This Plan replaces earlier local environmental plans and sets the zoning, maps and rules that govern land use across Waverley. It specifies what uses are allowed, which require Council consent, development standards (height, floor‑space, lot size), exempt/complying works, heritage listings and site‑specific controls. It affects landowners, developers and the Council: developers either comply with map‑based limits or apply for consent, and the Council decides and imposes conditions (including possible contributions). The Plan therefore determines where and how development may occur in Waverley.
This instrument is the local environmental plan (LEP) that sets the statutory land use framework for the Waverley local government area. It does that by: defining zones (cl 2.1; cl 2.2; Land Zoning Map), listing permitted, prohibited and consent-requiring uses in the Land Use Table (cl 2.3 and the Land Use Table), fixing development standards (notably maximum building heights on the Height of Buildings Map, cl 4.3, and floor space ratio controls on the Floor Space Ratio Map, cl 4.4), and applying a range of local and site-specific controls in Parts 4-6 and in Schedules 1-6. The Plan is map‑driven: the maps (Land Zoning, Height, Floor Space Ratio, Lot Size, Heritage, Active Street Frontages, Terrestrial Biodiversity, Acid Sulfate Soils, Key Sites, Alternative Height/FSR, Land Reservation Acquisition, and others) determine zone boundaries, standards and site coverage (cl 1.7; cl 2.2; cl 4.3(2); cl 4.4(2); cl 4.1(3)).
Mechanically, the Plan:
Repeals prior local environmental instruments applying to the same land (cl 1.8).
Commences upon publication on the NSW legislation website (cl 1.1AA).
Confers consent authority functions to the Council (subject to the Act) (cl 1.6).
Specifies exempt development (Schedule 2) and complying development types/conditions (Schedule 3) and excludes environmentally sensitive areas from exempt/complying development (cl 3.3).
Requires development consent for subdivision (cl 2.6), demolition (cl 2.7), earthworks (cl 6.2), works affecting acid sulfate soils (cl 6.1), heritage‑related works (cl 5.10), development below mean high water mark (cl 5.7), and a range of zone‑specific and site‑specific matters (Parts 4-6).
Prescribes standards and flexibility mechanisms: e.g. maximum heights and FSRs (cl 4.3; cl 4.4), an exceptions-to-standards pathway requiring written justification and record keeping (cl 4.6(2)-(4)), and specific FSR exceptions for small lots (cl 4.4A).
Current sections
Direct links to the current provisions in Waverley Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Attached dwellings; Bed and breakfast accommodation; Boarding houses; Building identification signs; Business identification signs; Centre-based child care facilities; Community facilities; Dual occupancies; Dwelling houses; Emergency services facilities; Environmental facilities; Environmental protection works; Exhibition homes; Exhibition villages; Flood mitigation works; Group homes; Health consulting rooms; Home-based child care; Home businesses; Home industries; Hostels; Information and education facilities; Markets; Neighbourhood shops; Oyster aquaculture; Places of public worship; Pond-based aquaculture; Recreation areas; Respite day care centres; Roads; Secondary dwellings; Semi-detached dwellings; Seniors housing; Tank-based aquaculture
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone R2 Low Density Residential and marked “Classified Road” | Transport for NSW |
| Zone R3 Medium Density Residential and marked “Classified Road” | Transport for NSW |
| Zone MU1 Mixed Use and marked “Road” | Council |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for that land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
cl 5.1: Am 2020 No 30, Sch 4.118; 2022 (828), Sch 1.24[5].
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Acid sulfate soils
6 Acid sulfate soils
6.1 Acid sulfate soils
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(1) Must be associated with access to an open hard stand space, a carport or garage.
(2) Must not be constructed or installed on or in, or in relation to, a heritage item or a draft heritage item or on land in a foreshore area.
(3) Must be constructed so that any surface water is disposed of without causing a nuisance to adjoining owners.
(4) Must not require cut or fill more than 600mm nor be elevated or suspended below or above ground level (existing).
(5) Must not be wider than the open shared stand space, carport or garage with which it is associated.
(6) Must be constructed in accordance with Australian Standard AS 2890.1—1993, Parking facilities–Off-street car parking.
(7) Must not require a new gutter crossing.
sch.2-sec-oc.2
Earthworks and retaining walls for non-domestic purposes
sch.2-sec-oc.2 Earthworks and retaining walls for non-domestic purposes
Earthworks and retaining walls for non-domestic purposes
(1) Must not be constructed or installed on or in, or in relation to, a heritage item or a draft heritage item.
(2) Must be located at least 900mm from each lot boundary.
(3) Must not require cut or fill more than 600mm below or above ground level (existing).
(4) If a retaining wall—
(a) must not be higher than 600mm (including the height of any batters) above ground level (existing), and
(b) if it is on a sloping site and stepped to accommodate the fall in the land—must not be higher than 800mm above ground level (existing) at each step, and
(c) must have adequate drainage lines behind it.
(5) Must not redirect the flow of surface water onto an adjoining property.
(6) Surface water must be disposed of without causing a nuisance to adjoining owners.
(7) Must be located at least 1m from any registered easement, sewer main or water main.
(8) If the fill is more than 150mm deep—must not occupy more than 50% of the landscaped area.
(9) If it is carried out, constructed or installed in a heritage conservation area or a draft heritage conservation area—must be located in the rear yard.
(10) Must be located at least 50m from a waterbed (natural).
sch.2-sec-oc.3
Pathways and paving for non-domestic purposes
sch.2-sec-oc.3 Pathways and paving for non-domestic purposes
Pathways and paving for non-domestic purposes
(1) Must be constructed so that any surface water is disposed of without causing a nuisance to adjoining owners.
(2) Must not require cut or fill more than 600mm below or above ground level (existing).
(3) Must not have an area more than 15% of the floor area of the associated development.
sch.2-sec-oc.4
Pergolas (open) for non-domestic purposes
sch.2-sec-oc.4 Pergolas (open) for non-domestic purposes
Pergolas (open) for non-domestic purposes
(1) Must not be roofed or enclosed.
(2) Maximum height—2.4m above ground level (natural).
(3) Must be located at least 900m2 from each lot boundary.
(4) Maximum pergola floor area—20m2.
sch.2-sec-oc.5
Restaurants or cafes (located on the footway of a public road)
sch.2-sec-oc.5 Restaurants or cafes (located on the footway of a public road)
Restaurants or cafes (located on the footway of a public road)
(1) Must be associated with an approved restaurant or cafe on the adjoining property.
(2) Must maintain continuous pedestrian paths of travel along the footpath and not obstruct access to neighbouring properties.
