The Tweed Local Environmental Plan 2014 sets the legal rules for land use and development across the Tweed area by adopting zoning, statutory maps and development standards, listing permitted/consent/prohibited uses, and defining consent processes. It affects landowners, developers and the Council (as consent authority), who must meet site-specific, environmental and heritage controls and provide management plans or technical evidence for many approvals. Practically, it reshapes development opportunities, imposes compliance costs, and concentrates benefits or restrictions by parcel.
Mechanically, this instrument is the Tweed Local Environmental Plan 2014 (the Plan). It commenced on publication on the NSW legislation website (cl 1.1AA) and applies to the land identified on the Plan’s Land Application Map (cl 1.3). The Plan replaces earlier local environmental plans and deemed instruments in respect of the land it covers (cl 1.8), except for land shown as “Deferred matter” (cl 1.3(1A)), and it is expressly subject to any State environmental planning policy (SEPP) that prevails under section 3.28 of the Environmental Planning and Assessment Act 1979 (the Act) (cl 1.9(1)).
The Plan sets the consent authority (subject to the Act) as the Tweed Shire Council (cl 1.6). It adopts mapped development controls , notably a Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio (FSR) Map, Flood Planning Map and other technical maps , and makes those maps part of the operative instrument (cl 1.7; multiple clauses reference maps). The Land Use Table in Part 2 prescribes, zone by zone, objectives, development that is permitted without consent, development that requires consent and prohibited development (cl 2.3). In practice this means whether a use can be undertaken without consent, may be undertaken subject to a DA, or is forbidden is determined by matching the land’s zoning on the Land Zoning Map to the Land Use Table.
The Plan operates several parallel regulatory tracks:
Development that is exempt development as specified by Schedule 2 and Part 3 (cl 3.1); exempt development still must meet the Schedule standards and other approvals under different Acts may still be required (cl 3.1(2)-(5)).
Complying development where a complying development certificate can be issued if Part 1 of Schedule 3 conditions are satisfied (cl 3.2).
Current sections
Direct links to the current provisions in Tweed Local Environmental Plan 2014.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agricultural produce industries; Agritourism; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Cellar door premises; Dual occupancies (attached); Dwelling houses; Environmental facilities; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Forestry; Group homes; Helipads; Home-based child care; Home businesses; Home industries; Industrial retail outlets; Intensive livestock agriculture; Jetties; Open cut mining; Plant nurseries; Roads; Roadside stalls; Rural workers’ dwellings; Turf farming; Water recreation structures; Water storage facilities
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision of land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the water table is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the water table is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the water table is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the water table is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority, required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the water table.
(7) Despite subclause (2), development consent is not required under this clause for the carrying out of works for the purpose of agriculture if—
(a) a production area entitlement is in force in respect of the land when the works are carried out, and
(b) the works are carried out in accordance with a drainage management plan, and
(c) the works are not carried out in respect of a major drain identified on the Acid Sulfate Soils Map, and
drainage management plan means an irrigation and drainage management plan that—
(a) is prepared in accordance with the NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005), and
(b) is endorsed by the Sugar Milling Co-operative as being appropriate for the land.
NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005) means the guidelines approved by the Director-General of the Department of Infrastructure, Planning and Natural Resources on 25 May 2005.
production area entitlement means a contractual arrangement between the Sugar Milling Co-operative and a grower member of that co-operative for the production of sugar cane for milling.
Sugar Milling Co-operative means the New South Wales Sugar Milling Co-operative Limited or its successor.
Note.
The NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005) is available on the Department of Planning and Infrastructure’s website.
Use of certain land at Tweed Valley Way, Chinderah
4A Use of certain land at Tweed Valley Way, Chinderah
4A Use of certain land at Tweed Valley Way, Chinderah
(1) This clause applies to land at Tweed Valley Way, Chinderah, being part of Lot 11, DP 1134229 and part of Lot 1, DP 1165676, identified as “7” on the Additional Permitted Uses Map.
(2) Development for the purpose of a highway service centre is permitted with development consent.
5A
5A
5A (Repealed)
8
Use of certain land at Turnock Street, Kingscliff
8 Use of certain land at Turnock Street, Kingscliff
8 Use of certain land at Turnock Street, Kingscliff
(1) This clause applies to land at Turnock Street, Kingscliff, being Lot 13, DP 871753, identified as “9” on the Additional Permitted Uses Map.
(2) Development for the purpose of a shop is permitted with development consent.
9
Use of certain land at 3 Nullum Street, Murwillumbah
9 Use of certain land at 3 Nullum Street, Murwillumbah
9 Use of certain land at 3 Nullum Street, Murwillumbah
(1) This clause applies to land at 3 Nullum Street, Murwillumbah, being Lot B, DP 174482, identified as “8” on the Additional Permitted Uses Map.
(2) Development for the purpose of office premises is permitted with development consent.
10
Use of certain land at Coronation Avenue and Elizabeth Street, Pottsville
10 Use of certain land at Coronation Avenue and Elizabeth Street, Pottsville
10 Use of certain land at Coronation Avenue and Elizabeth Street, Pottsville
(1) This clause applies to the following land at Pottsville, identified as “12” on the Additional Permitted Uses Map—
(a) 23–31, 33–40 and 42, 44, 46, 48 and 50 Coronation Avenue, being Lots 156, 404–409 and 439–443, DP 755701, Lots 2 and 3, DP 1122541, SP 75403, SP 80157, SP 77642, SP 64963, SP 70690 and SP 83294,
(b) 1, 3, 5, 7, 9, 11, 13, 15 and 17B Elizabeth Street, being Lots 448–451, DP 755701, Lots 1 and 2, DP 615444, Lot 1, DP 403532, Lot 3, DP 564752 and SP 63480.
(2) Development for the purpose of residential accommodation is permitted with development consent.
11
11
11 (Repealed)
12
Use of certain land at Ozone Street and Pacific Motorway, Chinderah
12 Use of certain land at Ozone Street and Pacific Motorway, Chinderah
12 Use of certain land at Ozone Street and Pacific Motorway, Chinderah
(1) This clause applies to land at Ozone Street and Pacific Motorway, Chinderah, being Lot 2, DP 1010771 and part of Lot 1, DP 1127741, identified as “14” on the Additional Permitted Uses Map.
