This Act makes councils responsible for providing, operating and maintaining public stormwater systems to reduce urban flood risk (ss 5–6). It gives councils powers to require or remove private connections (ss 21–22), enter land to build or repair infrastructure (ss 15–17), set connection fees (s 19) and issue notices with fines for non‑compliance (multiple sections). Who pays: councils fund service delivery but may recover specified costs from property owners; who decides: general managers, the Minister, arbitrators and the Appeal Tribunal (s 3 def.).
This Act creates a statutory framework for the provision, protection and regulation of urban stormwater services in a municipal area. Mechanically, it does the following.
Assigns primary duties to councils (the stormwater service providers) to plan for, provide and maintain public stormwater systems in their urban areas (s 5(1); s 6(1)). Councils must develop a stormwater system management plan within six years of commencement (s 10(1)-(2)) and maintain publicly available maps showing public stormwater system components (s 12).
Defines and separates “public stormwater system” from “private stormwater system”, and fixes the legal meaning of “connection point” where private systems meet public infrastructure (s 3).
Regulates physical works near or on stormwater infrastructure by prohibiting, except with the general manager’s consent, specified building, filling, removal or interference near easements and public stormwater systems (s 13) and prohibiting connection, alteration or interference with a public stormwater system without consent (s 14).
Provides councils and authorised officers with powers of entry and operational powers to install, construct, clean, maintain and repair public stormwater systems on public and private land, subject to notice rules, identity verification, hours of entry, emergency exceptions and compensation or restoration obligations (ss 15-17; s 16(9)-(10)).
Establishes a right to a connection point where the property boundary lies within 30 metres of a public stormwater system and it is reasonable to connect, and empowers councils to charge a fee for providing the connection (s 19(1)-(3)). The general manager may require owners to connect or disconnect (ss 21-22).
Sets substantive prohibitions on discharging anything other than stormwater into the public stormwater system and on discharging stormwater into systems other than the public system without permission (s 18).
Current sections
Direct links to the current provisions in Urban Drainage Act 2013.
expenses, in relation to a stormwater service provider, includes –
(a) the salaries and wages of its employees; and
(b) the compensation, purchase money or rent payable for land; and
(c) the cost of materials used, and the consideration payable under any contract, in connection with any work, undertaking or duty which the stormwater service provider is empowered or required to undertake or perform under this Act;
private stormwater system means an installation on a property, that –
(a) is not part of the public stormwater system; and
(b) is used for collecting or disposing of stormwater; and
(c) comprises any or all of the following:
(i) roof gutters and downpipes;
(ii) rainwater tanks;
(iii) surface channels;
(iv) kerbs and gutters;
(v) subsoil drains and stormwater drains;
(vi) any inlet pits which are used, or intended to be used, for the conveyance of stormwater to a disposal system;
public land means land owned by –
(a) the Crown; or
(b) an instrumentality or agent of the Crown; or
(c) a council or other local government body, other than a water or sewerage corporation;
public stormwater system means –
(a) the whole, or part, of a waterway; and
(b) any infrastructure used for –
(i) the collection or storage of stormwater, including connection points; or
(ii) the conveyance or reticulation of stormwater; or
(iii) the treatment or disposal of stormwater, including any outfall pipe or other work that stores or conveys water leaving the infrastructure that is used for the treatment and or the disposal of stormwater –
but does not include –
(c) any private stormwater system, including any pipe, fitting or apparatus that is situated upstream of a connection point to a public stormwater system; or
(d) infrastructure situated entirely within one property and not connected to any other infrastructure situated within another property;
regulations means regulations made under this Act;
stormwater means run-off water that has been concentrated by means of a drain, surface channel, subsoil drain or formed surface;
stormwater service means the service that is provided in connection with the collection, storage, treatment, reticulation and disposal of stormwater;
stormwater service provider means the council, or an agent engaged to act on behalf of the council, that operates and maintains the public stormwater system within a municipal area;
waterway means a creek, rivulet, stream or other natural depression in the land into which rainwater flows.
4
Objects of Act
4 Objects of Act
The objects of this Act are –
(a) to protect people and property by ensuring that stormwater services, infrastructure and planning are provided so as to minimise the risk of urban flooding due to stormwater flows; and
(b) to provide for the safe, environmentally responsible, efficient and sustainable provision of stormwater services in accordance with the objectives of the resource management and planning system of Tasmania as set out in Schedule 1 .
Part 2
Obligations of Stormwater Service Providers
Part 2 Obligations of Stormwater Service Providers
5
Council to provide adequate public stormwater systems
5 Council to provide adequate public stormwater systems
(1) A council must, in accordance with the objects of this Act, provide for such public stormwater systems as may be necessary to effectively drain the urban area of the council's municipal area.
(2) If a complaint is made to the Minister that a council has failed or neglected to make provision in accordance with subsection (1) , the Minister may investigate the complaint.
(3) If, after investigating a complaint, the Minister is satisfied that the council has failed or neglected to perform its duty, he or she may make an order declaring the council to be in default and directing it to make provision in accordance with subsection (1) within such period as may be specified in the order.
(4) A council may appeal to the Appeal Tribunal against an order under subsection (3) within the period specified in the order.
(7) If a council fails to comply with any requirement of an order within the period specified, the Minister may take whatever action he or she considers necessary to rectify the council's default, and all the costs and expenses of and incidental to the Minister's action must be paid by the council to the Crown.
6
Provision of stormwater services
6 Provision of stormwater services
(1) Except as otherwise provided in this Act, a council must keep the public stormwater systems owned and operated by it in good working order.
(2) For the purposes of cleaning, maintaining and repairing public stormwater systems, a council may exercise all the powers available to it for the construction of public stormwater systems.
(3) In ensuring that stormwater services are available to the urban areas of its municipal area, a council may engage a third-party to provide stormwater services, or use the infrastructure of a third-party.
(4) If a council wishes to engage a third-party or use its infrastructure under subsection (3) , the parties must enter into a commercial agreement for that use or engagement.
(5) [Section 6 Subsection (5) amended by No. 17 of 1996, Applied:10 May 2024] Nothing in this Act authorises a council to use, injure or interfere with any sluices, flood gates, sewers, breakwaters, sea defences or other works, whether made before or after the commencement of this Act, that are vested in, or under the control of, any person, drainage trust or Corporation, within the meaning of the Water and Sewerage Corporation Act 2012 , without the consent of that person, trust or Corporation, as the case requires.
(6) Consent under this section must not be unreasonably withheld and, if a question arises as to whether or not the consent is unreasonably withheld, either party may require its reference to an arbitrator, to be appointed in accordance with the Commercial Arbitration Act 2011 .
7
Negotiation for provision of stormwater services
7 Negotiation for provision of stormwater services
Where a council or a third-party provider of stormwater services wishes to commence negotiations with the other for the provision of stormwater services, either party may serve on the other party a written notice setting out –
(a) the general terms and conditions for the provision of those services; and
(b) any other matters that may be prescribed.
8
Provision where commercial arrangements cannot be agreed
8 Provision where commercial arrangements cannot be agreed
(1) Subject to subsection (2) , where a council and a third-party owner of infrastructure or operator of stormwater services cannot reach agreement on the contract details for the provision of stormwater services, either party may refer the matter to an arbitrator to be appointed in accordance with the Commercial Arbitration Act 2011 .
(2) A matter may be referred to an arbitrator only after at least one of the following conditions has been satisfied:
(a) at least 6 months have passed since the service of the notice under section 7 and in the opinion of one or both parties it is unlikely a resolution will be quickly reached;
(b) in the opinion of the council involved, the third-party provider of stormwater services is unreasonably withholding consent for the council to use the third-party's infrastructure.
(3) For the purposes of subsection (1), an arbitrator has, in addition to the powers conferred by the Commercial Arbitration Act 2011 , the power to determine –
(a) the conditions relating to the supply of stormwater services; and
(b) a price for those services and transition price policies to minimise price shocks; and
(c) any performance indicators to be implemented and modified over time; and
(d) the period over which the commercial agreement applies; and
(e) contract dispute resolution processes.
(4) Before making a determination under subsection (3) , the arbitrator is to seek advice from –
(5) In making a determination in respect of assets that have been transferred from a council to a water and sewerage corporation in accordance with a notice under section 41 of theWater and Sewerage Corporations Act 2008 , an arbitrator must try to achieve the best outcomes for the community in respect of –
(a) limiting price shocks; and
(b) providing for the equitable distribution of costs.
(6) In making a determination to which subsection (5) applies, the arbitrator is to take into account the following:
(a) that the asset will be renewed over time;
(b) that the provider should be provided with a reasonable opportunity to recover the efficient costs which it reasonably incurs in providing the service and complying with its regulatory obligations;
(c) the returns on council-owned stormwater assets in Tasmania;
(d) that both parties are not to be constrained from executing their statutory obligations;
(e) that any charge for providing stormwater services must take into account any costs of operating and maintaining the service that have been paid by another customer;
(f) any other matter that is prescribed or that the arbitrator considers relevant.
9
Local government authorities for delivery of stormwater services
9 Local government authorities for delivery of stormwater services
This Act does not limit in any way a council’s ability to establish a single authority, or be one of the councils to establish a joint authority, as outlined in the Local Government Act 1993 , for the provision of stormwater services.
10
Stormwater system management plans
10 Stormwater system management plans
(1) A council must develop a stormwater system management plan for the urban area of its municipal area within 6 years after the day on which this Act commences.
(2) A stormwater system management plan is to specify –
(a) plans for the management of any assets used for the delivery of a stormwater service; and
(b) the level of risk from flooding for each urban stormwater catchment in the public stormwater system; and
(c) any other matters prescribed in the regulations or that the council considers appropriate.
11
Power of council to adopt stormwater systems
11 Power of council to adopt stormwater systems
(1) A general manager may agree with a person who has private stormwater systems, or is constructing or proposing to construct private stormwater systems or associated works, that if those works are constructed in accordance with the terms of the agreement, the council will, upon the completion of the work, or at some specified date, or on the happening of some future event, declare the works to be vested in the council.
(2) An agreement under subsection (1) is enforceable against the council by the owner or occupier for the time being of any premises that are, or are intended to be, served by the works.
(3) A council must not make an agreement under this section with respect to works situated within the municipal area of another council unless that other council consents.
(4) Where a person proposes to construct a drain, the general manager may, if the general manager considers that the proposed drain is, or is likely to be, needed to form part of a public stormwater system that it has provided or proposes to provide, require that person to construct the drain in a different way, to a greater hydraulic capacity or with different materials from which the person proposes or could otherwise be required by the council.
