Urban Drainage Act 2013
22Requirement to disconnect
Start here
Get a plain-English read of 22
Turn the raw legal text into a practical explanation grounded in Urban Drainage Act 2013.
22 Requirement to disconnect
(1) A general manager may, by notice served on the owner of a property, require the owner to remove any existing connection between that property and the public stormwater system –
(a) if that connection has been made in contravention of this Act or it contravenes any regulation made under this Act; or
(b) if, in the opinion of the general manager, it is necessary to do so; or
(c) if it is in the interests of health, safety or the environment; or
(d) to prevent damage to the public stormwater system.
(2) The owner of land who has been served with a notice under subsection (1) must comply with the notice within 28 days, or any longer period allowed by the general manager.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 100 penalty units; or
(b) an individual, a fine not exceeding 50 penalty units.
(3) If an owner of land who has been served with a notice under subsection (1) does not comply with the notice within 28 days or any longer period allowed by the general manager, the council may –
(a) do the things that the owner was required by the notice to do; and
(b) recover from the owner its reasonable costs of doing so.
(4) The owner of land who has been served with a notice under subsection (1) may apply to the Appeal Tribunal for a review of the decision by the general manager to serve the notice.