Mechanically, the Plan replaces earlier local environmental plans and sets the zoning, permitted/prohibited uses, consent requirements and mapped overlays for land in Richmond Valley. It prescribes lot‑size and subdivision rules, development standards and exempt/complying development lists, plus site‑specific permitted uses.
It affects landowners, developers and the Council (the consent authority) by determining what can be built or used where, what approvals and studies are required (heritage, flood, biodiversity, acid sulfate soils, airport surfaces, aquaculture) and the conditions for exemptions and exceptions.
This instrument is a local environmental plan for the Richmond Valley, made under the Environmental Planning and Assessment framework. Mechanically it: establishes the Plan’s name and commencement date (commences 21 April 2012, cl 1.1AA); sets out the Plan’s aims (cl 1.2); declares the consent authority (the Council, cl 1.6); defines the mapping and overlay regime that applies to land to which the Plan relates (cl 1.7; cl 2.2); repeals prior local environmental instruments that applied to the area (cl 1.8); and creates the zoning framework, permitted/prohibited uses, development standards, local controls and specialist overlay rules that govern development and land use for the Plan area (Parts 2-6, Land Use Table and Schedules).
Operationally the Plan does the following tasks (selective, citation-based list):
Establishes zones and detailed Land Use Tables for those zones (cl 2.1; cl 2.3; Land Use Table). The Plan lists rural, residential, employment, special purpose, recreation, conservation and waterway zones (cl 2.1) and then specifies permitted without consent, permitted with consent and prohibited uses for each zone in the Land Use Table.
Sets minimum subdivision lot sizes, strata and community-title controls, and exceptions (Part 4, notably cl 4.1, cl 4.1AA, cl 4.1A, cl 4.1B, cl 4.1C, cl 4.2-4.2C).
Prescribes a height control for buildings via a Height of Buildings Map (cl 4.3).
Provides the procedure by which a consent authority can approve development that would contravene a development standard, subject to specified tests and record-keeping (cl 4.6).
Identifies exempt and complying development (Part 3: cl 3.1-3.3; Schedules 2 and 3) and excludes environmentally sensitive areas from exempt/complying development (cl 3.3).
Current sections
Direct links to the current provisions in Richmond Valley Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Under the Standard Instrument (Local Environmental Plans) Order 2006, Schedule 1, clause 6(2), this Plan is, until 26 April 2025, taken to apply to land identified as “Land subject to Richmond Valley Regional Jobs Precinct Process” on the Land Zoning Map (the subject land) as if certain amendments to this Plan had not commenced on 26 April 2023. As a result, until 26 April 2025 and to the extent this Plan applies to the subject land, this Plan is taken to include the references to business and industrial zones that were in this Plan immediately before 26 April 2023.
Agritourism; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Community facilities; Correctional centres; Crematoria; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Farm stay accommodation; Flood mitigation works; Funeral homes; Group homes; Helipads; Home-based child care; Home businesses; Home industries; Home occupations (sex services); Hospitals; Information and education facilities; Intensive livestock agriculture; Intensive plant agriculture; Jetties; Kiosks; Landscaping material supplies; Moorings; Open cut mining; Passenger transport facilities; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Restaurants or cafes; Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Service stations; Signage; Turf farming; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Advertising structures; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone C1 National Parks and Nature Reserves and marked “National Park—Lots 393 and 395, DP 755624” | Minister administering the Environmental Planning and Assessment Act 1979 |
Note.
If land, other than land specified in the Table to subclause (2), is required to be acquired under the owner-initiated acquisition provisions, the Minister for Planning and Infrastructure is required to take action to enable the designation of the acquiring authority under this clause. Pending the designation of the acquiring authority for that land, the acquiring authority is to be the authority determined by order of the Minister for Planning and Infrastructure (see section 21 of the Land Acquisition (Just Terms Compensation) Act 1991).
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
cl 5.1: Am 2022 (830), Sch 1.21[8].
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Acid sulfate soils
6 Acid sulfate soils
6.1 Acid sulfate soils
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works. |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan is not required for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine maintenance work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, and
(b) the works are not likely to lower the watertable.
(7) Despite subclause (2), development consent is not required under this clause for the carrying out of works on land for the purpose of agriculture if—
(a) a production area entitlement is in force in respect of the land when the works are carried out, and
(b) the works are carried out in accordance with a drainage management plan, and
(c) the works are not carried out in respect of a major drain identified on the Acid Sulfate Soils Map, and
(d) the works are not carried out on land within Zone C2 Environmental Conservation or on land identified as “coastal wetlands” on the Coastal Wetlands and Littoral Rainforests Area Map, within the meaning of State Environmental Planning Policy (Resilience and Hazards) 2021, Chapter 2.
(8) In this clause—
drainage management plan means an irrigation and drainage management plan that—
(a) is prepared in accordance with the NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005), and
(b) is endorsed by the Sugar Milling Co-operative as being appropriate for the land.
NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Soils (2005) means the guidelines approved by the Director-General of the Department of Infrastructure, Planning and Natural Resources on 25 May 2005.
production area entitlement means a contractual arrangement between the Sugar Milling Co-operative and a grower member of that Co-operative for the production of sugar cane for milling.
Sugar Milling Co-operative means the New South Wales Sugar Milling Co-operative Limited (ACN 051 052 209) or its successor.
Note.
The NSW Sugar Industry Best Practice Guidelines for Acid Sulfate Souls (2005) is available on the Department of Planning and Infrastructure’s website.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(2) Must be located on a lot in one of the following zones—
(a) Zone RU1 Primary Production,
(b) Zone RU5 Village,
(c) Zone R1 General Residential,
(d) Zone R5 Large Lot Residential.
(3) Must not be constructed or installed on or in, or in relation to, a heritage item or draft heritage item.
(4) Must be constructed or installed so that roof water is disposed of without causing a nuisance to adjoining owners.
(5) Must be designed by, and constructed in accordance with the specifications of, a professional engineer.
(6) Must be constructed of non-combustible material if located within 5m of a dwelling located on bush fire prone land.
