The plan rests on a small set of interlocking legal and management concepts, each defined or referenced in the plan text. Practitioners should map these concepts against the schedules and the Water Act for operational detail.
Plan area and boundary, and how to inspect it. The plan applies to the geographic area shown on the map in schedule 1 (s 4). The exact boundary is held in digital electronic form at the department, may be scaled, and may be inspected at the department’s head office in Brisbane (s 5). The plan therefore contemplates a digital authoritative boundary rather than a paper-only map in the plan text.
Categories of regulated water. The plan applies to surface water, overland flow water (subject to one explicit spring-related exclusion), and hydraulically-linked groundwater not covered by the separate Great Artesian Basin plan (s 6). Surface water is defined in the plan as water in a watercourse or lake and springs not connected to the Great Artesian Basin plan (s 6). This conceptual triage determines which water uses are within the plan’s regulatory scope.
Outcomes and ecological objectives. The plan specifies outcomes to balance economic use with ecological integrity and cultural and social values (s 7). Ecological objectives are specific, listing pool habitats, near pristine riverine habitats, species richness, active river-forming processes including sediment transport, and connections between waterholes at low flow. The plan also calls for maintaining water quality downstream into South Australia and for continual improvement in water use efficiency (s 7).
Non-increase principle. A mechanical constraint in decision-making is the prohibition on the chief executive making a decision that would increase the total volume of water that may be taken in the plan area (s 9). The provision contains express exceptions, which materially affect how the non-increase rule operates in practice.
Regulation of overland flow water. The plan draws a distinct regulatory line for overland flow water. Section 10 lists the only circumstances in which a person may take overland flow water: stock and domestic use, under an authority authorised by section 12, under an authorisation, unallocated water granted under the resource operations plan, small amounts necessary to satisfy certain environmental permits or contaminated agricultural runoff water (as defined by an operational code), and no general open entitlement (s 10). Decisions about overland flow applications must consider specified cultural, ecological and downstream user impacts (s 11).
Transitional treatment of existing works. Existing works and permissible reconfigurations that do not increase the average annual take are authorised to continue for one year after plan commencement, and longer if a notice in approved form and any required additional information is given to the chief executive (s 12). If the chief executive is satisfied that the average annual volume taken using those works has increased beyond historical levels, the chief executive must grant a water licence under s 212 and impose a condition to cap the average annual volume to the pre-plan operating level (s 13).
Resource operations plan as the implementation vehicle. The resource operations plan is the implementing instrument for replacing authorities with licences, defining parts of the plan area where replacement may occur, stating the works to which each authority relates, and deciding volumes and shares for overland flow allocation consistent with the plan outcomes (s 14). The resource operations plan also must state monitoring requirements for water and natural ecosystems to assist Ministerial oversight (s 22).
Strategic reserve and unallocated water. Unallocated water is held as a strategic reserve and its allocation is limited to the uses and total annual volumes listed in schedule 2; the chief executive may substitute equivalent volumes in overland flow water or hydraulically-linked groundwater where appropriate, and must consider a broad list of matters when dealing with unallocated water (s 16 to s 19).
Decision factors and discretion. The plan prescribes mandatory factors to be considered for overland flow applications (s 11), for allocating unallocated water (s 19) and for granting water licences to local government for town supply (s 20). At the same time the plan repeatedly provides that the list of factors does not limit what the chief executive may consider, which preserves administrative discretion (for example s 19(2) and s 20(2)).
Monitoring and amendment pathways. The resource operations plan must set monitoring requirements (s 22). Minor amendments to monitoring requirements under part 5 may be made under s 57(b) of the Water Act pursuant to s 25. The Minister must consider amendment or replacement of the plan if authorisations are insufficient to meet the water needs of a project of State significance, with specified factors to guide that consideration (s 26).
Cross-references and definitions. The plan delegates finer definitional work to schedule 3 (dictionary), and to external instruments such as the Environmental Protection Act 1994, the Planning Act, the Water Act (notably s 212, s 217, s 57 cited), and the Lake Eyre Basin Agreement Act 2001. Practitioners must therefore treat key concepts as distributed across the plan, its schedules, the resource operations plan, and the Water Act.