Mechanically, this Plan sets the zoning, maps, permitted/prohibited uses, exempt and complying development rules, and development standards (lot sizes, building heights) for land in Wollondilly and repeals earlier local plans (cl 1.3; cl 1.8; cl 2.1; cl 4.1; cl 4.3). It affects landowners, developers and the Council as consent authority (cl 1.6): most works need development consent or must fit exempt/complying rules (cl 3.1–3.2), and applications must meet heritage, biodiversity and flood tests and other local controls (cl 5.10; cl 7.2; cl 5.21).
Mechanically, the Wollondilly Local Environmental Plan 2011 (the Plan) sets the local land‑use regime for land within the Wollondilly local government area by: specifying zones (cl 2.1; cl 2.2), prescribing the Land Use Table that lists permitted, permitted‑with‑consent and prohibited uses for each zone (cl 2.3; Land Use Table), fixing primary development standards such as minimum lot sizes and building heights via the Lot Size Map and Height of Buildings Map (cl 4.1; cl 4.3), identifying matters that trigger development consent including heritage and environmental protections (cl 5.10; cl 7.2; cl 7.3), and declaring particular classes of exempt and complying development (Part 3, Schedule 2, Schedule 3). The Plan also adopts a range of local provisions addressing specialist matters: aquaculture (cl 5.19; Schedule 6), intensive livestock agriculture (cl 5.18), temporary and visitor‑economy uses (cl 2.8; cl 7.13; cl 7.15), flood planning (cl 5.21), public bushland (cl 5.23) and controls on function centres, caravan parks and other uses in specified zones (cll 7.11-7.12). The consent authority for the Plan is the Council, subject to the Act (cl 1.6).
The Plan operates together with state instruments. It is expressly subject to any State environmental planning policy (SEPP) that prevails over it under s 3.28 of the Act (cl 1.9(1)). It repeals prior local environmental plans that applied only to the land within the Plan (cl 1.8). Savings and transitional measures are included: development applications made before the Plan’s commencement are to be determined as if the Plan had not commenced in specified circumstances (cl 1.8A). Clause 1.9A enables suspension of private agreements or covenants to the extent necessary to allow development under the Plan, while excluding a range of Crown, conservation and planning agreement instruments from that suspension (cl 1.9A(1)-(3)).
Current sections
Direct links to the current provisions in Wollondilly Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agriculture; Air transport facilities; Animal boarding or training establishments; Aquaculture; Artisan food and drink industries; Boat launching ramps; Camping grounds; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Community facilities; Crematoria; Depots; Dual occupancies (attached); Dwelling houses; Eco-tourist facilities; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Flood mitigation works; Forestry; Function centres; Funeral homes; Group homes; Helipads; Home-based child care; Home businesses; Home industries; Home occupations (sex services); Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Landscaping material supplies; Markets; Open cut mining; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (indoor); Recreation facilities (major); Recreation facilities (outdoor); Research stations; Restaurants or cafes; Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings; Signage; Timber yards; Tourist and visitor accommodation; Transport depots; Truck depots; Veterinary hospitals; Water recreation structures; Water supply systems; Wharf or boating facilities
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone E1 Local Centre and marked “Car park” | Council |
| Zone SP2 Infrastructure and marked “Local road” | Council |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
cl 5.1: Am 2022 (857), Sch 1.9[10].
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
6
6.1 (Repealed)
Part 7
Additional local provisions
Part 7 Additional local provisions
Part 7 Additional local provisions
7
Essential services
7 Essential services
7.1 Essential services
(1) Development consent must not be granted to development unless the consent authority is satisfied that any of the following services that are essential for the proposed development are available or that adequate arrangements have been made to make them available when required—
(a) the supply of water,
(b) the supply of electricity,
(c) the disposal and management of sewage.
(2) This clause does not apply to the following—
(a) development for the purpose of providing, extending, augmenting, maintaining or repairing any public utility infrastructure referred to in this clause,
Use of certain land at Bingara Gorge Estate, Wilton in Zone R2 Low Density Residential
8 Use of certain land at Bingara Gorge Estate, Wilton in Zone R2 Low Density Residential
8 Use of certain land at Bingara Gorge Estate, Wilton in Zone R2 Low Density Residential
(1) This clause applies to land at Bingara Gorge Estate, Wilton, being part of Lot 17, DP 270536, within Zone R2 Low Density Residential.
(2) Development for the following purposes is permitted with development consent—
business premises; entertainment facilities; function centres; hotel or motel accommodation; information and education facilities; office premises; pubs; recreation facilities (indoor); registered clubs; restaurants; take away food and drink premises; shops.
9
Use of certain land at Bronzewing Street, Tahmoor in Zone RU2 Rural Landscape
9 Use of certain land at Bronzewing Street, Tahmoor in Zone RU2 Rural Landscape
9 Use of certain land at Bronzewing Street, Tahmoor in Zone RU2 Rural Landscape
(1) This clause applies to land at 7 Bronzewing Street, Tahmoor, being Lot 110, DP 8982 within Zone RU2 Rural Landscape.
(2) Development for the purposes of a car park is permitted with development consent.
(3) Development consent may only be granted under this clause if the consent authority is satisfied that the car park will provide parking in connection with the lawful use of land in the vicinity of the land to which this clause applies.
10
Use of certain land at Menangle
10 Use of certain land at Menangle
10 Use of certain land at Menangle
(1) This clause applies to the following land at Menangle—
(a) 15 Menangle Road, being Lot 201, DP 590247,
(b) 1370 Moreton Park Road, being Lot 202, DP 590247,
(c) 45 Stevens Road, being Lot 21, DP 581462.
(2) Development for the purposes of attached dwellings is permitted with development consent on the land identified as “10” on the Additional Permitted Uses Map.
(3) Development for the purposes of function centres is permitted with development consent on the land identified as “11” on the Additional Permitted Uses Map.
(4) Subdivision of land to which this clause applies that results in a lot that is less than the minimum size shown on the Lot Size Map in relation to the land is permitted with development consent, but only if—
(a) the land is in Zone RU1 Primary Production, and
(b) the consent authority is satisfied that the subdivision facilitates development on the land to which this clause applies.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
Advertising structures in employment or mixed use zones
sch.2-sec Advertising structures in employment or mixed use zones
Advertising structures in employment or mixed use zones
(1) Area must not exceed 2.25m2.
(2) Must comply with the relevant development control plan relating to advertising structures and signage.
(3) Must not be illuminated.
(4) Must not be pole signs.