(2) Development for the purpose of a highway service centre is permitted with development consent.
13
Use of certain land at Eviron Road, Eviron
13 Use of certain land at Eviron Road, Eviron
13 Use of certain land at Eviron Road, Eviron
(1) This clause applies to land at Eviron Road, Eviron, being part of Lot 8, DP 12676, identified as “16” on the Additional Permitted Uses Map.
(2) Development for the purpose of a dwelling house is permitted with development consent.
14
Use of certain land at 100 Altona Road, Chinderah
14 Use of certain land at 100 Altona Road, Chinderah
14 Use of certain land at 100 Altona Road, Chinderah
(1) This clause applies to land at 100 Altona Road, Chinderah, being Lot 20, DP 1082482, identified as “17” on the Additional Permitted Uses Map.
(2) Development for the purpose of extensive agriculture is permitted without development consent.
15
Use of certain land at 165 Smiths Creek Road, Smiths Creek
15 Use of certain land at 165 Smiths Creek Road, Smiths Creek
15 Use of certain land at 165 Smiths Creek Road, Smiths Creek
(1) This clause applies to land at 165 Smiths Creek Road, Smiths Creek, being Lot 2, DP 550508, identified as “18” on the Additional Permitted Uses Map.
(2) Development for the purpose of recreation facilities (outdoor) is permitted with development consent.
16
Use of certain land at 12 Philp Parade, Tweed Heads South
16 Use of certain land at 12 Philp Parade, Tweed Heads South
16 Use of certain land at 12 Philp Parade, Tweed Heads South
(1) This clause applies to land at 12 Philp Parade, Tweed Heads South, being part of Lot 1, DP 100121, identified as “15” on the Additional Permitted Uses Map.
(2) Development for the purposes of a camping ground is permitted with development consent.
17
Use of certain land at 224 Carool Road, Carool
17 Use of certain land at 224 Carool Road, Carool
17 Use of certain land at 224 Carool Road, Carool
(1) This clause applies to land at 224 Carool Road, Carool, being Lots 14 and 22, DP 821933, identified as “19” on the Additional Permitted Uses Map.
(2) Development for the purpose of a dwelling house is permitted with development consent.
18
Use of certain land at 719 Eviron Road, Eviron
18 Use of certain land at 719 Eviron Road, Eviron
18 Use of certain land at 719 Eviron Road, Eviron
(1) This clause applies to land at 719 Eviron Road, Eviron, being Lot 1, DP 34555, identified as “20” on the Additional Permitted Uses Map.
(2) Development for the purpose of a council pound is permitted with development consent.
Use of certain land at Oyster Point Road, Banora Point
19 Use of certain land at Oyster Point Road, Banora Point
19 Use of certain land at Oyster Point Road, Banora Point
(1) This clause applies to land at Oyster Point Road, Banora Point, being part of Lot 7008, DP 1069422 and part of Lot 2, DP 1140522, identified as “21” on the Additional Permitted Uses Map.
(2) Development for the purpose of a recreation area is permitted with development consent.
20
Use of certain land between Crabbes Creek and Murwillumbah for rail trail
20 Use of certain land between Crabbes Creek and Murwillumbah for rail trail
20 Use of certain land between Crabbes Creek and Murwillumbah for rail trail
(2) Development for the purposes of a rail trail is permitted without development consent.
(3) Development for the purposes of a rail trail includes development for the purposes of one or more of the following in connection with the rail trail—
(a) environmental protection works,
(b) restaurants or cafes,
(c) kiosks,
(d) car parks,
(e) camping grounds,
(f) caravan parks,
(g) eco-tourist facilities,
(h) office premises,
(i) recreation facilities (outdoor),
(j) take away food and drink premises,
(k) shops.
(4) Development for the following purposes is permitted without development consent if the development is ancillary to development for the purposes of a rail trail—
(a) signage,
(b) temporary lay-down areas for materials or equipment and stockpiling of materials or equipment,
(c) bridges,
(d) pathways,
(e) traffic and pedestrian safety devices,
(f) access ramps,
(g) lighting,
(h) stairs,
(i) stormwater drainage works,
(j) earthworks,
(k) minor road improvement works (including road surface upgrades, kerbs and guttering),
(l) minor internal and external alterations to existing buildings,
(m) public toilets and related facilities.
(5) In this clause—
rail trail means a dedicated public carriageway or pathway used by pedestrians and cyclists for recreation that—
(a) is part of a disused railway line that has been converted into the carriageway or pathway, and
(b) is generally aligned with the disused railway line.
traffic and pedestrian safety devices includes chicanes, fencing, line markings and other controls.
21
Use of certain land at 92 and 102 Lundberg Drive, South Murwillumbah
21 Use of certain land at 92 and 102 Lundberg Drive, South Murwillumbah
21 Use of certain land at 92 and 102 Lundberg Drive, South Murwillumbah
(1) This clause applies to the following land at South Murwillumbah, identified as “24” on the Additional Permitted Uses Map—
(a) 92 Lundberg Drive, being Lot 1, DP 232745,
(b) 102 Lundberg Drive, being part of Lot 2, DP 1139059.
(2) Development for the purposes of a community facility that is a council pound and a place used for rehoming animals is permitted with development consent.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch.2-sec
Cemeteries or burial grounds (that are not heritage items)
sch.2-sec Cemeteries or burial grounds (that are not heritage items)
Cemeteries or burial grounds (that are not heritage items)
(1) Development must only involve—
(a) the creation of a new grave or monument, or
(b) an excavation or disturbance of land for the purpose of carrying out the conservation or repair of a monument or grave marker.
(2) Must not disturb human remains, relics in the form of grave goods or an Aboriginal place of heritage significance.
sch.2-sec-oc.2
Events on Council land
sch.2-sec-oc.2 Events on Council land
Events on Council land
(1) Applies to Council owned land or land for which the Council has care, control or management.
(2) Must be consistent with any applicable plan of management under the Local Government Act 1993 for the land.
