6 New system not to be commissioned unless properly designed
6 New system not to be commissioned unless properly designed
The person responsible for a storage system must not commission the system, or authorise or permit the commissioning of the system, unless—
(a) the system has been designed by a duly qualified person, and
(b) the person by whom the system has been designed has provided the person responsible for the system with—
(i) a list of the industry standards that have been followed in connection with the design of the system, and
(ii) a copy of the design specifications for the system.
Maximum penalty—200 penalty units (in the case of an individual) and 400 penalty units (in the case of a corporation).