(5) Must not obscure the line of sight of vehicles using nearby streets and driveways.
sch.2-sec-oc.2
Roadside stalls in Zones RU1, RU2, RU4 and R5
sch.2-sec-oc.2 Roadside stalls in Zones RU1, RU2, RU4 and R5
Roadside stalls in Zones RU1, RU2, RU4 and R5
(1) Area of the place or structure used for the sale and display for sale must not exceed 20m2.
(2) Must be set back at least 20m from a public road and must not create direct access for vehicles to an arterial road or to a road with a junction to an arterial road that is less than 90m from that junction.
(3) A car parking area must be provided in close proximity to the building or that part of the land used for the stall.
(4) Maximum of 3 signs per property (one at either side of boundary and one at entrance to the property). Each sign must not exceed 2m2.
(5) Signage must not obscure the line of sight of vehicles entering and exiting the property.
sch.2-sec-oc.3
Temporary use of land for the purposes of function centres, recreation facilities (outdoor) and markets
sch.2-sec-oc.3 Temporary use of land for the purposes of function centres, recreation facilities (outdoor) and markets
Temporary use of land for the purposes of function centres, recreation facilities (outdoor) and markets
(1) The temporary use of land for the purposes of function centres, recreation facilities (outdoor) or markets that meets the following standards—
(a) must not cause a change to the building classification of any existing building,
(b) must not involve the erection of permanent structures,
(c) if on land other than public land—must not take place on more than 12 occasions in any 12-month period,
(d) each occasion on which the temporary use takes place must not exceed a total period of 7 consecutive days, comprising—
(i) not more than 3 consecutive days of use, and
(ii) not more than 4 days for set up and pack down,
(e) must not take place outside of the hours of 7am–10pm, including set up and pack down,
(f) if on land zoned Rural or Conservation—must have parking within the boundary of the land,
(g) must have artificial lighting to ensure safe movement of patrons that is directed away from adjacent residential properties,
(h) must not take place on a lot if any part of the lot is bush fire prone land,
(i) must be readily accessible by vehicles, including emergency vehicles, from a public road,
(j) must have waste containers for the removal of waste at the conclusion of the temporary use,
(2) This clause ceases to apply if—
(a) the use involves a gathering of more than—
(i) for land zoned Rural or Conservation—500 people,
(ii) for land within the Sydney Drinking Water Catchment—150 people,
(iii) otherwise—1500 people.
(b) the use involves the use of loudspeakers and amplifying devices—
This Plan is Wollondilly Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Wollondilly in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to provide for the management of natural resources and the protection of the natural landscape character,
(b) to protect, conserve and enhance the built, landscape and Aboriginal cultural heritage,
(c) to protect water quality in land that is situated within water supply catchments,
(d) to encourage development that provides for an integrated transport and infrastructure system and adequate facilities and service provision for future growth,
(e) to recognise, manage and protect rural resource lands for sustainable agriculture and extractive industry practices,
(f) to maintain the separation between towns and villages to retain their unique character and rural and natural settings,
(g) to provide for a built environment that contributes to the health and well-being of residents, workers and visitors.
cl 1.2: Am 2021 (145), Sch 1[1].
1 Land to which Plan applies
1 Land to which Plan applies
1.3 Land to which Plan applies
The Plan allocates decision rights and procedural duties. The Council must have regard to zone objectives when deciding applications (cl 2.3(2)), must be satisfied about availability or timely provision of essential services for development (cl 7.1), and must follow process requirements in heritage matters including notifying the Heritage Council or local Aboriginal communities in certain cases (cl 5.10(7)-(9)). Where an applicant proposes to contravene a development standard, the Plan permits consent only when the applicant demonstrates the matters in cl 4.6(3) and the consent authority records the assessment (cl 4.6(2)-(4)).
Officially, the Plan frames these measures as implementing the relevant standard environmental planning instrument under s 3.20 of the Act and advancing local aims such as protecting natural and Aboriginal heritage, managing water quality in drinking catchments, supporting rural resource lands, and providing built‑environment outcomes contributing to health and wellbeing (cl 1.2). Those purpose‑claims are presented as aims (cl 1.2); the Plan’s provisions are the implementing mechanisms that give effect to those aims by restricting or enabling certain development and by imposing procedural checks.
Viewed as a ruleset, the Plan (a) defines who may carry out what development in which place (zones, Land Use Table, Schedule 1 additional permitted uses), (b) sets discrete standards that gate subdivision and building development (Lot Size Map, Height Map, cl 4.1, cl 4.3), (c) creates classes of lower‑risk development that do not require development consent if they meet technical standards (Part 3, Schedule 2; Schedule 3), and (d) sets bespoke local controls for sensitive activities (heritage cl 5.10; aquaculture cl 5.19 and Schedule 6; flood planning cl 5.21). The Plan also allocates particular development‑planning tasks to Council (consent authority, classification of public land under cl 5.2) and identifies certain state acquisition authorities for land reserved for public purposes (cl 5.1).
Where the text supplies procedural safeguards or limits, it simultaneously creates compliance burdens: applicants must check multiple maps and schedules, demonstrate service availability (cl 7.1; cl 6.2 for urban release areas), satisfy heritage and biodiversity tests (cl 5.10; cl 7.2), and in some cases obtain concurrence or follow Departmental guidelines (cl 7.8). The statutory design embeds both discretionary assessment and specific prohibitions (for example, canal estate development is prohibited , cl 2.9). The material that follows enlarges on those mechanisms, the parties affected, duties created, enforcement touchpoints and practical compliance steps, citing the Plan where relevant.
Main concepts
The Plan organises land regulation around a set of recurring legal and planning concepts. These are stated objectives, zoning with a Land Use Table, mapped controls, development consent versus exempt/compliant development regimes, minimum lot sizes and other development standards, heritage/environmental protection, and targeted local controls for particular uses.
Objectives and zone‑based assessment: For each zone the Plan sets explicit objectives which the consent authority must have regard to when deciding a development application (cl 2.3(1)-(2)). The Land Use Table corresponds to zones and specifies uses that are permitted without consent, permitted with consent or prohibited (cl 2.3). The Council must therefore align decisions to both the textual objectives for a zone and the use categories in the Land Use Table.
Zoning maps and mapped standards: The Plan relies heavily on spatial layers: the Land Zoning Map determines the zone of any parcel (cl 2.2); the Lot Size Map sets minimum subdivision lot sizes (cl 4.1); the Height of Buildings Map fixes maximum building heights (cl 4.3); and other maps are referenced for public land reservation, odour buffer areas, natural resources (biodiversity and water), original holdings, odour buffers and urban release areas (see multiple clauses referencing maps, e.g. cl 4.1B, cl 5.1, cl 7.6, cl 7.9). The Plan makes those maps part of the operative fabric and confirms maps may be electronic (cl 1.7(4)).