(7) Maximum floor area—
(a) on a lot that has an area of less than 2ha—20m2, or
(b) on a lot that has an area of at least 2ha—60m2.
(8) Must not have a wall height, excluding gables, greater than 3m above ground level (existing).
(9) Maximum 1 per lot.
(10) Must be located clear of any sewer main, water main or stormwater main to a minimum distance of 1.5m, with footings and foundations to be extended down to a depth of 300mm below the zone of influence for the main (an area contained within 30° to the horizontal from the invert of the main).
(11) Must be located at least 20m from any bush fire hazard.
(12) Must be located—
(a) if the land is in Zone RU1 Primary Production or Zone R5 Large Lot Residential—at least 3m from each side and rear boundary and 20m from a boundary fronting a road, or
(b) if the land is in Zone RU5 Village or Zone R1 General Residential—at least 900mm from each side or rear boundary and 5.5m from a boundary fronting a road.
sch.2-sec-oc.2
Special events on public land, other than land in Zone C2 or C3
sch.2-sec-oc.2 Special events on public land, other than land in Zone C2 or C3
Special events on public land, other than land in Zone C2 or C3
(1) Must not have a duration of more than 52 days (including set up and dismantling) in any 12 month period.
(2) Must be located on land owned by the Council or for which the Council has care, control or management (including roads and Crown land).
(3) Event organiser must have adequate public liability insurance for the event.
(4) Must not involve the erection of permanent structures on the land, other than structures being a type of exempt development.
(5) Must have obtained all required approvals at least 2 working days before the event.
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Richmond Valley Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on 21 April 2012 and is required to be published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Richmond Valley in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the proper management, development and conservation of natural and man-made resources,
(b) to support and encourage social and economic benefits within Richmond Valley,
(c) to ensure that suitable land for beneficial and appropriate uses is made available as required,
(d) to manage appropriate and essential public services, infrastructure and amenities for Richmond Valley,
(e) to minimise the risk of harm to the community through the appropriate management of development and land use.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
Imposes a range of local provisions that must be addressed in development assessment, including heritage (cl 5.10), flood planning (cl 5.21 and cl 5.22), bushfire work (cl 5.11), aquaculture (cl 5.19 and Sch 6), intensive livestock thresholds (cl 5.18), acid sulfate soils (cl 6.1), terrestrial biodiversity (cl 6.6), landslide risk (cl 6.7), riparian protections (cl 6.8), drinking water catchments (cl 6.9), wetlands (cl 6.10), airport/airspace considerations (cl 6.11) and other site-specific controls.
Provides for special local measures such as temporary use limits (max 52 days, cl 2.8), a prohibition on canal estate development (cl 2.9), protection for live music at licensed premises (consent authorities cannot refuse for many music-related grounds, cl 5.20), and additional permitted uses for particular lots (Schedule 1).
The Plan repeatedly cross-references State instruments and other Acts. It is explicitly subject to State environmental planning policies that prevail (cl 1.9) and it names multiple other Acts and SEPPs as relevant to applications (for example, State Environmental Planning Policy (Transport and Infrastructure) 2021, cl 2.3 notes). Several provisions condition consent on compliance with external technical documents and guidelines, for example the Considering Flooding in Land Use Planning Guideline referenced in cl 5.21. The Plan therefore operates as a mapped zoning and standards instrument that allocates decision rights to the Council, sets activity-specific constraints and approvals triggers, and institutes overlay-based risk-management requirements to be satisfied in development consent.
Main concepts
The Plan’s organising concepts are zoning, consent, overlay constraints, permitted uses, development standards, exempt/compliant development, and local variations for heritage, environment and infrastructure. These are enacted through the following mechanisms.
Zoning and Land Use Table (cl 2.1; cl 2.3)
Land is assigned to named zones shown on the Land Zoning Map (cl 2.2). The Land Use Table across Part 2 specifies for each zone the objectives, what can be done without consent, what requires consent, and what is prohibited (cl 2.3(1)). The consent authority must have regard to the zone objectives when assessing DAs (cl 2.3(2)).
Consent authority and assessment frame (cl 1.6; Part 5)
The Plan names the Council as the consent authority (cl 1.6). The Plan imposes numerous matters for the Council to consider before granting consent: flood compatibility, biodiversity impacts, heritage impacts, acid sulfate soils management plans, availability of essential services, and so on (see, for example, cl 5.21, cl 6.1, cl 6.2, cl 6.6, cl 5.10). Several clauses require consulting other bodies (for example cl 6.11 consulting the relevant Commonwealth body for airspace penetrations; cl 5.10(7)-(9) notification/consideration of responses from the Heritage Council or local Aboriginal communities).
Exempt and complying development (Part 3)
The Plan identifies categories of exempt development (Schedule 2) and of complying development (Schedule 3, and by reference to State SEPPs). The Plan specifies baseline technical requirements (BCA compliance, exclusion of designated development, fire safety, and manufacturer’s instructions) for exempt development to qualify (cl 3.1). It also excludes exempt and complying development from environmentally sensitive areas (cl 3.3).
Development standards and exceptions (Part 4)
Principal development standards include minimum lot sizes (cl 4.1 and amendments such as cl 4.1AA-4.1C), subdivision rules (cl 2.6), height of buildings by map (cl 4.3), and a general power to allow exceptions to development standards subject to the "unreasonable or unnecessary" test and sufficient environmental planning grounds (cl 4.6). Clause 4.6 requires a record of the assessment and specifies exclusions where the clause does not operate (for example, development standards for complying development and certain BASIX-related standards).
Overlay and site-specific controls (Parts 5 and 6)
The Plan uses maps and clausal overlays: Acid Sulfate Soils Map (cl 6.1), Lot Size Map (cl 4.1), Height of Buildings Map (cl 4.3), Dwelling Opportunity Map (cl 4.2B), Terrestrial Biodiversity Map (cl 6.6), Landslide Risk Map (cl 6.7) and many others. Each overlay triggers specified tests or mandatory requirements (for example cl 6.1 requires an acid sulfate soils management plan for works in mapped classes).