(3) Must have obtained all required approvals.
sch.2-sec-oc.3
Lighting (external)
sch.2-sec-oc.3 Lighting (external)
Lighting (external)
(1) Must not be for the lighting of tennis courts or sports fields.
(2) Must not cause glare to adjoining properties or streets.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
sch 4: Am 2023 (459), cl 4.
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
sch 5: Am 2017 (179), Sch 1 [9]–[11].
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Tweed Local Environmental Plan 2014.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Tweed in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to give effect to the desired outcomes, strategic principles, policies and actions contained in the Council’s adopted strategic planning documents, including, but not limited to, consistency with local indigenous cultural values, and the national and international significance of the Tweed Caldera,
(b) to encourage a sustainable local economy and small business, employment, agriculture, affordable housing, recreational, arts, social, cultural, tourism and sustainable industry opportunities appropriate to Tweed,
(c) to promote the responsible sustainable management and conservation of Tweed’s natural and environmentally sensitive areas and waterways, visual amenity and scenic routes, built environment, and cultural heritage,
(d) to promote development that is consistent with the principles of ecologically sustainable development and to implement appropriate action on climate change,
(e) to promote building design which considers food security, water conservation, energy efficiency and waste reduction,
(f) to promote the sustainable use of natural resources and facilitate the transition from fossil fuels to renewable energy,
Development that requires development consent under the Act (numerous clauses; e.g. cl 2.6 subdivision, cl 2.7 demolition, and many zone-specific items in the Land Use Table).
Principal development standards are mapped and numerically constrained: minimum lot sizes (cl 4.1 and related clauses), building height (cl 4.3), and floor space ratio (cl 4.4), together with calculation rules for site area and FSR (cl 4.5). Clause 4.6 provides the mechanism for exceptions to those development standards where the consent authority can be satisfied an applicant has shown compliance with the “unreasonable or unnecessary” and “sufficient environmental planning grounds” tests; subclauses set limits on use of the exception in specified zones and for certain standards (cl 4.6).
The Plan layers site- and use-specific controls over the base zoning. Examples include heritage controls (cl 5.10, Schedule 5), flood and coastal planning provisions with prescribed guidelines to be applied (cl 5.21 and cl 7.5), acid sulfate soils controls that require management plans for works in mapped classes (cl 7.1), aquaculture controls and operational requirements in Schedule 6 (cl 5.19), and targeted additional permitted uses in Schedule 1 (cl 2.5). It contains administrative mechanisms such as savings for development applications made before Plan amendments or commencement (cl 1.8A), suspension of private covenants to the extent necessary to allow development consistent with the Plan (cl 1.9A) subject to specified exceptions, and classification/reclassification of public land (cl 5.2 and Schedule 4).
The Plan does not itself set out criminal fines or an enforcement regime; it operates within the Act’s framework for authorisations, conditions and enforcement. It repeatedly requires the consent authority to be “satisfied” before granting consent for many classes of development (for example heritage, eco-tourism, flood-prone land), thereby vesting a degree of discretionary judgement in the Council and in some instances in State agencies whose approval is required (e.g. Director-General certification for certain urban release infrastructure under cl 6.1).
The Plan’s stated aims (cl 1.2) include environmental protection, support for local economic and cultural activity, affordable housing, and transition to renewable energy. Those stated aims are implemented by the zoning, mapped standards, special clauses and schedules summarised above, together with cross-references to State policies and other statutes.
Main concepts
The Plan’s governing concepts are zoning, mapped standards, consent pathways, and specific overlay provisions.
Zoning and the Land Use Table
The Plan divides the land within the Plan area into named zones (cl 2.1) and places each parcel on the Land Zoning Map (cl 2.2). For each zone the Land Use Table sets the objectives, uses permitted without consent, uses permitted with consent, and prohibited uses (cl 2.3). The consent authority must have regard to the zone objectives when determining a DA (cl 2.3(2)).
Mapped development standards
Key measurable controls are mapped and binding: Lot Size Map (minimum subdivision lot sizes and a set of related clauses, cl 4.1 and following), Height of Buildings Map (cl 4.3), and Floor Space Ratio Map (cl 4.4). Clause 4.5 sets rules for calculating site area and FSR including exclusions (public land, land where development is prohibited) and addressing strata or multi-lot sites and potential “double dipping” by covenant conditions (cl 4.5(4)-(11)).
Consent pathways and assessment tracks
Exempt development: Schedule 2 lists exempt development and Part 3 sets the tests and limitations (cl 3.1). Exempt development is not exempt from other statutory approvals (cl 3.1(5) and Schedule 2 Note 2).
Complying development: Schedule 3 and cl 3.2 identify complying development types and specify the certificate and conditions process.
Development requiring consent: Many activities , demolition, subdivision, erection of most buildings , require development consent (cl 2.6, cl 2.7 and the Land Use Table).
Overlay and site-specific controls
The Plan attaches numerous overlay-style clauses that control or condition development irrespective of base zoning. Notable overlays include heritage (cl 5.10 and Schedule 5), flood planning and special flood considerations (cl 5.21 and cl 5.22), coastal risk planning (cl 7.5), acid sulfate soils (cl 7.1), aquaculture controls (cl 5.19 and Schedule 6), airport/airspace operations (cl 7.8 and 7.8A), and development near zone boundaries (cl 5.3). These provisions are typically framed as mandatory matters the consent authority must be satisfied about before granting consent.
Discretion and exceptions
Clause 4.6 allows the consent authority to permit contraventions of development standards where an applicant can demonstrate that compliance is “unreasonable or unnecessary” and there are “sufficient environmental planning grounds” (cl 4.6(2)-(3)). Subclauses delimit the exercise of that power for certain subdivisions and particular zones (cl 4.6(6)) and exclude some standards from the operation of the clause (cl 4.6(8)).
Interplay with other statutes and policies
The Plan is expressly subject to SEPPs that prevail under section 3.28 of the Act (cl 1.9). It references numerous other statutes for external approvals or definitions (for example the Heritage Act 1977, Crown Land Management Act 2016, Local Government Act 1993, Fisheries Management Act 1994 and the Land Acquisition (Just Terms Compensation) Act 1991). Many clauses require consideration of or consultation with statutory bodies (for example consultation with the Heritage Council for archaeological site DAs, cl 5.10(7), or the relevant Commonwealth body for development penetrating airport surfaces, cl 7.8).