Development consent gating and categories of development: The Plan distinguishes development that is prohibited, that requires development consent, that is exempt development (Part 3, Schedule 2) and that is complying development (Part 3, Schedule 3). Exempt development must meet the standards in Schedule 2 and not be located in environmentally sensitive areas for exempt or complying development (cl 3.1; cl 3.3). Complying development is defined by Part 1 of Schedule 3 subject to meeting deemed‑to‑satisfy provisions of the Building Code of Australia and other conditions (cl 3.2).
Principal development standards: Minimum lot sizes for subdivision (cl 4.1) are central controls; community title schemes have special minimums (cl 4.1AA) and there are special rules for dual occupancies (cl 4.1A; cl 4.1C). The Plan allows rural subdivision flexibility for primary production (cl 4.2) but bars dwellings on resulting lots in certain circumstances (cl 4.2(5)). Clause 4.6 sets the mechanism for an exception to development standards, requiring applicants to demonstrate that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds, with the consent authority required to keep a record of its assessment (cl 4.6(2)-(4)).
Heritage and environmental protection: Heritage items, conservation areas and archaeological sites are listed in Schedule 5 and mapped; cl 5.10 requires development consent for demolition or alteration of specified heritage items, and sets notification requirements (Heritage Council, Aboriginal communities) and allows the consent authority to require heritage management documents or conservation management plans (cl 5.10(2)-(6), (7)-(9)). Biodiversity and water protection clauses require the consent authority to consider adverse impacts on native ecological communities, threatened species habitat and water quality within mapped “sensitive land” areas and to refuse consent unless impacts can be avoided, minimised or mitigated (cll 7.2, 7.3).
Special local controls and exceptions: The Plan contains dozens of localised controls , examples include the prohibition on canal estate development (cl 2.9), protections for licensed premises against refusal for specified music‑related matters (cl 5.20), controls on intensive livestock agriculture including thresholds for when consent is not required and locational constraints (cl 5.18), aquaculture operational and site requirements (cl 5.19; Schedule 6), and temporary use windows for visitor economy and other short‑term events (cll 2.8; 7.13; 7.15).
Interaction with other laws and Crown rights: The Plan is prepared under the Environmental Planning and Assessment Act framework and repeatedly cross‑references other statutes. It expressly remains subject to SEPPs (cl 1.9), does not affect the rights of public authorities under registered instruments (cl 1.9A(3)), and interfaces with the Crown land, national parks, heritage, forestry, fisheries and local government statutes where relevant (clauses across Parts 1, 5 and Schedules).
These concepts determine regulatory incentives. For landholders, the zoning and Land Use Table determine whether a use is commercially realisable and whether it will require a formal application to Council. For developers, mapped minimum lot sizes, height caps and required infrastructure/service availability (cl 7.1; cl 6.2) shape the cost and timing of projects. For the Council and state agencies, the Plan delegates assessment tasks (notice, notifications, record‑keeping) and gives the Council substantive discretion in weighing zone objectives, environmental constraints and heritage considerations. Where the Plan authorises exempt or complying development, private actors gain route options that reduce transaction time, but those routes are constrained by the Plan’s technical standards and exclusions (cl 3.1-3.3; Schedule 2; Schedule 3).
Who it affects
The Plan affects multiple classes of actors; the effects are concrete and clause‑specified.
Landowners and prospective developers within the area identified on the Land Application Map (cl 1.3). Whether a proposed use is allowed, needs consent or is prohibited depends on the zone shown on the Land Zoning Map and the Land Use Table (cl 2.2; cl 2.3). Owners must check Lot Size, Height of Buildings, Natural Resources and other maps referenced in the Plan before acting (cl 4.1; cl 4.3; cll 7.2-7.3).
Wollondilly Council, as the consent authority (cl 1.6). Council must assess development applications against the Plan’s objectives and mapped standards (cl 2.3(2); cl 4.1; cl 4.3), satisfy itself about availability of essential services for proposed development (cl 7.1), and consider specific requirements in urban release areas (cl 6.2-6.3). Council is also empowered to classify or reclassify public land under the Local Government Act (cl 5.2) and to keep records required by cl 4.6(4).
Applicants for particular land uses that attract procedural triggers. Notable groups include:
Heritage‑sensitive applicants where development affects a heritage item, conservation area, archaeological site or an Aboriginal place of heritage significance; such proposals require notifications to the Heritage Council or Aboriginal communities and may require heritage assessment documents or conservation management plans (cl 5.10(2), (4)-(9)).
Aquaculture operators: pond‑, tank‑ and oyster aquaculture are governed by cl 5.19 and Schedule 6 with siting and operational requirements (cl 5.19(2)-(6); Schedule 6).
Intensive livestock operators who may be able to carry out small feedlots without consent only if locational and capacity thresholds are met (cl 5.18(4)-(5)).
Licensed premises operators (pubs, clubs) in respect of the playing or performance of music: the consent authority must not refuse an application for licensed premises on the grounds listed in cl 5.20(1) and must not refuse on noise grounds if noise “may be managed and minimised to an acceptable level” (cl 5.20(2)).
State authorities and agencies: the Plan assigns acquisition authorities for specific types of reserved land under the owner‑initiated acquisition provisions (cl 5.1(2) and table). It also preserves the rights of public authorities under registered instruments (cl 1.9A(3)), and defers to SEPPs that prevail over the Plan (cl 1.9(1)). For infrastructure projects, the Plan does not restrict projects authorised under State SEPPs such as the Transport and Infrastructure SEPP, Chapter 2 (cl 5.12(1)).
Community groups and local Aboriginal communities: the Plan mandates notification of local Aboriginal communities before consent for development in Aboriginal places of heritage significance (cl 5.10(8)). For developments affecting public bushland, the Plan requires consideration of ecological values and public interest (cl 5.23(1)-(3)) and, where recreational use is permitted without consent, requires a management plan adopted by Council (cl 5.23(5)).
Holders of private instruments, covenants and easements: cl 1.9A provides that agreements, covenants or similar instruments that restrict development do not apply to the extent necessary to enable development under the Plan, but carves out a list of instruments that remain effective (cl 1.9A(1)-(2)), and preserves public authority rights under registered instruments (cl 1.9A(3)).
Event organisers and the visitor economy: temporary uses of land are regulated by cl 2.8 (52‑day maximum), cl 7.13 (temporary use for particular uses with a 12‑times per 12‑months cap and restoration requirements) and cl 7.15 (visitor economy temporary use up to 52 days) as well as the temporary use standards in Schedule 2 (sch.2‑sec‑oc.3). Those provisions place explicit limits on duration, numbers and restoration obligations.
