CTHIn ForceLegislation
Tariff Concession Order 1048997
1Tariff Concession Order 1048997
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in Tariff Concession Order 1048997.
| TARIFF CONCESSION ORDERUnder Section 269P of the Customs Act 1901, I, Wendy Knowles, a delegate of the Chief Executive Officer declare that the goods specified in Column 1 of THE TABLE are goods to which the item in Part III of Schedule 4 to the Customs Tariff Act 1995 specified in Column 2 of THE TABLE applies. This Order shall have effect from 03.11.10 and continue in force until revoked under sections 269SC or 269SD of the Act, or the date, if any, specified in Column 2. |
|---|
THE TABLE
| COLUMN 1Description of Goods including theCustoms Tariff Classification | COLUMN 2Schedule 4 Item NumberLast date of effect |
|---|
<table cellspacing="0" cellpadding="0" style="width:526.75pt; border-collapse:collapse"><tbody><tr><td colspan="2" style="width:60.45pt; padding:5.65pt 5.4pt 2.85pt; vertical-align:top"><p class="RomanBodyText" style="margin-top:0pt"><a id="TCO"></a><span>8431.49.90</span></p></td><td style="width:372.95pt; padding:5.65pt 5.4pt 2.85pt; vertical-align:top"><p><span>PARTS, CARBON BAKE FACILITY, FURNACE TENDING ASSEMBLY, with OR</span><br><span>without operator cabins, being EITHER of the following:</span><br><span></span><span>(A) overhead travelling crane sub-assembly, comprising ALL of</span><br><span></span><span>the following:</span><br><span></span><span>(a) long travel trolleys, having ALL of the following:</span><br><span></span><span>(i) end truck lines (fabricated beams);</span><br><span></span><span>(ii) girders AND/OR rails;</span><br><span></span><span>(iii) frame work, being access stairs and ladders</span><br><span></span><span>and guard rails and platforms and hoist frames,</span><br><span></span><span>(b) cross (main) travel trolleys, having BOTH of the</span><br><span></span><span>following:</span><br><span></span><span>(i) end truck lines (fabricated beams);</span><br><span></span><span>(ii) frame work, being access stairs and ladders and</span><br><span></span><span>guard rails and platforms and hoist frames,</span><br><span></span><span>(c) main hanging platform, having access stairs or</span><br><span></span><span>ladders or guard rails or hatches;</span><br><span></span><span>(d) pneumatic conveyance assembly, having ALL of the</span><br><span></span><span>following:</span><br><span></span><span>(i) air compressor;</span><br><span></span><span>(ii) hoppers AND/OR cyclones;</span><br><span></span><span>(iii) filters;</span><br><span></span><span>(iv) coolers,</span><br><span></span><span>(e) jaws;</span><br><span></span><span>(f) grab beams and lifting beams</span><br><br><span></span><span>(B) anode handling sub-assembly, comprising ALL of the</span><br><span></span><span>following:</span><br><span></span><span>(a) flue wall assembly, comprising BOTH the following:</span><br><span></span><span>(i) brushes;</span><br><span></span><span>(ii) straighteners,</span><br><span></span><span>(b) double scissor grabs;</span><br><span></span><span>(c) anode grabs OR jaws;</span><br><span></span><span>(d) sucking and filling pipes;</span><br><span></span><span>(e) vacuum pumps;</span><br><span></span><span>(f) axial fans;</span><br><span></span><span>(g) hoists;</span><br><span></span><span>(h) electric panels;</span><br><span></span><span>(i) cabling</span><br><span></span></p><p><a id="AtEnd"></a><span>Op. 03.11.10</span><span style="width:249.99pt; display:inline-block"> </span><span>- TC 1048997</span></p><p><span></span></p><p><span></span></p><p><span></span></p></td><td style="width:60.1pt; padding:5.65pt 5.4pt 2.85pt; vertical-align:top"><p style="text-align:center"><span>50</span></p></td><td style="border-bottom:0.75pt solid #000000; vertical-align:top"></td></tr><tr><td style="vertical-align:top"></td><td colspan="4" style="width:511.7pt; border:0.75pt solid #000000; padding:8.12pt 6.72pt 5.28pt; vertical-align:top"><p class="Published" style="margin-top:12pt; margin-bottom:6pt"><span style="font-family:'Courier New', monospace">This is page </span><span class="PageNumber" style="font-family:'Courier New', monospace">1</span><span class="PageNumber" style="font-family:'Courier New', monospace"> of </span><a id="Pages"><span class="PageNumber" style="font-family:'Courier New', monospace">1</span></a><span style="font-family:'Courier New', monospace"> </span><span style="font-family:'Courier New', monospace">Page</span><span style="font-family:'Courier New', monospace"> of the above Table.</span></p><p class="Published"><span style="width:316.77pt; display:inline-block"></span><span style="font-family:'Courier New', monospace">Wendy Knowles..........................</span></p><p><span>Dated 07 February 2011</span><span style="width:211.15pt; display:inline-block"> </span><span>Delegate of the Chief Executive Officer</span></p><p class="Footer"><span></span></p></td></tr><tr style="height:0pt"><td style="width:0.85pt"></td><td style="width:70.4pt"></td><td style="width:383.75pt"></td><td style="width:70.9pt"></td><td style="width:0.85pt"></td></tr></tbody></table>