(5) A person must comply with the requirements of a council under subsection (4) .
(6) A person who is aggrieved by the requirements of a council under subsection (4) may, within 28 days after receipt of notification of the requirements, apply to the Appeal Tribunal to review the requirements.
(7) On receipt of an application, the Appeal Tribunal may –
(a) disallow the requirement; or
(b) allow the requirement; or
(c) allow the requirement with modifications.
(8) A council that imposes a requirement under subsection (4) must pay to the person constructing the drain –
(a) any extra expenses reasonably incurred by the person in complying with the requirement; and
(b) until the drain becomes part of a system, any expenses reasonably incurred by the person, in repairing or maintaining the drain, as may be attributable to that requirement.
12
Council to maintain maps
12 Council to maintain maps
A council that provides stormwater services must maintain and make publicly available maps showing all public stormwater systems within the urban area of its municipal area, including those portions of waterways that have a primary role in transporting stormwater.
Part 3
Powers of Stormwater Service Providers
Part 3 Powers of Stormwater Service Providers
13
Protection of stormwater assets
13 Protection of stormwater assets
(1) Unless subsection (11) applies, a person must not, without a general manager's consent, cause or permit –
(a) any prescribed structure to be built on, or any filling to be placed on or removed from, land over which –
(i) an easement exists in favour of the relevant council; or
(ii) an easement exists for public stormwater systems; or
(b) any prescribed structure to be built on, or any filling to be placed or removed from, within one metre laterally from the outer edge of any public stormwater systems of the council or such other distance as determined by the general manager; or
(c) any prescribed structure to be built above or below any area prohibited by paragraph (b) ; or
(d) the removal of any soil, rock or other matter that supports, protects or covers any stormwater-related works of the council.
Penalty: Fine not exceeding 100 penalty units.
(2) If, in contravention of this section, any thing is erected or constructed, the general manager may serve on the person responsible for the building or construction a written notice requiring the person to demolish, remove or remedy the works and carry out such other works as are necessary to restore or reinstate the public stormwater system within 28 days or any longer period the general manager allows.
(3) A person must comply with a notice issued under subsection (2) .
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 500 penalty units; or
(b) an individual, a fine not exceeding 200 penalty units.
(4) If a person fails to carry out the works required in the notice within the specified period, the council may demolish, remove or remedy the building or construction and carry out any works necessary for restoring or reinstating the public stormwater system.
(5) If the council carries out works under subsection (4) –
(a) the person who carried out the erection or construction and any person who directed it to be done are jointly and severally liable for the expenses incurred by the council in carrying out the works referred to in subsection (4) ; and
(b) any such expenses are recoverable in a court of competent jurisdiction.
(6) This section does not prevent or impede the maintenance, repair or renewal of a building, wall, bridge, fence or other structure under which a public stormwater system has been constructed so long as that work does not injure or obstruct the system.
(7) An application for the general manager's consent under subsection (1) must be made in the manner determined by the general manager, and must be accompanied by any plans and other information that the general manager requires.
(8) The general manager may –
(a) refuse the application; or
(b) grant the application; or
(c) grant the application subject to any terms and conditions that he or she thinks fit.
(9) A person who, with the consent of a general manager, causes or permits anything referred to in subsection (1) to be done must make sure that it is done in accordance with any terms and conditions subject to which the general manager gave his or her consent in granting the application under subsection (8)(c) .
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 500 penalty units; or
(b) an individual, a fine not exceeding 200 penalty units.
(10) Terms and conditions subject to which the general manager grants an application under subsection (8)(c) are binding on the successors in title or assigns of the person who applied for that consent.
(11) Subsection (1) does not apply in respect of the authority responsible for the management of a road if it is necessary for the authority to do anything referred to in that subsection for the purpose of constructing a road or conducting maintenance works on a road.
14
Interference with public stormwater systems
14 Interference with public stormwater systems
(1) A person must not, without a general manager's consent, cause or permit –
(a) any works to be connected to a public stormwater system; or
(b) the alteration or removal of, or interference with, a public stormwater system.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 500 penalty units; or
(b) an individual, a fine not exceeding 200 penalty units.
(2) If a person contravenes subsection (1) , a general manager may serve on the person a written notice requiring the person to remove the connection, rectify any damage or desist from discharging material into the public stormwater system within 28 days or any longer period the general manager allows.
(3) A person must comply with a notice issued under subsection (2) .
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 200 penalty units; or
(b) an individual, a fine not exceeding 50 penalty units.
(4) If a person fails to comply with the notice within the specified period, the council may demolish, remove or remedy the works and carry out any works necessary for restoring or reinstating the infrastructure.
(5) If the council carries out works under subsection (4) –
(a) the person responsible for the works demolished, removed or remedied and any person who directed those works to be done are jointly and severally liable for the expenses incurred by the council in carrying out the works referred to in subsection (4) ; and
(b) any such expenses are recoverable in a court of competent jurisdiction.
15
Power of authorised officers to carry out work on or adjacent to public land
15 Power of authorised officers to carry out work on or adjacent to public land
(1) An authorised officer may enter and remain on land to –
(a) install public stormwater systems on public land or on a waterway located on, or adjacent to, public land; and
(b) carry out operational work or protective work, on public stormwater systems on public land or a waterway located on or adjacent to public land, for the provision of a stormwater service.
(2) Subject to subsections (3) and (7) , if an authorised officer seeks to enter land under this section, the officer must give the authority responsible for the land not less than 7 days' written notice stating the reason and the date and time of the proposed entry.
(3) If the purpose of the authorised officer's entry is only to undertake –
(a) investigations of existing public stormwater systems; or
(b) pre-construction investigations on public land on which the council plans to construct new public stormwater systems –
the officer must –
(c) if the occupier is present at the time of entry, give notice to the occupier before entering the land; or
(d) if the occupier is not present at the time of entry, leave notice that the officer entered the land.
(4) An authorised officer must –
(a) subject to subsection (5) , only exercise a power of entry under this section between the hours of 7 a.m. and 7 p.m. on any day; and
(b) obtain the agreement of the authority responsible for the land as to how the installation or work is to be carried out before commencing the installation or work.
(5) An authorised officer may exercise a power of entry under this section outside the hours referred to in subsection (4)(a) if a general manager determines that the relevant works can be carried out more effectively outside those hours.
(7) In an emergency, an authorised officer may exercise a power of entry under this section –
(a) at any time and without prior notice, if it is not practicable to give such notice; and
(b) if necessary in the circumstances, by the use of reasonable force.
(8) When an authorised officer enters land under this section, the officer –
(a) may be accompanied by such other persons as the officer considers necessary or appropriate; and
(b) may bring on to the land any vehicles and equipment that the officer considers necessary or appropriate for the work which the council is to carry out on the land.
(9) If the authority responsible for the land, on being given notice under subsection (2) –
(a) seeks to include, in the agreement under subsection (4)(b) , conditions that the council considers unreasonable; or
(b) disputes that the council is entitled to carry out the proposed work –
the council may appeal to the Appeal Tribunal.
(10) Subsection (9) does not apply if the authority responsible for the land is a Minister or a person or body to whom directions may be given by a Minister in respect of the matter in dispute.
(13) A council must make good, to the satisfaction of the authority responsible for the land, any damage caused by the exercise of powers under this section as soon as practicable.
(14) If a council fails to make good, to the satisfaction of the authority responsible for the land, any damage caused by the exercise of powers under this section, the responsible authority may make good the damage itself.
(15) The cost of making good the damage referred to in subsection (14) may be recovered by the authority responsible for the land in a court of competent jurisdiction as a debt owed to it by the council.
(16) This section does not derogate from an obligation to comply with any other Act.
16
Power of authorised officers to enter private land, &c.
16 Power of authorised officers to enter private land, &c.
(1) An authorised officer may –
(a) enter and remain on private land or a waterway located on or adjacent to private land to install or construct a public stormwater system and to carry out investigations in connection with that installation or construction; and
(b) enter and remain on private land or a waterway located on or adjacent to private land, for the purposes of carrying out operational or protective work on land on which a public stormwater system is situated, where that land is identified, on a map maintained in accordance with section 12 , as containing part of the public stormwater system.
(2) Subject to subsections (3) and (7) , if an authorised officer seeks to enter land under this section, the officer must give the occupier of the land not less than 7 days' written notice stating the reason and the date and time of the proposed entry.
(3) If the purpose of the authorised officer's entry is only to undertake –
(a) investigations of existing public stormwater systems; or
(b) pre-construction investigations on private land on which the council plans to construct new public stormwater systems –
the officer must –
(c) if the occupier is present at the time of entry, give notice to the occupier before entering the land; or
(d) if the occupier is not present at the time of entry, leave notice that the officer entered the land.
(4) Subject to subsection (5) , an authorised officer may only exercise a power of entry under this section between the hours of 7 a.m. and 7 p.m. on any day.
(5) An authorised officer may exercise a power of entry under this section outside the hours referred to in subsection (4) if a general manager determines that the relevant works can be carried out more effectively outside those hours.
(7) In an emergency, an authorised officer may exercise a power of entry under this section –
(a) at any time and without prior notice, if it is not practicable to give such notice; and
(b) if necessary in the circumstances, by the use of reasonable force.
(8) When an authorised officer enters land under this section, the officer –
(a) may be accompanied by such other persons as the officer considers necessary or appropriate; and
(b) may bring on to the land any vehicles and equipment that the officer considers necessary or appropriate for the work which the officer is to carry out on the land.
(9) Subject to this section, the council must make good any damage caused by the exercise of powers under this section as soon as practicable or pay reasonable compensation for the damage.
(10) If the owner of the land and the council do not agree as to the extent of compensation, or the council refuses to pay compensation, the claim for compensation is to be determined –
(b) in any other case, as if it were a disputed claim for compensation under the Land Acquisition Act 1993 .
17
Power to undertake construction of public stormwater systems
17 Power to undertake construction of public stormwater systems
(1) If, in the opinion of the council, a street, right-of-way or private land is not adequately drained, the council may construct any public stormwater systems it thinks fit for the purpose of meeting its obligations under this Act.
(2) Before proceeding with the construction, the council is to give to the owners of all land through, under or over which the public stormwater system is to pass 28 days' notice in writing of its intention to construct it.
18
Discharge of matter into public stormwater system
18 Discharge of matter into public stormwater system
(1) A person must not discharge, or cause or permit to be discharged, anything other than stormwater into a public stormwater system.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 100 penalty units; or
(b) an individual, a fine not exceeding 10 penalty units.
