Water Plan (Pioneer Valley) 2002
sec.22GElectrical conductivity—groundwater
Start here
Get a plain-English read of sec.22G
Turn the raw legal text into a practical explanation grounded in Water Plan (Pioneer Valley) 2002.
sec.22G Electrical conductivity—groundwater
The chief executive must decide whether to install a meter for measuring and recording the electrical conductivity of groundwater taken under a water entitlement using a water bore on land in groundwater sub-area 11, 12, 13, 15, 16 or 17. In deciding whether to install the meter, the chief executive must have regard to— the electrical conductivity of the groundwater in the sub-area; and the proximity of the bore to the seawater intrusion front. If the chief executive decides to install the meter, it must be used from the day and in the circumstances mentioned in the resource operations plan. s 22G ins 2009 SL No. 212 s 27 (sec.22G-ssec.1) The chief executive must decide whether to install a meter for measuring and recording the electrical conductivity of groundwater taken under a water entitlement using a water bore on land in groundwater sub-area 11, 12, 13, 15, 16 or 17. (sec.22G-ssec.2) In deciding whether to install the meter, the chief executive must have regard to— the electrical conductivity of the groundwater in the sub-area; and the proximity of the bore to the seawater intrusion front. (sec.22G-ssec.3) If the chief executive decides to install the meter, it must be used from the day and in the circumstances mentioned in the resource operations plan.
- (a) the electrical conductivity of the groundwater in the sub-area; and
- (b) the proximity of the bore to the seawater intrusion front.