This local environmental plan sets the rules for land use in Warren: zoning, what development is allowed or prohibited, which works need consent, and environmental protections (notably for the Macquarie Marshes, watercourses, flood areas and heritage). The Council is the consent authority; landowners and developers must meet map-based lot‑size, subdivision and operational standards or obtain consent, and may rely on exempt or complying development pathways. The Plan repeals earlier local plans and establishes the current local controls and assessment criteria.
This local environmental plan (the Plan) sets the planning framework that governs land use and development for the Warren local government area by making zoning, consent, standards and procedural rules that apply to the land identified on its maps. Mechanically the Plan does the following.
Brings a single instrument into force for Warren on publication (cl 1.1AA), replacing earlier local environmental instruments that applied only to the same land (cl 1.8). It therefore consolidates zoning, land-use permissions and local development controls into one statutory instrument for the mapped area.
Identifies the consent authority and the maps to be relied on. The Council is specified as the consent authority for the Plan, subject to the Act (cl 1.6). The Plan depends on a suite of named maps: Land Application Map, Land Zoning Map, Lot Size Map, Macquarie Marshes Map, Watercourse Map and Heritage Map (see cl 1.3, cl 2.2, cl 1.7 and the textual cross-references).
Establishes the land use zones and the Land Use Table. Clause 2.1 lists the zones used (for example Zone RU1 Primary Production, Zone R1 General Residential, Zone E3 Productivity Support, Zone C1 National Parks and Nature Reserves). Clause 2.3 requires the consent authority to have regard to the zone objectives when assessing applications, and the Land Use Table attached to the Plan specifies, for each zone, what development is permitted without consent, what requires consent, and what is prohibited.
Prescribes the principal development standards and consent rules relevant to subdivision, dwelling erection, and specific uses. Key provisions include mandatory development consent for subdivision (cl 2.6) and demolition (cl 2.7), minimum subdivision lot sizes (cl 4.1 and related clauses), controls on erection of dwellings in rural zones (cl 4.2A), and targeted provisions for intensive agriculture, aquaculture, riparian land and the Macquarie Marshes (cl 5.18, cl 5.19, cl 6.3, cl 6.6-6.7).
Current sections
Direct links to the current provisions in Warren Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Camping grounds; Cellar door premises; Cemeteries; Community facilities; Correctional centres; Depots; Dwelling houses; Eco-tourist facilities; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Freight transport facilities; Heavy industrial storage establishments; Heavy industries; Home-based child care; Home occupations (sex services); Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Jetties; Landscaping material supplies; Open cut mining; Recreation areas; Recreation facilities (major); Recreation facilities (outdoor); Roadside stalls; Rural industries; Rural workers’ dwellings; Secondary dwellings; Truck depots; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Warren Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Warren in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to realise the economic potential of rural land in Warren by following the principles of sustainable natural resource management,
(b) to encourage the proper management, development and conservation of natural and man-made resources in Warren by protecting, enhancing and conserving—
(i) agricultural land, and
(ii) timber, minerals, soil, water and other natural resources, and
(iii) the Macquarie Marshes Nature Reserve, and
(iv) areas of significance for nature conservation, and
(v) areas of high scenic or recreational value, and
(vi) places and buildings of archaeological or heritage significance, including relics and Aboriginal places of heritage significance,
(c) to ensure that development is permitted on land with due regard to environmental constraints, accessibility and existing land use patterns,
(d) to allow for the equitable provision of social services and facilities for the community,
Defines the scope of exempt and complying development. The Plan identifies exempt development types in Schedule 2 and complying development in Schedule 3 (cl 3.1-3.2) and sets conditions and exclusions (for example, environmentally sensitive areas excluded from exempt/complying options, cl 3.3).
Creates special local provisions for heritage, earthworks, river front areas, essential services and other locally significant matters. For example, cl 5.10 requires consent for demolition or alteration of heritage items and prescribes notification and heritage management processes; cl 6.1 requires consent for earthworks except where exempt or ancillary; cl 6.5 requires essential services to be available or arranged.
Provides local exceptions and procedural flexibilities. Clause 4.6 permits the consent authority to grant consent that contravenes a development standard where the applicant demonstrates the matters specified, subject to record-keeping requirements (cl 4.6(3)-(4)). Clause 2.8 permits temporary land uses for up to 182 days subject to specific tests.
Imposes environmental constraints on certain developments and expressly prohibits particular forms of development, for example canal estate development (cl 2.9) and specified uses in Zone RU6 (cl 6.8). It also declares some development in the buffer area of the Macquarie Marshes to be designated development (cl 6.7(3)).
The Plan contains an explicit statement of aims (cl 1.2). Those aims include promoting arts and cultural activity, sustainable economic realisation of rural land, protection of agricultural land and other natural resources, conserving the Macquarie Marshes Nature Reserve, minimising land use conflict and promoting ecologically sustainable development. The aims are presented as the instrument’s stated policy objectives; they do not, by themselves, create new consent powers but inform how the Land Use Table and the Plan’s clauses are to be applied by the consent authority (cl 1.2).
