The applicant demonstrate that the proposal is consistent with maintaining the character and amenity of any adjoining dwellings and the operations of any existing nearby commercial and industrial uses, particularly relating to unreasonable:
The responsible authority may agree to height or development bonuses if this will facilitate:
Is the proposed built form an acceptable response to the existing circumstances and planning context?
Would the proposal unreasonably affect abutting dwellings?
When approved the plan will be endorsed and will then form part of the permit. Waste collection from the development must be in accordance with the plan, to the satisfaction of the Responsible Authority.
The Waste Management Plan may be amended to the satisfaction of the Responsible Authority.
for construction vehicles (including temporary and permanent vehicle crossings), traffic management during construction including road closures/road occupation/footpath closures, work zones/construction zones to accommodate vehicles and deliveries.
(h) Service connections/road and footpath openings and anticipated impact on public land during the connection of different services.
(i) Measures to be used to protect Council infrastructure from damage.
(j) Existing services and environmental management.
(k) A list of all environmental hazards that the activities on-site pose i.e. contaminated soil, materials and waste, dust, stormwater contamination from run-off and wash-waters sediment from the site on roads, construction noise, hours of operation, vibration, washing of concrete trucks and other vehicles and machinery, spillage from refuelling cranes and other vehicles and machinery etc.
(l) Protection measures that will be undertaken to minimise the risk of the above hazards being realised.
(m) Regular monitoring/inspections of the above protection measures.
(n) Identification as to who will be responsible for managing all of the above issues.
(o) Anticipated staging of the development.
All activities associated with the construction of the buildings and works hereby permitted must be carried out in accordance with the approved Construction Management Plan. The Construction Management Plan may be amended to the satisfaction of the Responsible Authority.
Four copies of the Certificate of Environmental Audit and/or Statement, complete audit report and audit area plan must be submitted to the Responsible Authority prior to the commencement of the use or development of the land.
The Responsible Authority may extend the times referred to if a request is made in writing before the Permit expires or within the three (3) months afterwards.
[1] The participative rights of Respondent Objectors are limited given third party exemptions apply under Clause 34.01. That means the grounds able to be pursued by residents are confined to matters such as land use and car parking/traffic rather than buildings and works. We have considered all of the material before us within the ambit of our discretion. However, we have been greatly assisted by the ability to inspect the Morris' and Ms Bryant's apartments.
[3] The site straddles Areas I and J on Map 1 to Clause 22.02. There is no setback mentioned for Area I and a setback for Area J as: "The building be consistent with adjoining properties".
[5] Chapel Vision Structure Plan 2007-2031, December 2007.
[8] The precinct boundary is approximately centrally east-west across the site.
[13] We do not recite these in detail but they include, for example, Clause 21.05, 22.12 and 22.13.
[14] Located on the opposite corner of Clifton and High Streets.
[15] There are two buildings one of which is more prominent in the context of the review site.
[16] This development having been decided by the Tribunal (Member Baird) in Dentow Pty Ltd v Stonnington CC and Ors [2002] VCAT 306 and Dentow Pty Ltd v Stonnington CC &Ors [2002] VCAT 571.
[17] See for example Ryssal Three Pty Ltd v Stonnington CC [2008] VCAT 2113 and Ryssal Three Pty Ltd v Stonnington CC [2008] VCAT 2619.
[20] Guidelines for Higher Density Residential Development at page 25.
[22] These commercial schemes are operational in inner Melbourne as explained in Ms Dunstan's evidence. A commercially based scheme would not be limited to residents of the building. In that event, additional security on-site may be required, such as an extra gate in the car park. We have no objection to that.
[23] We have not discussed the debate as to the appropriate application for showrooms that vary between the parties.