TASIn ForceAct
Residential Building Work Contracts and Dispute Resolution Act 2016
19Variation document must be signed
Start here
Get a plain-English read of 19
Turn the raw legal text into a practical explanation grounded in Residential Building Work Contracts and Dispute Resolution Act 2016.
19 Variation document must be signed
As soon as practicable after an appropriate variation document is made, the building contractor must –
(a) sign the document; and
(b) take all reasonable steps to ensure the document is signed by the owner.
Penalty: In the case of –
(a) a body corporate, a fine not exceeding 300 penalty units; or
(b) an individual, a fine not exceeding 100 penalty units.