The Plan cross-references the Environmental Planning and Assessment Act and a range of State and Commonwealth instruments and other Acts. It does not, within its text, create criminal sanctions or fines; it structures permissions, exclusions, procedural steps, consultation requirements and conditions that must be met for development to proceed under the statutory planning framework set out in the Act.
Main concepts
The Plan’s organising legal concepts are zoning, development consent, exempt and complying development, development standards (particularly subdivision lot sizes), designated development, maps and schedules, and procedural duties for the consent authority. Each of these has a precise role in the Plan.
Zoning and Land Use Table. The Plan uses named zones that define permissible and prohibited uses. The Land Use Table (cl 2.3 and the Land Use Table Part) sets out, for each zone, the objectives and the three-tiered permission regime: development permitted without consent, development permitted only with development consent, and prohibited development. The consent authority must have regard to zone objectives when deciding applications (cl 2.3(2)).
Maps and mapping instruments. The Plan relies on various named maps to define the land to which the instrument applies (cl 1.3) and to show zoning, lot sizes, heritage areas, watercourses and the Macquarie Marshes buffer. Maps are part of the instrument and may be in electronic or paper form (cl 1.7). The Plan incorporates map amendment procedures (cl 1.7(1)(b)) and requires the maps to be available for public access (cl 1.7(3)).
Development consent. Many activities require development consent under the Plan. Subdivision requires consent (cl 2.6), demolition requires consent (cl 2.7) and earthworks require consent unless exempt or ancillary (cl 6.1). Consent is the central authorising mechanism for permitted-with-consent uses listed in the Land Use Table.
Exempt and complying development. The Plan identifies exempt development in Schedule 2 and complying development in Schedule 3 (cl 3.1-3.2). Exempt development must comply with Building Code of Australia deemed-to-satisfy provisions, avoid designated development and not be located on land subject to State heritage listing (cl 3.1). Exempt/compliant development is prohibited in environmentally sensitive areas (cl 3.3).
Development standards and exceptions. Clause 4.1 sets minimum lot sizes on the Lot Size Map; variants apply (for example, Area A exceptions at cl 4.1(3A)). Clauses 4.1AA and 4.1A set additional minimum lot size rules for community title and strata subdivisions. Clause 4.6 permits exceptions to development standards when the applicant satisfies the consent authority that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds; the consent authority must keep a record of that assessment (cl 4.6(3)-(4)).
Designated development and environmental thresholds. The Plan designates some development types as designated development in local contexts. For example, development for certain purposes in the Macquarie Marshes buffer is declared to be designated development (cl 6.7(3)). The Plan also identifies capacity thresholds for intensive livestock agriculture that determine when consent is or is not required (cl 5.18(4)-(5)).
Heritage and Aboriginal consultation duties. Clause 5.10 sets the consent requirement for demolition, alteration and other works affecting heritage items, Aboriginal objects and archaeological sites. The clause prescribes consultation and notification obligations (for example notifying the Heritage Council before granting consent for works on archaeological sites, cl 5.10(7); notifying local Aboriginal communities for developments affecting Aboriginal places, cl 5.10(8)).
Interaction with State planning instruments and other Acts. Clause 1.9 makes the Plan subject to State environmental planning policies that prevail under the Act. Clause 1.9A suspends certain covenants to enable development in accordance with the Plan but excludes a list of covenant types and instruments (cl 1.9A(2)). The Plan repeatedly cross-references other statutory regimes (for example, the Crown Land Management Act, National Parks and Wildlife Act, Local Government Act, Fisheries, Biodiversity and Rural Fires Acts) and states where particular development is regulated by those other Acts.
These concepts structure who must act, what approvals are required and which matters the consent authority must consider when assessing applications. The Plan blends land-use zoning with site-specific controls (lot size map, watercourse setbacks, flood planning, Macquarie Marshes buffer) and procedural obligations for heritage, environmental impacts and record-keeping.
Who it affects
The Plan affects multiple categories of actors whose rights, obligations and options are determined by zoning, maps and the permissions table. The primary affected parties are:
Landowners and prospective developers within the mapped Warren LGA. The Plan applies to land identified on the Land Application Map (cl 1.3) and to specified mapped areas such as the Macquarie Marshes and Watercourses. For those owners, the Plan determines whether a proposed use is permitted without consent, permitted only with consent, or prohibited (cl 2.3).
The Council as consent authority. Clause 1.6 nominates the Council as the consent authority (subject to the Act). The Council is therefore the decision-maker for development applications under the Plan, must apply the zone objectives when determining applications (cl 2.3(2)), and must discharge specific procedural duties set out in the Plan (for example, requiring heritage management documents or conservation plans as a condition of consent, cl 5.10(5)-(6), and keeping records where the Plan’s exceptions to development standards are invoked, cl 4.6(4)).
Farmers, agricultural operators and intensive agriculture developers. Zone RU1 Primary Production and related clauses directly regulate agriculture, intensive livestock agriculture and intensive plant agriculture. Clause 5.18 sets assessment matters and thresholds for intensive livestock agriculture, and clauses 4.2, 4.2B and Schedule 1 address subdivision and development specific to primary production and intensive agricultural operations.
