NSWIn ForceAct
Water Industry Competition Act 2006
7IConditions of operational approval
Start here
Get a plain-English read of 7I
Turn the raw legal text into a practical explanation grounded in Water Industry Competition Act 2006.
#### 7I Conditions of operational approval
7I Conditions of operational approval
> > (1) Without limiting section 7G, conditions of an operational approval imposed by the regulations or by IPART may require the following—
> >
> > > (a) the operation of the infrastructure in accordance with specified plans and systems and other requirements,
> >
> > > (b) the infrastructure to meet specified criteria for safe and reliable operation and the protection of the environment and public health.
>
> > (2) A registered operator operating water industry infrastructure to which this Part applies must—
> >
> > > (a) comply with the conditions of the relevant operational approval and the relevant scheme approval, and
> >
> > > (b) ensure compliance with the conditions by other persons who are engaged by or act on behalf of the registered operator or for whom the registered operator is otherwise responsible in connection with the operation of the infrastructure.
> >
> > Maximum penalty—
> >
> > > (a) for a corporation—18,000 penalty units, or
> >
> > > (b) for an individual—3,500 penalty units.
>
> **s 7I:** Ins 2021 No 26, Sch 1\[4\].