Plain English Summary
8/10 complexity
Sets local land-use rules for Port Macquarie‑Hastings: zoning maps, lists what development is permitted, requires development consent for most subdivisions/demolitions, sets lot sizes, height and floor‑space limits, and imposes heritage, environmental and aquaculture controls. It affects landowners, developers and the Council (the consent authority); applicants bear compliance costs and must meet mapped limits and environmental/heritage tests before Council will grant or condition consent.
This instrument is the Port Macquarie‑Hastings Local Environmental Plan 2011 (the Plan). It sets the local planning rules that apply to the land shown on its Land Application Map and Land Zoning Map, including zones, permitted and prohibited land uses, development standards, maps and schedules that modify or qualify those standards (clauses 1.1-1.3, 2.1-2.3). The Plan:
Prescribes the zoning system for the council area (clause 2.1 and clause 2.2) and a Land Use Table that specifies objectives for each zone and what development is permitted with or without consent and what is prohibited (clause 2.3 and the Land Use Table at Part 2).
Sets local development standards and calculation rules: minimum lot sizes and exceptions (clauses 4.1, 4.1AA-4.1B, 4.1A), height limits (clause 4.3), floor space ratios and how to calculate site area and gross floor area (clauses 4.4-4.5), plus a local application of the exceptions to standards mechanism (clause 4.6).
Identifies exempt and complying development categories specific to the Plan (Part 3; Schedule 2 and Schedule 3) and excludes exempt/compliant development from environmentally sensitive areas (clause 3.3).
Specifies a range of locally tailored controls and constraints that the consent authority must apply: heritage provisions (clause 5.10 and Schedule 5), acid sulfate soils (clause 7.1), flood planning and special flood considerations (clauses 5.21-5.22), koala habitat (clause 7.5), coastal erosion risk (clause 7.6), airspace and aircraft noise considerations (clauses 7.7-7.8), acoustic controls (clause 7.9), and numerous use‑specific limits (for example bed and breakfast, home business, secondary dwellings, neighbourhood shops at clause 5.4 and clause 5.5).
Provides site or area specific departures and additions: additional permitted uses on particular lots (Schedule 1 and clause 2.5), restrictions on large retail or commercial floor areas in identified parts of the E1, E3 and MU1 zones (clauses 7.11, 7.19, 7.12/7.15), and detailed provisions for urban release areas that require infrastructure certification, development control plans and other staging requirements (Part 6, clauses 6.1-6.4).
Current sections
Direct links to the current provisions in Port Macquarie-Hastings Local Environmental Plan 2011.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agriculture; Air transport facilities; Airstrips; Animal boarding or training establishments; Aquaculture; Bed and breakfast accommodation; Building identification signs; Business identification signs; Cellar door premises; Community facilities; Dual occupancies (attached); Dwelling houses; Eco-tourist facilities; Environmental facilities; Environmental protection works; Extractive industries; Farm buildings; Farm stay accommodation; Forestry; Helipads; Home-based child care; Home businesses; Home industries; Industrial retail outlets; Intensive livestock agriculture; Intensive plant agriculture; Open cut mining; Roads; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Secondary dwellings;
4
Prohibited
4 Prohibited
4 Prohibited
Any development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
| Zone R1 General Residential and marked “Local Road” | Council |
| Zone R1 General Residential and marked “School” | Minister for Education and Training |
| Zone RE1 Public Recreation and marked “Local Road” | Council |
| Zone SP2 Infrastructure and marked “Local Road” | Council |
| Zone SP2 Infrastructure and marked “Sewerage” | Council |
| Zone SP3 Tourist and marked “Local Road” | Council |
| Zone C2 Environmental Conservation and marked “Environment Protection” | Council |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
cl 5.1: Am 2022 (828), Sch 1.17[6].
Part 6
Urban release areas
Part 6 Urban release areas
Part 6 Urban release areas
6
Arrangements for designated State public infrastructure
6 Arrangements for designated State public infrastructure
6.1 Arrangements for designated State public infrastructure
(1) The objective of this clause is to require satisfactory arrangements to be made for the provision of designated State public infrastructure before the subdivision of land in an urban release area to satisfy needs that arise from development on the land, but only if the land is developed intensively for urban purposes.
(2) Development consent must not be granted for the subdivision of land in an urban release area if the subdivision would create a lot smaller than the minimum lot size permitted on the land immediately before the land became, or became part of, an urban release area, unless the Director-General has certified in writing to the consent authority that satisfactory arrangements have been made to contribute to the provision of designated State public infrastructure in relation to that lot.
