This local environmental plan sets the legal rules for development on the Harold Park land: it fixes zoning, maps, permitted and prohibited uses, and technical controls (height, floor space, parking, heritage, flood and environmental requirements). It replaces previous local plans for the same land (cl 1.8) and names the Council as the consent authority (cl 1.6). The Plan changes what landowners and developers may do without consent, what needs consent, and how the Council assesses design, heritage and environmental risks; it also limits some private covenants to enable development under the Plan (cl 1.9A).
This instrument is a local environmental plan that sets zoning, permitted uses, development standards and procedural controls for the land identified on its Land Application Map in the City of Sydney. The Plan is the Sydney Local Environmental Plan (Harold Park) 2011 and commences on publication on the NSW legislation website (cl 1.1AA; cl 1.1). It replaces previous local environmental plans and deemed environmental planning instruments that applied to the same land (cl 1.8). The consent authority for development under the Plan is the Council, subject to the Act, with the Central Sydney Planning Committee able to exercise Council functions for major developments under the City of Sydney Act 1988 (cl 1.6, note).
Mechanically the Plan does the following (text citations are to clauses and Schedules in the instrument):
identifies the land to which it applies via the Land Application Map and prescribes zones and the Land Use Table , the primary zone shown is MU1 Mixed Use (cl 1.3; cls 2.1-2.3; Land Use Table);
specifies permitted, permitted-with-consent and prohibited land uses for each zone (Land Use Table, Zone MU1 items 2-4);
imposes development controls and standards including height (cl 4.3), floor space ratio (cl 4.4) and rules for calculating site area and FSR (cl 4.5);
provides for exempt and complying development categories and associated conditions, and excludes environmentally sensitive areas from exempt/compliant development (Part 3; cl 3.1-3.3; Schedule 2; Schedule 3);
sets procedural and substantive requirements for heritage, bushfire, flood planning, acid sulfate soils and public bushland (cl 5.10, cl 5.11, cl 5.21, cl 6.2, cl 5.23);
prescribes local provisions affecting design (design excellence cl 6.4), car parking maxima (cl 6.1), essential services (cl 6.5) and incentives allowing additional gross floor area in defined circumstances (cl 6.6 and cl 6.7);
Current sections
Direct links to the current provisions in Sydney Local Environmental Plan (Harold Park) 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Amusement centres; Boarding houses; Car parks; Centre-based child care facilities; Commercial premises; Community facilities; Entertainment facilities; Function centres; Information and education facilities; Light industries; Local distribution premises; Medical centres; Oyster aquaculture; Passenger transport facilities; Places of public worship; Recreation areas; Recreation facilities (indoor); Registered clubs; Respite day care centres; Restricted premises; Shop top housing; Tank-based aquaculture; Tourist and visitor accommodation; Vehicle repair stations; Any other development not specified in item 2 or 4
4
Prohibited
4 Prohibited
4 Prohibited
Eco-tourist facilities; Extractive industries; Heavy industrial storage establishments; Heavy industries; Pond-based aquaculture
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Note.
When this Plan was made it did not include Zone RE1 Public Recreation, Zone SP2 Infrastructure or Zone E1 National Park and Nature Reserves. Accordingly, a Land Reservation Acquisition Map was not adopted.
Part 6
Local provisions
Part 6 Local provisions
Part 6 Local provisions
6
Car parking ancillary to other development
6 Car parking ancillary to other development
6.1 Car parking ancillary to other development
(1) The objectives of this clause are—
(a) to identify the maximum number of car parking spaces that may be provided to service particular uses of land, and
(b) to minimise the amount of vehicular traffic generated by a proposed development.
(2) Development consent must not be granted to development proposing car parking spaces in connection with a proposed use of land if the total number of car parking spaces (including existing car parking spaces) provided in relation to the land would be greater than the maximum set out in this clause.
(3) If the total number of car parking spaces under this clause is not a whole number, the total is to be rounded down to the next whole number.
(4) The maximum number of car parking spaces is as follows—
(a) for multi dwelling housing, residential flat buildings and dual occupancies—
(i) 0.4 spaces per studio dwelling, and
(ii) 0.5 spaces per 1 bedroom dwelling, and
(iii) 1 space per 2 bedroom dwelling, and
(iv) 1.2 spaces for all other dwellings,
(b) for dwelling houses, attached dwellings and semi attached dwellings, 2 spaces per dwelling
(c) for retail premises, 1 space per 50 square metres of gross floor area that is used for that purpose,
(d) for business premises or office premises, 1 space per 75 square metres of gross floor area that is used for that purpose,
(e) for health consulting rooms or medical centres, 2 spaces per consulting room,
(f) for places of public worship or entertainment facilities, the greater of—
(i) 1 space per 30 square metres of gross floor area that is used for those purposes, or
(ii) 1 space per 10 fixed seats in the place of public worship or entertainment facility,
(g) for centre-based child care facilities, 1 space per 100 square metres of gross floor area that is used for that purpose,
(h) for information and education facilities, 1 space per 200 square metres of gross floor area that is used for that purpose,
(i) for warehouse or distribution centres, 1 space per 300 square metres of gross floor area that is used for that purpose,
(j) for industries, 1 space per 100 square metres of gross floor area used for that purpose,
(k) for serviced apartments or hotel and motel accommodation—
(i) 1 space per 4 bedrooms, for up to 100 bedrooms, and
(ii) 1 space per 5 bedrooms, for more than 100 bedrooms.
(5) For multi dwelling housing, residential flat buildings and dual occupancies the following number of visitor car parking spaces in addition to the maximum number of car parking spaces under subclause (4) may be provided—
(a) 1 space per 5 dwellings for the first 30 dwellings,
(b) 1 space per 8 dwellings for the next 40 dwellings,
(c) 1 space per 15 dwellings for all dwellings in excess of 70 dwellings.