Maps and place-specificity
Many controls are map-dependent. The plan repeatedly instructs users to consult the various maps (Land Zoning, Lot Size, Height of Buildings, FSR, Flood Planning, Heritage, Coastal Risk, Additional Permitted Uses etc.) which are authoritative for what applies to any parcel (cl 1.7; see also cl 2.2 and the numerous references). Deferred matters are excluded from the Plan where identified on the Land Application Map (cl 1.3(1A)).
Administrative and procedural mechanics
The Plan names Council as consent authority (cl 1.6), provides savings for existing DAs and for particular Plan amendments (cl 1.8A), permits the Council to classify/reclassify public land and to discharge some trusts under conditions (cl 5.2), identifies relevant State acquisition authorities for particular mapped reservations (cl 5.1), and requires the preparation of local development control plans for urban release areas and specified sites (cl 6.3 and cl 7.13).
These main concepts structure the Plan’s operation: a mapped zoning and standards regime, layered overlays and special clauses, multiple consent tracks, and reliance on Council discretion and inter-agency consultation where specific risks or objectives (heritage, flood, airport operations, etc.) arise.
Who it affects
The Plan’s reach is geographic and interest-based. Primary affected parties are:
Landowners and developers within the Plan area: The Plan applies to land identified on the Land Application Map (cl 1.3). For owners it changes what they can lawfully do on their parcel , whether a use is permitted without consent, requires a DA, is complying development, or is prohibited (cl 2.3 and the Land Use Table). Owners of parcels shown as “Deferred matter” are only partially captured , they remain subject to the prior LEP where identified (cl 1.3(1A) and cl 1.8 note).
Tweed Shire Council: The Council is the consent authority under the Plan (cl 1.6). Council is responsible for day-to-day decision-making under the Act in respect of DAs, for classification/reclassification of public land (cl 5.2), and for administering public land as described in Schedule 4. The Plan imposes duties on Council to be “satisfied” before granting consent in many circumstances (for flood planning, heritage, eco-tourism, urban release infrastructure etc.) and to consult or notify specified bodies in certain cases (cl 5.10(7)-(9), cl 7.8A(3)).
State agencies and the Commonwealth: The Plan requires consultation or certification by State authorities in particular contexts. For example, the Director-General must certify that satisfactory arrangements are in place for designated State public infrastructure before certain subdivisions in urban release areas can proceed (cl 6.1(2)). The Plan is subject to SEPPs that may prevail (cl 1.9(1)). The consent authority must consult the relevant Commonwealth body when development will penetrate airport limitation surfaces (cl 7.8).
Indigenous communities and heritage stakeholders: Clauses dealing with Aboriginal places and archaeological sites require notification and consideration of local Aboriginal communities and the Heritage Council before consent is granted in many cases (cl 5.10(7)-(9)). The Plan’s aims include giving effect to local indigenous cultural values (cl 1.2(2)(a)).
Utilities and infrastructure providers: Development proposals must demonstrate the availability or planned provision of essential services (water, electricity, sewage, stormwater, access) (cl 7.10) and public utility infrastructure for urban release areas must be available or arrangements made (cl 6.2). The Plan identifies the relevant State acquisition authorities for land earmarked for reservation/acquisition (cl 5.1).
Businesses and community groups: The Land Use Table, Schedule 1 (additional permitted uses) and Schedule 2 (exempt development) create opportunities and constraints specific to business types. Schedule 1 contains site-specific additional uses (for example highway service centres or small-scale retail on particular lots), benefiting particular landholders. Clause 5.20 prohibits refusing consent for licensed premises solely on the basis of the playing or performance of music, subject to the consent authority being satisfied noise may be managed (cl 5.20).
Certifiers and private providers: Complying development certificates (Schedule 3) and some certifier obligations (note under Schedule 3) mean accredited certifiers and private service providers (for example private fire alarm monitoring providers, cl 5.8) operate within the Plan’s framework.
Secondary effects and parties likely to pay or act
Applicants pay compliance costs: studies for flood, heritage, acid sulfate soils, EISs for designated development, and the documentation needed when seeking an exception to a development standard (cl 4.6) are the applicant’s expense. Development contributions may be required under contributions plans and can be imposed by accredited certifiers under s 94EC of the Act (Schedule 3 note).
Neighbouring landowners and communities carry amenity and environmental impacts: the Plan requires consent authorities to consider impacts on adjoining zones and amenity (cl 2.4(2), cl 7.2(3)(d), cl 5.19(3)(b) etc.), but the Plan delegates judgement to the consent authority to weigh those considerations.
Excluded or special categories
Crown land and public authorities are treated in particular ways: the Plan allows Crown infrastructure under relevant SEPPs and does not restrict Crown use of buildings (cl 5.12). The suspension of covenants clause (cl 1.9A) does not affect Crown instruments, certain conservation agreements, biobanking agreements, or planning agreements listed in cl 1.9A(2), and the clause preserves public authority rights under registered instruments (cl 1.9A(3)).
In sum, the Plan affects anyone proposing physical works or uses within the mapped area, the Council as decision-maker, State and Commonwealth agencies with regulatory or certification roles, specific local landholders who benefit from site-specific permissive clauses, and neighbouring communities who may bear the indirect consequences of development approvals or refusals.
Key duties and rights
Duties imposed on decision-makers, applicants and landowners
Consent authority duties: The Plan repeatedly frames decision points as “must be satisfied” or “must consider” before granting consent. Examples:
Consider zone objectives when determining a DA (cl 2.3(2)).
Be satisfied about the adequacy of infrastructure or arrangements before consenting to urban release subdivisions (cl 6.1(2)-(3)) and public utility availability (cl 6.2(1)).
In heritage matters, the consent authority must consider heritage significance and may require a heritage management document or conservation management plan before granting consent (cl 5.10(4)-(6)).
For flood planning and special flood considerations, the consent authority must be satisfied that development is compatible with flood function, will not adversely affect flood behaviour, and incorporates appropriate measures to manage risk to life (cl 5.21(2)-(3); cl 5.22).
