Water Plan (Pioneer Valley) 2002
sch.4-sec-oc.5
Start here
Get a plain-English read of sch.4-sec-oc.5
Turn the raw legal text into a practical explanation grounded in Water Plan (Pioneer Valley) 2002.
Section sch.4-sec-oc.5
At each node mentioned in table 10, column 1, groundwater levels must not exceed the drawdown deviation stated in column 2 of the table. Table 10 Column 1 Column 2 Node Drawdown deviation (Metres) 1 0.5 2 0.5 3 0.5 4 1 5 5 6 5 7 3 8 1.2 9 5 10 5 11 1.5 12 1.1 13 0.5 14 0.6 15 0.5 16 0.5 17 1.5 18 0.8 19 0.7 20 0.5 21 0.8 22 0.6 23 2.75 24 5 25 1.1 26 0.5 (sch.4-sec-oc.5-ssec.12) At each node mentioned in table 10, column 1, groundwater levels must not exceed the drawdown deviation stated in column 2 of the table. Table 10 Column 1 Column 2 Node Drawdown deviation (Metres) 1 0.5 2 0.5 3 0.5 4 1 5 5 6 5 7 3 8 1.2 9 5 10 5 11 1.5 12 1.1 13 0.5 14 0.6 15 0.5 16 0.5 17 1.5 18 0.8 19 0.7 20 0.5 21 0.8 22 0.6 23 2.75 24 5 25 1.1 26 0.5