Aquaculture operators. Clause 5.19 and Schedule 6 lay out the operational and site location requirements for pond-based, tank-based and oyster aquaculture, including where extensive aquaculture is permitted without consent and the obligations on pond design and discharge controls.
Heritage interest-holders, Aboriginal communities and archaeologists. Works affecting heritage items, Aboriginal objects, heritage conservation areas and archaeological sites fall under cl 5.10 which requires consent, possible heritage management documents, and,where appropriate,notification of the Heritage Council or local Aboriginal communities (cl 5.10(7)-(9)).
Owners and managers of public land and public authorities. Clause 5.2 classifies or reclassifies public land under the Local Government Act, sets out how certain public land descriptions are to be treated (Schedule 4) and identifies which State authority is the relevant acquisition authority for land reservation purposes (cl 5.1 and the Land Reservation Acquisition Map). Clause 5.12 confirms that the Plan does not restrict development permitted under State SEPPs for infrastructure and does not restrict use of existing Crown buildings by the Crown.
Licensed premises and operators of entertainment venues. Clause 5.20 prohibits a consent authority from refusing development consent for licensed premises on certain standards related to playing or performance of music, dancing, stage orientation and similar features, and prevents refusal on noise grounds if the consent authority is satisfied the noise may be managed to an acceptable level.
Neighbouring landowners and the community. Many clauses require consideration of impacts on adjoining land and neighbourhood amenity (for example cl 2.4(2), cl 6.1(3)(d), cl 5.24 and cl 5.25 on farm stay and farm gate premises), so neighbours who may be affected by odour, traffic, water extraction, visual amenity or noise are implicated through the consent authority’s obligations to consider those matters.
Strata and community title developers and owners. Clauses 4.1AA and 4.1A regulate minimum lot sizes for community title schemes and strata plan schemes in rural and large-lot zones and therefore affect developers choosing these ownership forms and owners contemplating subdivisions.
Parties holding covenants, agreements or other instruments that restrict development. Clause 1.9A suspends private covenants to the extent necessary to enable development to proceed in accordance with the Plan, subject to a specified list of exclusions and without affecting public authority rights under registered instruments (cl 1.9A(1)-(3)).
Additionally, the Plan’s cross-references make other statutory actors indirectly affected: State Government agencies responsible for fisheries, biodiversity, national parks, Crown land, and transport will engage where their Acts or SEPPs have effect (see cl 1.9 and cl 1.9A). Practitioners must therefore treat the Plan as the local layer of a multi-layered regulatory environment: the Plan sets the local permissions and constraints, and other statutory regimes overlay those permissions with additional licences, authority approvals or prohibitions.
Key duties and rights
The Plan allocates duties to the consent authority and rights and obligations to landowners and applicants. The following are concrete, clause-based duties and rights drawn from the text.
Duties imposed on the consent authority
Apply zone objectives: The consent authority must have regard to the objectives for development in the relevant zone when deciding a development application (cl 2.3(2)).
Assess against specified criteria: For certain development types the Plan prescribes matters the consent authority must consider before granting consent. Examples include heritage-related constraints and required heritage management documents (cl 5.10(4)-(6)); riparian considerations for development near watercourses (cl 6.3(3)-(4)); aquaculture matters of satisfaction and operational compliance (cl 5.19(2)-(3)); and flood planning considerations (cl 5.21(2)-(3)).
Keep records when varying development standards: If the consent authority grants consent that contravenes a development standard under cl 4.6, it must keep a record of the assessment made under cl 4.6(3) (cl 4.6(4)).
Notification and consultation duties: For archaeological sites the consent authority must notify the Heritage Council and take its response into account (cl 5.10(7)). For Aboriginal places of heritage significance the consent authority must notify local Aboriginal communities and consider responses (cl 5.10(8)). For demolition of nominated State heritage items, the Heritage Council must be notified (cl 5.10(9)).
Rights, constraints and duties for landowners and applicants
Right to apply for development in accordance with the Land Use Table: The Plan sets out which land uses are permitted with or without consent in each zone (cl 2.3 and the Land Use Table). Landowners have the procedural right to seek development consent for uses listed as “permitted with consent.”
Obligation to obtain development consent where required: Subdivision requires consent (cl 2.6), demolition requires consent (cl 2.7), many earthworks require consent (cl 6.1) and erection of dwellings in some rural zones is expressly restricted (cl 4.2A).
Access to exempt or complying pathways where the Plan permits: Applicants may carry out specified exempt development in Schedule 2 provided the Schedule’s standards are met (cl 3.1). Complying development is available for items in Schedule 3 that meet the relevant standards and requirements (cl 3.2).
Right to seek a variation to development standards: The Plan permits the consent authority to grant consent that contravenes a development standard if the applicant demonstrates that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds (cl 4.6(2)-(3)). Applicants must prepare the grounds and the consent authority must record its assessment (cl 4.6(3)-(4)).
Duty to comply with other statutory requirements: Exempt development under the Plan remains subject to approvals and licences required under other Acts (Schedule 2, Note 2). Applicants must therefore obtain any approval under other applicable statutes even when the Plan treats development as exempt.
