Water and Sewerage Industry (General) Regulations 2019
10Subdivisions that are not development under Land Use Planning and Approvals Act 1993
Start here
Get a plain-English read of 10
Turn the raw legal text into a practical explanation grounded in Water and Sewerage Industry (General) Regulations 2019.
10 Subdivisions that are not development under Land Use Planning and Approvals Act 1993
(1) For section 56H(1)(b) of the Act, the area of the land is to be not greater than 800 square metres.
(2) For the purposes of section 56H(1)(c) of the Act, the requirements are that the proposed use of the land is to be –
(a) the installation or erection, and the use, of a pump station associated with the distribution or removal of water or sewage; or
(b) the laying, removal, repair, maintenance or modification, and the use, of a pipeline and ancillary works associated with the distribution or removal of water or sewage; or
(c) the laying, removal, repair, maintenance or modification, and the use, of a drainage channel associated with the distribution or removal of water; or
(d) the installation or erection, and the use, of a fluoridation station; or
(e) the installation or erection, and the use, of a chlorination station, if the chlorine used or stored is not at any time in a gaseous form; or
(f) the installation or erection, and the use, of a Level 1 wastewater treatment plant associated with the treatment of water or sewage; or
(g) the installation or erection, and the use, of a sludge farm or a sludge storage area associated with the treatment of water or sewage.
(3) In this regulation –
Level 1 wastewater treatment plant means a plant –
(a) that is used for the purpose of carrying out wastewater treatment which involves the discharge of treated or untreated sewage, septic tank effluent or industrial or commercial wastewater to land or water; and
(b) with a design capacity to treat an average dry-weather flow of less than 100 kilolitres per day.