(6) For the purposes of this clause—
car parking space means a space intended to be used for the parking of motor vehicles that is ancillary to another land use on the site, but does not include any of the following—
(a) a place primarily used for the purpose of washing vehicles,
(b) a place primarily used for the purpose of loading or unloading of goods,
(c) a place primarily used for the purpose of storing bicycles.
visitor car parking space means a car parking space that is to be used for the purposes of providing parking for visitors to the buildings to which those parking spaces relate and not for the purposes of providing parking for the residents of any such building.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2017 (751), Sch 1.5; 2020 No 30, Sch 4.105.
sch.2-sec
Street art
sch.2-sec Street art
Street art
(1) Must not project more than 30mm from a wall or other surface.
(2) Must not constitute signage.
Note.
Signage includes advertisements and advertising structures.
(3) Must not be located on a heritage item or within a heritage conservation area.
(4) Must not contain material that—
(a) discriminates against or vilifies any person or group, or
(b) is offensive or sexually explicit.
(5) In this clause, street art means art that is painted, marked or otherwise affixed to the outside of a building and that is visible from a public place (within the meaning of the Local Government Act 1993).
Note.
Street art may only be carried out subject to requirements to obtain the approval of the owner of the building on which the street art is located or any statutory authorities (such as Transport for NSW). See also Part 2 of the Graffiti Control Act 2008 for graffiti related offences.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Sydney Local Environmental Plan (Harold Park) 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in the City of Sydney in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to accommodate a diverse and growing population by providing for a range of housing needs,
(b) to provide employment and services to enhance the economic development and amenity of the local area without detracting from the viability of existing nearby centres,
(c) to enhance amenity and quality of life of the local community,
(d) to promote ecologically sustainable development,
(e) to ensure that land uses and density are integrated with nearby transport infrastructure and encourage travel by public transport, walking and cycling,
(f) to achieve a high quality urban form by ensuring that new development exhibits design excellence and responds to the character of the local area,
(g) to conserve the environmental heritage of the land to which this Plan applies,
(h) to protect, and to enhance the enjoyment of, the natural environment of the City of Sydney and its recreation areas.
1 Land to which Plan applies
1 Land to which Plan applies
1.3 Land to which Plan applies
enables, in limited terms, suspension of private covenants and similar instruments to the extent necessary to enable development under this Plan, subject to enumerated exceptions (cl 1.9A); and
contains specific sectoral provisions,for example, pond/tank/oyster aquaculture site and operational requirements in Schedule 6 (cl 5.19; Schedule 6), and a rule limiting grounds on which consent may be refused for licensed premises playing/performing music (cl 5.20).
The Plan expressly defers to any State environmental planning policy (SEPP) that prevails under the Environmental Planning and Assessment Act (cl 1.9(1)) and incorporates or references technical guidance and other statutes (for example, the Building Code of Australia requirements for exempt development, BASIX, the Heritage Act, the Local Government Act and the Land Acquisition (Just Terms Compensation) Act in specified clauses).
The instrument is mostly regulatory rather than punitive in form: it prescribes where development is permitted and under what procedural and evidential conditions. It does not itself enumerate monetary penalties or offences; enforcement and sanctioning mechanisms will be those available under the Act and associated regulations (see the Act references throughout the Plan).
Main concepts
The Plan is structured around a small set of core planning mechanisms. Each plays a distinct functional role; understanding them clarifies incentives for landowners, developers, the Council and other decision-makers.
Zoning and Land Use Table (cls 2.1-2.3; Land Use Table)
Zoning designates how land may be used. The primary zone applied is MU1 Mixed Use, whose objectives encourage a mix of business, retail, office, light industry and residential development and active ground-floor uses to support public transport and pedestrian activity (Zone MU1 objectives). The Land Use Table lists uses that are permitted without consent, permitted with consent and prohibited in the zone (cl 2.3(1)).
The consent authority must have regard to the zone objectives when determining applications (cl 2.3(2)). This embeds policy intent into the merits assessment.
Development standards and mapping (cl 4.3; cl 4.4; cl 4.5)
Built-form limits are map-based. Maximum building height and FSR are the maximums shown on the respective maps (cl 4.3(2); cl 4.4(2)). The Plan contains rules for calculating gross floor area and site area so that floor-space calculations are standardised and to limit “double-dipping” (cl 4.5).
There is scope for flexibility through the exceptions clause (cl 4.6). Development may be consented despite contravening a development standard if the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6(3)). The clause requires the consent authority to keep a record of its reasoning (cl 4.6(4)).
Exempt and complying development (Part 3; Schedule 2; Schedule 3)
Schedule 2 identifies exempt development and Schedule 3 complying development types and conditions. Exempt development must meet Building Code of Australia criteria and not be designated development or affect State heritage items (cl 3.1). Environmentally sensitive areas are excluded from exempt/compliant development (cl 3.3).
Procedural and sectoral controls (Part 5; Part 6; Schedules)
Heritage: demolition, exterior alteration, subdivision and works affecting heritage items, Aboriginal objects, archaeological sites and heritage conservation areas generally require development consent; the consent authority may require heritage management documentation, must notify the Heritage Council in some cases and may grant conservation incentives in defined circumstances (cl 5.10).
Design excellence: development involving a new building or external alteration must exhibit design excellence; the clause lists 10 matters the consent authority must have regard to (cl 6.4).
Car parking: the Plan sets maximum car parking rates by land use, and visitor parking rates for multi-dwelling housing (cl 6.1).
Environmental/specialised regulatory controls: acid sulfate soils controls require an acid sulfate soils management plan for works in mapped classes (cl 6.2); pond/tank/oyster aquaculture operations have detailed location and operational requirements in Schedule 6 (cl 5.19; Sch 6); flood planning requires compatibility with flood function and protection of safe evacuation (cl 5.21).
Temporary use: consent may be granted for temporary uses up to 52 days in any 12 months subject to impact tests (cl 2.8).