Site-specific duties for certain activities: Intensive livestock agriculture has specific thresholds and locational restrictions; smaller-scale operations listed at cl 5.18(5) may proceed without consent if not in environmentally sensitive locations and meeting separation distance requirements (cl 5.18(4)-(5)). Aquaculture developers must meet Schedule 6’s site location and operational requirements (cl 5.19(2)-(3)).
Heritage-related duties: Development that affects heritage items, Aboriginal places or archaeological sites will require consent and may trigger the preparation of heritage management documents or conservation management plans (cl 5.10(2), (5)-(6)) and notification obligations (cl 5.10(7)-(9)).
Specific procedural rights
Temporary use rights: Development consent may be granted for temporary uses for up to 182 days in any 12-month period, subject to the consent authority being satisfied about future development, amenity, environmental impacts and site restoration (cl 2.8).
Rights to use certain exemptions: Clause 1.9A provides that private covenants that would otherwise restrict carrying out development in accordance with the Plan do not apply to the extent necessary to permit that development, subject to enumerated exceptions (cl 1.9A(1)-(3)). This creates a limited operational right to proceed notwithstanding some private restrictions, but the clause excludes covenants imposed by the Council and several other instruments (cl 1.9A(2)).
Rights and constraints for public authorities
Public authorities retain rights under registered instruments: Clause 1.9A(3) expressly preserves the rights or interests of public authorities under any registered instrument.
Infrastructure development covered by certain SEPPs: Clause 5.12 provides that the Plan does not restrict infrastructure development permitted (with or without consent) by State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2, and does not prevent use of Crown buildings by the Crown.
In short, the Plan allocates the right to apply for development, the duty to obtain consent where required, procedural duties for the consent authority, and specific constraints and permissions for land-use types that reflect local planning aims such as protection of the Macquarie Marshes, protection of watercourses, and heritage conservation.
Penalties and enforcement
The Plan itself principally sets permissions, process and conditional approvals; it does not create a schedule of fines or criminal offences within its own text. Enforcement and penalties for non-compliance fall to the statutory enforcement regime established by the Environmental Planning and Assessment Act and other relevant legislation. The Plan connects to that enforcement framework in specific ways described in the instrument.
What the Plan says about enforcement mechanisms and compliance
No penalty provisions embedded in the Plan text. The Plan sets consent requirements and procedural preconditions (for example, consent required for subdivision cl 2.6, demolition cl 2.7, earthworks cl 6.1, heritage works cl 5.10) but contains no express penalty table or criminal sanction clauses. Practitioners should therefore look to the Act and the regulations for enforcement powers and sanctions applicable when works are undertaken without consent.
Reliance on the Act’s processes. Multiple clauses expressly operate “subject to the Act” or reference the Act’s parts and divisions. For example, the consent authority is nominated “subject to the Act” (cl 1.6), the Plan is subject to State environmental planning policies that prevail under s 3.28 of the Act (cl 1.9), and the savings provision around existing development applications references Division 3.5 of the Act (cl 1.8A). Those references indicate that statutory enforcement, review, and remedies under the Act apply to compliance matters.
Compliance conditions on exempt and complying development. The Plan requires exempt development to meet Building Code of Australia requirements and not to occur on State-listed heritage land (cl 3.1). Complying development certificates are subject to the conditions set out or referred to in Schedule 3 and to the broader Act and regulations (cl 3.2(4)-(5)). A failure to meet those conditions would attract enforcement under the Act and the regulatory regime for building approvals.
Record-keeping and administrative traceability. The Plan mandates administrative steps that support enforcement and review. For instance, cl 4.6(4) requires the consent authority to keep a record of assessments made under the exceptions to development standards, and cl 5.10 requires the consent authority to notify the Heritage Council and local Aboriginal communities in certain cases (cl 5.10(7)-(9)). These requirements create administrative records that will be relevant in compliance assessments and any subsequent review or enforcement action.
Preservation of other statutory rights and approvals. The Plan explicitly states that exempt development is not exempt from approvals required under other Acts and that public authority rights under registered instruments are unaffected (Schedule 2 Note 2; cl 1.9A(3)). This preserves other enforcement regimes (for example, fisheries or Crown land licensing regimes) that can be invoked where relevant.
Designated development triggers. The Plan declares some developments in the Macquarie Marshes buffer to be designated development (cl 6.7(3)). Designated development engages separate assessment and approval requirements under the Act and regulation, and those processes typically include environmental impact statements and statutory assessment pathways whose compliance obligations are enforced under the Act.
Practical effect for enforcement action
Enforcement will proceed under the Act and complementary legislation rather than under bespoke penalty clauses in the Plan. Where development occurs without the necessary consent, or where approvals are conditionally granted and conditions are breached, enforcement options will be those available under the Environmental Planning and Assessment Act and other applicable statutes,such as stop-work notices, orders to remedy breaches, fines and prosecutions,none of which are created by the Plan itself but are available under the broader statutory framework referenced throughout the Plan.
For practitioners, the Plan’s procedural requirements (notifications, records, thresholds) create the documentary trail that regulators rely on when investigating non-compliance. In particular, heritage notification obligations, records of contraventions of development standards and the designation of certain development types will be the focal points in any enforcement scenario.