Heritage and conservation (cl 5.10; Schedule 5)
The Plan lists heritage items, archaeological sites and a heritage conservation area in Schedule 5 and makes demolition/alteration of those items or works in conservation areas subject to development consent (cl 5.10(2)), with detailed procedural requirements including possible referral/notification to the Heritage Council and the need for heritage management documents or conservation management plans (cl 5.10(4)-(6), (7)-(9)).
Special local policy instruments (various)
The Plan includes local measures: temporary use (52 days, cl 2.8), prohibition on canal estate development (cl 2.9), standards that cannot be used to refuse consent for music in licensed premises (cl 5.20), aquaculture standards and minimum operational/site-location requirements with a Schedule 6 (cl 5.19 and Sch 6), and agricultural/tourism controls like farm stay/farm gate rules (cl 5.24-5.25).
Interplay with State and Commonwealth instruments
The Plan states it is subject to SEPPs that prevail (cl 1.9) and to Commonwealth consultation where airspace surfaces are penetrated (cl 6.11). Several provisions explicitly require consent authorities to have regard to State-issued guidelines (e.g., flood guidance in cl 5.21(4)-(5)).
Incentive and constraint logic
The Plan channels behaviour by (a) allowing particular land uses in particular zones; (b) setting thresholds and technical tests for certain higher-risk activities (intensive livestock, aquaculture, earthworks in acid sulfate soils) that raise compliance costs and require site-specific studies; and (c) containing mechanisms for limited flexibility (cl 4.6) where strict application of standards would be “unreasonable or unnecessary” but requiring documented environmental planning grounds and record-keeping.
Maps and site-specific schedules
The operative mapping regime (Land Zoning Map, Lot Size Map, Height of Buildings Map, overlays such as Biodiversity Map, Dwelling Opportunity Map, etc.) is central: the Plan’s permissions and obligations are frequently map-linked (cl 1.7; cl 2.2; see many clauses referencing specific maps).
Who it affects
Primary actors named, with their roles and the consequences the Plan creates:
Landowners and developers: The Plan defines when development consent is required (for demolition, subdivision, many uses) and when development can proceed without consent (permitted without consent items in the Land Use Table, Schedule 2 exempt development). Owners must prepare and fund any required technical documents: acid sulfate soils management plans (cl 6.1(3)), heritage management documents or conservation management plans when required (cl 5.10(5)-(6)), ecological assessments for biodiversity overlays (cl 6.6), flood compatibility assessments consistent with the Considering Flooding Guideline (cl 5.21(4)-(5)), aquaculture operational/site-location compliance with Schedule 6 and relevant industry development plans (cl 5.19), and planning submissions for exceptions to development standards (cl 4.6(3) and note regarding the Regulation requirement for an accompanying document). The Plan thus places direct compliance costs on intending developers and landowners; it also constrains the set of permitted uses and subdividable lot sizes (cl 4.1, Land Use Table).
The Council (consent authority): The Council makes consent decisions (cl 1.6), is required to have regard to zone objectives (cl 2.3(2)), must consider and be satisfied about essential services availability before granting consent (cl 6.2), must keep records for exceptions granted under cl 4.6(4), must consult or notify relevant bodies in some circumstances (eg cl 5.10(7)-(9), cl 6.11(2)), and manages classification or reclassification of community/operational land as provided in Schedule 4 and cl 5.2. The Council carries the administrative burden of applying the Plan’s overlay tests, managing public notice/consultation duties where required and ensuring conditions in development consents enforce matters such as heritage works, flood evacuation measures, or biodiversity mitigation.
State and Commonwealth authorities, and specialist bodies: Several provisions require consultation or confer functions on State agencies. cl 5.1 establishes which State authority is the relevant acquisition authority for land reserved for public purposes (e.g., Transport for NSW for classified roads shown on the Land Reservation Acquisition Map), and cl 6.11 requires consultation with the relevant Commonwealth body for developments penetrating airport Limitation or Operations Surfaces. cl 5.19 requires consent authorities to consider aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy. The Plan therefore channels some decision-making or input to State/ Commonwealth agencies, and in some cases binds their role to the consent process.
Local Aboriginal communities and the Heritage Council: cl 5.10(8) requires local Aboriginal community notification and consideration for applications affecting Aboriginal places of heritage significance, and cl 5.10(7), (9) requires notification/consultation with the Heritage Council in relation to archaeological sites and demolition of nominated State heritage items.
Public utilities, emergency services and infrastructure operators: The Plan conditions development on availability of essential services (cl 6.2) and on protection of infrastructure from flood/landslide risk (cl 5.21; cl 5.22; cl 6.7). The Plan also provides that infrastructure development carried out under State SEPP Chapter 2 is not restricted by the Plan (cl 5.12(1)).
Residents and adjoining landowners: The Plan places constraints intended to protect amenity,noise, odour and hours of operation are matters to be assessed for industrial precincts (cl 6.16), and the zoning table and clause 2.8(3) require consent authorities to be satisfied temporary uses will not adversely impact neighbours.
Who pays
The Plan assigns most compliance and transactional costs to applicants/landowners who wish to develop: preparation of management plans, heritage assessments, acid sulfate soils plans, flood and geotechnical studies, compliance with BASIX or BCA where relevant, and possible mitigation works. The Plan also contemplates State costs where land is acquired under owner-initiated acquisition provisions (cl 5.1(1) and notes). The Council bears administrative costs in assessment, record-keeping and any required public consultation. Specialist agencies incur the cost of providing expert advice where the Plan requires consultation (for example the Heritage Council, Commonwealth aviation authority, Department of Primary Industries for aquaculture strategy considerations).
Decision-making momentum and constraints
The Plan centralises approval power with the Council but channels specialized inputs to other agencies when risked matters arise (heritage, airspace, aquaculture, flood), which produces multiple sequential and parallel decision points for applicants. The Plan also creates binding map-based constraints that may limit the prospect of development (Lot Size Map, Height of Buildings Map, overlay maps).