Economic and behavioural implications for these groups derive from the Plan’s prescriptions. For example, minimum lot sizes (cl 4.1) and subdivision consent requirements (cl 2.6) constrain how and when owners can create saleable lots, affecting land value and development feasibility. Heritage and biodiversity protections impose pre‑application investigation and potential mitigation or design obligations for applicants (cl 5.10; cl 7.2). The exempt and complying development pathways (Part 3; Schedule 2; Schedule 3) offer faster routes for lower‑impact works but only when the specific technical standards are met (cl 3.1-3.2).
Key duties and rights
This section summarises the Plan’s most operative duties placed on decision‑makers and applicants and the rights conferred or preserved by particular clauses.
Duties placed on the consent authority (Council)
Apply zone objectives and the Land Use Table when determining applications (cl 2.3(2)). The consent authority must consider objectives for development in the zone of the land and assess compatibility in unzoned land (cl 2.4(2)).
Ensure availability of essential services before granting consent (cl 7.1(1)). For urban release areas, ensure public utility infrastructure essential for development is available or arrangements are in place (cl 6.2(1)).
In heritage matters, require heritage management documents or conservation management plans where appropriate, consider heritage impacts and notify the Heritage Council or local Aboriginal communities where the clause requires (cl 5.10(4)-(9)).
For flood‑prone land, satisfy itself the proposed development is compatible with flood function and will not adversely affect flood behaviour or life‑safety evacuation (cl 5.21(2)-(3)).
When considering applications within mapped odour buffer or coal seam gas proximity areas, take enumerated matters into account (cl 7.6(3); cl 7.7(1)).
Where an applicant seeks consent to contravene a development standard, satisfy the requirements in cl 4.6(3) (applicant must demonstrate compliance is unreasonable or unnecessary and sufficient environmental planning grounds exist) and keep a record of the assessment (cl 4.6(3)-(4)).
Duties placed on applicants and landowners
Comply with applicable mapped standards (Lot Size Map cl 4.1; Height of Buildings Map cl 4.3) or seek development consent and, if seeking to depart from a standard, prepare the document required by the regulations to address cl 4.6(3) (note in cl 4.6(3) referencing the Regulation requirement).
For exempt or complying development, meet the standards in Schedule 2 or Part 1 of Schedule 3 and the Building Code of Australia requirements (cl 3.1(2)-(3); cl 3.2(2)-(3)).
Where development may affect heritage items, Aboriginal places or archaeological sites, prepare heritage management documents, management plans or conservation plans when required and comply with notification processes (cl 5.10(4)-(6), (7)-(9)).
For aquaculture or intensive livestock agriculture, comply with the site location and operational requirements set out in cl 5.19 and Schedule 6 and the threshold/location rules in cl 5.18 (cl 5.19(2)-(6); cl 5.18(3)-(5)).
Ensure restoration and non‑permanence when relying on temporary use permissions (cl 2.8(3)(d); cl 7.13(2)(b); cl 7.15(4)(b)).
Rights, exemptions and qualified permissions
Right to carry out development that is permitted without consent under the Land Use Table, provided other relevant statutory approvals are in place and the works satisfy the environmental approvals regime (cl 2.3(1); note under Land Use Table and Schedule 2 that development identified as exempt in other instruments may also be so carried out).
Right to carry out exempt development listed in Schedule 2 and to seek a complying development certificate for development specified in Schedule 3 where its conditions are met (cl 3.1-3.2; Schedule 2; Schedule 3).
Clause 1.9A permits suspension of private covenants and agreements to the extent necessary to enable development under this Plan, with carve‑outs for specified instruments including those under Crown or conservation statutes and planning agreements (cl 1.9A(1)-(2)). This gives an owner a conditional right to proceed where a private covenant would otherwise block development under the Plan, but the exception is limited by cl 1.9A(2).
Clause 5.20 grants a limited procedural protection for licensed premises: the consent authority must not refuse development for licensed premises on enumerated music‑related grounds and must not refuse on noise grounds if the consent authority is satisfied noise may be managed and minimised to an acceptable level (cl 5.20(1)-(2)).
Process duties and record keeping
The consent authority must keep a record of assessments under cl 4.6(3) where a development standard is contravened (cl 4.6(4)). Heritage and Aboriginal place procedures impose formal notice periods and consideration duties (cl 5.10(7)-(9)).
For developments that require concurrence or guidance, cl 7.8 requires the consent authority to have regard to particular Secretary’s Guidelines in relation to specified lots in Appin (cl 7.8(2)). Urban release area rules (cl 6.3) make the preparation and application of development control plans a precondition for most development consents in those areas.
Limitations and exclusions
Several clauses explicitly exclude applicability: exempt/complying development cannot occur in environmentally sensitive areas for exempt/compliant development (cl 3.3); cl 4.6(8) excludes certain development standards from being varied by that clause (including development standards for complying development and certain named clauses).
The suspension of covenants under cl 1.9A does not affect rights or interests of public authorities under registered instruments (cl 1.9A(3)) and excludes a list of instruments (cl 1.9A(2)(a)-(g)).
Collectively, these duties and rights form an operational matrix: applicants have conditional rights to develop but must clear procedural and technical gates; Council has discretionary and quasi‑jurisdictional duties to test proposals against maps, standards and statutory notification obligations; and some private encumbrances are temporarily displaced but important Crown and public authority rights persist.
Penalties and enforcement
The Plan sets substantive rules and procedural gates but does not itself contain a schedule of fines or criminal offences. It operates as a local environmental planning instrument under the Environmental Planning and Assessment Act framework and therefore relies on the Act’s enforcement and compliance mechanisms rather than creating new penalty provisions within the Plan text. The instrument therefore embeds enforcement by means of requirements to obtain development consent, to comply with conditions of consent or complying development certificates, and to observe mapped prohibitions and exclusions.
Express Plan touchpoints relevant to enforcement and compliance:
Development consent gating: Many activities may be carried out only with development consent (for example demolition cl 2.7; subdivision cl 2.6; erection of dwellings on certain land cl 4.2A). Carrying out development without consent where consent is required engages enforcement consequences under the Environmental Planning and Assessment Act, which is the Plan’s enabling statute (the Plan repeatedly states “subject to the Act” e.g. cl 1.6).
Complying and exempt development: The Plan prescribes conditions and technical standards that, if unmet, mean that a development which was intended to be exempt or complying will not be lawful (cl 3.1(2)-(5); cl 3.2(2)-(4); Schedule 2 Note 2 states exempt development is not exempt from any approval, licence, permit or authority required under any other Act).