Interplay with private instruments and State law
The Plan includes a suspension-of-covenants clause (cl 1.9A) that prevents restrictive covenants, agreements or similar instruments from applying to the extent necessary to enable development under the Plan, subject to exceptions (notably covenants imposed by the Council, Crown land instruments, conservation agreements and planning agreements). This changes the bargaining environment between private parties and developers where the Plan applies.
Incentives and limits
Two explicit GFA incentives exist: an additional 10,630 m2 of GFA where BASIX-affected buildings exceed both water and energy targets by at least 25% and the GFA is not used for certain social housing uses (cl 6.6); and up to 500 m2 extra GFA for development providing group homes, respite, seniors housing or affordable housing (cl 6.7). Both require consent authority satisfaction about distribution and conditions.
Standards that cannot be used to refuse consent
For licensed premises, the consent authority must not refuse consent on several grounds related to music, dancing, stage orientation, decorations, or noise provided the authority is satisfied noise may be managed to an acceptable level (cl 5.20). This limits discretionary grounds available to local decision-makers for certain entertainment uses.
Maps, schedules and external references
The Plan relies on a suite of maps (Land Zoning, Height of Buildings, Floor Space Ratio, Lot Size, Land Reservation Acquisition, Acid Sulfate Soils, Heritage Map) kept on the NSW Planning Portal and subject to the Department’s standard technical requirements (cl 1.7). The instrument also invokes external manuals, strategies and SEPPs that bear on interpretation and application (for example, BASIX, Considering Flooding in Land Use Planning Guideline).
Collectively these mechanisms set a map-based, standards-led regulatory environment with targeted allowances and constraints, sectoral rules and procedural requirements that govern how and when development may occur on the mapped Harold Park land.
Who it affects
The Plan allocates decision rights, regulatory obligations and practical effects across a relatively narrow set of actors. Identifying who pays, who decides and who changes behaviour follows directly from the text.
Primary decision-maker
The Council is the consent authority for the Plan’s purposes (cl 1.6). The Central Sydney Planning Committee constituted under the City of Sydney Act 1988 may exercise Council functions for major developments, so major projects can be decided by that committee rather than the full Council (cl 1.6, note).
State agencies and authorities
The Plan identifies specific State authorities as the “relevant acquisition authority” for owner-initiated acquisition for land reserved on the Land Reservation Acquisition Map (cl 5.1(2) and table). Examples include Transport for NSW for classified roads and the corporation formed under s 2.5 of the Environmental Planning and Assessment Act for regional open space. The Plan also expressly defers to SEPPs that prevail (cl 1.9(1)) and cross-references State instruments (BASIX, SEPPs, Fisheries, Heritage, Rural Fires, Crown land legislation) that will affect approvals and compliance (multiple clauses).
Landowners and developers
Owners of land within the Land Application Map face the Plan’s zoning, standards and consent requirements (cl 1.3; cl 2.2). They must seek development consent for activities the Plan places in the “permitted with consent” column (cl 2.3(1)(c)) and for actions such as subdivision (cl 2.6), demolition (cl 2.7) and temporary uses beyond the time limits (cl 2.8). They must comply with design excellence (cl 6.4), essential services availability (cl 6.5), car parking maxima (cl 6.1) and any applicable sectoral requirements (acid sulfate soils cl 6.2; heritage cl 5.10; aquaculture cl 5.19/Sch 6).
Licensed-premises operators and arts/cultural users
The Plan’s stated aims include protecting and promoting arts and cultural activity (cl 1.2(2)(aa)). It also constrains the consent authority’s ability to refuse development for licensed premises on grounds relating to music and performance (cl 5.20). That allocates a greater degree of predictability and legal protection to operators of music and performance venues, at least in the grounds available to refuse consent.
Community and adjoining landholders
The consent authority must consider the zone objectives and impacts on adjoining zoned land when determining applications including unzoned land proposals (cl 2.3(2); cl 2.4). For temporary uses (cl 2.8), the authority must be satisfied that amenity will not be adversely impacted. For public bushland (cl 5.23) and flood planning (cl 5.21), the Plan places duties on consent authorities to consider environmental effects and safety related to adjoining land.
Aboriginal communities and heritage stakeholders
Development affecting Aboriginal places of heritage significance triggers specific consultation and assessment duties: the consent authority must consider impacts and notify local Aboriginal communities and take into account any response within 28 days (cl 5.10(8)). For archaeological sites not on the State Heritage Register, the Heritage Council must be notified and responses considered (cl 5.10(7)).
Public authorities and Crown
The Plan clarifies that it does not restrict development carried out by or on behalf of public authorities where permitted under State policy (cl 5.12). It also provides exceptions for public authority works regarding acid sulfate soils (cl 6.2(5)). The Plan maintains Crown uses for existing Crown buildings (cl 5.12(2)).
Third parties with private rights
The Plan’s suspension of covenants clause (cl 1.9A) alters the legal effect of private instruments that restrict development, except where the covenant is imposed by or required by the Council, or where the covenant is one of the listed protected instruments (cl 1.9A(2)). Registered interests of public authorities are unaffected (cl 1.9A(3)). This changes the relationship between private covenant-holders and prospective developers in practice, though certain instruments remain protected.
Practitioners
Town planners, architects and heritage consultants will be affected practically because the Plan requires certain documents (heritage management documents, acid sulfate soils management plans, BASIX certificates, evidence to show compliance or justify contravention under cl 4.6). The consent authority must record assessments in some cases (cl 4.6(4)), which affects administrative practice.
In short, the Plan materially affects landowners and developers on mapped land, the City of Sydney Council as the primary decision-maker (and its Central Sydney Planning Committee for major projects), licensed-premises and arts/cultural operators through reduced discretionary grounds to refuse, heritage stakeholders and Aboriginal communities through consultation duties, certain State agencies (in acquisition and reserved land contexts), and adjoining communities through amenity and flood-safety provisions.
Key duties and rights
This section summarises the principal duties imposed on decision-makers and applicants, and select rights or limitations created by the Plan.