Key duties and rights
The Plan establishes duties, discretionary powers, and certain rights for applicants and consent authorities. Key duties/rights, with their textual bases and practical implications:
Duty to obtain consent where required
Demolition, subdivision and many other forms of development require development consent unless specified as permitted without consent or exempt/compliant under Schedule 2/3 or relevant SEPPs (cl 2.6; cl 2.7; cl 2.3; cl 3.1-3.2). The Plan requires consent for earthworks except where exempt or ancillary (cl 6.3(2)). It also requires consent for works in acid sulfate soils unless explicitly excepted (cl 6.1(2)-(7)).
Duty to satisfy overlay-specific tests before consent
Applicants must satisfy tests specific to overlays and land uses: acid sulfate soils management plan and preliminary assessment requirements (cl 6.1(3)-(4)); biodiversity impact avoidance/minimisation/mitigation tests (cl 6.6(3)-(4)); flood-compatibility and evacuation measures in flood planning areas (cl 5.21(2)-(3)); heritage management documentation when required (cl 5.10(4)-(6)); landslide risk assessments (cl 6.7(3)-(4)); aquaculture site and operational requirements (cl 5.19 and Sch 6). These duties typically require demonstration through technical documents and evidence in the development application.
Right of the consent authority to impose conditions and refuse
The Plan sets matters the consent authority must consider and be satisfied with before granting consent for certain developments (see cl 4.2B(4) for dual occupancies in rural zones, cl 6.2 for essential services). The consent authority retains discretion to refuse where the statutory tests are not met (for example cl 5.21(2) denies consent unless satisfied about flood compatibility). The consent authority also may require heritage conservation actions as a condition where they facilitate conservation (cl 5.10(10)).
Limited right to vary development standards subject to tests
Clause 4.6 allows development consent to be granted despite non-compliance with a development standard, subject to the consent authority being satisfied that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds (cl 4.6(2)-(3)). The clause mandates record-keeping of the assessment (cl 4.6(4)). Clause 4.6 also identifies development standards to which it does not apply (cl 4.6(8)).
Rights and duties connected to exempt/compliant development
To qualify as exempt, development must meet Schedule 2 standards and the Building Code of Australia requirements, must not be designated development, and must not affect State heritage items (cl 3.1). To be complying development, development must be permissible in the zone, meet BCA deemed-to-satisfy provisions, and where required, have Council approval for on-site effluent on unsewered land (cl 3.2(3)).
Special duties to consult and notify
The consent authority must notify certain bodies and consider their responses in particular cases: e.g., Heritage Council for archaeological sites (cl 5.10(7)), local Aboriginal communities for Aboriginal places (cl 5.10(8)), and the Heritage Council for demolition of nominated State heritage items (cl 5.10(9)). cl 6.11(2) requires the consent authority to consult the relevant Commonwealth body where a proposed development will penetrate the Limitation or Operations Surface for Casino and Evans Head Airports.
Rights connected to temporary and special uses
Temporary use is permitted by development consent for up to 52 days in any 12-month period (cl 2.8), with tests designed to protect future development potential and amenity (cl 2.8(3)). The Plan allows certain small-scale, low-impact aquaculture and intensive livestock activities without consent subject to distance and capacity thresholds (cl 5.18(4)-(5); cl 5.19(4)-(6)).
Acquisition and public land duties
Clause 5.1 identifies the relevant acquisition authority for specified land shown on the Land Reservation Acquisition Map and states that development on land acquired may, before use for the reserved purpose, be carried out with consent for any purpose (cl 5.1(2)-(3)). Clause 5.2 sets out how public land is classified or reclassified as operational or community land per the Local Government Act and the effect on trusts and dedications where land is reclassified (cl 5.2(2)-(5)).
Limits on bases for refusal in specific contexts
The Plan prohibits refusal of consent to licensed premises on a number of music/dance-related grounds (cl 5.20(1)) and restricts refusal for music-related noise if it can be managed to an acceptable level (cl 5.20(2)). This creates a legal limit on the factors the consent authority may rely on for refusal in that particular context.
Record-keeping and procedural duties
Clause 4.6(4) requires the consent authority to keep a record of assessments made under cl 4.6(3) for contraventions of development standards. Several other clauses require written confirmation (cl 6.1(4) requested preliminary assessment confirmation in writing) or written advice/notification (cl 5.10(3), 5.10(7)-(9)).
The Plan’s duties and rights are therefore primarily administrative and technical: applicants must demonstrate that specific site-based risks are addressed, and the Council must evaluate and record its satisfaction against enumerated matters before granting consent. Many duties translate into document-preparation burdens and technical studies, with the Council as gatekeeper.
Penalties and enforcement
The Plan itself contains few express penalty provisions. Instead, enforcement and penalties for non-compliance with development controls are implemented under the Environmental Planning and Assessment Act 1979 and other relevant legislation referenced in the Plan. The Plan repeatedly references the Act and other statutes (see cl 1.2, cl 1.6, cl 1.9, cl 4.6 note and other clauses). Practical enforcement consequences that follow from the Plan’s rules include the following effects and mechanisms as provided or implied by the text:
Development consent requirement as a compliance trigger: Numerous clauses make development consent a prerequisite for carrying out works or development (for example cl 2.6 subdivision; cl 2.7 demolition; cl 3.1 exempt development prerequisites; cl 6.1 acid sulfate soils; cl 6.3 earthworks). Carrying out development without required consent would therefore be a breach of the statutory regime and would be enforceable under the controlling Acts and their enforcement provisions (the Plan itself does not specify monetary fines or specific sanctions).
Conditions on consent and compliance monitoring: Consent authority powers to impose conditions and require works (for example in cl 5.10(10) where consent may be granted to otherwise prohibited development if it facilitates conservation and requires all necessary conservation works to be carried out) give rise to compliance obligations enforceable as conditions of consent. The Plan anticipates consent conditions that address heritage works, conservation measures, flood evacuation design, infrastructure provision and other mitigation measures.
Record-keeping obligations and procedural requirements: Some procedural duties are imposed on the consent authority and applicants which have compliance consequences. For instance, cl 4.6(4) requires the consent authority to keep a record of its assessment for exceptions to development standards. cl 6.1(3) requires an acid sulfate soils management plan to be prepared and provided to the consent authority; cl 5.10(5)-(6) allows the consent authority to require heritage management documents or conservation management plans.