Heritage and notification obligations: cl 5.10 makes specific processes compulsory where heritage or archaeological matters arise (notification of the Heritage Council, notifying Aboriginal communities, potential requirement for heritage management documents and conservation plans). Failure to comply with consent conditions in those contexts will be addressed under the Act and relevant heritage laws referenced (Heritage Act 1977), which the Plan cross‑references at several points.
Environmental and biodiversity protections: cll 7.2-7.3 require consideration of impacts and set “must not be granted” tests unless impacts can be avoided/minimised/mitigated; conditions may be imposed in a consent that, if breached, give rise to compliance action under the Act.
Records and transparency: cl 4.6(4) requires the consent authority to keep a record of its assessment when a development standard is contravened. That record‑keeping facilitates audit and review and provides a documentary basis for judicial review or merits appeals where permitted under the Act.
What the Plan does not do, and the enforcement consequences of that absence
The Plan itself does not set out fines or statutory penalty regimes within its body. Enforcement detail such as infringement notices, penalties, or specific enforcement discretions are not included in the text supplied; those are matters handled by the primary Act and regulations, which the Plan references (see cl 3.1 and notes).
The Plan preserves the operation of other regulatory regimes: Schedule 2 Note 2 states explicitly exempt development under the Plan does not exempt the proponent from approvals, licences or permits required under other Acts. In practice this means enforcement can arise under fisheries, water, environmental protection, building, heritage or Crown instruments in addition to enforcement under the Act.
Practical enforcement implications and administrative risk
The Plan increases administrative work for Council: multiple notification obligations, the requirement to assess biodiversity/water/heritage impacts and to keep records for standard‑contravening decisions create ongoing compliance administration (cl 5.10; cl 7.2-7.3; cl 4.6(4)). Record‑keeping obligations and the need to consider external guidelines (for example the Secretary’s Guidelines in cl 7.8) create documentary traces that can be relied on in legal challenges.
Developers face enforcement risk where they misclassify their activity as exempt or complying. Schedule 2 and Schedule 3 set technical standards; where an activity departs from those, the exempt/complying route is not available and the carrying out of the development may expose the operator to action under the Act and under cross‑referenced statutes (Schedule 2 Note 2).
Areas of discretionary assessment (heritage, aquaculture, intensive livestock) are likely to produce tightly contested conditions that parties may challenge. The Plan prescribes notification windows (28 days for certain heritage notifications , cl 5.10(7)-(9)) that can delay approvals and increase exposure to compliance or judicial review.
In sum, enforcement is effected by the Act’s compliance machinery but the Plan creates the substantive triggers and procedural obligations that give rise to enforcement. Practitioners must therefore map Plan obligations against the enforcement tools available under the Environmental Planning and Assessment Act and the numerous cross‑referenced statutes (for example Heritage Act 1977, Fisheries Management Act 1994, Local Government Act 1993), because the Plan itself does not carry a standalone penalty schedule.
How it interacts with other laws
The Plan repeatedly cross‑references and is framed to operate within a network of state and Commonwealth instruments. The text itself identifies the principal interactions; the following points extract the express cross‑references and operational interfaces.
Primary enabling statute and SEPPs
The Plan is made under the Environmental Planning and Assessment Act framework and is “subject to the Act” in multiple places (cl 1.6; cl 1.2 refers to s 3.20 of the Act). Clause 1.9(1) states the Plan is subject to State environmental planning policies (SEPPs) that prevail under s 3.28 of the Act. The Land Use Table notes also list several State SEPPs that may be relevant to development (for example SEPP (Housing) 2021; SEPP (Transport and Infrastructure) 2021; SEPP (Resilience and Hazards) 2021 among others).
Other statutory regimes expressly referenced
Crown and Crown land instruments: cl 1.9A interacts with the Crown Land Management Act 2016, explicitly excluding “relevant instrument” within s 13.4 of that Act from suspension (cl 1.9A(2)(b)). Clause 5.2(2) and the schedule link classification/reclassification of public land to the Local Government Act 1993 and note Governor approval requirements for discharging trusts.
Heritage: cl 5.10 cross‑references the Heritage Act 1977 for items listed on the State Heritage Register and for interim heritage orders. The Plan requires notification to the Heritage Council for archaeological site proposals (cl 5.10(7)) and for nominated State heritage items proposed for demolition (cl 5.10(9)).
Biodiversity and conservation: cl 3.3 and Schedule 6 refer to biodiversity exclusions and the Biodiversity Conservation Act 2016 and lists conservation exclusion zones (Schedule 6 Div 1 cl 1). The Plan also references the Local Land Services Act 2013 in cl 3.1(5) note with respect to vegetation clearing authorisations.
Fisheries and aquaculture: cl 5.19 and Schedule 6 reference the Fisheries Management Act 1994, the NSW Oyster Industry Sustainable Aquaculture Strategy and the Fisheries Management (Aquaculture) Regulation 2017 (Schedule 6 definitions), affecting aquaculture siting and operations.
Local government and land acquisition: cl 5.1 and cl 5.2 interact with the Land Acquisition (Just Terms Compensation) Act 1991 and the Local Government Act 1993 for acquisition and classification/reclassification of public land.
Rural Fires Act and flood planning: cl 5.11 notes bush fire hazard reduction work authorised by the Rural Fires Act 1997 may be carried out without consent; cl 5.21 references the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual, and directs consideration of climate‑change‑projected flood behaviour.
Building and BASIX requirements: cl 3.1(3)(a) requires exempt development to meet relevant deemed‑to‑satisfy provisions of the Building Code of Australia; cl 4.6(8) excludes variations to development standards arising from BASIX commitments where relevant.
Operational consequences of these interactions
Parallel approvals: Schedule 2 Note 2 emphasises exempt development under the Plan does not remove the requirement to obtain approvals, licences or permits required under other Acts. Practitioners must therefore run concurrent checks for approvals under fisheries, water, heritage, Crown land, local government and environmental protection legislation as applicable.
Priority of instruments: SEPPs that prevail will override Plan provisions where there is inconsistency (cl 1.9(1)). Practitioners need to check for SEPPs that apply to a site first.
Delegated rights and acquisition: cl 5.1 sets out which State authority is the relevant acquisition authority for owner‑initiated acquisition of certain reserved land; this has implications for infrastructure delivery and for landowners negotiating acquisition under the Land Acquisition (Just Terms Compensation) Act 1991.
Statutory carve‑outs and preserved rights: cl 1.9A preserves the rights of public authorities under registered instruments, so applications must consider whether there are registered public authority interests that remain enforceable despite the Plan’s suspension power for private covenants.