Duties of the consent authority (Council)
Have regard to zone objectives when deciding development applications (cl 2.3(2)). This duty structures the merits exercise: the authority must align decisions to the articulated objectives.
Ensure development shows design excellence before granting consent for new buildings or external alterations (cl 6.4(3)); the clause lists specific matters the authority must consider (cl 6.4(4)(a)-(x)).
For applications proposing contravention of development standards, the consent authority must be satisfied the applicant has demonstrated that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds (cl 4.6(3)); it must keep a record of its assessment (cl 4.6(4)).
For heritage-related development, the consent authority must consider effects on heritage significance and may require heritage documents or conservation management plans, notify Heritage Council or local Aboriginal communities where required, and consider their responses (cl 5.10(4)-(9)).
For flood planning, refuse consent unless satisfied development is compatible with flood function and will not adversely affect flood behaviour, safe evacuation, or the environment, and incorporates risk measures (cl 5.21(2)-(3)).
For acid sulfate soils works, the consent authority must not grant consent unless an acid sulfate soils management plan has been prepared and provided (cl 6.2(3)).
For aquaculture proposals, ensure compliance with Schedule 6 site and operational requirements and industry development plans (cl 5.19(2)-(3)).
Duties of applicants and developers
Obtain development consent where required (for example, subdivision cl 2.6; demolition cl 2.7; temporary uses beyond permitted days cl 2.8); meet requirements for exempt and complying development where relevant (cl 3.1-3.2).
For contraventions of development standards, prepare the required document to demonstrate grounds under cl 4.6 as required by the regulations (cl 4.6(3), note).
Supply an acid sulfate soils management plan when works are in mapped classes (cl 6.2(3)); provide preliminary assessment for minor works or to show management plan not required and obtain Council confirmation where relevant (cl 6.2(4)).
Provide heritage management documents or conservation management plans when required by the consent authority (cl 5.10(5)-(6)).
For BASIX-related GFA uplift, ensure the BASIX commitments exceed both water and energy targets by at least 25% and satisfy the consent authority about distribution of uplift (cl 6.6).
For temporary uses, ensure end-of-use restoration and avoid impacts on adjoining land and neighbourhood amenity as required by cl 2.8(3).
Rights and limits for developers/third parties
The Plan allows additional gross floor area in defined circumstances (cl 6.6 and cl 6.7) if conditions are met and the consent authority is satisfied; these are development incentives.
The Plan limits private covenant enforcement to the extent necessary to enable development under the Plan (cl 1.9A(1)), but this suspension excludes covenants imposed by the Council, specified Crown instruments, conservation agreements and planning agreements (cl 1.9A(2)).
Licensed-premises operators have a constrained set of local grounds on which consent may be refused: genre, whether live or amplified, number of musicians, dancing, decorations and stage orientation are not to be used as grounds, and noise cannot be used to refuse consent if it can be managed to an acceptable level (cl 5.20(1)-(2)).
Procedural rights and obligations of third parties
Heritage Council and local Aboriginal communities receive notification rights when certain heritage or archaeological matters are before the consent authority, and their responses must be taken into account within specified timeframes (cl 5.10(7)-(9)).
The consent authority is required to keep records of assessments under cl 4.6(4), which establishes an evidentiary trail for later review.
Limits on local discretion
The Plan is subject to SEPPs that prevail under the Act (cl 1.9(1)). Where a SEPP prevails it will limit local discretion. The Plan also contains express prohibitions (for example, canal estate development is prohibited, cl 2.9).
Operational consequences and binding documentation
Conditions of consent may include requirements to register covenants preventing double counting of floor area where a consent involves multiple lots (cl 4.5(9)-(10)). This creates lasting private-law obligations tied to approved development.
The Plan therefore creates a framework of duties on both decision-makers and applicants, grants limited rights to developer incentives and constrained rights to private covenant holders, and sets procedural protections for heritage and Aboriginal stakeholders.
Penalties and enforcement
The Plan itself is a land use instrument; it sets permissions, standards and procedures. It does not, within the text provided, set specific monetary fines, criminal penalties or enforcement sanctioning regimes. Enforcement, prosecution and sanctioning for development that contravenes the Plan will operate under the broader Environmental Planning and Assessment Act, the regulations made under that Act and other relevant statutes cited in the Plan (for example, the Heritage Act, Liquor Act for licensed premises operations, Local Government Act for public land classification). The Plan repeatedly references the Act and other statutes as the statutory environment in which its controls operate (for example cl 1.9, cl 1.6, note to cl 1.6, and numerous cross-references in Part 5 and Schedules).
What the Plan does specify that carries enforcement implications
Consent requirement triggers liability for unauthorised works: many activities are permitted only with development consent (examples: subdivision cl 2.6; demolition cl 2.7; development in heritage areas cl 5.10; works on mapped acid sulfate soils cl 6.2). Carrying out those activities without consent will invoke enforcement mechanisms under the Act. The Act provides for orders, penalties and prosecution for unauthorised works; the Plan establishes where consent is required and thus where non-compliance may arise.
Conditions and documentation: the Plan requires specific documents to be prepared and submitted (heritage management documents cl 5.10(5); acid sulfate soils management plans cl 6.2(3); BASIX certificates and associated performance evidence relevant to cl 6.6). Failure to comply with conditions on a consent or with preconditions can found compliance or enforcement action under the Act and its regulations.
Notifications and consultation duties: the Plan requires notice to the Heritage Council or local Aboriginal communities in certain circumstances (cl 5.10(7)-(9)). If the authority fails to follow required procedural steps, affected parties may challenge a decision by way of merits review or judicial review under the Act.
Private covenants: clause 1.9A operates to suspend certain private covenants to the extent necessary to enable Plan-compliant development. That changes the private enforcement landscape , covenant-holders would be prevented from exercising their usual private-law remedies to stop development to the extent the clause applies. The clause preserves rights of public authorities under registered instruments (cl 1.9A(3)) and excludes specified instruments from suspension (cl 1.9A(2)).