Referral/consultation and statutory referrals: Several provisions require referral or notification to other statutory bodies whose responses may affect consentability. Failure to consult where the Plan requires it could expose the Council’s decision to legal challenge or to constraints imposed by other legislation. Examples include cl 6.11 (consult Commonwealth body for airspace), cl 5.10(7)-(9) (notify Heritage Council and local Aboriginal communities), and cl 5.1(2) (designation of State acquiring authority).
Interaction with other Acts that carry specific enforcement regimes: The Plan references other statutes that themselves contain enforcement tools. For example, the Plan’s provisions on heritage rely on the Heritage Act 1977 (cl 5.10) and on National Parks and Wildlife Act for Aboriginal objects; the Rural Fires Act 1997 is referenced in cl 5.11 for bush fire hazard reduction; aquaculture and fisheries provisions reference Fisheries Management Act materials (cl 5.19). Enforcement of offences under those Acts will be governed by their own penalty regimes where applicable.
What the Plan does not do in penalties and enforcement
The Plan does not set out express monetary penalties or a sanctions schedule within its text. It does not itself prescribe infringement notices, on-the-spot fines or a local enforcement code. Instead it situates duties and procedural tests within the planning consent framework; non-compliance therefore engages the enforcement provisions of the Environmental Planning and Assessment Act and other laws the Plan references.
Practical enforcement implications for practitioners
Expect enforcement action to be pursued under the Act rather than the LEP text itself if an unauthorised development takes place.
Where the Plan requires technical approvals (heritage management plans, acid sulfate soils management plans), a failure to lodge or to comply with imposed conditions is the usual trigger for regulatory action, remediation orders or the refusal/voiding of consent under the broader statutory regime.
Counsel and applicants should be mindful that some Plan provisions confer mandatory considerations that, if ignored by the consent authority, can render a consent vulnerable to challenge (for example failure to consider flood risk under cl 5.21 or biodiversity impacts under cl 6.6).
How it interacts with other laws
The Plan is expressly nested in a broader web of State and Commonwealth legislation and policy documents. The Plan repeatedly cross-references the Environmental Planning and Assessment Act, other State Acts, and State Environmental Planning Policies; it also requires consultation with Commonwealth aviation authorities in some circumstances.
Hierarchy and precedence
Clause 1.9 makes the Plan subject to any State environmental planning policy that prevails over it under section 3.28 of the Act. This establishes the primacy of SEPPs where there is inconsistency. The Plan also cross-refers to the Standard Instrument Order (note under Land Use Table) for transitional application to the Regional Jobs Precinct land until specified dates.
Cross-references to other Acts and instruments
The Plan references and requires compliance with, or consideration of, multiple other laws and policy instruments, including:
Environmental Planning and Assessment Act 1979 (the Act): procedural framing, consent authority role and standard-making context are under the Act (see cl 1.2, cl 1.6, multiple notes).
State Environmental Planning Policies: specific SEPPs are cited as relevant, for example State Environmental Planning Policy (Transport and Infrastructure) 2021, (Resources and Energy) 2021, (Resilience and Hazards) 2021, (Industry and Employment) 2021, (Primary Production) 2021, and the Exempt and Complying Development Codes 2008 referred to in cl 3.1 and elsewhere.
Heritage Act 1977 and National Parks and Wildlife Act 1974: referenced in cl 5.10 for heritage items and Aboriginal objects, and in cl 1.9A exclusions.
Land Acquisition (Just Terms Compensation) Act 1991: referenced in cl 5.1 in relation to owner-initiated acquisition provisions.
Local Government Act 1993: used for classification/reclassification of public land (cl 5.2).
Rural Fires Act 1997: referenced for bush fire hazard reduction exemptions (cl 5.11).
Fisheries Management Acts and Regulations in relation to aquaculture (cl 5.19 and Sch 6).
Building Code of Australia requirements are conditions for exempt and complying development (cl 3.1 and cl 3.2).
BASIX commitments and related regulation-expressed standards are excluded from cl 4.6 flexibility (cl 4.6(8)(b)).
Mechanisms of interaction
Supremacy and precedence: The Plan is subject to SEPPs that prevail; the Plan also identifies certain SEPP exclusions for the Plan area (cl 1.9(2) lists a SEPP clause that does not apply).
Referral and consultation: The Plan builds statutory referral and consultation obligations into the local assessment process (cl 6.11 Commonwealth consultation for airport surfaces; cl 5.10 Heritage Council notification).
Technical guideline reliance: The Plan delegates technical matters to external guidelines and manuals, creating a compliance path tied to those documents (cl 5.21 references the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual).
Parallel regulatory regimes: Where another Act regulates an activity (for example Crown land instruments under the Crown Land Management Act, or aquaculture licensing under Fisheries laws), the Plan either excludes its operation to the extent necessary (cl 1.9A suspending covenants, with specified exceptions) or requires applicants to meet those licensing requirements independent of planning consent (cl 3.1 Note 2 emphasises that exempt development is not exempt from other Acts).
Acquisition and trust discharge interplay: Clause 5.2 interacts with the Local Government Act on classification/reclassification, and the Plan’s Schedule 4 entries may discharge trusts or affect reservations, subject to Governor approval where required (note to cl 5.2(5)).
Practical implications of interactions
Applicants must navigate multiple statutory systems. A planning consent under the Plan may be necessary but not sufficient: separate licences or approvals under other statutes (e.g., fisheries, Aboriginal heritage approvals, water licensing) may be required.
The Plan’s references to State guidelines and strategies mean that failure to align an application with those documents (for example the NSW Oyster Industry Sustainable Aquaculture Strategy, cl 5.19(5)) may be a practical barrier to obtaining consent.
Where the Plan requires consultation with a Commonwealth or State body, that body’s advice can be material to the outcome and may preclude consent (cl 6.11(3)-(4) gives the Commonwealth body a practical veto where it advises penetration of airport surfaces should not occur).