(3) Must not have furniture within 3m of a bus stop or taxi stand.
(4) Must have obtained an approval under section 125 of the Roads Act 1993.
sch.2-sec-oc.6
Scaffolding, hoardings and temporary construction site fences (being development to which State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 does not apply)
sch.2-sec-oc.6 Scaffolding, hoardings and temporary construction site fences (being development to which State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 does not apply)
(2) The vertical height above footpath level of the structure being erected or demolished must be less than 4m.
(3) If it is a temporary construction site fence adjoining, or on, a public place, must be covered in chain wire mesh.
(4) Must be removed immediately after the purpose for which it was erected has finished and when no safety issue will arise from its removal.
sch.2-sec-oc.7
Signage (initial installation of building identification signs or a business identification signs)
sch.2-sec-oc.7 Signage (initial installation of building identification signs or a business identification signs)
Signage (initial installation of building identification signs or a business identification signs)
(1) Must not be constructed or installed on or in, or in relation to, a heritage item or a draft heritage item or on land in a heritage conservation area or draft heritage conservation area.
(2) Must not cover mechanical ventilation inlets or outlet vents.
(3) If the sign is a flush wall sign—
(a) must not be illuminated, and
(b) must not exceed maximum dimensions—300mm high and 450mm long, and
(c) maximum of 1 sign per site.
(4) If the sign is a fascia sign—
(a) must not be illuminated, and
(b) must not project above or below the fascia or return end of the awning, and
(c) must be flush with the fascia.
(5) If the sign is a top hamper sign—
(a) if illuminated—must have electrical conduits taken directly into the building, and
(b) must be flush to the external face of the shop front and must not project more than 150mm beyond the face of the building, and
(c) maximum of 1 sign per site, and
(d) must not extend below the head of the doorway or window to which it is attached, and
(e) must be setback 600mm from the side boundary.
(6) If the sign is an under awning sign—
(a) if illuminated—must have electrical conduits taken directly into the building, and
(b) must not project beyond the awning, and
(c) maximum of 1 sign per site, and
(d) must be erected horizontal to the ground and at right angles to the building, and
(e) must not exceed maximum dimensions—450mm high and 2400mm long, and
(f) not less than 2.6m above the ground or pavement level, and
(g) must be a minimum of 600mm from the kerb or roadway edge, and
(h) must be securely fixed by metal supports.
(7) If the sign is a window sign—
(a) must not be illuminated, and
(b) must be located on the ground level facade, and
(c) maximum of 1 sign per site, and
(d) 60% of the shop window must remain uncovered.
(8) If the sign is a real estate sign—
(a) must not be illuminated, and
(b) maximum of 1 sign per site, and
(c) for residential premises or serviced apartments—maximum area of 2.5m2, and
(d) for commercial premises—maximum area of 4.5m2.
(9) If the sign is a temporary sign—
(a) must not be illuminated, and
(b) the sponsor’s name or logo must be subsidiary to the event or matter being advertised, and
(c) maximum of 1 sign per site.
sch.2-sec-oc.8
Signage—bus shelter advertising
sch.2-sec-oc.8 Signage—bus shelter advertising
Signage—bus shelter advertising
(1) Must be carried out by or on behalf of the Council.
(2) Must not extend beyond 5m from the perimeter of the bus shelter.
(3) Must not contain flashing or neon signage.
(4) Must not obstruct sight lines for drivers, cyclists or pedestrians.
(5) Must not be attached to a heritage item.
(6) Must not be in a heritage conservation area, except for a bus shelter located on the following—
(a) Birrell Street in Bondi, Bondi Junction, Bronte, Queens Park, Tamarama or Waverley,
(b) Blair Street in Bondi, Bondi Beach or North Bondi,
(c) Bondi Road in Bondi, Bondi Beach or Bondi Junction,
(d) Bronte Road in Bondi Junction, Bronte, Queens Park or Waverley,
(e) Campbell Parade in Bondi Beach or North Bondi,
(f) Macpherson Street in Bronte or Waverley,
(g) Oxford Street in Bondi Junction.
sch.2-sec-oc.9
Signage—communications panel
sch.2-sec-oc.9 Signage—communications panel
Signage—communications panel
(1) Must be carried out by or on behalf of the Council.
(2) Must be carried out on land in Zone E1, E2 or MU1.
(3) Must be used for the display of Council or other public communications.
(4) May also be used for advertisements, other than advertisements for political purposes.
(5) If not located in a pedestrian mall, the structure must not be more than—
(a) 2200mm high, and
(b) 1150mm wide, and
(c) 500mm deep.
(6) Must not contain flashing or neon signage.
(7) Must not obstruct the following—
(a) sight lines for drivers, cyclists or pedestrians,
(b) access for people with a disability,
(c) a footpath,
(d) an outdoor dining area.
(8) Must not be carried out on land comprising a heritage item or on which a heritage item is located.
(9) Must not be in a heritage conservation area, except on the following—
(a) Birrell Street in Bondi, Bondi Junction, Bronte, Queens Park, Tamarama or Waverley,
(b) Blair Street in Bondi, Bondi Beach or North Bondi,
(c) Bondi Road in Bondi, Bondi Beach or Bondi Junction,
(d) Bronte Road in Bondi Junction, Bronte, Queens Park or Waverley,
(e) Campbell Parade in Bondi Beach or North Bondi,
(f) Macpherson Street in Bronte or Waverley,
(g) Oxford Street in Bondi Junction.
sch.2-sec-oc.10
Street art
sch.2-sec-oc.10 Street art
Street art
(1) Must not project more than 30mm from a wall or other surface.
(2) Must not constitute signage.
Note.
Signage includes advertisements and advertising structures.
(3) Must not be located on a heritage item or within a heritage conservation area.
(4) Must not contain material that—
(a) discriminates against or vilifies any person or group, or
(b) is offensive or sexually explicit.
(5) In this clause, street art means art that is painted, marked or otherwise affixed to the outside of a building and that is visible from a public place (within the meaning of the Local Government Act 1993).
Note.
Street art may only be carried out subject to requirements to obtain the approval of the owner of the building on which the street art is located or any statutory authorities. See also Part 2 of the Graffiti Control Act 2008 for graffiti related offences.
sch.2-sec-oc.11
Temporary events on public land and public roads and associated temporary structures
sch.2-sec-oc.11 Temporary events on public land and public roads and associated temporary structures
Temporary events on public land and public roads and associated temporary structures
(1) Must take place on land owned by the Council or for which the Council has care, control and management (including Crown land) or a public road for which the Council is the roads authority under the Roads Act 1993.