In sum, the Plan sets the substantive permissions and procedural obligations; it relies on the Act and other statutes for enforcement and penalties. The Plan’s provisions that require notification, record-keeping and particular approvals are the mechanisms by which the compliance status of a development will be established and enforced under the broader statutory enforcement regime.
How it interacts with other laws
The Plan is one layer of a multi‑layered regulatory framework and contains numerous express cross-references to other statutory instruments and State policies. The text identifies where other laws prevail, where they constrain the Plan’s operation and where joint compliance is required.
State environmental planning policies and the Act
Prevailing SEPPs. Clause 1.9 makes the Plan subject to the provisions of any State environmental planning policy that prevails over the Plan under s 3.28 of the Environmental Planning and Assessment Act. This means where a SEPP and the Plan conflict, the SEPP’s operative provisions will take precedence as provided by the Act.
Cross-referenced SEPPs. The Land Use Table and other notes expressly identify relevant SEPPs that may apply to particular development types (for example, SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021, SEPP (Resources and Energy) 2021). Clause 5.12 explicitly preserves the operation of SEPP (Transport and Infrastructure) 2021, Chapter 2, for infrastructure development by public authorities.
Other Acts and statutory regimes
Crown land and national parks. Clause 1.9A(2) lists instruments and agreements that are excluded from the clause’s suspension of covenants, and several of these are instruments under the Crown Land Management Act 2016 and the National Parks and Wildlife Act 1974. Clause 6.6 and cl 5.10 refer to the Macquarie Marshes and to land reserved under the National Parks and Wildlife Act (cl 6.6(1) and cl 5.10 notes).
Local Government Act. Clause 5.2 invokes Part 2 of Chapter 6 of the Local Government Act 1993 to enable classification or reclassification of public land by the Council. Schedule 4 identifies public land classification changes and ties that process to the Local Government Act powers.
Fisheries, biodiversity and aquaculture legislation. Clause 5.19 and Schedule 6 cross-reference the Fisheries Management Act 1994, the Fisheries Management (Aquaculture) Regulation and the Biodiversity Conservation Act 2016. The Plan imports definitions and control concepts from those statutes (for example “extensive aquaculture” and “priority oyster aquaculture area” in cl 5.19(7)).
Heritage Act and Aboriginal heritage. Clause 5.10 operates alongside the Heritage Act 1977 for State-listed heritage items and requires notification consistent with heritage decision-making processes. The Plan requires consent for works affecting Aboriginal objects and places of heritage significance and prescribes local Aboriginal consultation (cl 5.10(8)).
Building Code of Australia and BASIX. The Plan requires exempt and complying development to meet relevant deemed-to-satisfy provisions of the Building Code of Australia (cl 3.1(3)(a) and cl 3.2(3)(b)), and it excludes variations of standards arising from BASIX commitments (cl 4.6(8)(b)).
Rural Fires Act and bush fire matters. Clause 5.11 allows bush fire hazard reduction works authorised by the Rural Fires Act 1997 to be carried out without development consent, thus acknowledging the operation of that Act regarding bush fire works.
Land acquisition and Crown authority interactions. Clause 5.1 assigns the relevant State authority for owner-initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 and notes the consequence that land acquired may be developed with consent before being used for the reserved purpose.
Practical consequences of these interactions
Multiple-approvals regimes. The Plan explicitly notes that exempt development under the Plan may still require licences, approvals or permits under other Acts (Schedule 2 Note 2). Practitioners must therefore test a development against both the Plan and all relevant statutory regimes (e.g. fisheries licences, Crown land licences, water licences, heritage approvals).
SEPP over-ride risk. Because SEPPs can prevail over the Plan (cl 1.9), an applicant cannot rely solely on the Plan where a SEPP addresses the same matter; the SEPP’s provisions will govern to the extent of inconsistency.
Complementary tests and standards. Many Plan clauses require the consent authority to consider matters governed by other laws (for example water extraction, biodiversity significance, and aquaculture operational standards). Applicants will usually need to present evidence and approvals under the relevant Acts alongside the development application.
Preservation of registered public authority interests. Clause 1.9A(3) preserves the rights and interests of public authorities under registered instruments, so planning decisions under the Plan must recognise any pre-existing public rights recorded on title or in public registers.
In sum, the Plan operates alongside a network of SEPPs and other Acts; it establishes the local planning rules but anticipates and defers to State law where those laws prevail or impose separate licensing and regulatory regimes.
Amendment history
The Plan text contains a number of embedded amendment notations and explanatory notes. The Plan has been subject to incremental amendment across years; the textual notes included in the material provided identify specific changes and the instruments that made them. The following is a compilation of the amendment notations that appear in the provided text.
Clause 1.8A (Savings provision relating to development applications) was amended by 2019 (621), Sch 5[1] (text note at cl 1.8A).
Clause 1.9A (Suspension of covenants, agreements and instruments) was amended by 2019 (621), Sch 5[2]-[4] (text note at cl 1.9A).
Clause 2.1 (Land use zones) was amended by 2022 (832), Sch 1.29[1] (text note at cl 2.1).