Amendment history
The Plan text contains inline amendment annotations. These are the Plan’s internal records of changes; the Plan was made to commence on 21 April 2012 (cl 1.1AA). The clauses carry numerous amendment notes specifying the amending instrument (by year and occasional schedule/reference). The instrument has been amended on multiple occasions; the source text records selected amendments as follows (non-exhaustive list limited to amendments expressly shown in the Plan text):
2012 commencement: Plan commences on 21 April 2012 (cl 1.1AA).
2013 amendments: multiple amendments indicated (for example cl 4.1AA: Am 2013 (383), Sch 1[2]; Schedule 5 amendments Am 2013 (383) Sch1[4]-[23]; Schedule 4 Am 2013 (668) cl 4(1)(2)). These 2013 notations appear across clauses dealing with minimum lot sizes and schedules.
2014 amendments: cl 4.1 was amended in 2014 (cl 4.1: Am 2014 (135), Sch 1[1]) and other 2014 notations exist (e.g., Schedule 2 amendments).
2016 amendments: multiple, including substitutions and insertions in Part 4 and other clauses (for example cl 4.2B Subst 2016 (123), Sch 1[3]; cl 4.6 was amended in 2016 (see cl 4.6: Am 2022 (830), Sch 1.21[7] but earlier 2016 subst note).
2017 and 2018: Schedule and clause amendments, such as additions to Schedule 1 and changes to cl 6.1 (2018 (106), Sch 2.10).
2019: Amendments recorded in cl 1.8A (Am 2019 (621), Sch 5[1]) and cl 1.9A (Am 2019 (621), Sch 5[2]-[4]).
2021-2023: Notable amendments include replacement/substitution of cl 5.5 in 2021 (cl 5.5: Subst 2021 (714), Sch 11.34), flood planning/special flood considerations updated in 2023 (cl 5.21 and cl 5.22 reflect 2023 references, with cl 5.22 Subst 2023 (609), Sch 1.1[2]). Clause 1.8A includes the 2023 amendment relating to SEPP Amendment (Flood Planning) 2023 (cl 1.8A(2)).
2022-2025: Several items carry 2022 amendments, including expansion of the zone list (cl 2.1: Am 2022 (830), Sch 1.21[1][2]) and multiple references to Sch 1.21 amendments (cl 4.6, cl 4.1AA and others). There is a 2025 insertion,cl 2.1 notes an amendment 2025 (121), Sch 1[1] and the Land Use Table notes 2025 (121) Sch 1[2]. Clause 6.16 was inserted in 2025 (Ins 2025 (121), Sch 1[3]) governing development on and surrounding the Richmond Valley Regional Jobs Precinct. Schedule 1 additions show 2025 (121), Sch 1[4]-[7].
The amendment annotations in the source should be read as the Plan’s record of modifications and insertions made by subsequent instruments. Practitioners must check the Plan’s consolidated version on the NSW legislation and Planning Portal sites for up-to-date amendment history and dates, because the Plan’s clauses include multiple cross-references to amendments and transitional arrangements (for example the Standard Instrument Order note under the Land Use Table that certain amendments do not apply to the "Land subject to Richmond Valley Regional Jobs Precinct Process" until specified dates).
Institutional procedure for certain changes
Some Plan actions require additional approval beyond the Council: for example cl 5.2(5) notes that approval of the Governor is required before the description of public land is inserted in Part 2 of Schedule 4 if the reclassification discharges trusts. Clause 1.9A also records that, under section 3.16 of the Act, the Governor approved the suspension of covenants provision before its making.
Documented legislative references
Where provisions reference outside policy documents (BASIX, Flood Risk Management Manual, Considering Flooding Guideline, NSW Oyster Industry Strategy, industry development plans) those instruments and documents may be updated independently of the LEP; the Plan links to them as external sources the consent authority must have regard to (cl 5.19(5); cl 5.21(4)-(5)).
Litigation history
The Plan text does not record judicial decisions or litigation history. The instrument as provided includes no listings or references to court cases, tribunal decisions or legal challenges. It contains procedural and substantive tests that may give rise to administrative review or judicial review in practice (for example, decisions on cl 4.6 exceptions to development standards or cl 5.21 flood compatibility findings), but the Plan document itself does not summarise any litigation or list any precedent. Practitioners should therefore not rely on the Plan as a source of case law; any challengeable items are governed by the Act and administrative law principles and would appear in external case law databases rather than in the LEP text.
If a practitioner requires litigation history relevant to the Plan, the appropriate next steps are:
Search administrative and judicial decisions under the Environmental Planning and Assessment Act and related planning case law mentioning the Richmond Valley Local Environmental Plan 2012 or specific map areas/items (this document does not provide those searches).
Review any determinations and reasons for decision from the Land and Environment Court and any relevant merits review determinations that address application of the Plan's clauses (particularly flood, heritage, biodiversity or cl 4.6 exceptions).
Gotchas
This Plan contains numerous technical traps and timing points for practitioners. The following are concrete, source-grounded items to watch for.
Savings for pre-commencement DAs (cl 1.8A)
If a development application was lodged before the commencement of the Plan and not finally determined at commencement, it must be determined as if the Plan had not commenced (cl 1.8A(1)). This can preserve earlier permissible rights; it is a decisive transitional protection. cl 1.8A(2) also preserves pre-existing positions for development applications made but not finally determined before commencement of a specified SEPP Amendment (Flood Planning) 2023. Practitioners must check application dates carefully.
Suspension of covenants (cl 1.9A)
The Plan suspends covenants/agreements to the extent necessary to allow development in accordance with the Plan (cl 1.9A(1)), but this does not apply to covenants imposed or required by the Council, certain Crown instruments, conservation agreements, biobanking agreements or planning agreements (cl 1.9A(2)). It also does not affect rights of public authorities under registered instruments (cl 1.9A(3)). This suspension can change the legal landscape for landowners, but has specific exclusions.