(2) Must not involve demolition.
(3) Must not involve overnight accommodation on bushfire prone land.
(4) Must not be conducted for more than 52 days (whether or not consecutive) in any period of 12 months.
(5) In this clause, event means any event (including, without limitation, a market, exhibition, ceremony, meeting, concert, sporting event or fete) that would, but for this clause, require development consent.
Note.
The proposed event may involve activities that require approvals under the Local Government Act 1993 and other legislation. Such activities include the closure of public roads, the erection of temporary structures and activities on public land.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Schedule 6A
Contribution requirements for certain development on Planning Proposal Land
Schedule 6A Contribution requirements for certain development on Planning Proposal Land
Schedule 6A Contribution requirements for certain development on Planning Proposal Land
clause 6.18
| Planning Proposal Land | Contribution requirement |
| Lot 1, DP 619753, 50 Botany Street, Bondi Junction | 9.27% of the gross floor area of all buildings on the land |
sch 6A: Ins 2025 (699), Sch 1[5].
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Waverley Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Waverley in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to promote and co-ordinate a range of commercial, retail, residential, tourism, entertainment, cultural and community uses to service the local and wider community,
(b) to strengthen the viability and vitality of Bondi Junction as a strategic centre for investment, cultural and civic activity, retail, health care and entertainment, and to promote Bondi Junction as a centre for investment and employment opportunities in the knowledge and innovation sector,
(c) to provide for a range of residential densities and range of housing types to meet the changing housing needs of the community,
(ca) to encourage the development of a variety of housing on land close to public transport, essential goods and services and open space,
(d) to provide an appropriate transition in building scale around the edge of centres to protect the amenity of surrounding residential areas,
(e) to protect, maintain and accommodate a range of open space uses, recreational opportunities, community facilities and services available to the community,
(f) to enhance and preserve the natural environment through appropriate planning, protecting the integrity of natural systems and by protecting existing trees,
Implements site-specific design governance for key Bondi Junction sites: design excellence requirements, competitive design process for some sites, and mandatory development control plans for those sites (cl 6.9-6.11; cl 6.10(3)).
Introduces targeted policy instruments: active street frontage controls (cl 6.5), protections for music at licensed premises (cl 5.20), flood planning requirements (cl 5.21), biodiversity and public bushland protections (cl 6.4; cl 5.23), and affordable housing contributions (cl 6.17; cl 6.18; Schedule 6A).
The Plan records multiple amendments in‑text (see amendment notes attached to many clauses) and embeds references to state instruments and other Acts (for example the Act itself, the Heritage Act 1977, the Local Government Act 1993 and the Land Acquisition (Just Terms Compensation) Act 1991), establishing how state and local rules interact (cl 1.9; cl 5.1; cl 5.2; cl 5.12).
The instrument sets rights and duties by defining where development is permitted, permitted with consent, or prohibited (cl 2.3 and the Land Use Table). It also creates procedural duties (e.g. requirements to prepare heritage management documents or acid sulfate soils management plans before consent may be granted (cl 5.10(5); cl 6.1(3))). It enables consent conditions such as covenants to prevent “double dipping” in FSR calculations (cl 4.5(9)-(10)) and authorises the Council to classify and reclassify public land (cl 5.2).
Officially the Plan’s purpose is stated in clause 1.2: to make local environmental planning provisions for Waverley and to promote a long list of aims including protecting arts and cultural activity, strengthening Bondi Junction as a strategic centre, providing a range of housing types, protecting natural and heritage values, promoting water and energy management and prioritising walking, cycling and public transport (cl 1.2(1)-(2)). Those purpose claims are part of the instrument and therefore shape decision‑making; later sections provide the concrete mechanisms by which the Plan seeks to achieve those aims (for example, active street frontage requirements, design excellence processes and affordable housing contribution powers).
Main concepts
The Plan’s principal organising concepts are zoning, mapped development standards, consent pathways, exemptions/compliance pathways and site‑specific controls.
Zoning and Land Use Table: The Plan divides land into zones (e.g. R2, R3, R4, E1, E2, MU1, SP2, RE1, RE2, C2) (cl 2.1) and attaches objectives and a Land Use Table that specify uses that are permitted without consent, permitted only with consent, or prohibited in each zone (cl 2.3). The consent authority must have regard to the zone objectives when determining applications (cl 2.3(2)). The Land Use Table is the primary legal filter for what can legally occur on a site.
Map-led standards: Building height limits and floor space ratio maxima are not described only in the text; they are shown on maps and the Plan ties those mapped values to legal limits (cl 4.3(2) and cl 4.4(2)). Lot size minima for subdivisions are also map-faced (cl 4.1(3)). The Plan repeatedly instructs that maps prevail for site detail and that maps may be electronic (cl 1.7(4)).
Consent pathways and exemptions: The Plan distinguishes development that must have development consent, exempt development (Schedule 2 , minimal environmental impact, subject to BCA, other approvals and exclusions, cl 3.1 and Schedule 2 Notes), and complying development (Schedule 3, cl 3.2) for certain development types. Exempt or complying development is not permitted on specified environmentally sensitive areas (cl 3.3).
Standards and flexibility: The Plan sets mandatory standards (height, FSR, lot sizes) but includes an exceptions mechanism permitting contraventions if the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds; the consent authority must keep a written record of its assessment (cl 4.6(2)-(4)). Some standards are expressly excluded from that exceptions clause (cl 4.6(8)).
Site‑specific and strategic controls: The Plan contains spatially targeted provisions: design excellence (cl 6.9), Bondi Junction design competition and development control plan requirements (cl 6.10-6.11), retention of non‑residential FSR on certain MU1 land in Bondi Junction (cl 6.12), Edina Estate integrated requirements for deep soil and sustainability (cl 6.13), active street frontages (cl 6.5), and maximum retail GFA caps on particular Bronte sites (cl 6.8). Schedule 1 sets additional permitted uses for particular parcels (cl 2.5; Schedule 1).
Heritage, biodiversity and environmental risk: The Plan embeds heritage protection mechanisms (consent triggers for demolition/alteration around heritage items and conservation areas, heritage assessment and notification processes, cl 5.10), terrestrial biodiversity considerations for mapped biodiversity areas (cl 6.4), acid sulfate soils controls (cl 6.1), stormwater and public bushland protections (cl 6.15; cl 5.23), and flood planning controls referencing state flood guidance (cl 5.21).