Mechanisms for contesting decisions
The Plan does not itself set appeals mechanisms; recourse will be by the statutory avenues available under the Environmental Planning and Assessment Act and relevant regulations , merits review by the relevant tribunal or challenge in court where judicial grounds exist. The Plan’s requirement that the consent authority keep records when granting exceptions to development standards (cl 4.6(4)) is material because those records support later review.
Practical enforcement implications
Owners and developers must ensure compliance with Plan triggers (maps, heritage listings, acid sulfate soils classes) because failure to do so invites enforcement under the Act. Practitioners should check maps and schedules (Land Zoning Map, Height Map, FSR Map, Acid Sulfate Soils Map, Heritage Map, Land Reservation Acquisition Map) to identify where consent or special documentation is required (cl 1.7; various clauses).
In short, enforcement consequences flow from the Act and regulation regime that sits above the Plan. The Plan allocates permissions and preconditions that, if breached, will expose actors to the usual enforcement tools under planning and other relevant laws (orders, fines, injunctions and prosecution), but does not itself create novel penalty mechanisms in its text.
How it interacts with other laws
The Plan is explicitly designed to sit within a network of State legislation, regulations, SEPPs and technical guidance. The instrument repeatedly cross-references those other legal and policy instruments and both defers to them and incorporates their requirements.
Primacy of SEPPs and the Environmental Planning and Assessment Act
The Plan is subject to any State environmental planning policy that prevails under section 3.28 of the Environmental Planning and Assessment Act (cl 1.9(1)). That means where a SEPP has operative primacy, its provisions override inconsistent Plan provisions. The Plan also references the Act at many points for procedural effects (cl 1.6 note referencing the City of Sydney Act and cl 1.8 on repeal of prior local instruments).
Building Code and BASIX
For exempt development the Plan requires compliance with relevant deemed-to-satisfy provisions of the Building Code of Australia (cl 3.1(3)(a)), and BASIX commitments and certificates are relevant to GFA incentives (cl 6.6; note to cl 6.6 referencing the Environmental Planning and Assessment Regulation).
Heritage and Aboriginal law
The Plan cross-references the Heritage Act 1977 for State heritage register items and interim heritage orders (cl 3.1(3)(d); cl 5.10 references). Heritage obligations include notification to the Heritage Council and consultation with local Aboriginal communities in certain circumstances (cl 5.10(7)-(9)). The Plan’s heritage provisions operate alongside the statutory duties under the Heritage Act and the Act’s processes.
Crown land and Crown authorities
The suspension of covenants clause carves out “relevant instruments” under the Crown Land Management Act 2016 and protects public authority registered instruments (cl 1.9A(2)-(3)). The Plan also preserves Crown uses of buildings and does not restrict the carrying out of infrastructure development by or for public authorities where permitted by the SEPP Transport and Infrastructure 2021 Chapter 2 (cl 5.12).
Flooding, biodiversity and fisheries
Flood planning refers to the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (cl 5.21), bringing in State technical guidance. Exempt/compliant development is excluded from environmentally sensitive areas defined by the Coastal Management Act, Local Land Services Act and other laws (cl 3.3). Aquaculture rules refer to the Fisheries Management Act and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19 and Sch 6).
Local Government Act
Classification and reclassification of public land under the Plan is tied to the Local Government Act 1993 and its regime for operational and community land (cl 5.2). Section 30 approval by the Governor is required for some reclassifications before insertion in Schedule 4 (cl 5.2 note and cl 5.2(5)).
Land Acquisition law
Clause 5.1 identifies relevant State authorities for owner-initiated acquisitions under the Land Acquisition (Just Terms Compensation) Act 1991 and thus interfaces with resumption and acquisition processes.
Regulatory instruments and manuals
The Plan relies on supporting technical materials, for example the Acid Sulfate Soils Manual for management plan content (cl 6.2(3)-(4)) and the Department’s Standard technical requirements for LEP maps and GIS data referred to in cl 1.7. These external instruments shape the content of required plans and how map data is maintained and used.
Operational priority and exceptions
The Plan contains a suspension mechanism for private covenants that interacts with private property law by limiting the enforceability of certain private instruments to enable Plan-compliant development (cl 1.9A). That clause explicitly preserves Council-imposed covenants and certain Crown or conservation instruments and planning agreements (cl 1.9A(2)). It also notes Governor approval pursuant to s 3.16 of the Act for the clause (cl 1.9A(4)), showing executive oversight.
Practical interaction effects
Practitioners must navigate a mesh of cross-referenced laws: a single development application may require compliance with BASIX, Building Code standards for exempt development, heritage approvals under the Heritage Act, acid sulfate soils management plan requirements, flood risk guidelines and SEPP provisions. The Plan acts as the local map-and-standards node within that network.
In short, the Plan operates not in isolation but as part of the State planning framework: SEPPs and the Act have primacy; the Plan references and imports requirements from heritage, flood, biodiversity, Crown land, building and local government law; and it alters some private-law effects via the covenant suspension clause while preserving many statutory rights and interests.
Amendment history
The instrument text includes amendment annotations that identify alterations and insertions by year and schedule item. The Amendment notes in the Plan are the primary source for the Plan’s amendment history as included in the text supplied. Key amendments recorded within the Plan text are:
2017 amendments
cl 6.1 (Car parking) amended by 2017 (493), Sch 1.2[2] which updated or restated the car parking rates (cl 6.1 includes an amendment note).
Schedule 2 (Exempt development) amended by 2017 (751), Sch 1.5 which added or altered items in the exempt development Schedule (sch 2 note).
2018 amendments
cl 5.4 (Controls relating to miscellaneous permissible uses) amended by 2018 (406), Sch 1.128 [1] [2]. This clause contains controls on bed and breakfast accommodation, home businesses/industries, industrial retail outlets and other small-scale use caps.