Exempt/compliant development exclusions and overlays (cl 3.3)
Exempt and complying development cannot be carried out on a lengthy list of environmentally sensitive areas (cl 3.3(1)-(2)), which include coastal waters, coastal lakes, coastal wetlands/littoral rainforest areas, aquatic reserves, Ramsar and World Heritage areas, land within 100 metres of those areas, land identified as high Aboriginal cultural or biodiversity significance, national park or dedicated conservation land, declared areas of outstanding biodiversity and critical habitat. An otherwise exempt development may thus become consenting development simply by map overlay.
Music protections for licensed premises (cl 5.20)
The consent authority is prohibited from refusing consent for licensed premises on multiple music/dance-related grounds (cl 5.20(1)) and cannot refuse on noise grounds if the consent authority is satisfied the noise can be managed to an acceptable level (cl 5.20(2)). Applicants and councils must therefore focus on whether noise can be managed; refusal on aesthetics or genre is excluded as a lawful ground per the Plan.
Minimum lot size complexity and exceptions (cl 4.1 and following)
The Plan sets minimum lot sizes via the Lot Size Map (cl 4.1(3)). There are multiple special rules and exceptions: strata and community title exemptions (cl 4.1(4)), village subdivision minimums (cl 4.1(4A)(a)), residual lot exception (cl 4.1(4A)(b)), community title-specific rules (cl 4.1AA), strata plan rules for rural/residential/conservation zones (cl 4.1A), dual occupancy lot size tables (cl 4.1B), and a special allowance for dual occupancy subdivision to 350m2 in serviced village/residential zones (cl 4.1C). These nested rules can be easy to misapply.
Exception power to contravene development standards (cl 4.6)
The flexibility clause permits contravention of a development standard only if compliance is unreasonable or unnecessary and sufficient environmental planning grounds exist (cl 4.6(2)-(3)); the consent authority must record its assessment (cl 4.6(4)). Certain standards cannot be varied under cl 4.6 (cl 4.6(8)), including standards for complying development, BASIX commitments, and enumerated clauses (cross-referenced). The Regulation requires an accompanying document for applications that seek to contravene a development standard (note under cl 4.6). Procedural missteps here can render an approval vulnerable.
Flood planning and special flood considerations (cl 5.21-5.22)
Flood planning requires the consent authority to be satisfied about flood compatibility, evacuation, design and impact on flood behaviour (cl 5.21(2)-(3)). The consent authority must consider projected changes from climate change, and cl 5.22 extends scrutiny to land between the flood planning area and the probable maximum flood for sensitive/hazardous development. The Plan binds applicants to national/state guidance (Considering Flooding guideline and Flood Risk Management Manual, cl 5.21(4)-(5)). Practitioners must ensure flood risk assessments align with these documents.
Heritage referral and Aboriginal consultation (cl 5.10)
Before granting consent for development on archaeological sites or for demolition of nominated State heritage items, the consent authority must notify the Heritage Council and consider its response (cl 5.10(7), (9)). For Aboriginal places of heritage significance, the consent authority must consider impacts via adequate investigation and notify local Aboriginal communities and consider their responses (cl 5.10(8)). Failure to follow these steps risks procedural invalidity.
Acid sulfate soils planning (cl 6.1)
Works on land mapped for acid sulfate soils require a management plan prepared in accordance with the Acid Sulfate Soils Manual, and the consent authority must receive that plan before consenting (cl 6.1(3)). Preliminary assessments that indicate a management plan is not required must be confirmed in writing by the consent authority (cl 6.1(4)). There are specific exemptions for public authority emergency works, routine maintenance and minor works, and for certain agricultural works where production area entitlements and endorsed drainage management plans exist (cl 6.1(5)-(7)). Practitioners must obtain required confirmations in writing.
The Plan sets capacity thresholds for intensive livestock operations below which consent is not required (cl 5.18(4)-(5)), but also prescribes location restrictions (e.g., distances from sensitive areas). Aquaculture (cl 5.19) imposes site-selection and operational requirements; Schedule 6 details pond design, discharge rules and conservation exclusion zones. Aquaculture in priority oyster aquaculture areas may be permitted without consent subject to area limits (cl 5.19(6)). Checking precise zone and map-based status is essential.
Subdivision and dual occupancy rules (cl 2.6; cl 4.2B)
Subdivision that would separate a principal dwelling and a secondary dwelling is subject to minimum lot sizes and the definition of secondary dwelling (cl 2.6(2) and Note). The Plan also contains detailed rules for erection of dual occupancies and dwellings in certain rural/conservation zones with tight tests about prior entitlements or dwelling opportunities on maps (cl 4.2B(2)-(3)).
Localised special provisions (e.g., The Glebe, cl 6.13; Jobs Precinct, cl 6.16)
Special site-specific restrictions apply to particular mapped areas: The Glebe dwellings restricted unless reticulated water/sewerage present (cl 6.13) and strict assessment requirements in and around the Richmond Valley Regional Jobs Precinct (cl 6.16), newly inserted in 2025. Practitioners must locate the subject land against the Plan’s maps.
Maps and data currency
The Plan repeatedly requires reliance on named maps and the NSW Planning Portal (cl 1.7 note). Mapping accuracy and the date/version of GIS data can materially affect whether a proposed activity falls within a constrained overlay. Always confirm current maps and any recent map amendment instruments.
How to comply
Concrete, stepwise compliance guidance grounded in the Plan’s text.
Identify zone and overlays early
Consult the Land Zoning Map, Lot Size Map, Height of Buildings Map, Dwelling Opportunity Map and the overlay maps (Terrestrial Biodiversity Map, Acid Sulfate Soils Map, Landslide Risk Map, Riparian Land and Waterways Map, Wetlands Map, Drinking Water Catchment Map, Heritage Map, Land Reservation Acquisition Map, Key Sites Map and others) specified in the Plan (cl 1.7; cl 2.2; many clauses reference maps). Determine whether the proposed development is:
Permitted without consent in the zone (check Land Use Table, cl 2.3).
Exempt development listed in Schedule 2 and meeting all Schedule 2 conditions (cl 3.1 and Sch 2).
Complying development in Schedule 3 or under a State SEPP (cl 3.2 and Sch 3).