Interaction with state law and third‑party instruments: The Plan is subject to State environmental planning policies where they prevail (cl 1.9(1)). Clause 1.9A temporarily suspends private covenants that would otherwise restrict development consistent with this Plan, subject to specific exceptions and public authority interests (cl 1.9A). There are cross‑references to the Building Code of Australia, BASIX, the Heritage Act 1977, Local Government Act 1993, Land Acquisition (Just Terms Compensation) Act 1991 and a range of fisheries, biodiversity and Crown land statutes (e.g. cl 3.1(3)(a)-(d); cl 4.5(9); cl 5.1-5.2; cl 5.10).
The Plan therefore couples high‑level aims (cl 1.2) with technical, map‑driven rules and discretionary pathways for individual development outcomes, while preserving state policy primacy and embedding local design and heritage processes.
Who it affects
The Plan affects multiple groups through different channels of cost, decision‑making power and behavioural constraint.
Landowners and developers: They are the primary economic actors affected. The Plan defines where and how they may develop land, what uses they may lawfully carry on, and the standards they must meet for consenting. Developers seeking greater heights or FSR than mapped face either refusal or must rely on the exceptions process (cl 4.3; cl 4.4; cl 4.6). Projects on key Bondi Junction sites must run competitive design processes and satisfy design excellence tests (cl 6.10; cl 6.11). Those proposing certain residential types (independent living units, multi dwelling housing, residential flat buildings, shop top housing) may face affordable housing contribution conditions (cl 6.17; cl 6.18; Sch 6A). Owners of sites identified in Schedule 1 (additional permitted uses) obtain discrete rights (Schedule 1). Owners of heritage items or land in heritage conservation areas face consent triggers and possible heritage management plan requirements (cl 5.10).
Council (consent authority): The Plan explicitly makes Council the consent authority for this Plan (cl 1.6). Council carries the operational burden of assessing development applications against the Plan, applying the exceptions-to-standards test and keeping records of assessments (cl 4.6(3)-(4)), deciding whether to require heritage management documents (cl 5.10(5)), and approving development control plans for site‑specific matters (cl 6.11(3)). The Plan also empowers the Council to class or reclassify public land (cl 5.2) and to collect affordable housing contributions or accept land dedication (cl 6.17(3)).
Residents and neighbours: The Plan affects local amenity, character and services. Zone objectives commit to maintaining or enhancing neighbourhood character and amenity (see objectives across R2-R4 and E1-E2 zones). Controls on active street frontages (cl 6.5), public bushland protection (cl 5.23), solar access for certain public spaces (cl 6.7), noise considerations for licensed premises including music protections (cl 5.20), and flood planning criteria (cl 5.21) are all measures that constrain development outcomes directly relevant to neighbours and users of public space.
Heritage and Aboriginal community stakeholders: The Plan requires specific consultation and notification in relation to archaeological sites and Aboriginal places of heritage significance (cl 5.10(7)-(9)). The consent authority must notify relevant bodies (Heritage Council, local Aboriginal communities) and consider responses within 28 days (cl 5.10(7) and (8)). The Plan identifies state and local heritage items (Schedule 5) and archaeological sites (Schedule Part 3) and sets the consent triggers.
Utilities, transport and state agencies: The Plan designates certain acquisition authorities for land acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 and identifies which state authority is the relevant acquiring authority for specific land types shown on the Land Reservation Acquisition Map (cl 5.1). The Plan preserves rights for Crown infrastructure development under State SEPPs (cl 5.12). Transport for NSW and other state agencies are explicitly named as the relevant acquiring authority for certain map items (cl 5.1(2) Table).
Cultural and business operators: Licensed premises are subject to a protection for playing and performing music in that the consent authority may not refuse development for music‑related reasons where noise can be managed (cl 5.20). Retail operators face size caps for neighbourhood shops and neighbourhood supermarkets (cl 5.4(7); cl 5.4(7AA)) and site‑specific retail GFA caps (cl 6.8). Active street frontage rules prioritise business/retail ground floors in specified mapped frontages (cl 6.5).
State government and statutory bodies: The Plan is subject to, and interacts with, State environmental planning policies (cl 1.9(1)). It defers to other statutes for areas such as biodiversity, national parks, Crown land and fisheries (e.g. cl 1.9A exceptions list and cl 5.19 references).
Who pays and who decides: owners/developers bear the direct costs of compliance, application fees, design competitions where required, heritage and environmental assessments, affordable housing contributions (or land dedication), and any remedial works or covenant registrations (cl 4.5(9); cl 6.13(5); cl 6.17(2)-(3)). Council decides on consents, imposes conditions, and administers public land classification and acquisition mapping processes (cl 1.6; cl 5.1; cl 5.2). State agencies can override or modify Plan operation where SEPPs prevail (cl 1.9). The Plan distributes decision‑making authority mainly to the Council but situates certain decisions in processes that require external notification and input (Heritage Council, local Aboriginal communities; cl 5.10).
Key duties and rights
The Plan creates a bundle of duties for applicants, the consent authority and the Council, and confers rights to development where permitted.
Key duties on applicants and consent holders
Determine permissibility against the Land Use Table and maps: Applicants must start by checking zone permissibility, mapped height, mapped FSRs, lot sizes and other overlays (cl 2.2; cl 4.3(2); cl 4.4(2); cl 4.1(3)). The Plan makes the Land Use Table the determinant of permitted uses in each zone (cl 2.3(1)).
Prepare specialist documentation where required: The Plan requires particular supporting documents prior to consent in certain circumstances:
Acid sulfate soils management plan before certain works on mapped classes (cl 6.1(3)).
Heritage management documents or heritage conservation management plans where directed by the consent authority (cl 5.10(5)-(6)).
Compliance documents for BASIX, NABERS, NatHERS and other sustainability targets for specific sites (Edina Estate cl 6.13(5)(b)-(d)).
Documents for exceptions to a development standard under clause 4.6, which the regulations require to accompany DA’s (cl 4.6(3) and Note).
Maximise design integration and active frontage obligations: Applicants must ensure, for mapped streets, that new ground floor premises facing the street are business or retail uses (cl 6.5(3)-(5)).
Manage environmental, flood and biodiversity risks: Applicants must show development is compatible with flood planning area functions, that it will not increase flood impacts or affect evacuation capacity, and consider projected climate change impacts (cl 5.21). For mapped biodiversity land, the consent authority must be satisfied of avoidance, minimisation or mitigation measures (cl 6.4(3)-(4)).
Observe exempt/compliant development conditions: Where relying on Schedule 2 (exempt) or Schedule 3 (complying), applicants must meet the specific conditions and other statutory approvals (cl 3.1(2)-(5); Sch 2 notes; Sch 3 general conditions).
