Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2019
10Modified system not to be commissioned unless properly designed
Start here
Get a plain-English read of 10
Turn the raw legal text into a practical explanation grounded in Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2019.
10 Modified system not to be commissioned unless properly designed
10 Modified system not to be commissioned unless properly designed
The person responsible for a modified storage system must not commission the system, or authorise or permit the commissioning of the system, unless—
(a) the modification has been designed by a duly qualified person, and
(b) the person by whom the modification has been designed has provided the person responsible for the system with—
(i) a list of the industry standards that have been followed in connection with the design of the modification, and
(ii) a copy of the design specifications for the modification.
Maximum penalty—200 penalty units (in the case of an individual) and 400 penalty units (in the case of a corporation).