(2) Without the permission of the relevant general manager, a person must not discharge, or cause or permit to be discharged, stormwater into any system other than the public stormwater system.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 100 penalty units; or
(b) an individual, a fine not exceeding 10 penalty units.
(3) For the purposes of this section, the permission of a general manager may be general or specific and conditional or unconditional.
Part 4
Connections
Part 4 Connections
19
Connection to stormwater service
19 Connection to stormwater service
(1) If a property at its nearest property boundary point is located within 30 metres of a public stormwater system, and it is reasonable to make a connection, the stormwater service provider must provide the property with a connection point for the disposal of stormwater.
(2) If the owner of a property that is permitted to connect to a public stormwater system requests to do so, the stormwater service provider must ensure that a single separate stormwater connection point is constructed.
(3) The stormwater service provider may set an appropriate fee for the cost of providing a stormwater connection point to a property and the property owner is to pay that fee before the work is undertaken.
(4) A stormwater service provider must not deprive a property that is lawfully connected to a public stormwater system of the use of that infrastructure, unless the stormwater service provider –
(a) provides an alternative public stormwater system that is equally effective for the purpose; and
(b) at its own expense, carries out any work necessary to connect the property to the alternative public stormwater system so provided.
20
Limits on connection point
20 Limits on connection point
(1) A private stormwater system serviced by a connection point must be wholly contained within the boundaries of the property, unless the general manager gives specific approval for the connection point to service more than one property.
(2) A property will be provided with a single connection point to a public stormwater system, unless the general manager provides approval for more than one connection to be provided.
21
Requirement to connect
21 Requirement to connect
(1) A general manager may, by notice served on the owner of a property, require the owner to connect the property's private stormwater system to a public stormwater system to reduce the flooding risk to the property or to other properties in the stormwater catchment, if the property is located within 30 metres of the public stormwater system.
(2) The owner of a property who has been served with a notice under subsection (1) must comply with the notice within the period specified, or any longer period allowed by the general manager.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 100 penalty units; or
(b) an individual, a fine not exceeding 50 penalty units.
(3) If an owner of land who has been served with a notice under subsection (1) does not comply with the notice within 28 days, or any longer period allowed by the general manager, the council may –
(a) do the things that the owner was required by the notice to do; and
(b) recover from the owner its reasonable costs of doing so, other than costs that are prescribed in the regulations to be the responsibility of the council.
(4) The owner of land who has been served with a notice under subsection (1) may apply to the Appeal Tribunal for a review of the decision by the general manager to serve the notice.
22
Requirement to disconnect
22 Requirement to disconnect
(1) A general manager may, by notice served on the owner of a property, require the owner to remove any existing connection between that property and the public stormwater system –
(a) if that connection has been made in contravention of this Act or it contravenes any regulation made under this Act; or
(b) if, in the opinion of the general manager, it is necessary to do so; or
(c) if it is in the interests of health, safety or the environment; or
(d) to prevent damage to the public stormwater system.
(2) The owner of land who has been served with a notice under subsection (1) must comply with the notice within 28 days, or any longer period allowed by the general manager.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 100 penalty units; or
(b) an individual, a fine not exceeding 50 penalty units.
(3) If an owner of land who has been served with a notice under subsection (1) does not comply with the notice within 28 days or any longer period allowed by the general manager, the council may –
(a) do the things that the owner was required by the notice to do; and
(b) recover from the owner its reasonable costs of doing so.
(4) The owner of land who has been served with a notice under subsection (1) may apply to the Appeal Tribunal for a review of the decision by the general manager to serve the notice.
Part 5
Miscellaneous
Part 5 Miscellaneous
23
Property owners not to direct stormwater onto neighbouring properties
23 Property owners not to direct stormwater onto neighbouring properties
(1) A property owner must ensure that stormwater is not discharged from a private stormwater system so that it causes or is likely to cause a nuisance to a neighbouring property or its residents.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 100 penalty units; or
(b) an individual, a fine not exceeding 20 penalty units.
(2) If a property owner directs stormwater onto a neighbouring property and creates a nuisance, a general manager may –
(a) issue a notice to the property owner giving him or her 28 days to stop causing the nuisance; and
(b) if the property owner does not comply with the notice, the council may carry out such works as may be necessary to rectify the nuisance, with the costs of such rectification to be borne by the property owner.
(3) Any costs incurred under subsection (2)(b) are recoverable in a court of competent jurisdiction.
24
Regulations
24 Regulations
(1) The Governor may make regulations for the purposes of this Act.
(2) Without limiting the generality of subsection (1) , the regulations may provide for –
(a) matters to be taken into account when determining appropriate pricing for the provision of stormwater services; and
(b) matters that may be included in stormwater system management plans.
The Act specified in Schedule 3 is repealed and all Statutory Rules made under that Act are rescinded.
27
Consequential amendments of regulations do not prevent their subsequent amendment
27 Consequential amendments of regulations do not prevent their subsequent amendment
The amendment by this Act of a provision of any regulations does not prevent that or any other provision of those regulations from being amended or rescinded by a subsequent regulation.
(a) the administration of this Act is assigned to the Minister for Primary Industries and Water; and
(b) the department responsible to that Minister in relation to the administration of this Act is the Department of Primary Industries, Parks, Water and Environment.
SCHEDULE 1 - Objectives of Res
SCHEDULE 1 - Objectives of Resource Management and Planning System of Tasmania
SCHEDULE 1 - Objectives of Res SCHEDULE 1 - Objectives of Resource Management and Planning System of Tasmania
1. The objectives of the resource management and planning system of Tasmania are –
(a) to promote the sustainable development of natural and physical resources and the maintenance of ecological processes and genetic diversity; and
(b) to provide for the fair, orderly and sustainable use and development of air, land and water; and
(c) to encourage public involvement in resource management and planning; and
(d) to facilitate economic development in accordance with the objectives specified in paragraphs (a) , (b) and (c) ; and
(e) to promote the sharing of responsibility for resource management and planning between the different spheres of government, the community and industry in Tasmania.
2. In item 1(a) –
sustainable development means managing the use, development and protection of natural and physical resources in a way, or at a rate, which enables people and communities to provide for their social, economic and cultural wellbeing and for their health and safety while –
(a) sustaining the potential of natural and physical resources to meet the reasonably foreseeable needs of future generations; and
(b) safeguarding the life-supporting capacity of air, water, soil and ecosystems; and
(c) avoiding, remedying or mitigating any adverse effects of activities on the environment.
Sourced from Tasmanian Legislation Online (legislation.tas.gov.au), CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
1 Short title
1 Short title
This Act may be cited as the Urban Drainage Act 2013 .
2 Commencement
2 Commencement
This Act commences on the day on which this Act receives the Royal Assent.
3 Interpretation
3 Interpretation
In this Act, unless the contrary intention appears –[Section 3 Amended by No. 18 of 2021, s. 343, Applied:05 Nov 2021]
[Section 3 Amended by No. 18 of 2021, s. 343, Applied:05 Nov 2021]Appeal Tribunal means the Tasmanian Civil and Administrative Tribunal;
authorised officer means a person authorised to enter land under section 20A of theLocal Government Act 1993 ;
connection point means –
(a) the point at which a property's private stormwater system connects with the public stormwater system; or
(b) such other point as may be prescribed by regulations as the connection point;
contract means –
(a) an agreement, arrangement, undertaking, lease, licence, warranty or other contract; or
(b) part of an agreement, arrangement, undertaking, lease, licence, warranty or other contract;
council has the same meaning as in the Local Government Act 1993 ;
expenses, in relation to a stormwater service provider, includes –
(a) the salaries and wages of its employees; and
Provides dispute-resolution and decision-review routes: councils may negotiate or enter commercial agreements with third parties (s 6(3)-(4); s 7); arbitration is available where parties cannot agree (s 8), and specified decisions can be appealed to the Appeal Tribunal (s 5(4)-(5); s 11(6); s 15(9)-(12); s 21(4); s 22(4)). The Minister has investigatory and corrective powers where councils fail to provide adequate systems (s 5(2)-(7)).
Sets out enforcement mechanisms: notices to remedy, council powers to carry out works and recover costs, fines in penalty units that differ for corporates and individuals, and joint and several liability for persons responsible for unauthorised works (ss 13-14; ss 21-23).
The Act states its objects in s 4: to protect people and property by minimising urban flooding and to provide for safe, environmentally responsible, efficient and sustainable stormwater services consistent with the resource-management and planning objectives set out in Schedule 1. These object clauses are the explicit policy rationale; the operative provisions above implement that rationale through duties, consents, entry powers, planning obligations, pricing authorisations and dispute-resolution mechanisms (see especially ss 4, 10, 12, 19 and 24).
Who pays, who decides and what behaviour changes are established by the Act. Councils decide what infrastructure is necessary (s 5(1); s 17(1)); general managers exercise consent, notice and enforcement discretions under multiple sections (eg s 13(8), s 14(2), s 21(1)); property owners pay fees for connection (s 19(3)) and can be required to connect or disconnect (ss 21-22). Councils may recover their reasonable costs where owners fail to comply (s 21(3); s 22(3)) and may carry out remedial work at the owner’s expense (ss 13(4)-(5); s 14(4)-(5); s 23(2)(b)). Arbitration and Appeal Tribunal routes are available where disputes arise (ss 8; 5(4)-(5)).
The Act creates a set of incentives: councils are incentivised to plan and maintain systems (and face Ministerial directions and penalties for failure, s 5), can charge for connection work (s 19(3)), and can recover costs from defaulting owners (ss 21(3); 22(3)). Property owners are incentivised to comply with connection/disconnection notices and to avoid discharges that contravene the Act (ss 18; 21-23). The Act also establishes administrative discretion that can be appealed to the Appeal Tribunal in many circumstances (s 5(4); s 11(6); s 15(9); s 21(4); s 22(4)).
This section summarises the Act’s mechanical changes and maps them to the Act’s stated objects. Subsequent sections explain concepts, affected parties, duties, penalties, interactions with other laws, amendment notes recorded in the text, litigation/appeal pathways stated in the Act, practical pitfalls and compliance steps.
Main concepts
The Act rests on a small set of statutory definitions and concepts that determine who does what.
Public stormwater system and private stormwater system (s 3). “Public stormwater system” is defined broadly to include whole or part of a waterway and any infrastructure used for collection, storage, conveyance, reticulation, treatment or disposal of stormwater, explicitly including connection points and outfall works (s 3). It excludes private stormwater systems (s 3(c)) and infrastructure entirely situated within one property and not connected to other properties (s 3(d)). “Private stormwater system” is defined to include roof gutters, rainwater tanks, surface channels, kerbs and gutters, subsoil and stormwater drains and inlet pits on a property that are not part of the public system (s 3).