Key duties and discretions on the consent authority (Council)
Have regard to zone objectives: When determining DAs, the consent authority must have regard to the objectives for development in the zone (cl 2.3(2)).
Apply exceptions‑to‑standards test with reasons and records: If development contravenes a development standard, the consent authority may only grant consent where cl 4.6’s requirements are satisfied and the authority must keep a record of the assessment (cl 4.6(2)-(4)).
Require and consider heritage, archaeological and Aboriginal heritage input: The consent authority may require heritage management documents and must notify the Heritage Council (or local Aboriginal communities) and consider submissions in set timeframes (cl 5.10(5)-(9)).
Impose conditions including covenants: The authority may require covenants to prevent double counting of floor area on consolidated sites, and may impose affordable housing contribution conditions (cl 4.5(9)-(10); cl 6.17(2)-(3)).
Assess specialised matters: The consent authority must be satisfied certain sustainability and urban design outcomes are achieved for designated sites (design excellence tests cl 6.9; Bondi competition cl 6.10).
Rights created or preserved
Rights to develop where a use is permitted: If a use is listed as "permitted with consent" in the Land Use Table, the applicant has a right to apply for consent and, subject to satisfying relevant provisions, to be considered (cl 2.3(1)-(3)).
Rights to carry out exempt development: Identified minimal impact works may proceed without development consent if they meet the Schedule 2 standards and other statutory requirements (cl 3.1(2); Schedule 2 notes).
State policy primacy and Crown rights: The Plan recognises that State environmental planning policies prevail where they apply (cl 1.9(1)) and preserves the use of existing Crown buildings and State SEPP infrastructure development (cl 5.12).
Temporary suspension of private covenants: The Plan suspends private agreements and covenants that would prevent carrying out development consistent with the Plan, to the extent necessary for that purpose, subject to specified exclusions (cl 1.9A(1)-(3)). That suspension does not affect rights or interests of public authorities under registered instruments (cl 1.9A(3)).
Procedural and transparency duties
Mapping availability and updates: Named maps are to be kept and made publicly accessible per arrangements approved by the Minister, and may be combined or kept in electronic form (cl 1.7(1)-(4)). This creates a duty for public access to the spatial rules.
Record keeping of exceptions assessments: The consent authority must keep a record of assessments under cl 4.6(3) (cl 4.6(4)).
The Plan therefore allocates legal duties primarily to applicants and Council, creates conditional rights to develop in line with mapped controls and sets out procedural obligations for preserving heritage, environmental and design outcomes.
Penalties and enforcement
The Plan itself sets prescriptive development rules, consent triggers and compliance conditions. However, the text supplies limited direct detail on penalties; enforcement primarily flows from the operation of the Environmental Planning and Assessment Act and other relevant Acts rather than from penalty clauses within the Plan text. The Plan manifests enforcement mechanisms by way of consent requirements, conditionable approvals, covenants and triggers that prevent development unless conditions are met.
Concrete enforcement/implementation mechanisms and instruments in the Plan
Development consent gatekeeping: Many activities are permitted only with development consent (for example subdivision cl 2.6; demolition cl 2.7; earthworks cl 6.2; works on heritage items cl 5.10). Consent denial or approval with conditions is the principal regulatory lever for the Plan.
Conditions and covenants: The Plan expressly allows conditions to be imposed on consents that may include registration of covenants to prevent “double dipping” in floor area calculations across consolidated sites (cl 4.5(9)-(10)). The Plan also anticipates conditions for affordable housing contributions (cl 6.17(2)-(4); cl 6.18(2)-(3)), sustainability conditions for Edina Estate (cl 6.13(5)), and design excellence requirements (cl 6.9(3)-(4)).
Procedural notification and consultation: The consent authority must notify the Heritage Council or Aboriginal communities for particular heritage/archaeological matters and take responses into account (cl 5.10(7)-(9)). Failure to observe these processes could invalidate consent decisions, exposing authority decisions to internal review or review under the Act.
Map and Schedule constraints: Exempt and complying development exclusions for environmentally sensitive areas (cl 3.3) operate as prohibitions on certain operational shortcuts, directing more development into the full DA process.
Interaction with other Acts: Enforcement of many development prohibitions and penalties will be via the broader statutory schemes referenced: the Environmental Planning and Assessment Act, the Heritage Act 1977, the Local Government Act 1993, the Land Acquisition (Just Terms Compensation) Act 1991 and other state environmental statutes. The Plan references those statutes for specific procedural or approval requirements (e.g. cl 3.1(3)(d) heritage register exclusion; cl 5.1 owner‑initiated acquisition procedure).
What the Plan does not itself specify in detail
No schedule of fines or express criminal/civil penalties are set out within the Plan text provided. The Plan relies on the primary Act and other statutes for enforcement sanctions (for example offences under the Environmental Planning and Assessment Act, the Heritage Act or Local Government Act) rather than embedding them in the LEP language.
The Plan does not set out appeal or review mechanisms; those are governed by the Act (and associated regulations) which are referenced but not reproduced in the Plan. For contravention of development consent or unauthorised development, enforcement action would be pursued under the Act and its regulations.
Practical enforcement implications and risks
Discretion creates implementation risk: Many obligations are pathway‑based and leave significant discretion to the consent authority (e.g. design excellence assessment cl 6.9; exceptions from standards cl 4.6). That discretion can generate uncertainty for applicants and predictable grounds for merits review or legal challenge if reasons and records are inadequate (cl 4.6(4) requires a record).
Conditions that require ongoing performance: Conditions such as affordable housing contributions, covenants preventing double counting and sustainable performance requirements (NABERS, NatHERS, BASIX-related targets in cl 6.13) create ongoing compliance obligations that may require monitoring and enforcement by Council.
Interplay with state instruments: Because SEPPs can prevail (cl 1.9(1)), enforcement outcomes may change where a state policy applies; applicants must check state SEPPs as well as the LEP. The Plan’s suspension of private covenants (cl 1.9A) reduces one private enforcement channel in limited cases, while preserving public authority rights under registered instruments (cl 1.9A(3)).
In short, the Plan sets a rules framework that is enforced primarily through the planning consent process, conditions, registered covenants and the enforcement provisions of the primary and referenced statutes, not by standalone LEP penalty clauses.
How it interacts with other laws
The Plan is intentionally embedded within a broader statutory network and cross‑references state policies and other Acts to allocate competence and resolve conflicts.