Conflict and conformity management
The Plan instructs the consent authority to consider other instruments and guidance. For example, cl 7.8 requires the consent authority to have regard to specified Secretary’s Guidelines for development at particular Appin lots. Clause 5.19(5) requires consent authorities determining oyster aquaculture applications to consider aquaculture industry development plans and the Oyster Industry Strategy.
Where conflicts arise between the Plan and other statutes, the usual statutory principles of inconsistency and prevails‑over rules under the Environmental Planning and Assessment Act and other relevant Acts will determine outcomes; the Plan itself draws attention to that architecture (cl 1.9).
In short, the Plan is an element in a web of statutes and policies. Compliance requires mapping Plan obligations against these other laws, and in many cases obtaining or considering approvals beyond the development consent process described in the Plan.
Amendment history
The Plan text contains embedded amendment annotations and footnotes that record amendment activity across a number of years. The Plan as provided includes multiple amendment markers appended to clauses and schedules. The instrument’s own footnotes identify insertions, substitutions and amendments; these are the Plan’s contemporaneous record of legislative change.
Representative amendment milestones and clause‑level examples (as recorded in the Plan text)
Initial instrument and early amendments: many clauses record Amendment 2011 (363) Sch 28 entries indicating the Plan’s operative consolidations and initial insertions following 2011 enactment (for example cl 4.1AA Ins 2011 (363), Sch 28 [23]).
2014 and mid‑decade adjustments: cl 2.1 records amendments in 2014 (2014 (19), Sch 1 [1]; 2014 (156), Sch 1 [1]) affecting zoning lists. Schedule 5 (heritage) shows a series of amendments noted as Am 2014 (19), Sch 1[5]; 2014 (266) cl 5, reflective of updated heritage lists.
2016-2018 updates: Land Use Table and other clauses show amendments spanning 2016 (2016 (167), Sch 1 [2]) and 2018 (2018 (383) cl 4 (1); 2018 (488), Sch 1.1 [1]), indicating periodic adjustments to permitted uses and regional controls.
Late‑2010s and 2020 updates: cl 1.8A notes amendments in 2019 (621), Sch 5[1] and 2020 (195) cl 3(1) relating to savings provisions for development applications. Clause 6.3 and other urban release area provisions were affected by later amendments (see cl 6.3: Am 2014 No 74, Sch 3.51).
2021-2023 changes: Multiple clauses show 2021 amendments (for example cl 1.2 Am 2021 (145), Sch 1[1]); cl 5.9 was inserted in 2021 (Ins 2021 (302), Sch 1.36). In 2022 there are numerous entries: cl 2.1 (2022 (857), Sch 1.9[1] [2]), cl 4.1AA Am 2022 (857), Sch 1.9[5], and Schedule amendments at 2022 (554) Sch 1[15]. New provisions in 2022 and 2023 introduce clauses such as cl 5.23 (Public bushland) Ins 2022 (629), Sch 2[1] and cl 7.15 (visitor economy) Ins 2023 (389), Sch 1[14].
Most recent recorded amendments in the text: Schedule 5 shows a notation Am 2025 (598), Sch 1, indicating the Plan’s heritage schedule has been amended up to 2025 as recorded in the Plan text provided.
Methodology for reading amendment entries in the Plan
The Plan’s clause‑level footnotes show the instrument, year and schedule/column references for each amendment line. Practitioners should treat those footnote entries as the Plan’s internal amendment ledger and consult the State legislation database for the full traced changes (the Plan notes maps and schedules are to be made available on the NSW Planning Portal , cl 1.7 Note).
Implications of the amendment record
The Plan has been materially updated over time to add specialized local provisions (for example, clauses addressing odour buffers cl 7.6, coal seam gas proximity cl 7.7, public bushland cl 5.23), to tweak development standards and minimum lot sizes (cl 4.1AA, cl 4.1C), and to introduce or adjust exemptions and complying development lists (schedules). The amendment history shows an ongoing process of local calibration in response to state policy changes, environmental considerations, and local planning priorities.
For any specific development or research task, the amendment annotations in the Plan should be taken as the starting point; users will need to consult the consolidated instrument on the NSW legislation website and any published explanatory materials or instrument‑level amending Acts referenced in the footnotes to obtain the precise drafting history and clause‑by‑clause changes.
Litigation history
The Plan text as supplied does not record judicial decisions or statutory appeals concerning its provisions; it contains no case citations. The instrument itself is silent on past litigation. However, its structure and clauses identify a number of decision points and processes likely to generate disputes in practice and which therefore create potential litigation risk. The Plan’s own provisions disclose the procedural steps and records that would feature in any contest:
Record requirement for standard contraventions: Clause 4.6(4) requires the consent authority to keep a record of its assessment when it grants consent to contravene a development standard following cl 4.6(3). Those records will form the primary administrative material if a decision is challenged, for example by judicial review or an appeal process under the Act.
Heritage and Aboriginal place notifications and consultation: Clause 5.10 requires the consent authority to notify the Heritage Council or local Aboriginal communities and to consider any response within 28 days (cl 5.10(7)-(9)). Decisions made without complying with those notification or consultation requirements could be subject to challenge on procedural grounds.
Applications that rely on cl 1.9A (suspension of covenants): The clause suspends certain private instruments to the extent necessary to enable development under the Plan while excluding many others (cl 1.9A(1)-(3)). There is scope for disputes about the extent of suspension, whether an instrument falls within the excluded categories, and whether Crown or public authority interests remain effective; such disputes would focus on statutory construction of cl 1.9A and any relevant registered instruments.
Boundary adjustments, community title scheme lot size rules and dual occupancy exceptions: Clauses 4.1AA, 4.2B and 4.1C set out special subdivision and lot size rules. Challenges could arise where applicants contend Council should exercise its discretion under cl 4.2B(3) to permit boundary adjustments that produce lots under mapped minima, or when an applicant seeks consent under cl 4.6 to contravene lot‑size standards. The Plan’s requirement that the consent authority be satisfied about specified matters (cl 4.2B(3)(a)-(f)) provides the evidentiary frame for contest.
Exempt and complying development classification disputes: Whether a proposed work is properly classified as exempt/compliant under Part 3 and Schedule 2/3, and whether the site is an “environmentally sensitive area” for the purpose of cl 3.3, are facts and law that can generate disputes if a development proceeds and third parties or regulators contend the development was unlawful.
Environmental and flood planning decisions: Clauses 5.21 (flood planning) and 7.2-7.3 (biodiversity and water) set tests and matters to be considered. Disputes often arise about whether the consent authority properly considered climate‑change projections, flood behaviour or cumulative environmental impacts in accordance with these clauses and the guidelines they reference.