Connection point (s 3). The point where a property’s private stormwater system connects with the public stormwater system, or another point prescribed by regulations, is the “connection point” (s 3). This concept fixes the legal boundary between public and private systems and carries practical consequences under the provisions governing consent, liability and maintenance (eg ss 13-14; 19-20).
Stormwater service and stormwater service provider (s 3). “Stormwater service” is the service of collection, storage, treatment, reticulation and disposal of stormwater (s 3). “Stormwater service provider” is defined as the council or an agent engaged by the council to operate and maintain the public stormwater system within a municipal area (s 3).
General manager (s 3). The term adopts the same meaning as in the Local Government Act 1993 and appears as the decision-maker for consents (s 13(8); s 14(1)), for serving notices requiring connection or disconnection (ss 21(1); 22(1)) and for other operational discretions such as allowing multiple connections (s 20(1)).
Authorised officer (s 3). Defined by reference to s 20A of the Local Government Act 1993, authorised officers have statutory powers of entry on public land (s 15) and private land (s 16) for installation, maintenance and investigation purposes and must carry identification and observe notice rules (ss 15-16).
Appeal Tribunal (s 3). The Act uses the Tasmanian Civil and Administrative Tribunal as the Appeal Tribunal for specified appeals (s 3; s 5(4)-(5); s 15(11)-(12)). The Act frequently directs decisions or disputes to arbitration or to the Appeal Tribunal (eg ss 5, 8, 11, 15, 21-22).
Ministerial oversight (s 5). The Minister may investigate complaints that a council has failed to provide adequate public stormwater systems and may declare a council in default, direct remedial action, and, ultimately, take necessary action and recover costs from the council (s 5(2)-(7)).
Stormwater system management plans and maps (ss 10-12). Councils must prepare management plans that identify asset management and flood-risk levels for urban catchments and must maintain publicly available maps showing public stormwater systems (ss 10-12).
Dispute-resolution mechanisms (s 8). Where commercial arrangements with third-party infrastructure owners or operators cannot be agreed, either party may refer the matter to arbitration under the Commercial Arbitration Act 2011, subject to preconditions and with specific arbiter powers to set prices, transition policies and performance indicators; arbitrators must consult the Department and the Tasmanian Economic Regulator (s 8).
Penalty- and notice-based enforcement (ss 13-14, 18, 21-23). The Act prescribes a mix of fines (varied by corporate/individual status), remedial notices, council remedial powers and cost-recovery mechanisms. It also provides for joint and several liability where a person erects unauthorised works (s 13(5)).
These concepts interact: for example, whether a structure is on an easement in favour of the council or within one metre laterally of an outer edge of a public stormwater system triggers consent requirements and potential penalties under s 13; whether a property is within 30 metres of a public stormwater system triggers a council obligation to provide a connection point and a general manager’s power to require connection (ss 19-21). The Act explicitly links stormwater infrastructure policy to broader resource-management objectives (s 4 referencing Schedule 1), which frames how councils must balance sustainability and economic development when planning and operating stormwater systems.
Compliance and legal risk hinge on these core definitions: misidentifying the connection point can shift maintenance responsibility and expose owners to notices and cost-recovery; failure by councils to publish maps or prepare management plans may trigger Ministerial intervention (ss 10-12; s 5).
Who it affects
The Act creates obligations, rights and enforcement levers that affect several clearly identified groups. State who pays and who decides, and the typical behaviour changes expected for each group.
Councils (the stormwater service providers)
Primary duty-bearers: councils must provide for adequate public stormwater systems to drain their urban areas (s 5(1); s 6(1)). Councils decide what infrastructure is necessary and must keep systems in good working order (s 6(1)). They must develop stormwater system management plans within six years (s 10(1)), maintain public maps (s 12), negotiate and enter commercial agreements with third parties (s 6(3)-(4)), and may engage third-party providers (s 6(3)).
Financial exposure: councils may be fined for failure to comply with a Ministerial order (s 5(6)), must pay costs if the Minister rectifies their default (s 5(7)), and may incur costs when exercising powers of entry where they must make good damage to land (s 15(13)). Councils may recover costs from property owners who fail to comply with connection/disconnection notices (ss 21(3); 22(3)), and they can carry out remedial works and recover expenses from persons responsible for unauthorised works (s 13(5); s 14(5)).
Decision-making role: the general manager of the council is the central decision-maker for consents to build near stormwater assets (s 13(8)), consents for connections (s 14(1)), notices requiring connection/disconnection (ss 21-22), and entry time exceptions (ss 15(5); 16(5)). The general manager’s consent can be refused, granted, or granted subject to conditions (s 13(8)).
Property owners (private landowners and occupiers)
Obligations: owners must ensure private stormwater systems do not cause nuisance to neighbours (s 23(1)); must not discharge anything other than stormwater to the public stormwater system (s 18(1)); may be required to connect to a public stormwater system if within 30 metres and if required by the general manager (s 21(1)); may be required to disconnect where the connection contravenes the Act, threatens health, safety or environment, or risks damage to the public system (s 22(1)).
Financial liabilities: owners pay for connection-point fees set by the stormwater service provider and payable before work (s 19(3)). Owners who fail to comply with notices may have the council carry out the work and recover reasonable costs (ss 21(3); 22(3)). Owners who erect works in contravention of s 13 can be jointly and severally liable for council costs to demolish/remedy (s 13(5)). Penalties differ for corporates and individuals (various sections).
Procedural rights: owners served with connection/disconnection notices may apply to the Appeal Tribunal for review (ss 21(4); 22(4)). Owners may also seek compensation where councils enter private land and cause damage (s 16(9)-(10)).
Third-party infrastructure owners and operators
Councils may use third-party infrastructure or engage third-party providers for stormwater services, but must enter commercial agreements (s 6(3)-(4)). If parties cannot agree, arbitration is available after statutory preconditions (s 8). Arbitrators have powers to set prices, transition policies, performance indicators and contract periods, and must seek advice from the Department and the Economic Regulator (s 8(3)-(4)).
Owners of infrastructure transferred from councils to a water and sewerage corporation are the subject of special consideration: an arbitrator dealing with disputes about such assets must seek “best outcomes for the community” in limiting price shocks and providing equitable cost distribution and must take specified matters into account including asset renewal and efficient cost recovery (s 8(5)-(6)).
The Minister and relevant Department
The Minister may investigate complaints that a council has failed to provide adequate stormwater systems, declare a council in default and order remedial action (s 5(2)-(3)). If the council does not comply, the Minister may act and recover costs from the council (s 5(7)). The Department is a consultation party for arbitration under s 8(4).
Other public authorities and “authorities responsible for land”
Those responsible for land (including Ministers and bodies to whom a Minister gives directions) have special procedural positions in appeals against proposed council works on land (s 15(9)-(12)). Road authorities are exempt in some respects from s 13 restrictions to the extent necessary for road construction or maintenance (s 13(11)). Authorities responsible for land receive notice of proposed entries (s 15(2)) and can be entitled to have the council make good any damage or to do so themselves and recover the costs (ss 15(13)-(15)).
Appeal bodies and arbitrators
The Tasmanian Civil and Administrative Tribunal is the statutory Appeal Tribunal for multiple appeal points specified in the Act (s 5(5); s 15(11)). Arbitrators appointed under the Commercial Arbitration Act 2011 have expanded powers to set prices and policies where commercial arrangements with third parties fail (s 8).
Water and sewerage corporations
The Act recognises that assets may have been transferred to water and sewerage corporations and requires arbitrators to consider that fact when resolving disputes about assets and pricing (s 8(5)-(6)). Councils must seek consent to interfere with infrastructure vested in or under control of other corporations (s 6(5)).
The legislative design concentrates day‑to‑day operational decisions with councils and their general managers, assigns remedial enforcement with both councils (through notices and remedial works) and the Minister (for council default), and provides property owners with duties, fees and appeal rights. The financial flows the Act contemplates include fees payable by owners for connection work (s 19(3)), cost-recovery by councils for remedial works (ss 13(5); 21(3); 22(3); 23(2)(b)), and Ministerial recovery from councils (s 5(7)).
Key duties and rights
This section catalogues the principal operative duties and rights created by the Act and identifies the decision-makers who exercise discretion under those provisions.
Councils: duties and powers
Duty to provide adequate public stormwater systems (s 5(1)). Councils must provide such public stormwater systems as may be necessary to effectively drain the urban area of the municipal area, in accordance with the objects of the Act. The Minister may investigate complaints alleging failure and may order remedial action (s 5(2)-(4)). Councils must comply with Ministerial orders or appeal to the Appeal Tribunal; failure to comply attracts fines (s 5(6)) and the Minister may itself take action and charge the council (s 5(7)).
Maintenance and operational duty (s 6). Councils must keep public stormwater systems in good working order (s 6(1)) and may exercise construction powers for cleaning, maintaining and repairing public stormwater systems (s 6(2)). Councils may engage third-party providers or use third-party infrastructure but must enter commercial agreements for such engagements (s 6(3)-(4)). Consent to use infrastructure vested in others cannot be unreasonably withheld, with arbitration available if the question of reasonableness arises (s 6(5)-(6)).
Planning and asset-management duties (s 10). Councils must develop a stormwater system management plan within six years and specify asset management plans, flood-risk levels for urban catchments and other prescribed or council-determined matters (s 10(1)-(2)).
Mapping duty (s 12). Councils that provide stormwater services must maintain and make publicly available maps showing all public stormwater systems in their urban area, including waterways with a primary role in transporting stormwater (s 12).
Power to adopt private works (s 11). A general manager may enter agreements that private works, constructed to agreed terms, will be vested in the council upon completion or on a specified event (s 11(1)-(2)). Councils cannot make such agreements about works situated in another council’s municipal area without that council’s consent (s 11(3)). Councils may require proposed drains to be constructed to different specifications and must pay extra expenses reasonably incurred by the constructor attributable to such requirements (s 11(4)-(8)).
General manager: a central decision-maker
Consents and conditions. The general manager grants or refuses consents and sets conditions for works near stormwater assets (s 13(7)-(9)). The general manager issues notices requiring owners to connect or disconnect (ss 21(1); 22(1)) and determines time windows for entry outside ordinary hours (ss 15(5); 16(5)). The general manager’s decisions give rise to appeal rights to the Appeal Tribunal in several contexts (ss 11(6); 15(9); 21(4); 22(4)).