2019 amendments
cl 1.9A (Suspension of covenants, agreements and instruments) was inserted or amended in 2019 (621), Sch 5[2]-[4], as recorded directly beneath cl 1.9A and marked “Am 2019 (621), Sch 5[2]-[4]”.
2020 amendments
Schedule 2 amended by 2020 No 30, Sch 4.105 (note contained in schedule header).
2021 amendments
cl 6.3 was repealed by 2021 (225), Sch 1 (cl 6.3 note shows “Rep 2021 (225), Sch 1”).
2022 amendments
cl 2.1 (Land use zones) amended by 2022 (828), Sch 1.22[1], which lists Mixed Use Zones and MU1 Mixed Use (cl 2.1, amendment note).
Land Use Table amendment noted as Am 2022 (828), Sch 1.22[2].
cl 5.23 (Public bushland) inserted in 2022 (629), Sch 2[1] (cl 5.23 includes “Ins 2022 (629), Sch 2[1]”).
2023 amendments
cl 5.4 was further amended in 2023 (458), Sch 1[1] (the cl 5.4 header shows both 2018 and 2023 amendment notations).
Ancillary notes in the Plan
The Plan’s explanatory notes (for example, notes to clauses referencing the Land Use Table, Schedule functions, and map availability on the NSW Planning Portal) appear to reflect how the Plan was implemented and updated over time (cl 1.7 note referring to Departmental technical requirements). The clauses that reference external strategies and guidelines (BASIX, Flood Risk Manual, Oyster Industry Strategy) indicate that the Plan’s substantive operation has been intended to interact with subsequent State guidance and strategies.
Limitations of the amendment record in this text
The Plan’s internal annotations record only amendments formally inserted into the instrument text and referenced by clause notes. They do not provide a complete chronological account of every textual or map-based change that may have been effected by ancillary instruments, nor do they provide the explanatory memoranda or second-reading speeches that accompanied the amendments. For complete legislative amendment history, including dates and full text changes, practitioners should consult the NSW legislation website’s consolidated instrument and the amendment instruments cited (for example, 2019 (621), 2022 (828)).
In practice, the amendments recorded materially alter how the Plan applies on specific topics: insertion of cl 1.9A in 2019 modifies private covenant enforceability; 2022 schedule updates modified zone listings and the Land Use Table; 2022 insertion of cl 5.23 introduced a public bushland protection regime. Each annotated amendment should be read in sequence against the consolidated Plan for a full understanding of current operative text.
Litigation history
The Plan text provided does not include or cite any judicial decisions, appeals or tribunal determinations applying or construing the Plan. There are no cases named or annotated within the instrument itself. Therefore, the Plan’s text contains no internal litigation history.
What this absence means for practitioners
Because the instrument does not list judicial or tribunal decisions, practitioners must look to external sources , Tribunal decisions, court judgments and administrative review records , to establish how particular clauses have been interpreted in practice (for example, how cl 4.6 has been applied in cases about contravening development standards or how cl 1.9A has been treated in conflicts with private covenants). That requires searching relevant NSW planning and administrative law databases and consolidated law reports.
The Plan prescribes administrative steps that produce documentary records (for example the requirement to keep a record of assessment under cl 4.6(4)). Such records can be relevant in later disputes and appeals, but the Plan text itself does not show whether and how those records have been used in litigation.
Potential dispute loci suggested by the Plan
Exceptions to development standards (cl 4.6): decisions granting or refusing exceptions are often disputed and litigated in the planning context; the Plan’s requirement for recorded reasoning (cl 4.6(4)) may be material in reviews.
Suspension of private covenants (cl 1.9A): this clause materially affects private rights. Disputes between covenant-holders and developers, or between covenant-holders and the Council, could arise where the covenant’s enforceability is contested in light of the clause’s protective carve-outs (cl 1.9A(2)-(3)).
Heritage and Aboriginal consultation (cl 5.10): where a consent is granted for work that affects heritage or Aboriginal places, procedural failures to notify or to take submissions into account might be subject to procedural review under the Act.
Licensed-premises music protections (cl 5.20): venues refused consent notwithstanding cl 5.20 might seek review, and decisions about whether noise “may be managed and minimised to an acceptable level” are factual matters that could be subject to challenge.
Recommended next steps for researching litigation
Search Tribunal and court databases (NSW Land and Environment Court, NSW Civil and Administrative Tribunal if relevant, and appellate courts) for decisions citing Sydney Local Environmental Plan (Harold Park) 2011 or specific clauses such as cl 1.9A, cl 4.6, cl 5.10 and cl 5.20. Also check consolidated instrument histories and notice registers for appeals or review proceedings noted in decision logs.
Because the instrument contains no in-text litigation references, any claims about litigation outcomes, precedential treatment or judicial interpretation must be sourced from external case law; the Plan text itself provides no litigational record.
Gotchas
The Plan contains several provisions that generate practical traps for practitioners and developers. These “gotchas” arise from interplay between map-based controls, procedural preconditions, constrained grounds for refusal, and private-law effects.
Suspension of covenants alters private-law expectations (cl 1.9A)
cl 1.9A prevents agreements, covenants or similar instruments that restrict development from applying to the extent necessary to enable development under the Plan, but with important exclusions: covenants imposed by the Council; relevant Crown land instruments; conservation agreements; Trust agreements under the Nature Conservation Trust Act (repealed reference retained in the schedule); property vegetation plans; biobanking agreements; and planning agreements (cl 1.9A(2)). Registered public authority interests remain unaffected (cl 1.9A(3)). Developers should not assume absolute freedom from private restrictions: verify whether the covenant is one of the protected instruments and whether the clause applies only "to the extent necessary" , the phrase limits, but does not eliminate, the covenant’s potential residual operation.
