If a significant modification is made to a storage system, the person responsible for the storage system must—
(a) ensure that the following information is recorded—
(i) a comprehensive description of the modification,
(ii) the dates of commencement and completion of the modification,
(iii) the results of the equipment integrity test carried out under clause 13, and
(b) ensure that the current “as-built” drawings for the system are revised to reflect the modification.
Maximum penalty—100 penalty units (in the case of an individual) and 200 penalty units (in the case of a corporation).