Requires development consent.
Check overlay-triggered documentary requirements
If mapped as acid sulfate soils (cl 6.1), prepare a preliminary assessment or an acid sulfate soils management plan in compliance with the Acid Sulfate Soils Manual and obtain written confirmation where relevant (cl 6.1(3)-(4)).
If the land sits on the Terrestrial Biodiversity Map (cl 6.6), prepare biodiversity assessments showing measures to avoid, minimise or mitigate impacts and demonstrate the development is designed, sited and managed accordingly (cl 6.6(3)-(4)).
If in flood planning area or between flood planning and probable maximum flood for sensitive/hazardous uses, prepare flood risk and evacuation analyses that address the Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual (cl 5.21(3)-(4); cl 5.22).
For heritage items and archaeological sites, prepare heritage impact statements, heritage management documents or conservation management plans as required and follow the notification/consultation steps with the Heritage Council or Aboriginal communities (cl 5.10(4)-(9)).
Ensure essential services and infrastructure arrangements
Demonstrate availability of essential services or adequate arrangements to provide them (water, electricity, sewerage, stormwater, road access) as cl 6.2 requires the consent authority to be satisfied before granting consent.
Prepare and align technical studies to referenced standards
Align technical documents to the standards referenced in the Plan: Building Code of Australia for exempt/compliant development (cl 3.1; cl 3.2), Acid Sulfate Soils Manual for acid sulfate soils (cl 6.1(3)), NSW Oyster Industry Sustainable Aquaculture Strategy and aquaculture industry development plans for aquaculture proposals (cl 5.19(5)), and the Considering Flooding guideline and Flood Risk Management Manual for flood matters (cl 5.21(4)-(5)). The Plan makes clear these are the documents the consent authority expects.
Check specific use constraints and size/area rules
Where proposing a dual occupancy, check the minimum lot size tables and the exceptions (cl 4.1B; cl 4.1C).
For subdivision, confirm minimum lot sizes and particular rules preventing subdivision that would create lots below minimums unless exceptions under cl 4.6 are satisfied; cl 4.2/4.2A/4.2B provide exceptions and tests for rural subdivisions.
Prepare to engage with external agencies where required
For developments that may penetrate airport Limitation or Operations Surfaces, undertake pre-lodgement consultation with the relevant Commonwealth aviation body as cl 6.11 requires and document responses (cl 6.11(2)-(4)).
For aquaculture, be ready to align proposals with industry development plans and the NSW Oyster Industry Strategy and consult the Department of Primary Industries material (cl 5.19(5)).
If seeking a departure from a development standard, satisfy cl 4.6 requirements
If the proposal contravenes a development standard, prepare the Regulation-required justification document demonstrating compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds (cl 4.6(3) and its explanatory note). Expect the consent authority to keep a record of its assessment (cl 4.6(4)). Remember cl 4.6 does not apply to certain categories of standards (cl 4.6(8)).
Plan for heritage and Aboriginal cultural heritage engagement
Early engagement with the Heritage Council and with local Aboriginal communities is required for applications affecting archaeological sites and Aboriginal places (cl 5.10(7)-(9)). A heritage management document or conservation management plan may be required before consent is granted (cl 5.10(5)-(6)).
For exempt or complying development, confirm all qualifying criteria
Exempt development must meet Schedule 2 conditions and BCA standards and must not be on State Heritage Register-listed land (cl 3.1). Complying development must be permissible with development consent in the zone and meet BCA deemed-to-satisfy provisions (cl 3.2).
Use the mapping regime to check special site rules and additional permitted uses
Check Schedule 1 for additional permitted uses applying to particular parcels (for example specified lots for rail freight, boat-building or an identified restaurant, Sch 1 entries). Confirm the subject parcel appears as “Item 1/2/3/4” on the Additional Permitted Uses Map before relying on Schedule 1.
If the land is public or intended for acquisition, note special constraints
If the land appears on the Land Reservation Acquisition Map, cl 5.1 designates which State authority is relevant for acquisition and cl 5.1A restricts development intended to be acquired for public purposes to certain works only until acquisition occurs. Pre-lodgement enquiries should clarify acquisition status.
Prepare for conditions and monitoring after consent
Expect conditions addressing conservation works, flood evacuation and mitigation, heritage conservation and long-term management, acid sulfate soils management, pollution controls, noise management for licensed premises, and biodiversity offsets or mitigation (the Plan anticipates these by listing matters the consent authority must be satisfied about in cl 5.10, cl 5.21, cl 6.1, cl 6.6, cl 5.19). Applicants should prepare commensurate operation/monitoring plans (for example management strategies for eco-tourist facilities under cl 5.13(k) and water/energy efficiency expectations).
Keep records and follow procedural steps
Where the Plan requires written confirmations or records (cl 6.1(4), cl 4.6(4), cl 5.10(7)-(9)), ensure these are obtained and retained. This reduces procedural risk and supports defensible approvals.
Check for temporal savings and transitional provisions
For existing DAs, confirm lodgement dates and whether the savings provision at cl 1.8A applies. Also check Standard Instrument transitional notes under the Land Use Table concerning the Richmond Valley Regional Jobs Precinct (Note 2 under the Land Use Table) and any expiry dates or temporary arrangements.
Seek pre-lodgement advice
Given the number of external guideline references, overlay triggers and mandatory documentary requirements, obtain pre-lodgement input from the Council and from relevant State agencies (heritage, aviation, fisheries, flood planning authorities) where the Plan requires or contemplates such input.
Applying these steps aligns an applicant’s approach with the Plan’s mapped and clause-based obligations and aims to minimise procedural and substantive rejection risks.
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Casino Local Environmental Plan 1992
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
Note.
The following local environmental plans cease to apply to the land to which this Plan applies under this provision—
Copmanhurst Local Environmental Plan 1990
Richmond River Local Environmental Plan 1992
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
State Environmental Planning Policy (Rural Lands) 2008 (clause 9)
cl 1.9: Am 2016 (310), Sch 4.21.
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land,
This is an opening excerpt, not the complete document.