Design excellence is a gate to consent (cl 6.4)
cl 6.4(3) makes design excellence a precondition to consent for new buildings and external alterations. The consent authority must consider a detailed list of matters (cl 6.4(4)). Applications lacking clear evidence of design rationale, material and environmental performance, and public domain improvements risk refusal or prolonged negotiation. This is not a mere aspirational phrase , the clause is mandatory.
Exceptions to development standards require structured evidence (cl 4.6)
Applicants seeking development that contravenes a standard must satisfy that compliance is unreasonable or unnecessary and provide sufficient environmental planning grounds (cl 4.6(3)). The Environmental Planning and Assessment Regulation requires a document setting out the grounds (cl 4.6 note). The Plan requires the consent authority to record its assessment (cl 4.6(4)). Failure to prepare robust justification or to obtain a well-documented consent authority assessment increases risk on judicial/merits review.
Heritage and Aboriginal consultation steps are prescriptive (cl 5.10)
Where heritage items or Aboriginal places are involved, the consent authority may require heritage management documents and must notify the Heritage Council or local Aboriginal communities in certain cases and consider their responses (cl 5.10(5)-(9)). Applicants sometimes overlook these notification windows (28 days in cl 5.10(7)-(9)), which can delay decisions or provide grounds for review if the procedures are not properly followed.
Exempt and complying development exclusions are broad (cl 3.3)
Environmentally sensitive areas are excluded from exempt/compliant development (cl 3.3). Exempt or complying classifications that apply statewide may be curtailed if the site falls within defined sensitive areas (coastal waters, Ramsar wetlands, 100 m buffers, listed high biodiversity or high Aboriginal cultural significance areas). Practitioners must check the Plan’s maps and the State instruments that define sensitive areas.
Car parking limits are ceilings, not minimums (cl 6.1)
cl 6.1 sets maxima for car parking spaces; development consent must not be granted if the total number would exceed the maximum. This is a cap, and developers cannot simply add parking to compensate for other impacts without further consent. Rounding down rules apply where totals are fractional (cl 6.1(3)). In dense urban contexts this affects development economics and design viability, particularly where parking is monetised in development pro formas.
Temporary use timeframe and restoration obligations (cl 2.8)
Temporary uses are limited to 52 days in any 12-month period unless the use is for a sales office for a new release (cl 2.8(2)-(4)). The consent authority must be satisfied the land will be restored to its prior condition “as far as is practicable” (cl 2.8(3)(d)). Applicants should plan for restoration costs and embedding these obligations into consent conditions.
Schedule 6 contains site location and operational requirements (for instance, pond design, discharge restrictions, screening outlets). The Plan ties aquaculture permissions to industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19(5)). Aquaculture operators must satisfy both fisheries licensing and local planning requirements; overlooking either can delay operations or expose them to enforcement.
Works within mapped classes trigger a mandatory acid sulfate soils management plan consistent with the Acid Sulfate Soils Manual (cl 6.2(3)). Public authority routine maintenance and small works exemptions exist, but the thresholds and classes are map-dependent. Misclassifying the land or failing to supply a management plan will prevent consent (cl 6.2(2)-(5)).
Noise management constraint for licensed premises (cl 5.20)
cl 5.20 forbids refusal on multiple grounds related to music and performance and constrains noise as a reason for refusal where noise “may be managed and minimised to an acceptable level” (cl 5.20(2)). This is a factual test for the consent authority and may produce disputes about what counts as "manageable" noise levels; have acoustic evidence ready.
“Double-dipping” prevention via covenants and site area rules (cl 4.5(9)-(10))
Conditions of consent may require covenants against creating floor area on a restricted lot if equivalent floor area is being created elsewhere because the site included the restricted lot (cl 4.5(9)). If such covenants exist, they can reduce permissible FSR on other parts of a consolidated site (cl 4.5(10)). Check whether earlier consents have imposed such covenants.
Interaction with SEPPs and State guidance can alter local outcomes (cl 1.9; cl 5.21)
The Plan is subordinate to SEPPs where they prevail (cl 1.9(1)). Flood planning invokes State flood guidance and manuals and requires consideration of climate change projections (cl 5.21(3)(a)). Practitioners should verify which SEPPs and State policies are applicable to avoid incorrectly assuming local controls are determinative.
These are not procedural niceties; they affect risk allocation, transaction costs and design choices. Address them upfront in assessment documentation and project budgets.
How to comply
This is a practical, clause-referenced checklist for practitioners (applicants, planners, architects, developers, lawyers) to follow when preparing a proposal affecting land to which the Plan applies.
Confirm the site is within the Plan’s application area and identify relevant maps
Check the Land Application Map and Land Zoning Map to confirm coverage (cl 1.3; cl 2.2). Check the Height of Buildings Map and the Floor Space Ratio Map to determine maximums applicable to the specific parcel (cl 4.3(2); cl 4.4(2)). Verify the Lot Size Map for any subdivision minimums (cl 2.6(2) referencing Lot Size Map).
Identify permissible uses and any prohibitions
Consult the Land Use Table for the MU1 zone to determine whether the proposed use is permitted without consent, permitted with consent, or prohibited (cl 2.3; Zone MU1 Land Use Table). If the use is prohibited, do not proceed unless the proposal can be recast to a permitted use or the zoning is changed.
Determine whether the proposal is exempt, complying or requires development consent
Check Schedule 2 (exempt development) and Schedule 3 (complying development) and State SEPPs such as the Exempt and Complying Development Codes SEPP referenced in the Plan (cl 3.1 note; Schedule 2 note). If exempt or complying, ensure compliance with the Building Code of Australia and relevant deemed-to-satisfy provisions (cl 3.1(3)(a), cl 3.2(3)(b)). For complying development, check the specific development standards and conditions in Schedule 3 and the relevant SEPP.
For applications that might contravene a development standard, prepare a robust justification
If a standard (e.g. height or FSR) would be contravened, prepare the required contravention submission under cl 4.6: demonstrate compliance is unreasonable or unnecessary and provide sufficient environmental planning grounds (cl 4.6(3)). Include the document required by the Environmental Planning and Assessment Regulation and be prepared for the consent authority to record its assessment (cl 4.6(4)).
