NSWIn ForceAct
Water Industry Competition Act 2006
70Unauthorised increase in capacity of connections
Start here
Get a plain-English read of 70
Turn the raw legal text into a practical explanation grounded in Water Industry Competition Act 2006.
70 Unauthorised increase in capacity of connections
70 Unauthorised increase in capacity of connections
A person must not increase the capacity of an existing connection to a water main or sewer main that forms part of a scheme unless authorised to do so by the registered operator of the scheme.
Maximum penalty—
(a) for a corporation—2,500 penalty units, or
(b) for an individual—500 penalty units.
s 70: Am 2021 No 26, Sch 1[49] [51] [52].