For eco-tourist facilities, the consent authority must be satisfied of a list of conservation, management and design requirements before granting consent (cl 5.13(3)(a)-(k)).
Applicant duties: Applicants must supply information where required and meet tests in the Plan and the Act. For example:
Demonstrate compliance with schedule standards for exempt development (cl 3.1(2)-(5)).
Where development proposes to contravene a development standard, provide the required document demonstrating why compliance is unreasonable or unnecessary and the environmental planning grounds (cl 4.6(3); note referring to the Environmental Planning and Assessment Regulation 2021).
For works in mapped acid sulfate soils areas, prepare and provide an acid sulfate soils management plan as set out in the Acid Sulfate Soils Manual (cl 7.1(3)).
For aquaculture, meet the site location and operational requirements in Schedule 6 (cl 5.19(2)-(3)).
Public notification and consultation duties: The Plan requires notification and consultation where heritage or Aboriginal heritage issues arise (cl 5.10(7)-(9)), and imposes specific consultation with the operator of Murwillumbah Airfield when obstacle limitation surfaces may be penetrated (cl 7.8A(3)).
Rights available under the Plan
Rights to make development applications and to rely on prior applications: Savings provisions preserve the rights of applicants who lodged DAs before commencement or a particular amendment, providing those applications are dealt with as if the Plan (or that amendment) had not commenced (cl 1.8A). This is a homeowner/developer protection against retrospective restriction.
Right to seek exceptions to standards: Clause 4.6 provides a route for applicants to seek approval even when they would contravene a development standard, by demonstrating the two-part test and having the consent authority record its assessment (cl 4.6(2)-(4)). The applicant must prepare the documentation required by the regulations (cl 4.6 note).
Rights to carry out exempt or complying development: Where development meets Schedule 2 or Schedule 3 standards and the relevant tests, the applicant can proceed without development consent (cl 3.1; cl 3.2).
Procedural safeguards and documentation
Record-keeping and reasons: Clause 4.6(4) requires the consent authority to keep a record of its assessment under the exception clause. Heritage and flood provisions require particular documentation (heritage management document, conservation management plan, flood impact assessments) before consent may be granted (cl 5.10(5)-(6); cl 5.21(3)).
Discretionary power limits and exclusions
Clause 4.6 excludes the use of the exception mechanism for certain development standards and contexts (cl 4.6(8)). Subclauses limit the capacity to grant exceptions to subdivisions in certain rural and conservation zones (cl 4.6(6)). These carve-outs put outer bounds on the consent authority’s discretion.
Interaction with other statutory and private controls
Suspension of private covenants: Clause 1.9A suspends covenants and similar instruments to the extent necessary to permit development consistent with the Plan, with enumerated exceptions (cl 1.9A(1)-(3)). That creates a statutory right to proceed despite some private encumbrances, while preserving rights of public authorities and listed instruments.
Relationship to SEPPs and State laws: The Plan is subject to SEPPs that prevail (cl 1.9(1)). Many clauses require applicants and the consent authority to consider other statutes (e.g. heritage matters in the Heritage Act, acid sulfate soils and the NSW Sugar Industry guidelines). This creates duties to obtain external approvals and to fit Plan requirements into a broader legal framework.
Who decides and standard of proof
The Plan places decision-making squarely with the consent authority (Council), often using qualitative thresholds such as “satisfied” and “must consider”. These standards are fact-sensitive and typically require applicants to tender professional evidence (heritage assessments, flood studies, acid sulfate soils management plans, environmental impact statements) to meet the “satisfied” tests.
In short, the Plan delegates broad discretionary duties to Council with specified documentary triggers for the applicant; it preserves certain rights (exempt/compliant tracks, saved DAs, exceptions to standards) but confines them through mapped standards, procedural steps and enumerated exclusions.
Penalties and enforcement
The Plan itself does not set a bespoke penalty schedule or prescribe enforcement mechanisms in stand-alone terms. Enforcement and penalties for unauthorised activity fall back to the Environmental Planning and Assessment Act 1979 and associated regulations and enforcement tools used by the consent authority under that Act. This is consistent with the Plan repeatedly operating “subject to the Act” (cl 1.6) and referring to Act provisions (for example Division 3.5 of the Act cited in the savings note to cl 1.8A).
What the Plan does specify that triggers enforcement mechanics under the Act
Requirement for development consent: The Plan repeatedly makes development consent a prerequisite for certain works (e.g. subdivision cl 2.6; demolition cl 2.7; building on heritage or Aboriginal heritage land cl 5.10(2); works in acid sulfate soils cl 7.1(2)). Carrying out such development without consent would engage the Act’s enforcement, compliance and penalty provisions.
Compliance with map-based standards: Where maps set limits (lot size, height, FSR), breaches attract the same enforcement regime as any unauthorised development under the Act, subject to any exception mechanism properly used (cl 4.6).
Conditions and compliance for exempt/compliant development: Exempt development is only permitted where the development meets the Schedule 2 standards and other statutory approvals. Non-compliance with those standards (for exempt or complying development) can render the work unauthorised and actionable under the Act.
Obligations to prepare specified management documents: The Plan mandates particular management documents in some contexts (for acid sulfate soils cl 7.1(3); heritage management documents cl 5.10(5); heritage conservation management plans cl 5.10(6)). Failure to obtain necessary approval or to comply with required management plans can trigger enforcement.
Where the Plan prescribes procedural steps involving third parties
Notices and consultations (Heritage Council, Aboriginal communities, Murwillumbah Airfield) are mandatory in some cases (cl 5.10(7)-(9); cl 7.8A(3)). Failure to follow required notification protocols may invalidate or compromise approvals and could be a ground for review under the Act.
Practical enforcement mechanisms (by reference to the Act and Plan operation)
Stop work orders, penalty notices and orders for remediation, and injunctions all sit within the Act. The Plan’s practical enforcement effect is to create the substantive conditions requiring consent and documentation; the Act provides the enforcement levers. Because the Plan does not restate penalty quantum or enforcement steps, practitioners must consult the Act and the Regulation for specifics on offences, fines and enforcement procedure.
