VCAT 938
It is policy that use and development maintain the character of the area, that development achieves a high standard of urban design and that new buildings not be significantly higher or lower than surrounding buildings.
Moderate change in development is expected to occur in areas in or beside large activity centres and beside public transport routes that are already well developed with medium to higher density housing. In these areas there will be incremental opportunities for infill development consistent with the preferred future character of the area.
Chapel Vision does not carry the same weight as the Planning Scheme but it is also self evident that the heights referred to in the local policy in the Scheme are outdated and there is no Scheme amendment to which weight can be afforded with respect to revised heights.
Development implications arising from site context and policy
Locate a substantial proportion of new housing in or close to activity centres and other strategic redevelopment sites that offer good access to services and transport by:
The proposed development should be seen in the context of the previously approved Larwill Hotel, to the East of the subject site. . . This section of High Street is in transition to a more intensive form of development consistent with the balance of the street through to Chapel Street. Subject to some suggested amendments, outlined below, this is an appropriate response to the development of this strategically important site and is consistent with the intent of the Chapel Street Vision Structure Plan. . .
[This] will assist in strengthening and consolidation of this important main road entry into the Principal Activity Centre from the West.
Interface with 106 High Street and impacts on amenity
Presentation to St John Street and interface with 1 St John Street
The design character of the St. John Street frontage is well articulated to acknowledge the smaller scale character of the street.
The proposed development provides vertical breaks to the St John Street elevation, roughly 4.5 metres in width, reflective of the attached dwellings in that street. It also provides a number of balconies fronting St John Street, which provide increased articulation and opportunities for passive surveillance.
To ensure the provision of an appropriate number of car spaces having regard to the activities on the land and the nature of the locality.
Under clause 52.06-5, two on site car parking spaces are to be provided for each dwelling, totalling 38 spaces. This amount may be reduced via a permit, having regard to considerations in clause 52.06-1.
. . . it should be noted that St John Street has a fairly narrow carriageway and a threshold treatment with High Street, which tends to affect the operation of the intersection and as such, it is likely that additional traffic generated by this proposal will intensify the existing conditions at this location. This concern, however, already exists and it is not considered appropriate to object to the proposal on these grounds.
permit conditions, so that the revised plans would translate into the plans to be submitted for endorsement with some revisions.
(iv) The collection of wastes and recyclables from the premises (other than normal Stonnington City Council collection) must be conducted between the hours of 7am and 4pm, Monday to Friday and between 9am and 1pm on Saturdays and must not occur on a public holiday, to the satisfaction of the Responsible Authority.
(v) Method of presentation of bins for waste collection
(vi) Strategies for how the generation of waste and recyclables from the development will be minimised
When approved, the plan will be endorsed and will then form part of the permit. Waste collection from the development must accord with the Waste Management Plan, to the satisfaction of the Responsible Authority.
The site must be drained to the satisfaction of the Responsible Authority and the discharge of water from the site must be controlled to prevent any discharge onto any adjacent property or street other than by means of an underground pipe discharged to a point nominated to the satisfaction of the Responsible Authority.
Before the development starts, a request for a legal point of stormwater discharge must be obtained from Council and a drainage design for the development must be prepared by a suitably qualified Engineer prior to a building permit being issued. The drainage must be constructed in accordance with the Engineer's design and certification for the design from the Engineer must be provided to Council at the completion of the works.
Air conditioning and other plant and equipment installed on the subject buildings must be positioned and baffled so that no noise disturbance is caused to occupiers of adjoining properties to the satisfaction of the Responsible Authority.
All services to the subject land and buildings approved as part of this permit must be provided underground to the satisfaction of the Responsible Authority.
All new crossovers must be constructed to Council's Standard Vehicle Crossover Guidelines unless otherwise approved by the Responsible Authority.
The level of any footpath must not be lowered or altered in any way to facilitate access to the site, except with the consent of the Responsible Authority.
External lighting must be designed, baffled and located to prevent any adverse effect on adjoining land to the satisfaction of the Responsible Authority.
All walls on or facing an exposed boundary of the site must be cleaned and finished to the satisfaction of the Responsible Authority.
(i) The development is not started within two years of the date of this permit; or
(ii) The development is not completed within four years of the date of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
[1] A similar objective is provided in clause 22.06.
[3] [2009]VCAT 938, a decision of Senior Member Baird and Member Chase. In that instance, they were referring to a 12 metre height for land within the Business 1 Zone, but similar comments can be made in respect of the lack of up-to-date maximum heights in the planning scheme for settings such as the subject land, recognising that the Chapel Vision Structure Plan currently sits outside the planning scheme.
[4] I also note that the double storey dwelling on the subject land provides a sheer double storey wall to 1 St John Street, projecting 3 metres forward of the front façade. The new wall would represent an approximate 2 metre increase to this height.
[5] In addition to other relevant matters in clause 52.06-1.
[6] As at 2006, 74% of studio dwellings did not own a car.
[7] In general, the Chapel Vision Structure Plan notes affordable housing for smaller households and young professionals as a key area of housing demand, at page 9.
[8] Relative to a predicted 80 vehicle movements per day with approximately 8 vehicle movements during peak hour (on the advertised proposal).
Aivatoglou
Stonnington CC & Ors [2009] VCAT 1903