Primary interactions and hierarchy
State environmental planning policies (SEPPs): The Plan is subject to State environmental planning policies that prevail where there is inconsistency, by operation of section 3.28 of the Environmental Planning and Assessment Act (cl 1.9(1)). The Plan lists relevant SEPPs in the Land Use Table Note and elsewhere (for example SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021). Practically this means where a SEPP provides a different rule or an express override to a local control, the SEPP will dictate the outcome.
Environmental Planning and Assessment Act and Regulations: The Plan presumes and operates under the Act. It references the Act’s DA processes (for example cl 1.8A on savings for existing DAs and the cross reference to Division 3.5 of the Act), and the Environmental Planning and Assessment Regulation 2021 (noted in cl 4.6 Note) for the requirements accompanying development applications seeking to contravene standards.
Cross‑references to substantive statutes and instruments
Heritage Act 1977: Heritage items listed on the State Heritage Register are excluded from exempt development (cl 3.1(3)(d)), and the Plan sets heritage consent triggers and notification obligations (cl 5.10).
Local Government Act 1993: The Plan refers to classification/reclassification of public land and the Council’s powers under the Local Government Act (cl 5.2; Schedule 4), and uses the Local Government Act definition of public place in cl 4.5(11) and cl 3.3(5) references.
Land Acquisition (Just Terms Compensation) Act 1991: The Plan designates relevant acquisition authorities and states acquisition rules for owner‑initiated acquisition (cl 5.1), including that the Minister may designate an acquiring authority where not specified.
Crown land and National Parks statutes: Clause 1.9A explicitly preserves the application of certain Crown land management instruments and excludes various conservation agreements and biobanking agreements from the Plan’s covenant‑suspension effect, referencing the Crown Land Management Act 2016, National Parks and Wildlife Act 1974, Nature Conservation Trust Act 2001 (repealed as listed), Native Vegetation Act 2003 (repealed), and the Threatened Species Conservation Act 1995 (repealed) (cl 1.9A(2)).
Fisheries and Biodiversity statutes: The Plan synchronises aquaculture controls with aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19). Biodiversity considerations are accommodated in cl 6.4 and cl 3.3 which reference the Biodiversity Conservation Act 2016 and Chapter 2 of SEPP (Biodiversity and Conservation) 2021.
Roads Act 1993: Schedule 2 exempt development for restaurants or cafes on footways require Road Act approval under section 125 (sch 2, sch.2-sec-oc.5(4)).
BASIX/NatHERS/NABERS and Building Code: The Plan requires adherence to Building Code of Australia standards for exempt/compliant development (cl 3.1(3)(a)); the Edina Estate clauses require BASIX/NatHERS/NABERS performances or equivalents (cl 6.13(5)(b)-(d)). Clause 4.6(8) excludes development standards that arise from BASIX commitments from the exceptions pathway.
Practical implications of these interactions
Multi‑instrument compliance burden: Applicants must check the LEP, relevant SEPPs, building code requirements, BASIX certificates, local development control plans and other statutory approvals (e.g. Roads Act consents, fisheries licences) for a single project. Schedule 2 Note 2 highlights that exempt development under the LEP does not remove the need for other statutory approvals.
Conflict resolution: Where state policy applies, SEPP provisions may override local LEP provisions (cl 1.9(1)), which can change permissible uses or standards for a site. Applicants must identify applicable SEPPs early.
Preserved Crown and public authority rights: The Plan expressly does not limit State SEPP‑allowed infrastructure development or the Crown’s use of existing buildings (cl 5.12), and it safeguards public authority interests where covenants are suspended (cl 1.9A(3)).
Heritage and Aboriginal consultation obligations: The Plan’s heritage and archaeological provisions require notification of statutory bodies which sits alongside other heritage regulatory frameworks (cl 5.10(7)-(9)).
Acquisition and classification interface: The Plan’s mapping of land reservation acquisition and its identification of the relevant acquiring authorities set the process for owner‑initiated acquisition and who must act if acquisition is required (cl 5.1; cl 5.1A).
In short, this LEP is not a standalone rulebook; it operates within a statutory hierarchy that often requires simultaneous compliance with state policies and other legislation, shifting both compliance burden and potential points of conflict onto applicants and the consent authority.
Amendment history
The Plan text includes intra‑document amendment footnotes and amendment notations beside many clauses. The instrument has been subject to incremental changes across multiple years; the Plan records these amendments in clause footnotes.
Key recorded amendment timestamps and topics (as reflected in clause notes)
2014: Insertions and amendments appear in several schedules and clauses (e.g. cl 6.7 insertion Ins 2014 (367) Sch 1[1] with later amendments noted).
2015: Repeal of some clauses (for example cl 4.4B was repealed in 2015 (Rep 2015 (38), cl 5)), and later amendments to cl 6.7 (2015 (414)).
2017: Significant amendments recorded such as changes to zones and Land Use Table references (Land Use tbl amendments listed 2017 (493), 2017 (729) etc), design excellence provisions (cl 6.9 Ins 2017 (729) Sch 1[6]), Schedule 4 amendments (sch 4 Am 2017 (352)). Several heritage schedule updates are annotated as 2017 (729).
2019: Insertions like cl 6.10 (Bondi Junction design excellence and competitive design process) Ins 2019 (470), cl 1.8A amended 2019 (621) Sch 5[1], and other targeted local provisions (cl 6.10 later amended 2023 (698) Sch 1.13[1]-[4]).
2020: Multiple amendments including cl 2.3 Am 2020 (501) Sch 2.11 and FSR changes (cl 4.4 Am 2020 (631) Sch 1[2]-[3]); also Schedule 2 exempt developments updated 2020 (631) Sch 1[5]. Cl 4.6 saw amendments 2020 (403), Sch 1[1].
2021: Inserts and changes for development standards and specific Bondi Junction controls (cl 6.12 Ins 2021 (71) Sch 1[3]); compliant development changes; heritage schedule updates. Also amendments cited 2021 (645) Sch 1[2].
2022: A substantial tranche of amendments across the Plan: zoning updates, active street frontages, public bushland (cl 5.23 Ins 2022 (629) Sch 2[1]), design excellence amendments (cl 6.9 Am 2022 (589), Sch 1[24]-[27]), and other mapping/controls (2022 (828), Sch 1.24 entries). 2022 (314), Sch 1 and 2022 (589), Sch 1[6]-[18] noted in Land Use Table.
2023: Amendment of the competitive design process definition referencing Design Competition Guidelines (cl 6.10(7) amended 2023 (698), Sch 1.13[1]-[4]).
2024: FSR exceptions for small lots inserted (cl 4.4A Am 2024 (310) Sch 1). Schedule 2 amended 2024 (309) Sch 1.