Implementation risk and uncertainty
Enforcement depends on correct identification of the applicable map(s) and the zone. Where boundaries are unclear or maps are updated (cl 1.7 contemplates maps being amended and combined), disputes may arise as to whether a DA was required, leading to potential compliance action or legal challenge. The Plan’s savings and transitional clauses (cl 1.8A) also create timing-based issues for enforcement and compliance, particularly where an application straddles amendment commencement.
In summary, the Plan establishes conditions for lawful development and places many triggers for enforcement on the need to comply with mapped standards, required consents and mandatory management plans. Enforcement and penalties are exercised under the Act; the Plan supplies the substantive rules whose breach activates those enforcement powers.
How it interacts with other laws
The Plan is not a standalone code; it operates as part of a statutory network. The instrument references and defers to multiple State Acts, State Environmental Planning Policies (SEPPs), the Building Code of Australia (BCA) and federal aviation/airspace regime where relevant.
Primacy and SEPPs
The Plan is subject to SEPPs that prevail under section 3.28 of the Act (cl 1.9(1)). Clause 1.9(2) lists specific SEPP provisions that do not apply to the Plan land, but the general rule is that an SEPP will override where it expressly provides.
Cross-references to the Act and Regulations
The Plan repeatedly cross-references the Environmental Planning and Assessment Act 1979: Channelling consent pathways, savings provisions and the exception process (cl 1.8A, cl 4.6, multiple notes referring to Divisions of the Act and to the Regulation). Clause 4.6 explicitly notes the Environmental Planning and Assessment Regulation 2021 requires a DA for a contravention to be accompanied by the document setting out the grounds under cl 4.6(3).
Building Code and construction law
Exempt and complying development must meet relevant deemed-to-satisfy provisions of the Building Code of Australia or be structurally adequate if no such provision exists (cl 3.1(3)(a)). For certain buildings classed under the BCA, particular fire safety documentation is required for exempt development (cl 3.1(4)).
Heritage law
Heritage matters require coordination with the Heritage Act 1977 and the Heritage Council. The Plan integrates heritage thresholds and notification obligations (cl 5.10) and references the State Heritage Register and interim orders under the Heritage Act (cl 3.1(3)(d), cl 5.10).
Fisheries and aquaculture
Clause 5.19 and Schedule 6 cross-reference the Fisheries Management Act and the concept of aquaculture industry development plans. Oyster aquaculture must be considered in the light of the NSW Oyster Industry Sustainable Aquaculture Strategy; priority oyster aquaculture areas are a mapped concept for exemptions (cl 5.19(5)-(6)).
Crown land and federal aviation law
The Plan preserves Crown rights and does not alter use of Crown buildings under the referenced SEPP (cl 5.12). For airspace, the Plan requires consultation with the relevant Commonwealth body for land that penetrates airport operational surfaces (cl 7.8), and with the Murwillumbah Airfield operator for obstruction penetration (cl 7.8A).
Local Government Act and public land classification
Clause 5.2 allows classification or reclassification of public land as operational or community land in accordance with the Local Government Act 1993, and Schedule 4 lists land subject to classification/reclassification.
Other specific statutory interactions
Acid sulfate soils controls (cl 7.1) reference the Acid Sulfate Soils Manual and, uniquely, the NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils and the Sugar Milling Co-operative for drainage management plan endorsement. Clause 1.9A suspends private covenants to enable development consistent with the Plan but excepts certain instruments, including planning agreements under Division 7.1 of the Act and specified conservation agreements.
Practical consequences of cross-linking
Applicants will often need to assemble approvals or consultations from multiple authorities. For example, a proposal for a coastal eco-tourist facility in a mapped flood planning area may trigger:
SEPP considerations,
heritage and Aboriginal place notifications if relevant,
flood and coastal risk assessments per cl 5.21 and cl 7.5 referencing State guidelines,
possible Commonwealth consultation for airspace if near airfields,
an acid sulfate soils management plan if in mapped classes, and
compliance with the BCA and possibly a BASIX commitment.
These cross-links create compliance complexity and multi-agency transaction costs. They also distribute decision-making across levels of government and private bodies (e.g., the Sugar Milling Co-operative in cl 7.1) where specific local industries are implicated.
Amendment history
The Plan text contains inline amending notes indicating a history of updates. The document records a series of amendments by citation; those citations and the clauses they affect are set out in the Plan. The following is a summary grounded in the amendment notes included in the text you supplied (not an exhaustive legislative history beyond those inline notes).
Clause-level and schedule amendments across 2015-2024: The Plan records multiple amendments in schedules and clauses, for example:
Schedule 1 and Schedule 4 entries and several site-specific clauses show various insertions and repeals across 2015-2024 (e.g. Schedule 1 amended 2015-2024; Schedule 4 amended 2023 (459)).
The Plan’s text includes many precise references to amending instruments by Act year and schedule or clause number. Practitioners should consult the consolidated LEP on the NSW legislation website or the local government’s planning portal for the authoritative consolidated instrument and the specific statutory instruments effecting each amendment. The inline amendment footnotes in the Plan identify the years and schedule/clause references for major changes; those references are the traceable markers for research into the particular amending instruments.
Effect of amendments recorded in the text
Amendments have changed zones, added or removed permitted uses, inserted site-specific provisions, added or adjusted compliance thresholds (for example for minimum lot sizes in particular contexts), and updated overlay provisions (e.g. flood/coastal provisions). Several amendments have inserted procedural protections such as savings provisions for DAs and clarified interactions with State environmental planning policy instruments.
Where to look for the current operative text
The Plan itself instructs that maps adopted by the Plan are to be kept and made public in accordance with Ministerial arrangements and are available on the NSW Planning Portal (cl 1.7 note). For precise amendment dates and the text of the amending instruments, the consolidated LEP on the NSW legislation website and the Gazette notices for each numbered instrument referenced in the Plan’s amendment notes are the primary sources.
Litigation history
The Plan text you supplied does not record judicial decisions, appeals or litigation history. It contains no case citations or judicial commentary. Therefore:
There are no cases named in the Plan text and no litigation history referenced in the source material provided.