The Land Use Table carries multiple amendment notes: Am 2016 (168), Sch 1[2]; 2017 (493), Sch 1.1[1]; 2018 (488), Sch 1.1[1]; 2019 (137), Sch 6[1]; 2019 (621), Sch 3; 2022 (314), Sch 1; 2022 (832), Sch 1.29[2]; 2023 (458), Sch 2.82 (this appears as a consolidated amendment history at the Land Use Table).
Clause 4.6 (Exceptions to development standards) shows repeals and amendments in its notes (subclauses (5) and (7) repealed; see cl 4.6 structure and notes).
Clause 6.2 was repealed: “cl 6.2: Rep 2021 (225), Sch 1.” (text note at cl 6.2).
Clause 6.6 (Development on land in the Macquarie Marshes Nature Reserve) was amended by 2022 (832), Sch 1.29[3] (text note at cl 6.6).
The Plan contains a map-related note: “Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment” (at cl 6.6 Maps note). This identifies administrative change in map maintenance.
Clause 5.24 (Farm stay accommodation) and cl 5.25 (Farm gate premises) show substantive substitution in 2023: “cl 5.24: Subst 2023 (458), Sch 1[4]” and “cl 5.25: Subst 2023 (458), Sch 1[4]”.
These annotations indicate that the Plan has been modified repeatedly to adjust zones, permitted uses, operational controls (for example on farm stay accommodation and industrial retail outlets), and administrative practice (map maintenance). The amendment notes in the text specify the amending instrument references and schedules, which are the Plan’s record of change.
What the amendment annotations do not do in the Plan text is provide a full legislative history with dates for every change in narrative form; instead they attach statutory amendment citations to specific clauses and schedules. Practitioners who need a chronological or consolidated history should extract the cited amending instruments (for example the schedule and year references shown) from the Plan’s amendment notes and consult the amending instruments and NSW legislative registers for the full sequence.
Litigation history
The Plan as provided does not include cases or judgments and contains no litigation history entries. It does not list administrative appeals, judicial decisions or precedents addressing its interpretation. The instrument instead sets procedural and substantive requirements that themselves create the factual matrix for litigation or merits review under the Environmental Planning and Assessment Act and other relevant statutes.
Relevant procedural hooks within the Plan that commonly feature in litigation (and which are therefore relevant to practitioners preparing or defending challenges) include:
Record-keeping and exceptions to development standards. Clause 4.6(3)-(4) requires the consent authority to be satisfied of specified matters before granting consent to development that contravenes a development standard and to keep a record of that assessment. Those records are commonly central to merits review or judicial review challenges that contest whether the exception was properly applied.
Notification and consultation steps tied to heritage and Aboriginal places. Clauses 5.10(7)-(9) require notification of the Heritage Council for archaeological sites and nominated State heritage items and require the consent authority to notify local Aboriginal communities when development affects Aboriginal places of heritage significance. Procedural non-compliance with these duties can be a ground for review if notification is required before a consent is granted.
Designation of certain development as designated development. Clause 6.7(3) declares certain development in the Macquarie Marshes buffer to be designated development. Designated development attracts higher-level environmental assessment requirements that are often contested in litigation about adequacy of environmental impact statements, scope of assessment, or referral of matters to the Minister.
Application of SEPPs and prevailing instruments. Clause 1.9 notes that SEPPs may prevail over the Plan under the Act. Disputes about the correct application of SEPPs versus local environmental plans and the interaction of overlapping statutory provisions are frequent subjects of litigation in planning law, though the Plan text itself does not catalogue cases.
Because the Plan does not contain an internal litigation history, practitioners seeking jurisprudence on any of the Plan’s clauses must examine case law that interprets the Environmental Planning and Assessment Act, relevant SEPPs and the other Acts to which the Plan cross-references, and then apply that jurisprudence to the Plan’s provisions. The Plan provides the statutory anchors,zone objectives, development standards, notification duties and designated development triggers,that will be central to any merits review or judicial review brought in relation to planning decisions under the Act.
Gotchas
This section flags concrete traps for practitioners and applicants that arise from specific wording and cross-references in the Plan. Each item points to the clause or schedule and explains the practical consequence.
Savings provision for current DAs (cl 1.8A). If a development application was lodged before this Plan commenced and not finally determined before commencement, the DA must be determined as if the Plan had not commenced. That means an application could avoid new local constraints if lodged and not finally determined before the Plan’s commencement. Do not assume that an application in process will be decided against the new rules; the savings provision operates in favour of the earlier regime.
Suspension of covenants (cl 1.9A). Clause 1.9A suspends private covenants to the extent necessary to allow development to proceed in accordance with the Plan, but it explicitly excludes several instruments (for example covenants imposed by the Council, conservation agreements under the National Parks and Wildlife Act, property vegetation plans, biobanking agreements, and planning agreements under the Act). Practitioners must check whether a covenant is of an excluded class; if so the suspension will not apply.
Minimum lot sizes and Area A exception (cl 4.1). The general rule is that subdivision must meet the Lot Size Map minima; however cl 4.1(3A) provides an exception for land identified as “Area A” where lots can be as small as 500 square metres only if connected to both water and sewage reticulation. Don’t assume small lots are allowed unless they meet the Area A connection test.