Progressive layering: The Plan demonstrates iterative, site‑specific policy layering rather than a single sweeping rewrite. That leads to a complex body of local rules where specific sites (Bondi Junction key sites, Edina Estate, Planning Proposal Land) have additional bespoke obligations.
Ongoing compliance checks: Because many amendments are map based (height, FSR, Key Sites Map) or schedule updates (heritage items), prospective developers and advisers must consult the current consolidated Plan and the maps on the NSW Planning Portal at the time of application (cl 1.7(3) and the notes directing users to the Planning Portal).
Transitional and savings rules: The Plan preserves some pre‑existing applications via cl 1.8A which requires DAs made before commencement to be determined as if this Plan had not commenced (cl 1.8A). This can preserve previously available rights for applicants.
In sum, the Plan has been amended repeatedly, frequently with targeted, spatially precise interventions rather than wholesale rule changes. The amendment notes in the Plan text are the authoritative record of those iterative changes.
Litigation history
The Plan document supplied contains no judicial decisions, case citations or summaries of litigation. It does not list any court or tribunal determinations about its provisions. The instrument itself names only statutes and policy guidance; it does not reference, summarise or rely on any judicial authority. Therefore, from this source alone:
There are no cases cited or included in the text.
There is no internal litigation history recorded in the Plan.
Practically, any litigation or merits review arising from the application of this Plan (for example, challenges to development consents, disputes over the exceptions‑to‑standards test, or heritage determinations) would proceed under the Environmental Planning and Assessment Act, associated regulations, and NSW civil procedure but those cases are not recorded in the instrument provided. Users wanting current case law on particular provisions would need to consult case databases or tribunal decisions outside the Plan text.
Gotchas
This Plan contains several provisions and drafting features that create specific practical traps or points of uncertainty for practitioners, investors and local residents. These are material because they change expected outcomes, create conditional rights, or produce procedural risk.
Map dependence and electronic changes: Height, FSR, lot size, heritage overlays, active street frontages and many rights are map‑driven (cl 1.7; cl 4.3(2); cl 4.4(2); cl 4.1(3); cl 6.5(2)). Maps may be amended or replaced and are made available electronically (cl 1.7(1)-(4)). That means a visual check alone is not sufficient; the operative map version, its timing and any recent map changes determine rights. Always reference the current Planning Portal maps.
Savings for pre‑existing DAs: If a DA was lodged before the Plan commenced and not finally determined, cl 1.8A requires it be determined as if the Plan had not commenced. That can preserve prior entitlements but can also create complexity for applicants and neighbours when a new Plan is published. Practitioners should check the commencement date and DA lodgement history (cl 1.8A).
Suspension of covenants (cl 1.9A): The Plan limits private covenants that would prevent development consistent with the Plan, but the clause has significant exceptions (does not apply to covenants imposed by or required by the Council, certain Crown instruments, conservation agreements, trust agreements, biobanking agreements, planning agreements). It also does not affect rights or interests of public authorities under registered instruments (cl 1.9A(2)-(3)). If relying on covenant suspension to enable development, verify the covenant’s origin and whether it is a listed exception.
Exempt/compliant development exclusions (cl 3.3): Exempt and complying pathways are barred on a wide list of environmentally sensitive areas including coastal waters, Ramsar sites, land within 100 metres of certain protected areas, and land identified in any instrument as of high Aboriginal cultural or biodiversity significance (cl 3.3(2)). An exempt development that seemed attractive may be prohibited on such overlays.
Exceptions-to-standards pathway requires evidentiary case and record keeping (cl 4.6): If proposing to breach a standard, the applicant must demonstrate that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds; the consent authority must keep a record of the assessment (cl 4.6(3)-(4)). The Regulation requires a supporting document. Absent a rigorous written case, an exceptions application is vulnerable.
BASIX and sustainability exclusions from exceptions (cl 4.6(8)): Clause 4.6(8) excludes from the exceptions pathway development standards for complying development and some standards arising from BASIX commitments and certain clauses (including cl 5.4, 5.5, 6.12 and cl 4 of Schedule 1). You cannot rely on cl 4.6 to vary those particular standards.
Heritage consent triggers and notification timeframes (cl 5.10): Demolition or alteration of heritage items, or works within conservation areas, routinely require consent and potentially a heritage management document; the consent authority may require a heritage plan and must consider its effects on heritage significance (cl 5.10(2)-(6)). The consent authority must notify the Heritage Council and consider any response within 28 days for certain sites (cl 5.10(7)-(9)). Failing to manage these steps correctly risks invalid decision‑making or delay.
Site‑specific obligations in Bondi Junction and Edina Estate: Some sites require competitive design processes, development control plans, and minimum non‑residential floor space retention (cl 6.10; cl 6.11; cl 6.12). Edina Estate requires 30% deep soil, NABERS/NatHERS/BASIX performance targets and affordable housing commitments (cl 6.13). These are non‑standard obligations that can significantly change project cost and program if overlooked.
Affordable housing contributions and Sch 6A: For most eligible residential development (cl 6.17) the consent authority may impose a 1% gross floor area contribution. On Planning Proposal Land the contribution may be set by Schedule 6A (cl 6.18; Sch 6A). Schedule 6A specifically sets a 9.27% contribution for Lot 1 DP 619753 50 Botany Street (Sch 6A). Practitioners must check whether the land is Planning Proposal Land and the applicable percentage before committing.
Music protections (cl 5.20): The consent authority must not refuse consent for licensed premises on grounds concerning music genre, live vs amplified, dancing, stage direction, lighting, and similar matters (cl 5.20(1)). Further, it must not refuse on noise grounds if satisfied noise may be managed to an acceptable level (cl 5.20(2)). This shifts the assessment from categorical prohibitions to a noise‑management focus and can limit neighbourhood objections framed only around the type of entertainment.
Covenants to prevent double dipping (cl 4.5(9)-(10)): When consent is granted on consolidated sites, Council can require a covenant preventing the same floor area being created again elsewhere on the former lots. This can affect site consolidation strategies and future development rights.
No standalone penalty schedule in the LEP: The Plan relies on statutory enforcement under the Act and other referenced statutes; the LEP itself does not quantify penalties. Enforcement steps and penalties will therefore be found in other legislation.
These “gotchas” are concrete, map‑based, procedural or evidentiary. They raise transaction costs, increase the need for targeted pre‑DA work, and create specific regulatory risk points that advisers should check early in project assessment.
How to comply
This section sets out a practical compliance roadmap, anchored to Plan clauses, for developers, landowners, consent authority officers and advisers.
