Water Management (Water Supply Authorities) Regulation 2025
55Plumbing works must use authorised plumbing fittings
Start here
Get a plain-English read of 55
Turn the raw legal text into a practical explanation grounded in Water Management (Water Supply Authorities) Regulation 2025.
55 Plumbing works must use authorised plumbing fittings
55 Plumbing works must use authorised plumbing fittings
(1) A person must not use a plumbing fitting for plumbing work unless the fitting is a fitting authorised by Essential Energy.
Maximum penalty—20 penalty units.
(2) Essential Energy may authorise a plumbing fitting.
(3) Before authorising a plumbing fitting, Essential Energy may require one or more of the following—
(a) a fitting of the same kind to be provided for examination and testing,
(b) a satisfactory result of tests of a fitting of the same kind carried out by a person or body approved by Essential Energy,
(c) a fitting of the same kind to be manufactured under a system of quality assurance approved by the authority.
(4) Essential Energy must not authorise a plumbing fitting unless Essential Energy is satisfied that the plumbing fitting complies with MP52—2005, Manual of authorization procedures for plumbing and drainage products, published by Standards Australia on 5 January 2005.