Practitioners seeking litigation history or administrative review decisions relevant to the Plan (for example NSW Land and Environment Court decisions interpreting clauses such as cl 4.6 exceptions to standards, heritage clauses cl 5.10, flood planning cl 5.21, or principles on the suspension of covenants cl 1.9A) must search court databases and tribunal decisions for cases citing “Tweed Local Environmental Plan 2014” or particular clause numbers.
Because the Plan repeatedly delegates qualitative assessments to the consent authority (for example “must be satisfied” tests in multiple clauses), many of the likely disputes will involve the exercise of administrative discretion, sufficiency of applicant evidence (heritage reports, flood studies, acid sulfate soils management plans), or the correctness of using the cl 4.6 exception pathway. Those are common contest points in land-use litigation, but the Plan provides no internal record of any litigated interpretation.
If a practitioner needs litigation precedents, the relevant approach is to search Land and Environment Court decisions, administrative law reports and any New South Wales appellate decisions that address application of LEPs generally or interpretations of clauses identical or comparable to those in this Plan. The Plan’s text should be used to identify likely legal issues (e.g. application of cl 4.6, heritage notification obligations cl 5.10, suspension of covenants cl 1.9A) and then targeted case-law research undertaken.
Gotchas
Practical traps and specific provisions that commonly generate issues for applicants and advisers:
Maps decide many outcomes
The Plan is heavily map-driven. Height, FSR, lot size, flood planning, coastal risk, heritage areas and additional permitted uses are map-defined (cl 1.7, cl 2.2, cl 4.1, cl 4.3, cl 4.4, cl 5.21, Schedule 1). Misreading or relying on an out-of-date map can be decisive. Map amendments can change what is permissible for a parcel.
Deferred matters remain governed by older instruments
Land identified as “Deferred matter” on the Land Application Map is excluded from the Plan’s application (cl 1.3(1A)) and may remain subject to Tweed Local Environmental Plan 2000 (note in cl 1.8). Applicants must check for deferred status.
The savings clause (cl 1.8A) preserves certain pre-commencement DAs and some amendment-specific savings (e.g., DA21/0010 concept DA exempted from Amendment No 35). Whether a DA is treated under an old instrument or the current Plan can materially affect consent. Timings and dependencies (for subsequent DAs reliant on a concept DA) are consequential.
Suspension of private covenants is limited
Clause 1.9A suspends private covenants only “to the extent necessary” to enable development consistent with the Plan, but explicitly excludes covenants imposed by Council, certain Crown instruments, conservation agreements, biobanking agreements and planning agreements (cl 1.9A(2)). Applicants cannot rely on cl 1.9A to override those excluded instruments.
Exceptions to development standards require specific proof and record
Clause 4.6 permits exceptions but requires the consent authority to be satisfied on two specific limbs and to keep a record (cl 4.6(3)-(4)). The Regulation mandates the form of the supporting document. For subdivisions in rural and conservation zones there are additional limits (cl 4.6(6)). Attempting to rely on cl 4.6 without proper documentation is a common procedural pitfall.
Exempt development still needs other approvals and must meet BCA
Exempt development under Schedule 2 must still meet Building Code requirements where relevant and is not an exemption from other statutory licences or approvals (cl 3.1(3)(a), cl 3.1(5) and Schedule 2 note). Practitioners must check for fisheries, water, heritage, biosecurity or Crown approvals.
Heritage and Aboriginal heritage obligations impose pre-DA consultation and notification
For archaeological sites and Aboriginal places, the consent authority must notify the Heritage Council and local Aboriginal communities and consider responses within 28 days (cl 5.10(7)-(8)). Failure to follow these steps can void consents or lead to successful challenges.
Flood and coastal controls require specific guidelines to be applied
Clause 5.21 refers to the Considering Flooding in Land Use Planning Guideline (published 14 July 2021). Clause 5.22 substitutes special flood considerations with references to the Flood Risk Management Manual (June 2023) and requires consideration of projected climate-change impacts. Practitioners must ensure flood studies reference the correct guideline/manual and consider sea-level rise and evacuation routes.
Clause 5.20 on music at licensed premises has a limited protection
Consent authorities must not refuse licensed premises on specified aesthetic grounds about music and performance (cl 5.20(1)), and must not refuse on noise grounds if the consent authority is satisfied noise may be managed (cl 5.20(2)). Applicants still need to demonstrate noise mitigation; the clause does not immunise venues from noise regulation.
Schedule 1 contains land-by-land provisions allowing particular uses (for example highway service centres, rail trails) that benefit specific landowners or public entities (Schedule 1 heads). Those site-specific permissions are a common source of contention with neighbours and local interest groups.
Complying development and contributions
A complying development certificate can be subject to a condition requiring payment of a monetary contribution under a contributions plan and the certifier may be obliged to impose it under s 94EC (Schedule 3 note). Applicants must plan for contribution liability even under the complying track.
Inter-agency consultation may prolong assessments
Clauses requiring consultation with the Director-General (cl 6.1), Commonwealth bodies (cl 7.8), the Murwillumbah Airfield operator (cl 7.8A) or the Heritage Council (cl 5.10) may introduce statutory timeframes and additional information requests. Applicants should factor time and cost for third-party responses.
Numerous “not adopted” or repealed clauses
The Plan includes several “Not adopted” or repealed entries. Practitioners should not assume absence means permissive; instead, confirm current operation in the consolidated instrument and maps.
These “gotchas” all arise from textually specified mechanisms in the Plan and its attachments. They point to the need for a mapped-based compliance checklist, early engagement with Council and potentially with State agencies, and thorough preparatory technical reporting.
How to comply
A practical compliance roadmap tied to the Plan’s mechanics:
Identify the parcel on the authoritative maps
Start with the Land Application Map and the Land Zoning Map (cl 1.3; cl 2.2). Then check the Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Flood Planning Map, Coastal Risk Planning Map, Heritage Map, Acid Sulfate Soils Map and any Additional Permitted Uses Map. The Plan makes these maps determinative for many controls (cl 1.7, cl 2.2, cl 4.1, cl 4.3, cl 4.4, cl 5.21). Confirm whether the parcel is a “Deferred matter” (cl 1.3(1A)).