Although the Plan does not list litigation, its administrative architecture creates the documentary pathways that would be deployed in any dispute. Practitioners should note the Plan’s specified records, notification windows and documentary requirements (for example cl 4.6(4); cl 5.10(7)-(9); cl 7.8(2)), because those are the procedural threads that underpin administrative law review and merits appeals under the Act.
Gotchas
The Plan contains a number of points where misreading or oversight can produce practical or legal pitfalls. The following concrete “gotchas” are grounded in the Plan text and the operational interactions between clauses and schedules.
Transitional applications are determined under the prior plan in certain cases (cl 1.8A)
If a development application was made before the Plan’s commencement and not finally determined, cl 1.8A(1) directs the application be determined as if the Plan had not commenced. Specific Amendment‑linked savings (cl 1.8A(2)-(3)) apply to amendment instruments. Practitioners must check the lodgement date and the relevant commencement entries; otherwise they may proceed under the wrong instrument.
Suspension of covenants is limited (cl 1.9A)
While cl 1.9A(1) suspends private agreements to the extent necessary to enable development under the Plan, the clause expressly does not apply to covenants imposed by Council or to certain Crown and conservation instruments listed at cl 1.9A(2)(a)-(g). It also preserves rights of public authorities under registered instruments (cl 1.9A(3)). Do not assume that any covenant blocking a proposal will be displaced; check whether the covenant sits within an excluded class.
Exempt or complying development can be excluded by location (cl 3.3)
Exempt and complying development are expressly barred on “environmentally sensitive areas” as defined in cl 3.3(2). Sites within 100 metres of coastal wetlands, Ramsar wetlands, mapped areas of high Aboriginal cultural significance or high biodiversity significance, land reserved under the National Parks and Wildlife Act, or land within declared outstanding biodiversity areas may not use the exempt/compliant routes even if the activity would otherwise meet Schedule 2 or Schedule 3 technical standards.
Different temporal limits for “temporary” uses: Schedule 2 v cl 2.8 v cl 7.13/7.15
There are multiple temporary‑use provisions with different timeframes and criteria: cl 2.8 allows temporary use for a maximum of 52 days in any 12‑month period subject to environmental criteria; cl 7.13 restricts discretionary temporary uses to no more than 12 events per year and a set‑up/pack‑down regime (Schedule 2 sch.2‑sec‑oc.3 further limits each occasion to a maximum of 7 consecutive days and specifies numbers and noise curfews). Practitioners must map which temporary use clause applies to avoid breaches of event caps, noise restrictions and restoration obligations.
Conflicting area limits and event numbers in Schedule 2
Schedule 2 sch.2‑sec‑oc.3(2)(a) refers to capacity limits where the clause “ceases to apply” (for instance 1500 people generally, 500 in rural or conservation land, 150 in Sydney Drinking Water Catchment). A proposed event may fall into a threshold that removes reliance on that exemption; organisers must check both attendee numbers and catchment status.
Music protections for licensed premises are conditional (cl 5.20)
Clause 5.20 protects licensed premises from refusal on enumerated music‑related grounds, but the protection is subject to cl 5.20(2): the consent authority must be satisfied the noise “may be managed and minimised to an acceptable level.” That is a fact‑sensitive test; applicants should prepare noise management strategies because the clause does not provide carte blanche for amplified music without mitigation.
Minimum lot sizes and community title exceptions (cl 4.1; cl 4.1AA)
The Plan fixes minimum subdivision lot sizes on the Lot Size Map (cl 4.1). Community title schemes have a separate clause cl 4.1AA that ensures community title subdivisions comply with Council’s minimum lot sizes. There are also specific provisions for dual occupancies with size bands (cl 4.1C). Failing to check whether a subdivision will trigger the special rules (including the R2/R3 reticulated sewer exception in cl 4.1(5)) can render a proposed plan non‑compliant.
Boundary adjustments and non‑creation of entitlements: cl 4.2B traps
Clause 4.2B allows boundary adjustments creating resultant lots below mapped minima only where the subdivision will not create additional lots and other conditions are satisfied. If an applicant inadvertently proposes a boundary adjustment that effectively creates additional dwelling entitlements or that would enable future subdivision, the exception will not apply.
Floor space ratio and other standards “not adopted” (cl 4.4; cl 4.5)
Clauses 4.4 and 4.5 are listed as “[Not adopted]”. Practitioners must not assume a local FSR regime exists in the Plan; instead rely on the Height Map and other standards. This absence can affect calculations for bulk controls.
Public land reclassification and trust discharges involve Governor approval (cl 5.2(5))
Clause 5.2(5) notes the approval of the Governor is required before certain public land descriptions are inserted into Part 2 of Schedule 4 and before discharge of trusts. Reclassification actions can therefore be delayed and have legal preconditions.
Schedule 2 Note 2 and numerous cross‑references make clear that compliance with this Plan does not absolve an applicant from obligations under other Acts such as the Heritage Act, Fisheries Management Act, Crown land legislation, Water NSW special area measures, and so forth. Expect parallel licensing and approvals.
Aquaculture and discharge constraints (Schedule 6)
Schedule 6 limits freshwater discharges for intensively cultivated aquaculture (Part 1 Div 2 cl 4) and excludes certain conservation areas (Part 1 cl 1). Applicants proposing pond or tank aquaculture must ensure pond design, discharge and screening requirements are met (Schedule 6 Divs 1-2), otherwise permitted or exempt status will not apply.
These concrete clause‑level “gotchas” are the places where practice commonly goes wrong: misreading which instrument governs, assuming suspended covenants apply in all cases, or failing to account for cumulative or spatial exclusions. A disciplined pre‑application checklist keyed to the Plan’s maps and schedules will reduce these risks.
How to comply
Practically, compliance requires a staged, map‑driven and document‑rich approach. The following steps, grounded in the Plan’s clauses, form a checklist for practitioners advising landowners, developers, or Council officers.
Confirm zoning and review applicable maps (cl 2.2; cl 1.7)
Identify the parcel on the Land Zoning Map to determine the zone and consult the Land Use Table to check whether the proposed use is permitted without consent, permitted with consent or prohibited (cl 2.2; cl 2.3).
Check the Lot Size Map, Height of Buildings Map, Land Reservation Acquisition Map, Natural Resources,Biodiversity Map and Natural Resources,Water Map, Odour Buffer Area Map and any “Original Holdings”, Urban Release Area, or Additional Permitted Uses maps mentioned in the Plan (cl 4.1; cl 4.3; cl 5.1; cl 4.1B; cl 7.6; cl 7.9; Schedule references).
