Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2019
7New system not to be commissioned unless properly installed
Start here
Get a plain-English read of 7
Turn the raw legal text into a practical explanation grounded in Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2019.
7 New system not to be commissioned unless properly installed
7 New system not to be commissioned unless properly installed
The person responsible for a storage system must not commission the system, or authorise or permit the commissioning of the system, unless—
(a) the system has been installed by a duly qualified person, and
(b) the person by whom the system has been installed has provided the person responsible for the system with—
(i) a list of the industry standards that have been followed in connection with the installation of the system, and
(ii) a copy of the installation specifications for the system, and
(iii) current “as-built” drawings for the system.
Maximum penalty—200 penalty units (in the case of an individual) and 400 penalty units (in the case of a corporation).