Authorised officers: entry and enforcement powers
Powers of entry. Authorised officers may enter public land and waterways adjacent to public land to install or maintain systems (s 15(1)), and may enter private land or waterways adjacent to private land to install public systems or carry out investigations and operational work where the land is shown on council maps as containing part of the public stormwater system (s 16(1)-(2)). Entry normally requires seven days’ written notice, with limited exceptions for investigative entries and emergencies (ss 15(2)-(3); 16(2)-(3); 15(7); 16(7)). Officers must produce identification on request (ss 15(6); 16(6)).
Restoration and compensation. The council must make good damage caused by exercise of powers on land and pay reasonable compensation where appropriate (ss 15(13)-(15); 16(9)-(10)). Compensation disputes are to be resolved in the minor civil claims division of the Magistrates Court or as if they were disputed claims under the Land Acquisition Act 1993 (s 16(10)).
Property owners: duties and rights
Connect/disconnect notices and obligations. A general manager may require owners of properties within 30 metres of a public stormwater system to connect their private stormwater systems to the public system to reduce flood risk (s 21(1)). Owners must comply within the specified period or longer period allowed and face fines for non-compliance; councils may do the work and recover reasonable costs if owners fail to comply (s 21(2)-(3)). Conversely, a general manager may require removal of existing connections where they contravene the Act, are necessary in the general manager’s opinion, are required for health, safety or environmental reasons, or prevent damage to the public system (s 22(1)). Owners served with such notices have appeal rights to the Appeal Tribunal (ss 21(4); 22(4)).
Prohibition on discharges and nuisances. Persons must not discharge anything other than stormwater into the public stormwater system (s 18(1)). Property owners must ensure private stormwater systems do not discharge stormwater so as to cause nuisance to neighbours (s 23(1)). Councils may issue notices and undertake remedial work at the owner’s expense where nuisance occurs (s 23(2)).
Rights to a connection point and fees. Where a property boundary lies within 30 metres of a public system and it is reasonable to make a connection, the stormwater service provider must provide a connection point (s 19(1)-(2)). Providers may set an appropriate fee for providing the connection point which must be paid by the property owner before the work (s 19(3)). A property lawfully connected must not be deprived of the use of that infrastructure unless an equally effective alternative is provided and the provider pays to connect the property to the alternative (s 19(4)).
Third parties and arbitral powers
Negotiation and arbitration. Where councils and third-party infrastructure owners cannot reach commercial agreements, either party may refer the matter to arbitration after certain preconditions (eg six months since notice under s 7 or where the council considers consent is being unreasonably withheld) (s 8(1)-(2)). Arbitrators have express powers to determine conditions for supply, prices, transition policies to limit price shocks, performance indicators, contract period and dispute-resolution processes (s 8(3)). Arbitrators must seek advice from the Department and the Tasmanian Economic Regulator and may consult other persons (s 8(4)). Where assets have been transferred to water and sewerage corporations, arbitrators must try to achieve community outcomes in limiting price shocks and equitable distribution of costs and must take into account asset renewal and efficient cost recovery (s 8(5)-(6)).
Minister and Department roles
Oversight and intervention. The Minister may investigate complaints about council performance and declare councils in default with orders for remedial action (s 5(2)-(3)); non-compliance with orders exposes councils to fines and potential Ministerial intervention with cost recovery against the council (s 5(6)-(7)). The Department is a mandatory consultation party for arbitrations (s 8(4)(a)).
Regulatory framework and supplementary rights
Regulations and pricing matters. The Governor may make regulations, including matters to be taken into account when determining appropriate pricing for stormwater services and matters to include in stormwater system management plans (s 24(1)-(2)). The Act thus leaves detailed pricing criteria and plan content to regulation.
Appeals and tribunal determinations. The Act specifies multiple appeal rights to the Appeal Tribunal and directs that the Appeal Tribunal is to hear appeals in accordance with the Tasmanian Civil and Administrative Tribunal Act 2020 (s 5(5); s 15(11)). The Act also limits who can be a party in some appeals (s 15(12)).
These duties and rights create an administrative architecture that places operational control and routine decision-making in councils and their general managers, reserves oversight and sanction powers to the Minister, and provides object-level dispute-resolution through arbitration and appeals to the Appeal Tribunal. The Act balances council discretion with statutory notice, appeal and compensation requirements.
Penalties and enforcement
The Act deploys a mixed enforcement architecture that combines criminal-style fines (penalty units), civil remedial notices, administrative powers to undertake work and recover costs, joint and several liability provisions, Ministerial corrective action, and appeal and compensation mechanisms.
Monetary penalties
The Act specifies monetary penalties expressed as penalty units, with different maxima depending on whether the offender is a body corporate or an individual. Representative examples include:
Failure to comply with a Ministerial order to provide adequate public stormwater systems: fine not exceeding 1 000 penalty units (s 5(6)).
Contraventions of s 13(1) (erecting structures or disturbing land over easements or near public stormwater systems without consent): penalty up to 100 penalty units (s 13(1)), plus higher penalties for failure to comply with demolition/remedial notices , up to 500 penalty units for a body corporate and 200 penalty units for an individual (s 13(3)).
Contravention of s 14(1) (connecting or interfering with public stormwater systems without consent): fines up to 500 penalty units for bodies corporate and 200 penalty units for individuals (s 14(1)).
Lesser fines for failure to comply with a notice to remove a connection or desist from discharging material (s 14(3)), and for discharging anything other than stormwater into a public stormwater system (s 18(1)) and for discharging stormwater into systems other than the public stormwater system without permission (s 18(2)).
Nuisance provisions (s 23(1)) carry fines of up to 100 penalty units for bodies corporate and 20 penalty units for individuals.
The Act does not state the monetary value of a penalty unit; that is fixed elsewhere. The Act’s pattern of higher corporate fines and lower individual fines is explicit in multiple provisions.
Remedial notices and execution
Remedy and removal notices. Where unauthorised works are erected or public stormwater systems are interfered with, the general manager may serve written notices requiring demolition, removal or remediation and specifying a compliance period (typically 28 days) (ss 13(2)-(3); 14(2)-(3)). Failure to comply with such a notice attracts fines and allows the council to carry out the works itself (ss 13(4); 14(4)).
Council execution and cost recovery. Where the council carries out remediation because an owner or other person failed to comply, the person who carried out or directed the works is jointly and severally liable for the council’s expenses, and such expenses are recoverable in a court of competent jurisdiction (s 13(5); s 14(5)). Where owners fail to comply with connection/disconnection notices, the council may perform the work and recover reasonable costs from the owner, except for costs prescribed by regulation to be the responsibility of the council (s 21(3)). For disconnection under s 22(3), the council may similarly recover reasonable costs.
Recovery as a debt. Costs recoverable under the Act are recoverable as debts; the Act repeatedly links cost-recovery to court processes (s 13(5); s 15(15); s 23(3)).
Ministerial enforcement against councils
Ministerial orders and remedial action. If the Minister is satisfied a council has failed to fulfil s 5(1), the Minister may declare the council in default and direct remedial action within a specified period (s 5(3)). A council may appeal an order to the Appeal Tribunal (s 5(4)). Failure to comply with orders exposes the council to fines and authorises the Minister to act and recover costs from the council (s 5(6)-(7)). This places ultimate supervisory enforcement power with the Minister for systemic council failures.
Entry and emergency powers
Authorised officers may enter land to install, inspect and maintain stormwater systems, with notice and time restrictions, and must provide identification on request (ss 15(2)-(4); 16(2)-(6)). Emergency powers permit entry at any time and by reasonable force where not practicable to give notice (ss 15(7); 16(7)). Failure to produce ID attracts small fines (up to 10 penalty units) (ss 15(6); 16(6)). Councils must make good any damage caused by exercise of entry powers and may be liable to pay compensation (ss 15(13)-(15); 16(9)-(10)).
Arbitration and tribunal processes
Arbitration for commercial deadlocks (s 8). Where councils and third-party owners cannot agree on contract details and statutory preconditions are met, either party may refer the matter to arbitration. An arbitrator has express powers to set conditions, prices, transition policies, performance indicators, contract periods and dispute-resolution processes (s 8(3)). Arbitrators must seek advice from the Department and the Tasmanian Economic Regulator (s 8(4)). These powers include pricing determinations that could materially affect cost allocation between parties (s 8(3)(b)-(c)).
Appeal tribunal review rights. Multiple council actions are subject to review by the Appeal Tribunal, including Ministerial orders (s 5(4)), requirements imposed under s 11 (s 11(6)), disputes over terms imposed by authorities responsible for land (s 15(9)) and owner disputes about connection/disconnection notices (ss 21(4); 22(4)). The Act directs that the Appeal Tribunal hear appeals in accordance with the Tasmanian Civil and Administrative Tribunal Act 2020 (s 5(5); s 15(11)), and contains a restriction on parties in certain appeals (s 15(12)).
Liabilities, joint and several responsibilities
Joint and several liability. Where unauthorised works are demolished or remedied by the council, the person who carried out the works and any person who directed them are jointly and severally liable for council expenses (s 13(5)). This imposes potentially substantial financial exposure on both actors and directors/agents involved in projects that interfere with public stormwater systems without consent.
Regulatory steering via regulations
Regulations may set matters to be taken into account in determining appropriate pricing and may prescribe what must be included in stormwater management plans (s 24(2)(a)-(b)). This creates an administrative lever for shaping cost allocation and plan content and therefore enforcement and pricing outcomes.
Enforcement incentives and behavioural effects
The Act combines upfront administrative control (consent and notice regimes), ex post remedial action (council work and cost recovery), financial penalties, and appeal/arbitration mechanisms. Councils are incentivised to issue and enforce notices and to maintain maps and plans to justify their operational work. Property owners face financial exposure for non‑compliance and are given defined appeal routes. Third-party infrastructure owners have access to arbitration if negotiations fail, with arbitrators empowered to set prices and transition arrangements to limit price shocks (s 8).
Implementation risk is evident in the reliance on councils’ operational capacity to maintain maps, exercise consents consistently, manage compensation claims, and pursue cost recovery through courts, and in the role of arbitrators and the Appeal Tribunal in resolving disputes that may be technical and capital-intensive.
How it interacts with other laws
The Act explicitly cross-references and embeds interaction with several other pieces of Tasmanian legislation and subordinate instruments, and it contemplates consequential amendments to particular Acts and regulations. The interaction is both definitional and procedural.
Definitional cross‑references
Local Government Act 1993. The definitions of “council”, “general manager”, “municipal area”, and the identity-card requirement for authorised officers are adopted from the Local Government Act 1993 (s 3; ss 15(6); 16(6)). Authorised officers are defined by reference to s 20A of the Local Government Act 1993 (s 3).
