Water Plan (Pioneer Valley) 2002
sec.7Nodes
Start here
Get a plain-English read of sec.7
Turn the raw legal text into a practical explanation grounded in Water Plan (Pioneer Valley) 2002.
sec.7 Nodes
A node mentioned in this plan is a place— on a watercourse in the plan area or in the groundwater management area; and for which environmental flow objectives are set for performance indicators. The location of each node is shown on the map in schedule 1 or schedule 2A and described in schedule 3 . Each node is identified on the map by a letter of the alphabet or number. s 7 amd 2009 SL No. 212 s 6 (sec.7-ssec.1) A node mentioned in this plan is a place— on a watercourse in the plan area or in the groundwater management area; and for which environmental flow objectives are set for performance indicators. (sec.7-ssec.2) The location of each node is shown on the map in schedule 1 or schedule 2A and described in schedule 3 . (sec.7-ssec.3) Each node is identified on the map by a letter of the alphabet or number.
- (a) on a watercourse in the plan area or in the groundwater management area; and
- (b) for which environmental flow objectives are set for performance indicators.