Match the proposed use to the Land Use Table
Determine whether the proposal is permitted without consent, permitted with consent, complying development, exempt development, or prohibited in the zone, using the Land Use Table for the parcel’s zone (cl 2.3). If the use is not listed, the Land Use Table’s “Any other development not specified” entries and prohibited lists are decisive.
Check exempt development and complying tracks
If the proposal might be exempt development, compare it to Schedule 2 and cl 3.1 requirements: is it of minimal environmental impact, does it meet the Schedule standards, will it contravene the BCA, does it affect a State heritage register item (cl 3.1(2)-(5))? If complying development is an option, check Schedule 3 and the BCA requirements and note possible contributions (Schedule 3 note).
Identify overlays and mandatory management documents
If the site triggers overlay clauses (heritage cl 5.10, acid sulfate soils cl 7.1, coastal/climate risk cl 7.5, flood planning cl 5.21, aquaculture Schedule 6), plan to prepare/commission the required management documents: heritage impact statements, archaeology reports, acid sulfate soils management plans, flood risk assessments consistent with the referred guidelines, eco-tourism management strategies (cl 5.13(3)), and aquaculture site-operational plans (cl 5.19 and Schedule 6).
Prepare the application to satisfy “must be satisfied” tests
Many clauses require the consent authority to be “satisfied” (heritage cl 5.10; flood cl 5.21; eco-tourist cl 5.13; essential services cl 7.10). Assemble technical evidence (engineering, environmental, heritage, EIA/EIS as needed), and anticipate specific issues the Plan highlights (e.g. odour and water quality for intensive livestock agriculture cl 5.18).
If a development standard would be breached, follow cl 4.6 process
For contraventions prepare the required statement addressing why compliance is unreasonable or unnecessary and identify sufficient environmental planning grounds (cl 4.6(3)); include the record for the consent authority per cl 4.6(4) and ensure the supporting documents meet the Regulation’s formatting and content requirements.
Plan for contributions, service availability and urban release requirements
For subdivisions, check Lot Size Map minima (cl 4.1) and the exceptions/limited boundary adjustment routes (cl 4.1C). For urban release subdivisions, obtain Director-General certification for arrangements for designated State public infrastructure if creating smaller lots than previously permitted (cl 6.1). Ensure essential services will be available or arrangements made (cl 6.2; cl 7.10).
Check special site clauses and schedules for site-specific permission or limits
Review Schedule 1 for additional permitted uses on particular lots; confirm any site-specific caps (cl 7.18: combined gross floor area limit). Look for clauses that may override ordinary zone rules for particular sites (cl 7.16, cl 7.17, Schedule 1 entries).
Consult early with relevant agencies and stakeholders
Heritage Council, local Aboriginal communities (cl 5.10), Director-General (cl 6.1), Commonwealth body for airspace matters (cl 7.8), Murwillumbah Airfield operator (cl 7.8A), the Sugar Milling Co-operative for acid sulfate soil drainage plans (cl 7.1) , consult early to avoid delays. Where statutory notification periods exist (28 days in some heritage clauses cl 5.10), allow time.
Prepare for post-approval compliance
If consent is granted, ensure conditions (which may require covenants, infrastructure works, conservation work and ongoing management plans) are discharged. Note cl 4.5(9) allows covenants to prevent “double dipping” of floor area; plan any land consolidation or covenant actions accordingly. For complying development certificates, check contributions obligations and certifier conditions (Schedule 3 note).
Factor in timing, cost and risk
Multi-agency consultations, mapping clarifications, and technical reports add cost and time. The Plan’s discretionary language and the consent authority’s “satisfied” test introduce some assessment risk; conservative scope and comprehensive documentation reduce review and appeal risk.
Check for transitional protections and savings
If an applicant has a DA lodged before a Plan amendment or Plan commencement, check cl 1.8A for whether the DA will be determined under the previous instrument. This can materially change outcomes and conditions.
Keep an audit trail
The Plan requires records for some assessments (cl 4.6(4)). Keep documented evidence of compliance, material submitted to the consent authority, and all notification correspondence to third parties.
Use the Plan’s objectives to frame submissions
When preparing statements demonstrating environmental planning grounds (for cl 4.6 or general DA justification), reference the Plan’s stated aims (cl 1.2) and zone objectives (Land Use Table) to show consistency with local aims.
This checklist is concrete and grounded in the Plan’s clauses. Practitioners should use the Plan’s mapped material as the first source of truth, then layer the Plan’s clause requirements, and finally assemble the technical evidence and third-party consultations necessary to satisfy the Plan’s “must be satisfied” thresholds.
(g) to conserve or enhance the biological diversity, scenic quality and geological and ecological integrity of Tweed,
(h) to promote the management and appropriate use of land that is contiguous to or interdependent on land declared a World Heritage site under the Convention Concerning the Protection of World Cultural and Natural Heritage, and to protect or enhance the environmental significance of that land,
(i) to conserve or enhance areas of defined high ecological value,
(j) to provide special protection and suitable habitat for the recovery of the Tweed coastal Koala.
(1A) Despite subclause (1), this Plan does not apply to the land identified as “Deferred matter” on the Land Application Map.
1 Definitions
1 Definitions
1.4 Definitions
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
Note.
However, Tweed Local Environmental Plan 2000 continues to apply to the land identified as “Deferred matter” under clause 1.3(1A).
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) If a development application has been made under clause 7.15 before the commencement of Tweed Local Environmental Plan 2014 (Amendment No 28) and the application has not been finally determined before that commencement, the application must be determined as if Tweed Local Environmental Plan 2014 (Amendment No 28) had not commenced.
(3) A development application made but not finally determined before the commencement of Tweed Local Environmental Plan 2014 (Amendment No 35) must be determined as if that Plan had not commenced.
(4) The amendments made to this Plan by Tweed Local Environmental Plan 2014 (Amendment No 35) do not apply to—
(a) concept development application DA21/0010 (the concept development application), and
(b) a development application made after the commencement of Tweed Local Environmental Plan 2014 (Amendment No 35), if the development application is subsequent to, and made in reliance on, the concept development application in relation to the same development.
(5) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of seconda