Determine the development category: exempt, complying, permitted with consent, or prohibited (cl 3.1; cl 3.2; Land Use Table)
If the activity is identified in Schedule 2 and meets its standards and is not in an “environmentally sensitive area” for exempt/compliant development (cl 3.1(2)-(5); cl 3.3), it can proceed without development consent subject to other approvals.
If the activity fits Part 1 of Schedule 3 and meets the relevant technical and Building Code of Australia requirements, consider applying for a complying development certificate (cl 3.2(2)-(4)).
If the use is permitted with consent or not listed, prepare a development application to Council (Land Use Table, cl 2.3).
Map and verify environmental and heritage constraints early (cl 3.3; cl 5.10; cll 7.2-7.3)
For sites within mapped “sensitive land” identify obligations under cl 7.2 (biodiversity) and cl 7.3 (water protection) and be prepared to demonstrate that the development avoids, minimises or mitigates adverse impacts.
Where heritage items, conservation areas or Aboriginal places are implicated, factor in heritage management documents or conservation management plans and the required notifications (cl 5.10(4)-(6); cl 5.10(7)-(9)). Allow time for a 28‑day response period where the Heritage Council or Aboriginal communities must be notified.
Check infrastructure and essential services requirements (cl 7.1; cl 6.2)
For any proposal, ensure water supply, electricity and sewage disposal will be available or that adequate arrangements exist for provision (cl 7.1).
For development within an urban release area, confirm public utility infrastructure provision or arrangements are sufficient, and ensure a development control plan has been prepared if required by cl 6.3.
Apply the Plan’s specific use controls (cl 5.4; cl 5.13; cl 5.18; cl 5.19; Schedule 6)
For uses subject to quantitative controls (bed and breakfast cl 5.4(1), home business/industry cl 5.4(2)-(3), industrial retail outlet cl 5.4(4), farm stay cl 5.24), design the proposal to fit within the size and operational limits.
For intensive livestock agriculture or aquaculture, follow the site location, operational and design requirements in cll 5.18 and 5.19 and Schedule 6 (for example, freshwater discharge rules, pond design, screening of outlets).
If seeking to vary a development standard, follow cl 4.6 process and record obligations
Prepare the document required by the regulations explaining why compliance with the standard is unreasonable or unnecessary and the environmental planning grounds supporting a contravention (cl 4.6(3) and the Regulation note).
Be aware that cl 4.6(6) and (8) place limits on when cl 4.6 can be used: in particular it cannot be relied on to grant subdivision consent resulting in multiple lots below mapped minima in certain zones and cannot be used to contravene standards excluded by cl 4.6(8).
For temporary uses and events, match the appropriate clause and technical conditions
Use cl 2.8 (52 days), cl 7.13 (temporary use for enumerated zones with a 12 times per year cap and restoration), cl 7.15 (visitor economy temporary use, up to 52 days) or Schedule 2 sch.2‑sec‑oc.3 depending on the zone and the event size and nature. Ensure parking, waste management, access, noise curfews and restoration conditions are addressed in the application (Schedule 2 sch.2‑sec‑oc.3(1)(c)-(j)).
Heritage and Aboriginal cultural heritage compliance
If the site contains or is near a heritage item, Aboriginal object or an archaeological site identified in Schedule 5 or Schedule 5 Part 3, follow cl 5.10. This may include a formal heritage impact assessment, a heritage management document, conservation management plan or consultation with Aboriginal groups and the Heritage Council. Factor in time and cost for archaeological investigation where cl 5.10(5)-(7) applies.
Prepare technical documentation and engage relevant agencies early
For aquaculture and livestock projects, obtain or review relevant aquaculture industry development plans and NSW industry strategies (cl 5.19(5)). For projects in water catchments, consult Water NSW special area requirements referenced by cl 6.3 and cll 5.19(6).
Where Transport for NSW, the National Parks Minister, or the corporation created under the Act is the relevant acquisition or affected authority for land (cl 5.1 table), notify and consult those authorities where acquisition or infrastructure interactions are likely.
Documentation and record keeping for applications and for consent authority
Keep the assessment materials required by cl 4.6(4) where a contravention is sought. Ensure the consent authority has the information to make the assessments required by cll 7.2-7.3 (biodiversity/water), cl 5.21 (flood planning), cl 5.10 (heritage) and the urban release area DCP requirements (cl 6.3(3)).
Check for additional permitted uses and localised schedule entries
Review Schedule 1 for site‑specific exceptions (for example additional permitted uses at identified addresses such as highway service centres, seniors housing, or attached dwellings at specified lots). These can change the use rights for a particular lot and override the Land Use Table for that location (cl 2.5(1)-(2)).
Consider staged engagement and pre‑lodgement
Given the Plan’s multiple thresholds and notification requirements and the potential for mandatory heritage or environmental studies, a pre‑lodgement meeting with the Council is advisable. Provide preliminary documentation demonstrating how the proposal responds to the Plan’s mapped constraints, cl 7.1 service rules and any DCP requirements if in an urban release area (cl 6.3).
The practical checklist above follows the Plan’s structure: mapping and zoning first (cl 2.2; cl 1.7), category determination and exempt/compliant checks (cl 3.1-3.3; Schedule 2/3), servicing and infrastructure checks (cl 7.1; cl 6.2), and specialist requirements (heritage cl 5.10; biodiversity cl 7.2; aquaculture cl 5.19). Where a proposal touches multiple specialised clauses (for example an aquaculture project in a mapped sensitive catchment near a heritage item), the applicant will need to integrate the required investigations and approvals from the start because Schedule 2 Note 2 makes clear that other statutory approvals remain necessary even for exempt development.
Practitioners should always cross‑check the Plan’s maps and schedules on the NSW Planning Portal (cl 1.7 Note) and read the Plan in conjunction with the Environmental Planning and Assessment Act and relevant State environmental planning policies to ensure the correct instrument and up‑to‑date amendment history are being applied.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Wollondilly Local Environmental Plan 1991
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provisions relating to development applications
1 Savings provisions relating to development applications
1.8A Savings provisions relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) If a development application has been made before the commencement of Wollondilly Local Environmental Plan 2011 (Amendment No 35) in relation to land to which that Plan applies and the application has not been finally determined before that commencement, the application must be determined as if that Plan had not commenced.
(3) If a development application has been made before the commencement of Wollondilly Local Environmental Plan 2011 (Amendment No 40) in relation to land to which that Plan applies and the application has not been finally determined before that commencement, the application must be determined as if that Plan had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development
This is an opening excerpt, not the complete document.