Heritage and Aboriginal matters
If the site contains a heritage item, is in a heritage conservation area, or contains Aboriginal objects or archaeological sites, prepare a heritage management document or conservation management plan if requested by the consent authority (cl 5.10(5)-(6)). For archaeological sites and nominated State heritage items, notify the Heritage Council and allow 28 days for response (cl 5.10(7), (9)). For Aboriginal places, notify local Aboriginal communities and consider responses within 28 days (cl 5.10(8)).
Design excellence and documentation
Ensure design documentation explicitly addresses the matters listed in cl 6.4(4): materials, public domain amenity, view corridors, bulk and massing, environmental impacts, access and movement, and ecologically sustainable development principles. Without evidence demonstrating design excellence, the consent authority must not grant consent under cl 6.4(3).
Essential services and infrastructure
Demonstrate availability or adequate arrangements for water supply, electricity, sewage management, stormwater drainage/on-site conservation and suitable road access as required by cl 6.5. Include service confirmation letters or network studies where necessary.
Car parking compliance
For developments that provide on-site car parking, ensure the total number does not exceed the maximums in cl 6.1. Visitor parking calculations for multi-dwelling housing must follow cl 6.1(5). Document calculations and demonstrate compliance.
Environmental and specialist technical plans
If within mapped acid sulfate soils classes, prepare and submit an acid sulfate soils management plan in accordance with the Acid Sulfate Soils Manual (cl 6.2(3)). For pond/tank aquaculture, comply with Schedule 6 site/operational requirements (cl 5.19; Sch 6). For sites in flood planning areas, include flood-risk assessments addressing the criteria in cl 5.21(2)-(3) and the Considering Flooding in Land Use Planning Guideline.
Address noise and entertainment venue considerations
For licensed premises or venues proposing music/dance, prepare acoustic assessments and management plans showing how noise “may be managed and minimised to an acceptable level” in accordance with cl 5.20(2). Because cl 5.20(1) narrows grounds for refusal, evidence of noise-management capability strengthens the application.
Check for planning agreements, registered covenants and the effect of cl 1.9A
Review title for private covenants that may purport to restrict development. cl 1.9A suspends such instruments to the extent necessary to enable development under the Plan, but excludes council-imposed covenants and a list of protected public/Crown instruments (cl 1.9A(2)-(3)). If a covenant falls in the protected class, plan for consent and potential negotiation. Also check whether a previous consent on site has required a covenant to prevent “double dipping” of FSR (cl 4.5(9)-(10)).
BASIX and GFA uplift opportunities
If pursuing additional GFA under cl 6.6, ensure BASIX certificates demonstrate at least 25% exceedance of both water and energy targets and show the proposed GFA uplift will not be used for the forbidden purposes in cl 6.6(1)(c). For social/affordable housing uplift under cl 6.7, document how uplifted GFA will be distributed to the qualifying uses.
Prepare consultation and notification strategies
Build in time for mandatory notifications to Heritage Council or Aboriginal communities where required (28-day response windows cl 5.10(7)-(9)). Factor in the potential for requests for heritage management documents and the consent authority’s discretionary requests.
Record-keeping and regulatory paperwork
For contraventions record the justification materials as the consent authority will keep assessment records (cl 4.6(4)). For applications where the Plan or SEPP requires specific certificates or manuals, include them in the application bundle.
Timing and temporary use management
If proposing temporary uses, limit proposals to 52 days in any 12-month period unless otherwise provided (cl 2.8(2)-(4)), and include a restoration plan to return the land to its prior condition "as far as is practicable" at the end of the authorised period (cl 2.8(3)(d)).
Check for map-based exceptions and inter-agency approvals
Confirm whether the Land Reservation Acquisition Map or other mapped designations bring the development within an acquisition or reserved land regime that requires liaising with a State authority (cl 5.1). Verify whether other statutory approvals (For example under the Fisheries Act, Crown land licences or the Rural Fires Act) are required in addition to planning consent (the Plan’s notes cross-reference these Acts).
Post-consent compliance
Ensure any consent conditions (including potential covenants required under cl 4.5(9)) are complied with before occupation. Plan for the registration of any required covenants and for fulfilling conditions related to conservation works or remediation (heritage and public bushland clauses require remediation and conservation measures in some circumstances cl 5.10 and cl 5.23).
Use this clause-by-clause checklist as the basis of application packs and risk registers. Where a proposal engages multiple Plan provisions (for example, a mixed-use building in the MU1 zone that triggers heritage, design excellence, BASIX uplift and flood planning), coordinate specialist reports and allow time for the procedural steps the Plan requires, including notifications and any SEPP overlays that may prevail.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
Note.
The City of Sydney Act 1988 constitutes the Central Sydney Planning Committee which has and may exercise the functions of the Council under Parts 4, 5 and 6 of that Act in relation to the carrying out of major developments, to the exclusion of the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
Note.
The Leichhardt Local Environmental Plan 2000 ceases to apply to land to which this Plan applies as a consequence of this Plan.
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Mixed Use Zones
MU1 Mixed Use
cl 2.1: Am 2022 (828), Sch 1.22[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3) (d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterway or waterbody, that—
(i) is inundated by surface water or groundwater movement, or
(ii) drains to a waterway or waterbody by surface water or groundwater movement, and
(b) the erection of a dwelling, and
(c) one or both of the following—
(i) the use of fill material to raise the level of all or part of the land on which the dwelling will be erected to comply with requirements for residential development in the flood planning area,
(ii) excavation to create a waterway.
(3) Canal estate development does not include development for the purposes of drainage or the supply or treatment of water if the development is—
(a) carried out by or with the authority of a person or body responsible for the drainage, supply or treatment, and
(b) limited to the minimum reasonable size and capacity.
(4) In this clause—
flood planning area has the same meaning as in clause 5.21.