Strata and community-title specific restrictions (cl 4.1AA, cl 4.1A). Community and strata subdivisions in certain rural or large-lot zones are subject to minimum lot sizes that prevent creating additional dwelling entitlements through strata or community titles. Developers must check whether these clauses apply to an intended ownership form.
Erection of dwellings on rural land (cl 4.2A). A dwelling cannot be erected on a lot in RU1 or RU6 unless the lot meets the minimum size on the Lot Size Map or satisfies narrow grandfathering exceptions (cl 4.2A(3)). New rural residential development will frequently be constrained.
Intensive agriculture subdivision and dwelling tests (cl 4.2B). Subdivision to support intensive livestock or plant agriculture can create lots smaller than the minimum lot size, but cl 4.2B(3) sets strict conditions for existing dwellings and cl 4.2B(3)(b) requires an irrigation water licence and adequate water entitlement. The water-license requirement is a hard constraint.
Exempt and complying development exclusions (cl 3.3). Exempt or complying development cannot be carried out in environmentally sensitive areas identified in cl 3.3. Even if a development appears minimal in impact, the location within an environmentally sensitive area makes the exempt/compliant pathway unavailable.
Music and entertainment protections (cl 5.20). Consent authorities must not refuse licensed-premises development on specified aesthetic and entertainment-related grounds (for example genre, live or amplified music, dancing, stage direction) and cannot refuse on noise grounds if the authority is satisfied the noise may be managed to an acceptable level. While favourable to venue operators, this clause imposes an evidentiary burden on neighbours and consent authorities to assess and manage noise, not automatically to refuse.
Macquarie Marshes buffer and designated development (cl 6.7, Schedule 1). The Plan both permits certain uses in the buffer via Schedule 1 (intensive plant agriculture and artificial waterbodies permitted with consent) and declares several development types in the buffer to be designated development (cl 6.7(3)), which triggers higher assessment requirements. Practitioners must test both permissibility and whether the development is designated and hence subject to a different assessment pathway.
Canal estate prohibition (cl 2.9). Canal estate development is prohibited. The Plan defines the concept tightly, including a prohibition on excavation to create waterways and the use of fill to raise land. This is an absolute prohibition for the defined class of development.
Essential services precondition (cl 6.5). Consent must not be granted unless the consent authority is satisfied essential services are available or adequate arrangements exist. An otherwise permissible use may fail because services cannot be delivered or arranged.
Aquaculture restrictions and discharge bans (cl 5.19 and Schedule 6). For intensive pond-based and tank-based aquaculture, discharges to natural waterbodies are largely prohibited except for open flow-through systems (Schedule 6, Part 1, cl 4). Pond design must prevent escape and discharges. The Plan’s cross-reference to aquaculture industry development plans obliges applicants to check external policy documents.
Heritage procedural traps (cl 5.10). The consent authority may require heritage management documents or conservation management plans and must notify heritage or Aboriginal bodies. Failure to observe these procedural steps before granting consent may undermine the lawfulness of the decision.
Development near zone boundaries (cl 5.3). Within 50 metres of a zone boundary the consent authority may allow development permissible in the adjoining zone if it is compatible. That flexibility can create unexpected permissibilities, but cl 5.3 excludes several sensitive zones and uses.
Intersection with SEPPs and other statutes (cl 1.9, Schedule 2 Note 2). The Plan’s operation is subject to SEPPs and other Acts; assuming the Plan alone defines all legal constraints is a common pitfall.
These are concrete points where the Plan’s drafting produces non-obvious effects. Practitioners should annotate title searches for covenants, consult the Lot Size Map and all relevant maps early, and confirm the presence of services, water licences, heritage listings and environmentally sensitive areas before advising clients or lodging applications.
How to comply
This section gives a practical, clause‑anchored checklist for practitioners advising landowners or developers about bringing a proposal into conformity with the Plan.
Confirm zoning and applicable maps
Identify the parcel on the Land Application Map and Land Zoning Map (cl 1.3; cl 2.2). Check the Lot Size Map for minimum lot sizes relevant to the parcel (cl 4.1).
Check the Macquarie Marshes Map and Watercourse Map for buffer, Watercourse or Macquarie Marshes designations (cl 6.6, cl 6.7, cl 6.3).
Verify the Heritage Map and Schedule 5 for listed items or heritage conservation areas (cl 5.10; Schedule 5).
Determine the applicable permission pathway
Use the Land Use Table to determine whether the proposed use is permitted without consent, permitted with consent, or prohibited in the relevant zone (cl 2.3 and the Land Use Table).
If the use appears to be exempt or complying, check Schedule 2 and Schedule 3 and cl 3.1-3.2 for the conditions and standards that must be met (including BCA compliance and BASIX/other exclusions).
Check cl 3.3: if the land is in an environmentally sensitive area, exempt and complying pathways are unavailable.
Check for special local controls
Subdivision: For subdivisions, ensure the lot sizes meet the Lot Size Map minima (cl 4.1) and consider exceptions for Area A (cl 4.1(3A)), community title (cl 4.1AA) or strata plan schemes (cl 4.1A).
Dwellings in rural zones: If erecting a dwelling in RU1 or RU6 check cl 4.2A for conditions that must be satisfied (minimum lot size, pre-existing lawful permissions, or replacement dwellings).
