Compliance under this instrument requires managing auction participation, payment and settlement, registration and technical compliance, coordination with protected receivers and adherence to ACMA processes. The steps below trace what a prospective applicant or licensee should do, mapped to the instrument’s provisions.
Pre-auction due diligence and application. Obtain and study the applicant information package that ACMA will publish in accordance with the allocation determination (section 13(1)). That package will set application requirements, bidding rules and the auction timetable referenced in section 10. Note the instrument’s warning that ACMA and the Commonwealth disclaim liability for auction participation and seek independent legal, technical and financial advice (section 10 note).
Mapping and geographic scope. Use the ASMG and the HCIS identifiers in Schedule 2 to determine the precise geographic footprint associated with each lot (Schedule 2 clause 1(2)-(3) and Table 1). Do not rely solely on the indicative maps provided in the schedule (Schedule 2 note). Translate HCIS identifiers into precise polygons for coverage planning and interference assessment.
Bid and funding readiness. Prepare settlement funds and payment arrangements to meet the balance of the pre-determined price or winning price as a condition of issue (section 15). Coordinate legal and financial counsel to confirm funding and underwriting, because ACMA will only issue the licence after payment (section 15(1)).
Understand allocation alternatives. Be aware of the single-applicant pre-determined price route in section 10(2). If you are the sole applicant for a lot and nomination timing aligns with the auction manager’s actions, allocation at a pre-determined price may occur rather than bidding in the clock auction. Verify nomination timing with the auction manager and the allocation determination.
Registration and transmitter certification. Plan to register transmitters under Part 3.5 of the Act unless your devices qualify for the explicit exemptions in section 20(2). For devices that are exempt from registration, verify they meet all exemption criteria precisely: either maximum radiated true mean power ≤ 23 dBm per occupied bandwidth, or maximum radiated true mean power always ≤ 43 dBm per occupied bandwidth with phase centre ≤ 10 metres and antenna front-to-back ratio ≥ 20 dB (section 20(2)). Even exempt devices must not cause harmful interference (section 19(7)).
Assess acceptable levels of interference and certification requirements. Consult the Radiocommunications (Unacceptable Levels of Interference , 2.3 GHz Band) Determination 2013 and any ACMA instruments setting acceptable interference levels referenced in the note to section 20(1). Use accredited persons for issuance of certificates under subsection 145(3) of the Act where required. Set testing procedures that align with the definitions in section 5 and with good engineering practice for measurement of mean power, occupied bandwidth and maximum true mean power.
Emission and spurious emissions compliance. Build compliance checks for the emission limits in Schedule 3 (outside-area limits) and Schedule 4 (non spurious and spurious emissions). For outside-area emissions, determine whether the 23 dBm EIRP per 5 MHz limit in Schedule 3 clause 2(a) applies (operating in the offset 0-5 MHz from the upper frequency limit when a frequency-adjacent licence exists) or whether the 68 dBm EIRP per 5 MHz alternative applies (Schedule 3 clause 2). For out-of-band and offset emissions, map your transmitter’s -3 dB points and foffset correctly to the relevant table in Schedule 4 and ensure specified bandwidth and dBm EIRP figures are met (Schedule 4 clauses 2-3 and Tables 1-4).
Coordinate with protected receivers and follow RALI and advisory guidelines. Prior to registration of transmitters in or near the Mid West RQZ and supplementary RQZ, follow RALI MS 32 as if the transmitter were an apparatus licensed transmitter (section 19(4)). For deep space receivers and certain licensed receiving earth stations, ensure compliance with RALI MS 37 and with Appendix 7 of the ITU Radio Regulations where the receiver was registered prior to the device being registered (section 19(5)-(6)). Use the advisory guidelines for practical coordination measures (section 22). Document coordination steps and outcomes for record-keeping and potential ACMA review.
Plan for third-party use and trading rules. If you intend to authorise third parties to operate under your licence or to trade (assign or partition) all or part of a licence, ensure arrangements comply with Division 1 and Division 5 of Part 3.2 and with the Radiocommunications (Trading Rules for Spectrum Licences) Determination 2012 (sections 25-26). Ensure assignments are recorded and registered in compliance with ACMA’s rules to effect legal transfer.
Prepare for monitoring, measurement and record keeping. Keep calibrated test equipment and measurement records consistent with the measurement definitions in section 5 and with "good engineering practice". Maintain records of power measurements, occupied bandwidth determinations, antenna height and front-to-back ratio measurements, and coordination agreements. Where written agreements set emission limits between adjacent licensees, maintain those agreements and ensure operations conform to the agreed limits (Schedule 3 clause 1).
Factor in administrative and re-issue risks. Recognise that licences can be varied, re-issued and even resumed or cancelled under the Act (section 16 note and section 29). Do not assume the initial licence will be re-issued in the same form at later allocation exercises. Include contractual protections in commercial arrangements that allow for regulatory change and consider insurance or contractual remedies where appropriate.
Engage legal, technical and auction advisory support. The instrument explicitly recommends independent legal, technical and financial advice for auction participants (section 10 note). Given the interplay of the allocation determination, technical emission limits, registration regimes and coordination obligations, engage specialists who can interpret the allocation rules, measure compliance against the Schedules and negotiate coordination agreements or trading arrangements.
Monitor referenced instruments and ACMA publications. Because references in the instrument are to documents as in force from time to time (section 6), monitor amendments to the allocation determination, the Unacceptable Levels Determination, RALI publications, advisory guidelines and any ACMA notices about re-issue, expiry or other administrative processes (sections 12, 24, 28). Keep a compliance calendar keyed to required registrations, certification renewals and potential publication dates.
In short, compliance requires integrating auction readiness, precise HCIS-based geographic analysis, strict technical measurement and testing protocols, formal coordination with protected receivers where necessary, administrative registration discipline, and legal and financial arrangements for payment and trading. Each compliance step is referenced to a particular clause or schedule in the instrument and to related APs and determinations that must be consulted and followed.