Water and Sewerage Corporation Act 2012. Section 6(5) preserves the need to obtain consent before a council uses, injures or interferes with works vested in or under the control of any person, drainage trust or Corporation within the meaning of the Water and Sewerage Corporation Act 2012, thereby protecting the property interests and statutory roles of other water entities.
Commercial Arbitration Act 2011. Arbitration disputes about commercial arrangements where councils and third-party owners cannot agree are to be referred to an arbitrator appointed in accordance with the Commercial Arbitration Act 2011 (s 8(1)). The Act adds specific powers to the arbitrator beyond Part 3 of the Commercial Arbitration Act by enumerating matters the arbitrator may determine (s 8(3)).
Economic Regulator Act 2009. Section 8(4)(b) requires an arbitrator to seek advice from the Tasmanian Economic Regulator appointed under s 9 of the Economic Regulator Act 2009 in appropriate disputes, introducing a regulatory economics input into arbitral pricing or transition decisions.
Tasmanian Civil and Administrative Tribunal Act 2020. The Appeal Tribunal is the Tasmanian Civil and Administrative Tribunal; the Act requires appeals to be heard in accordance with that Act (s 5(5); s 15(11)) and imposes a restriction under s 15(12) on who can be a party to appeals under certain clauses.
Land Acquisition Act 1993 and Magistrates Court (Civil Division) Act 1992. Compensation claims arising from damage caused by council works are to be determined in the minor civil claims division or as if they were disputed claims under the Land Acquisition Act (s 16(10)), importing compensatory standards and procedures from those laws.
Administrative Arrangements Act 1990. Until an administrative arrangements order is made, the Act is assigned to the Minister for Primary Industries and Water and the Department of Primary Industries, Parks, Water and Environment (s 28), fixing interim administrative responsibility.
Consequential amendments. Schedule 2 lists Acts and regulations to be consequentially amended: Local Government (Building and Miscellaneous Provisions) Act 1993; Local Government (Savings and Transitional) Act 1993; Local Government Act 1993; Building Regulations 2004; Local Government (General) Regulations 2005; Plumbing Regulations 2004 (Schedule 2). These consequential amendments indicate interaction with building and plumbing regimes that govern construction standards.
Procedural and substantive interactions
Consent and property rights. The Act preserves the need for consent from other statutory owners/vested bodies before councils interfere with infrastructure vested in them (s 6(5)), which interacts with statutory vesting and property rights under other Acts, requiring cross-agency or cross-corporation negotiations.
Pricing and economic regulation. The Act contemplates pricing matters being set or guided by regulation (s 24(2)(a)) and inserts the Tasmanian Economic Regulator into arbitral consultations (s 8(4)(b)). Where assets have been transferred to water and sewerage corporations, arbitrators must consider returns on council-owned assets and limiting price shocks (s 8(6)(c)-(e)). These provisions bring economic-regulatory considerations into disputes that might otherwise be treated as private commercial negotiations.
Appeals and tribunal jurisdiction. The Act integrates the Appeal Tribunal and specifies that appeals are to be heard in accordance with the Tasmanian Civil and Administrative Tribunal Act, importing procedural rules and limits on parties set out in that Act (s 15(11)-(12)).
Compensation regimes. Compensation for entry and damage is to be determined in courts or under the Land Acquisition Act framework (s 16(10)), connecting standard public-compensation rules to council entry powers.
Building/plumbing regulation alignment. Schedule 2’s list of consequential amendments indicates the Act’s practical overlap with building and plumbing regulatory regimes, implying that connection specifications, materials and construction requirements under local building regulations and plumbing regulations will need to be aligned with the Act’s consent and adoption mechanisms (s 11(4)-(8); Schedule 2).
Interaction risks and administrative coordination
Multiple statutory actors. The Act’s reliance on councils, water corporations, the Economic Regulator, the Department and the Tasmanian Civil and Administrative Tribunal creates potential coordination and jurisdictional friction points. For example, the need for consent under s 6(5) and the arbitrator’s requirement to consult the Economic Regulator (s 8(4)) may create multi-agency decision processes for single infrastructure projects.
Regulatory consistency. Regulations under s 24 may prescribe pricing criteria and plan content; those regulations must be consistent with the Act’s object that stormwater services be provided in a manner consistent with the resource management objectives in Schedule 1 (s 4). Where building and plumbing regulations (Schedule 2) are amended consequentially, the technical and procedural alignment will matter for councils’ consent and adoption powers under s 11(4).
Overall, the Act is designed to operate in a network of existing statutory instruments; it expressly imports definitions and adjudicative forums and requires coordination with economic regulation and building/plumbing standards. The statutory references create procedural paths and constraints that councils, owners and third-party operators must navigate.
Amendment history
The text of the Act as provided includes specific amendment annotations embedded in section notes. These are the amendments and applied dates recorded in the source text; the Act itself contains the following amendment notes.
Section 3: Amended by No. 18 of 2021, s 343, applied 05 Nov 2021. The note appears adjacent to the definitions at the head of s 3. The amendment relates to the definition of “Appeal Tribunal” and “authorised officer” among other entries in s 3 as indicated by the annotation (s 3 amended by No. 18 of 2021, s. 343, Applied:05 Nov 2021).
Section 5: Subsection (5) amended by No. 18 of 2021, s 344, applied 05 Nov 2021. This change appears in s 5(5) and concerns the Appeal Tribunal’s hearing and determination of appeals in accordance with the Tasmanian Civil and Administrative Tribunal Act 2020.
Section 6: Subsection (5) amended by No. 17 of 1996, applied 10 May 2024. This annotation appears after s 6(5) and concerns limits on a council’s authority to use, injure or interfere with works vested in other persons or corporations under the Water and Sewerage Corporation Act 2012, and the requirement that consent must not be unreasonably withheld with arbitrator recourse under the Commercial Arbitration Act 2011 (s 6(5)-(6)).
Section 8: Subsection (4) amended by No. 13 of 2015, s 85, applied 01 Jul 2015. This note appears at s 8(4) and concerns the requirement that arbitrators seek advice from the Department and the Tasmanian Economic Regulator.
Section 15: Subsection (11) amended by No. 33 of 2023, s 33, applied 27 Nov 2023. This amendment concerns the Appeal Tribunal hearing and determining appeals in accordance with the Tasmanian Civil and Administrative Tribunal Act 2020 (s 15(11)).
Section 15: Subsection (12) amended by No. 18 of 2021, s 345, applied 05 Nov 2021. This amendment sets a limit on who may be a party to appeals under clause 7(3) of Part 8 of Schedule 2 to the Tasmanian Civil and Administrative Tribunal Act 2020, specifically excluding persons other than the council and the authority responsible for the land from being parties to certain appeals (s 15(12)).
There are repeated small editorial notes such as “See Schedule 2” under s 25 and the schedule headings; Schedule 2 lists consequential amendments to multiple Acts and regulations (Local Government (Building and Miscellaneous Provisions) Act 1993, Local Government (Savings and Transitional) Act 1993, Local Government Act 1993, Building Regulations 2004, Local Government (General) Regulations 2005, Plumbing Regulations 2004).
Schedule 3 repeals the Drains Act 1954 (No. 67 of 1954) (s 26; Schedule 3).
The amendment notes are embedded in the text and the dates given are the applied dates stated in the source. The notes show periodic legislative adjustments to align the Act with other statutory changes (for example, the establishment of the Tasmanian Civil and Administrative Tribunal and involvement of the Tasmanian Economic Regulator) and to clarify procedural parties and consultation requirements. The Act leaves the detailed regulation-making power (s 24), allowing the Governor to make regulations on pricing and plan content, which is a continuing legislative lever for subsequent amendment or operational detail.
No other amendment history, legislative explanatory memoranda, or amendment rationale beyond the in-text amendment notes is included in the provided text; the summary above reports the amendment notes exactly as recorded.
Litigation history
The Act’s text does not contain case law or judicial decisions. It embeds prescribed appeal and dispute-resolution pathways rather than referring to judicial decisions.
Appeal pathways in the Act. The Act provides for:
Appeals by councils against Ministerial orders to the Appeal Tribunal (s 5(4)-(5)).
Appeals to the Appeal Tribunal against general-manager requirements about proposed drains (s 11(6)).
Appeals to the Appeal Tribunal where an authority responsible for land and the council dispute proposed terms or entitlement to carry out works (s 15(9)). The Act prescribes that the Appeal Tribunal is to hear and determine such appeals in accordance with the Tasmanian Civil and Administrative Tribunal Act 2020 (s 15(11)) and limits who may be parties to certain appeals (s 15(12)).
Owners served with connection or disconnection notices may apply to the Appeal Tribunal for review of the general manager’s decision (ss 21(4); 22(4)).
Compensation and damage claims arising from council entry and works are to be resolved in the minor civil claims division of the Magistrates Court or otherwise as disputed claims under the Land Acquisition Act (s 16(10)).
Arbitration. Where a council and a third-party owner or operator cannot agree on contract terms for stormwater services, either party may refer the matter to an arbitrator under the Commercial Arbitration Act 2011 after certain preconditions (s 8(1)-(2)). The arbitrator’s expanded powers and mandatory consultation requirements are set out in s 8(3)-(4).
Because the Act itself contains no reported judicial decisions, there is no litigation history included in the statutory text. The Act creates routes into administrative and arbitral decision-making and into court-based compensation processes, but does not refer to any decided cases or judicial interpretation. Users seeking judicial authority interpreting these provisions will need to consult court and tribunal decisions external to the Act.
Gotchas
The Act contains several provisions and drafting features that create practical pitfalls for parties or that produce non-obvious legal consequences. These are matters where operational practice commonly diverges from statutory assumptions; they are set out here with section references.
Connection-point threshold and “reasonable to make a connection” (s 19)
The stormwater service provider must provide a connection point if the property boundary is within 30 metres of a public stormwater system and it is reasonable to make a connection (s 19(1)). The Act leaves undefined what “reasonable” entails, creating potential disputes about eligibility. The general manager’s discretion and the ability to appeal to the Appeal Tribunal (s 21(4)) mean that owners and councils may litigate over the reasonableness of connections.
Fees for connection are payable before the work is undertaken (s 19(3)), which can create cashflow issues for property owners and may be challenged if the reasonableness of the connection is contested.
Split responsibility at the connection point
The Act delineates public versus private responsibility at the connection point (s 3). Misidentifying the connection point in practice can shift maintenance liabilities and expose owners to notices, fines and cost recovery for remedial work (ss 13-14; ss 21-22).