Intensive agriculture and aquaculture: For intensive livestock or plant agriculture review cl 5.18 and cl 4.2B for thresholds and locational restrictions; for pond/tank/oyster aquaculture follow cl 5.19 and Schedule 6 site and operational requirements.
Riparian and river front areas: If development is within the Watercourse Map area or within 40 metres of the highest bank, comply with riparian considerations in cl 6.3 and river front rules in cl 6.4.
Heritage: If the site contains a heritage item, Aboriginal place or archaeological site, plan for heritage management documents, conservation management plans and consultations (cl 5.10(4)-(6),(7)-(9)).
Prepare application materials to address mandatory matters
Environmental assessment matters: For developments the consent authority must consider a range of matters (heritage, odour, water quality, biodiversity, flood risk). Address these in the statement of environmental effects or EIS (cl 5.18 and cl 5.21).
Flooding: If within the flood planning area, provide flood compatibility analysis and evacuation/safety measures consistent with cl 5.21 and the Considering Flooding in Land Use Planning Guideline.
Heritage and Aboriginal consultation: Prepare heritage impact assessments and evidence of consultation where required by cl 5.10.
Aquaculture: Provide species selection, pond design, discharge control and screening details consistent with Schedule 6 and cl 5.19.
Consider the exempt/compliant route
If the project appears to be exempt development under Schedule 2 or complying under Schedule 3, verify compliance with Building Code of Australia provisions, any BASIX or fire safety requirements (cl 3.1-3.2), and ensure the site is not within an excluded environmentally sensitive area (cl 3.3).
If using the complying development route, ensure the development meets the Part 1 development types and Part 2 conditions referenced in Schedule 3 and the State’s Code SEPP conditions (cl 3.2(4)).
Test for variations and prepare justification
If the proposal contravenes a development standard, prepare the required document to demonstrate the matters in cl 4.6(3)(a)-(b): that compliance is unreasonable or unnecessary and that sufficient environmental planning grounds exist to justify the contravention. Expect the consent authority to keep a record of its assessment (cl 4.6(4)).
Anticipate additional evidence where the Plan excludes certain development standard variations (see cl 4.6(8) which disallows variation of some standards such as complying development standards and BASIX commitments).
Verify other statutory approvals and licences
Confirm whether other Acts require licences or approvals even if the Plan treats a development as exempt (Schedule 2 Note 2). Possible examples include water licences, aquaculture licences under fisheries law, Crown land approvals, and Aboriginal heritage consents.
For intensive agriculture requiring irrigation, secure the required water licence and evidence of entitlement where cl 4.2B or cl 5.18 require it.
Check covenants and the operation of cl 1.9A
Review title encumbrances. If a covenant restricts development, check whether cl 1.9A (suspension of covenants) applies. If the covenant is of an excluded type (for example a Council-imposed covenant, a conservation agreement, a biobanking agreement, cl 1.9A(2)), the suspension will not apply.
Do not rely on covenant suspension without confirming the clause’s operation and any Governor approvals reflected in the Plan (cl 1.9A(4) notes Governor approval before the making of this clause).
Prepare for heritage and Aboriginal procedural steps
If the site involves heritage items or Aboriginal places prepare to notify and engage with the Heritage Council and local Aboriginal communities where the Plan requires that prior to granting consent (cl 5.10(7)-(9)). Budget time for statutory notice periods (28 days in cl 5.10(7) and (9)).
Address essential services and access
Demonstrate that essential services will be available or that adequate arrangements exist for water, electricity, sewage and vehicular access (cl 6.5). If services are absent, prepare an evidence-based plan for staged services delivery acceptable to the consent authority.
Consider temporary use and compliance
For short-term uses, seek development consent for temporary use up to 182 days and address cl 2.8’s requirements about not prejudicing future development and restoring the site after the temporary use.
Maintain documentation and be audit-ready
Keep clear records of the consent authority’s assessments, submissions and any conditions (cl 4.6(4)), and ensure conditions attached to any complying development certificate are documented and met (cl 3.2(4)).
Use the right ownership form and subdivision pathway
Before lodging subdivision proposals, consider whether the preferred ownership form (strata or community title) is permitted under the local minimum size rules (cl 4.1AA and cl 4.1A) and whether subdivision would create additional dwelling entitlements that the Plan seeks to prevent.
Engage early with the Council and relevant agencies
Because the Plan has multiple local controls and interacts with State regimes (cl 1.9, cl 5.12), early engagement with the Council and relevant State agencies (for fisheries, biodiversity, water licences, and heritage) will identify cross-approval requirements and avoid wasted application costs.
This compliance checklist should be used as a practical navigation tool. Each matter references the clause that creates the requirement or permission. Where the Plan delegates to external policy documents (for example aquaculture industry development plans or the Considering Flooding guideline), ensure those materials are obtained and incorporated into the application evidence bundle.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Warren Local Environmental Plan 2009
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
RU6 Transition
Residential Zones
R1 General Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E3 Productivity Support
E4 General Industrial
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
cl 2.1: Am 2022 (832), Sch 1.29[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 182 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwell
This is an opening excerpt, not the complete document.