Start with maps and the Land Use Table (cl 2.2; cl 2.3)
Check the Land Zoning Map to confirm zone and refer to the Land Use Table for that zone to see whether the intended use is permitted without consent, permitted with consent, or prohibited (cl 2.2; cl 2.3(1)).
Confirm Height of Buildings Map, Floor Space Ratio Map and Lot Size Map to identify applicable numerical caps (cl 4.3(2); cl 4.4(2); cl 4.1(3)).
Determine the applicable pathway: exempt / complying / development consent (cl 3.1; cl 3.2; Schedules 2-3)
If intending exempt or complying development, verify eligibility against Schedule 2 or Schedule 3 and check cl 3.3 for environmentally sensitive area exclusions (cl 3.3). If exempt, remember other statutory approvals may still be needed (Sch 2 Note 2).
If the use is allowed only with consent or prohibited, prepare for a development application and plan for the supporting documentation required by the Plan and the Regulation.
Check overlay requirements and special provisions
Heritage: If the site is a heritage item or within a conservation area (Schedule 5; Heritage Map), anticipate a requirement for heritage management documents and possibly a heritage conservation management plan (cl 5.10(2)-(6)). Consult the Heritage Council where required (cl 5.10(7)-(9)).
Acid sulfate soils: For works in mapped classes on the Acid Sulfate Soils Map, prepare an acid sulfate soils management plan in accordance with the Acid Sulfate Soils Manual (cl 6.1(2)-(3)). A preliminary assessment may suffice if confirmed in writing by the consent authority (cl 6.1(4)).
Biodiversity: For land mapped “Biodiversity”, include assessment of impacts and avoidance/minimisation/mitigation measures (cl 6.4(2)-(4)).
Public bushland and stormwater: If the development adjoins public bushland or is in specified zones for stormwater management, include plans for remediation, minimisation of disturbance and on‑site stormwater measures (cl 5.23; cl 6.15).
Flood planning: If in a flood planning area, prepare a flood risk response consistent with the Considering Flooding guideline and the Flood Risk Management Manual and detail evacuation/safety measures and flood behaviour compatibility (cl 5.21).
Prepare required specialist reports and documentation
Where proposing to contravene development standards, prepare the exceptions justification document required by cl 4.6 and the Regulation; expect the consent authority to keep an assessment record (cl 4.6(3)-(4)).
For Edina Estate key site, assemble evidence showing 30% deep soil provision, NABERS/NatHERS/BASIX performance capability, and affordable housing components where applicable (cl 6.13(3)-(5)).
For design excellence or Bondi Junction key sites, plan and budget for a competitive design process and prepare design documentation meeting the design criteria in cl 6.9 and the Design Competition Guidelines where required (cl 6.10(3)-(7)).
For heritage sites, be ready to prepare a heritage management document or heritage conservation management plan if the consent authority requires (cl 5.10(5)-(6)).
Account for conditions and contributions
Anticipate possible conditions including covenants to prevent FSR double counting (cl 4.5(9)-(10)), energy/water performance requirements, public domain contributions, and affordable housing contributions (cl 6.17(2)-(4); cl 6.18(2)-(3)). Early dialogue with Council about potential conditions and the Affordable Housing Contributions Scheme is advisable.
Consult and notify where the Plan requires
For development affecting archaeological sites or Aboriginal places, follow cl 5.10(7)-(9) notification requirements and allow for the 28‑day response windows to influence programme.
Where state or Commonwealth approvals may be required (e.g. fisheries, marine parks, Crown land), secure those licences or permits in parallel with the DA process because cl 3.1 and cl 5.19 note that other Acts’ licences still apply.
Timing and programme considerations
Build the time for design competitions, heritage consultations, environmental assessments, and possible affordable housing negotiations into the project schedule. Some approvals (heritage notifications, design competitions) may add statutory 28‑day or discretionary periods (cl 5.10(7)-(9); cl 6.10(3) obligations).
For small urban lots: check FSR exceptions (cl 4.4A)
Clause 4.4A provides formulaic FSR exceptions for attached dwellings, dual occupancies and small lots in R2-R4. Use the formula to calculate applicable FSRs where lots are under 550 m2 (cl 4.4A).
Check music and licensed premises provisions (cl 5.20)
If you are operating or proposing licensed premises, prepare a noise management plan demonstrating how music noise will be managed to an acceptable level, because the consent authority must not refuse on certain entertainment grounds and must accept manageability of noise (cl 5.20(1)-(2)).
Post‑consent obligations and registrations
Expect to register covenants where required, to build to specified NABERS/NatHERS/BASIX capability levels on design and verify performance where conditions require, and to deliver any dedicated affordable housing or make monetary contributions per the Affordable Housing Contributions Scheme (cl 4.5(9); cl 6.13(5); cl 6.17(3)).
Where in doubt, clarify with Council and check SEPPs
Because SEPPs can prevail (cl 1.9(1)) and the Plan contains site‑specific complexities, early pre‑DA consultation with Council and checking relevant SEPPs and state policies is essential. Confirm the current active maps on the NSW Planning Portal and ask Council about likely conditions, map interpretations and expected supporting documents.
Following this roadmap, anchored to the clauses cited, reduces the risk of procedural missteps, ensures preparatory evidence is assembled for discretionary pathways, and aligns project design with the Plan’s mapped controls and site‑specific obligations.
(g) to identify, conserve and enhance the cultural, environmental, natural, aesthetic, social and built heritage, and existing scenic and cultural landscapes of Waverley, including the curtilage of Centennial Park, for current and future generations,
(h) to acknowledge and recognise the connection of Aboriginal people to Waverley and to protect, promote and facilitate Aboriginal culture and heritage,
(i) to achieve high quality public domain with significant tree canopy and accessible open space,
(j) to promote energy conservation, water cycle management, incorporating water conservation, water reuse, water catchment management, stormwater pollution control and flood risk management, and water sensitive urban design,
(k) to promote waste avoidance, waste minimisation and resource recovery,
(l) to improve connectivity and accessibility in Waverley and prioritise development that enables walking, cycling and the use of public transport,
(m) to enhance the amenity and quality of life of local communities, including through the provision of adequate social infrastructure, services and public art.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Waverley Local Environmental Plan 1996
Waverley Local Environmental Plan (Bondi Junction Centre) 2010
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
cl 2.3: Am 2020 (501), Sch 2.11.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development. See clauses 5.1A, 5.6, 5.7, 5.8, 5.10, 5.11 and 5.12.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporar
This is an opening excerpt, not the complete document.