Broad general-manager discretion with appeal as the main check
The general manager can refuse, grant or grant subject to conditions consents under ss 13 and 14 (s 13(8)) and may issue connection/disconnection notices (ss 21-22). The statutory check is appeal to the Appeal Tribunal (ss 11(6); 15(9); 21(4); 22(4)), but appeals can be time-consuming and expensive, and interim compliance obligations (eg 28-day deadlines) may impose costs before appeals are resolved.
Emergency entry powers and use of reasonable force (ss 15(7); 16(7))
Authorised officers can enter at any time and use reasonable force in emergencies. Councils must make good any damage or pay compensation (ss 15(13); 16(9)), but establishing what is an emergency and the propriety of force used can be contested. Owners should document entry and damage promptly to preserve compensation claims.
Joint and several liability for unauthorised works (s 13(5))
Persons who erect or direct unauthorised works that are demolished or remedied by the council are jointly and severally liable for council expenses, recoverable in court. This exposes developers, contractors and those instructing works to potentially significant joint financial liability.
Director/agent exposure and corporate fines
The Act sets higher fines for bodies corporate in multiple provisions. Agents, directors or instructing persons who directed unauthorised works may be liable under joint-liability provisions (s 13(5)), and criminal-style fines for corporate offenders can be substantial (eg up to 500 penalty units in several provisions).
Council cost-recovery exemptions by regulation (s 21(3))
Where councils do the work owners were required to do, the council can recover reasonable costs except for costs prescribed by regulation to be the council’s responsibility (s 21(3)). This regulatory carve-out means the precise cost-recovery exposure can depend on regulations not included in the Act text.
Arbitration powers that can set prices and transition policies (s 8)
An arbitrator may determine prices, transition price policies to minimise price shocks, and performance indicators (s 8(3)). Where infrastructure ownership has shifted to water and sewerage corporations, the arbitrator must try to achieve outcomes limiting price shocks and equitably distributing costs (s 8(5)-(6)). This gives arbitrators significant economic influence and implies that commercial parties subject to arbitration should prepare to engage with economic-regulatory considerations and the Tasmanian Economic Regulator (s 8(4)(b)).
Mapping and public disclosure obligations (s 12)
Councils must maintain and make publicly available maps showing all public stormwater systems (s 12). Failure to maintain accurate maps can undermine a council’s authority to enter land and to assert that a feature is public; conversely, public maps will reveal to owners where the council claims public systems lie, with consequential legal effects for entry, consent and liability.
Overlap with building and plumbing regimes (Schedule 2)
Schedule 2 lists consequential amendments to building and plumbing Acts and regulations. Practitioners should recognise that compliance with local building/plumbing rules will interact with the Act’s consent and adoption provisions (s 11), and failure to align approvals across these regimes can create additional compliance costs.
Ministerial intervention and liability for councils (s 5)
The Minister can declare a council in default and direct remedial action (s 5(3)); non-compliance exposes councils to fines (s 5(6)) and to the Minister taking action and recovering costs from the council (s 5(7)). Councils that do not maintain plans or systems risk voluntary or involuntary cost exposure.
Multiple fora and procedural complexity
Dispute resolution can proceed in multiple fora , arbitration (s 8), the Appeal Tribunal (multiple sections), courts for cost recovery and compensation (ss 13(5); 16(10)), and the minor civil claims division for compensation claims (s 16(10)). Parties should consider forum selection, parallel proceedings, and interlocutory relief when disputes involve urgent operational works or emergency entries.
Successors in title bound by consent conditions (s 13(10))
Terms and conditions placed on consents by the general manager are binding on successors in title or assigns of the person who applied (s 13(10)). Buyers of property should undertake due diligence for consent conditions affecting stormwater works, as obligations may run with the land.
Regulations will matter
The Act leaves important items , pricing criteria and stormwater plan content , to regulations (s 24). Until regulations are consulted, precise obligations and cost allocations may be uncertain.
These points indicate areas where operational practice should be attentive to statutory deadlines (28 days), notice periods (7 days), map maintenance, consent processes, and cost-recovery exposures. The Act establishes clear levers but leaves some definitions and criteria to regulation or to adjudicative bodies, which increases the need for administrative clarity and careful procedural steps.
How to comply
This section sets out practical, source‑grounded steps for councils, authorised officers, property owners, third-party operators and legal/compliance advisers to reduce legal and operational risk under the Act. The steps are drawn directly from the Act’s obligations, notice and appeal procedures.
For councils and stormwater service providers
Develop and adopt a stormwater system management plan (s 10)
Prepare a comprehensive stormwater system management plan within six years after commencement (s 10(1)). Ensure the plan:
Specifies asset-management plans for stormwater infrastructure (s 10(2)(a)).
Assesses and records the level of flood risk for each urban stormwater catchment in the public system (s 10(2)(b)).
Includes any matters prescribed in soon-to-be or extant regulations and matters the council considers appropriate (s 10(2)(c)).
Use the plan to justify operational decisions, prioritise capital works and inform communications with property owners.
Maintain and publish accurate maps (s 12)
Maintain maps showing all public stormwater systems, including waterways that primarily transport stormwater (s 12).
Make maps publicly available and keep versioning records; maps determine where council entry and maintenance powers apply (s 16(1)(b); s 16(2)) and affect owners’ notice obligations and compensation liability.
Operationalise consent processes and general-manager determinations (ss 13-14)
Draft formal application procedures, documentation requirements and standard consent conditions for works near public stormwater systems (s 13(7)-(9)). Require applicants to provide plans and information stipulated by the general manager (s 13(7)).
Establish a transparent framework for considering and documenting whether consents are refused, granted or granted with conditions (s 13(8)).
Formulate a consistent approach to allow or refuse connections, and to draft notice wording for connection/disconnection orders (ss 21-22).
Manage third-party engagement and negotiation (ss 6, 7, 8)
When entering commercial agreements with third-party stormwater providers or owners of infrastructure, ensure written commercial agreements are in place (s 6(4)). Use s 7 notice procedures when opening negotiation and preserve records of communication and terms proposed.
Prepare for arbitration by documenting negotiations for at least six months where required or by recording the council’s view that the third party is unreasonably withholding consent (s 8(2)). Be ready to present robust cost, asset and performance data to an arbitrator, and be prepared for arbitrators to consider pricing, transition policies and performance indicators (s 8(3)).
Set connection fees and payment processes (s 19)
Establish a published fee schedule for connection work, consistent with regulations as to pricing matters (s 19(3); s 24(2)(a)). Require payment before undertaking the connection work (s 19(3)) and provide receipts and documentation for owners.
Implement entry protocols and compensation procedures (ss 15-16)
Train authorised officers on notice procedures, ID presentation requirements (ss 15(2); 15(6); 16(2); 16(6)), hours of entry, and emergency powers (ss 15(4)-(7); 16(4)-(7)).
Maintain insurance and budget allocations to make good damage promptly and to address compensation claims (ss 15(13); 16(9)). Document all entries, give required notices, and maintain a claims handling process linked to magistrates-court and Land Acquisition Act procedures where disputes arise (s 16(10)).
Use notices and remedial power consistently (ss 13-14; s 23)
Where unauthorised works or nuisance discharges occur, serve written notices in conformity with s 13(2) and s 14(2) and allow the statutory period (typically 28 days) or a longer period if appropriate. Maintain templates and record service.
If owners fail to comply, record the grounds for council action to demolish/remove/remedy and follow proper procurement and cost-accounting procedures to ensure recoverability in court (s 13(4)-(5); s 14(4)-(5)).
Financial and regulatory planning
Budget for maintenance, emergency response, mapping, legal costs for appeals/arbitrations and potential Ministerial intervention costs. Recognise that the Minister may intervene and recover costs from councils that are declared in default (s 5(3); s 5(7)).
For property owners, developers and contractors
Identify connection rights and obligations (ss 3; 19-21)
Determine whether the property boundary is within 30 metres of a public stormwater system (s 19(1)). If so, request a connection if desirable (s 19(2)) and be prepared to pay the connection fee before works are undertaken (s 19(3)).
If served with a connection notice, comply within the specified period or apply to the Appeal Tribunal for review (ss 21(1)-(4)). If connected without council consent, expect a notice to disconnect and potential council remedial action (s 22).
Obtain consents before building near public stormwater systems (s 13)
Before building, filling or removing soil within easements in council favour or within one metre (or such other distance determined by the general manager) from the outer edge of public stormwater systems, secure the general manager’s consent (s 13(1)). Submit plans and required information and allow time for decision and potential appeal periods (s 13(7)).
Note that consent conditions bind successors in title (s 13(10)), so include stormwater consent review in due diligence when acquiring property.
Avoid prohibited discharges (s 18)
Do not discharge anything other than stormwater into public stormwater systems (s 18(1)), and do not discharge stormwater into systems other than the public stormwater system without permission (s 18(2)). Seek council permission if non-standard discharges are necessary for construction or other uses.
Avoid creating nuisance to neighbours (s 23)
Ensure private stormwater systems do not direct stormwater so as to cause nuisance to neighbouring properties (s 23(1)). If a council serves a notice requiring remedial action for nuisance, comply within the 28-day period or be prepared for the council to carry out work and recover costs (s 23(2)).
For third-party infrastructure owners and operators
Prepare for commercial agreements and arbitration (ss 6, 7, 8)
Negotiate commercial agreements with councils and document proposed terms under s 7’s notice process; preserve evidence of attempts to negotiate for the six‑month precondition to arbitration if necessary (s 8(2)(a)).
If arbitration becomes necessary, prepare to present asset valuations, efficient cost recovery models, proposed performance indicators and transition price policies; coordinate with the Tasmanian Economic Regulator and the Department as the arbitrator will consult them (s 8(3)-(4)).
Recognise special treatment where assets transferred (s 8(5)-(6))
If assets have been transferred from a council to a water and sewerage corporation, prepare to engage with arbitrators on community-outcome considerations such as limiting price shocks and equitable cost distribution (s 8(5)-(6)). Provide data on renewal needs and efficient cost recovery to assist the arbitrator.
For legal, compliance and finance teams
Build a regulatory-compliant playbook
Draft standard operating procedures for consent processing, notice writing and service, evidence collection for enforcement, cost accounting for recoverable expenses, and record-keeping for map updates and plan development (ss 10-12; ss 13-14).
Create timelines and checklists for appeal periods and Tribunal filing requirements (ss 5(4); 11(6); 21(4); 22(4)); ensure statutory deadlines (eg 28 days) are tracked.
Manage dispute risk
Where disputes are likely to be technical and capital-intensive, evaluate the costs of arbitration versus negotiation and consider early engagement with the Department and the Economic Regulator. Where interim relief from courts or the Tribunal is needed to stop unilateral works, plan for urgent applications.
Due diligence on property transactions
Ensure property searches review council maps and stormwater consent records (s 12), check whether any consents carry conditions binding on successors in title (s 13(10)), and confirm whether the property is within 30 metres of a public stormwater system and thus potentially subject to connection notices (s 19).
Monitor regulatory developments
Keep track of regulations made under s 24, which may prescribe pricing criteria and stormwater plan content, and of consequential amendments listed in Schedule 2 to ensure building and plumbing compliance lines up with stormwater obligations.
Insurance and budgeting
Ensure appropriate insurance coverage for councils and private owners for damage arising from entry, emergency works, remediation and third‑party liabilities. Recognise that councils may be liable to make good damage or pay compensation (ss 15(13); 16(9)).
Stakeholder engagement
Councils should consult communities and other spheres of government consistent with Schedule 1’s emphasis on public involvement and shared responsibility in resource management objectives (s 4; Schedule 1). Early engagement can reduce disputes and align expectations.
Compliance is largely process-driven under the Act: maintain accurate maps and plans, observe notice requirements and timeframes, secure consents before works, document commercial negotiations, and use the Act’s appeal and arbitration pathways deliberately when disputes arise.
(b) the compensation, purchase money or rent payable for land; and
(c) the cost of materials used, and the consideration payable under any contract, in connection with any work, undertaking or duty which the stormwater service provider is empowered or required to undertake or perform under this Act;
general manager has the same meaning as in the Local Government Act 1993 ;
municipal area has the same meaning as in the Local Government Act 1993 ;
private stormwater system means an installation on a property, that –
(a) is not part of the public stormwater system; and
(b) is used for collecting or disposing of stormwater; and
(c) comprises any or all of the following:
(i) roof gutters and downpipes;
(ii) rainwater tanks;
(iii) surface channels;
(iv) kerbs and gutters;
(v) subsoil drains and stormwater drains;
(vi) any inlet pits which are used, or intended to be used, for the conveyance of stormwater to a disposal system;
public land means land owned by –
(a) the Crown; or
(b) an instrumentality or agent of the Crown; or
(c) a council or other local government body, other than a water or sewerage corporation;
public stormwater system means –
(a) the whole, or part, of a waterway; and
(b) any infrastructure used for –
(i) the collection or storage of stormwater, including connection points; or
(ii) the conveyance or reticulation of stormwater; or
(iii) the treatment or disposal of stormwater, including any outfall pipe or other work that stores or conveys water leaving the infrastructure that is used for the treatment and or the disposal of stormwater –
but does not include –
(c) any private stormwater system, including any pipe, fitting or apparatus that is situated upstream of a connection point to a public stormwater system; or
(d) infrastructure situated entirely within one property and not connected to any other infrastructure situated within another property;
regulations means regulations made under this Act;
stormwater means run-off water that has been concentrated by means of a drain, surface channel, subsoil drain or formed surface;
stormwater service means the service that is provided in connection with the collection, storage, treatment, reticulation and disposal of stormwater;
stormwater service provider means the council, or an agent engaged to act on behalf of the council, that operates and maintains the public stormwater system within a municipal area;
waterway means a creek, rivulet, stream or other natural depression in the land into which rainwater flows.
4 Objects of Act
4 Objects of Act
The objects of this Act are –
(a) to protect people and property by ensuring that stormwater services, infrastructure and planning are provided so as to minimise the risk of urban flooding due to stormwater flows; and
(b) to provide for the safe, environmentally responsible, efficient and sustainable provision of stormwater services in accordance with the objectives of the resource management and planning system of Tasmania as set out in Schedule 1 .
Part 2 Obligations of Stormwater Service Providers
Part 2 Obligations of Stormwater Service Providers
5 Council to provide adequate public stormwater systems
5 Council to provide adequate public stormwater systems
(1) A council must, in accordance with the objects of this Act, provide for such public stormwater systems as may be necessary to effectively drain the urban area of the council's municipal area.
(2) If a complaint is made to the Minister that a council has failed or neglected to make provision in accordance with subsection (1) , the Minister may investigate the complaint.
(3) If, after investigating a complaint, the Minister is satisfied that the council has failed or neglected to perform its duty, he or she may make an order declaring the council to be in default and directing it to make provision in accordance with subsection (1) within such period as may be specified in the order.
(4) A council may appeal to the Appeal Tribunal against an order under subsection (3) within the period specified in the order.
(5) [Section 5 Subsection (5) amended by No. 18 of 2021, s. 344, Applied:05 Nov 2021] The Appeal Tribunal is to hear and determine an appeal in accordance with the Tasmanian Civil and Administrative Tribunal Act 2020 .
(6) A council must –
(a) comply with an order under subsection (3) within the period specified; or
(b) lodge an appeal in accordance with subsection (4) .
Penalty: Fine not exceeding 1 000 penalty units.
(7) If a council fails to comply with any requirement of an order within the period specified, the Minister may take whatever action he or she considers necessary to rectify the council's default, and all the costs and expenses of and incidental to the Minister's action must be paid by the council to the Crown.
6 Provision of stormwater services
6 Provision of stormwater services
(1) Except as otherwise provided in this Act, a council must keep the public stormwater systems owned and operated by it in good working order.
(2) For the purposes of cleaning, maintaining and repairing public stormwater systems, a council may exercise all the powers available to it for the construction of public stormwater systems.
(3) In ensuring that stormwater services are available to the urban areas of its municipal area, a council may engage a third-party to provide stormwater services, or use the infrastructure of a third-party.
(4) If a council wishes to engage a third-party or use its infrastructure under subsection (3) , the parties must enter into a commercial agreement for that use or engagement.
(5) [Section 6 Subsection (5) amended by No. 17 of 1996, Applied:10 May 2024] Nothing in this Act authorises a council to use, injure or interfere with any sluices, flood gates, sewers, breakwaters, sea defences or other works, whether made before or after the commencement of this Act, that are vested in, or under the control of, any person, drainage trust or Corporation, within the meaning of the Water and Sewerage Corporation Act 2012 , without the consent of that person, trust or Corporation, as the case requires.
(6) Consent under this section must not be unreasonably withheld and, if a question arises as to whether or not the consent is unreasonably withheld, either party may require its reference to an arbitrator, to be appointed in accordance with the Commercial Arbitration Act 2011 .
7 Negotiation for provision of stormwater services
7 Negotiation for provision of stormwater services
Where a council or a third-party provider of stormwater services wishes to commence negotiations with the other for the provision of stormwater services, either party may serve on the other party a written notice setting out –
(a) the general terms and conditions for the provision of those services; and
(b) any other matters that may be prescribed.
8 Provision where commercial arrangements cannot be agreed
8 Provision where commercial arrangements cannot be agreed
(1) Subject to subsection (2) , where a council and a third-party owner of infrastructure or operator of stormwater services cannot reach agreement on the contract details for the provision of stormwater services, either party may refer the matter to an arbitrator to be appointed in accordance with the Commercial Arbitration Act 2011 .
(2) A matter may be referred to an arbitrator only after at least one of the following conditions has been satisfied:
(a) at least 6 months have passed since the service of the notice under section 7 and in the opinion of one or both parties it is unlikely a resolution will be quickly reached;
(b) in the opinion of the council involved, the third-party provider of stormwater services is unreasonably withholding consent for the council to use the third-party's infrastructure.
(3) For the purposes of subsection (1), an arbitrator has, in addition to the powers conferred by the Commercial Arbitration Act 2011 , the power to determine –
(a) the conditions relating to the supply of stormwater services; and
(b) a price for those services and transition price policies to minimise price shocks; and
(c) any performance indicators to be implemented and modified over time; and
(d) the period over which the commercial agreement applies; and
(e) contract dispute resolution processes.
(4) Before making a determination under subsection (3) , the arbitrator is to seek advice from –
(a) the Department; and
(b) [Section 8 Subsection (4) amended by No. 13 of 2015, s. 85, Applied:01 Jul 2015] the Tasmanian Economic Regulator appointed under section 9 of theEconomic Regulator Act 2009 ; and
(c) any other persons the arbitrator thinks fit.
(5) In making a determination in respect of assets that have been transferred from a council to a water and sewerage corporation in accordance with a notice under section 41 of theWater and Sewerage Corporations Act 2008 , an arbitrator must try to achieve the best outcomes for the community in respect of –
(a) limiting price shocks; and
(b) providing for the equitable distribution of costs.
(6) In making a determination to which subsection (5) applies, the arbitrator is to take into account the following:
(a) that the asset will be renewed over time;
(b) that the provider should be provided with a reasonable opportunity to recover the efficient costs which it reasonably incurs in providing the service and complying with its regulatory obligations;
(c) the returns on council-owned stormwater assets in Tasmania;
(d) that both parties are not to be constrained from executing their statutory obligations;
(e) that any charge for providing stormwater services must take into account any costs of operating and maintaining the service that have been paid by another customer;
(f) any other matter that is prescribed or that the arbitrator considers relevant.
9 Local government authorities for delivery of stormwater services
9 Local government authorities for delivery of stormwater services
This Act does not limit in any way a council’s ability to establish a single authority, or be one of the councils to establish a joint authority, as outlined in the Local Government Act 1993 , for the provision of stormwater services.
10 Stormwater system management plans
10 Stormwater system management plans
(1) A council must develop a stormwater system management plan for the urban area of its municipal area within 6 years after the day on which this Act commences.
(2) A stormwater system management plan is to specify –
(a) plans for the management of any assets used for the delivery of a stormwater service; and
(b) the level of risk from flooding for each urban stormwater catchment in the public stormwater system; and
(c) any other matters prescribed in the regulations or that the council considers appropriate.
11 Power of council to adopt stormwater systems
11 Power of council to adopt stormwater systems
(1) A general manager may agree with a person who has private stormwater systems, or is constructing or proposing to construct private stormwater systems or associated works, that if those works are constructed in accordance with the terms of the agreement, the council will, upon the completion of the work, or at some specified date, or on the happening of some future event, declare the works to be vested in the council.
(2) An agreement under subsection (1) is enforceable against the council by the owner or occupier for the time being of any premises that are, or are intended to be, served by the works.
(3) A council must not make an agreement under this section with respect to works situated within the municipal area of another council unless that other council consents.
(4) Where a person proposes to construct a drain, the general manager may, if the general manager considers that the proposed drain is, or is likely to be, needed to form part of a public stormwater system that it has provided or proposes to provide, require that person to construct the drain in a different way, to a greater hydraulic capacity or with different materials from which the person proposes or could otherwise be required by the council.
(5) A person must comply with the requirements of a council under [subsection (4)](#GS11