(3) Subclause (2) does not apply to—
(a) any lot identified in the certificate as a residue lot, or
(b) any lot to be created by a subdivision on land that was the subject of a previous development consent granted in accordance with this clause, or
(c) any lot that is proposed in the development application to be reserved or dedicated for public open space, public roads, public utility undertakings, educational facilities or any other public purpose, or
(d) a subdivision for the purpose only of rectifying an encroachment on any existing lot.
(4) This clause does not apply to land in an urban release area if all or any part of the land is in a region within the meaning of the Act, Division 7.1, Subdivision 4.
(1) The objective of this clause is to ensure that development does not disturb, expose or drain acid sulfate soils and cause environmental damage.
(2) Development consent is required for the carrying out of works described in the Table to this subclause on land shown on the Acid Sulfate Soils Map as being of the class specified for those works.
| Class of land | Works |
| 1 | Any works |
| 2 | Works below the natural ground surface.Works by which the watertable is likely to be lowered. |
| 3 | Works more than 1 metre below the natural ground surface.Works by which the watertable is likely to be lowered more than 1 metre below the natural ground surface. |
| 4 | Works more than 2 metres below the natural ground surface.Works by which the watertable is likely to be lowered more than 2 metres below the natural ground surface. |
| 5 | Works within 500 metres of adjacent Class 1, 2, 3 or 4 land that is below 5 metres Australian Height Datum and by which the watertable is likely to be lowered below 1 metre Australian Height Datum on adjacent Class 1, 2, 3 or 4 land. |
(3) Development consent must not be granted under this clause for the carrying out of works unless an acid sulfate soils management plan has been prepared for the proposed works in accordance with the Acid Sulfate Soils Manual and has been provided to the consent authority.
(4) Despite subclause (2), development consent is not required under this clause for the carrying out of works if—
(a) a preliminary assessment of the proposed works prepared in accordance with the Acid Sulfate Soils Manual indicates that an acid sulfate soils management plan need not be carried out for the works, and
(b) the preliminary assessment has been provided to the consent authority and the consent authority has confirmed the assessment by notice in writing to the person proposing to carry out the works.
(5) Despite subclause (2), development consent is not required under this clause for the carrying out of any of the following works by a public authority (including ancillary work such as excavation, construction of access ways or the supply of power)—
(a) emergency work, being the repair or replacement of the works of the public authority required to be carried out urgently because the works have been damaged, have ceased to function or pose a risk to the environment or to public health and safety,
(b) routine management work, being the periodic inspection, cleaning, repair or replacement of the works of the public authority (other than work that involves the disturbance of more than 1 tonne of soil),
(c) minor work, being work that costs less than $20,000 (other than drainage work).
(6) Despite subclause (2), development consent is not required under this clause to carry out any works if—
(a) the works involve the disturbance of less than 1 tonne of soil, such as occurs in carrying out agriculture, the construction or maintenance of drains, extractive industries, dredging, the construction of artificial water bodies (including canals, dams and detention basins) or foundations or flood mitigation works, or
(b) the works are not likely to lower the watertable.
Use of certain land at corner of John Oxley Drive and Main Street, Thrumster (adjacent to the Thrumster Town Centre)
2A Use of certain land at corner of John Oxley Drive and Main Street, Thrumster (adjacent to the Thrumster Town Centre)
2A Use of certain land at corner of John Oxley Drive and Main Street, Thrumster (adjacent to the Thrumster Town Centre)
(1) This clause applies to land at the corner of John Oxley Drive and Main Street, Thrumster, being Lot 2, DP 1185319, shown as “Item 2A” on the Additional Permitted Uses Map.
(2) Development ancillary to a pub or restaurant located on adjoining land in Zone SP3 Tourist is permitted with development consent.
8
Use of certain land at Flynns Beach, Tuppenny Road, Port Macquarie
8 Use of certain land at Flynns Beach, Tuppenny Road, Port Macquarie
8 Use of certain land at Flynns Beach, Tuppenny Road, Port Macquarie
(1) This clause applies to land at Flynns Beach, Tuppenny Road, Port Macquarie, being part of Lot 7052, DP 1121282 shown as “Item 8” on the Additional Permitted Uses Map.
(2) Development for the purposes of a restaurant or cafe is permitted with development consent.
9
Use of certain land at Lighthouse Beach, Matthew Flinders Road, Port Macquarie
9 Use of certain land at Lighthouse Beach, Matthew Flinders Road, Port Macquarie
9 Use of certain land at Lighthouse Beach, Matthew Flinders Road, Port Macquarie
(1) This clause applies to land at Lighthouse Beach, Matthew Flinders Road, Port Macquarie, being part of Lot 7074, DP 1052955 shown as “Item 9” on the Additional Permitted Uses Map.
(2) Development for the purposes of a restaurant or cafe is permitted with development consent.
10
Use of certain land at Rainbow Beach, Beach Street, Bonny Hills
10 Use of certain land at Rainbow Beach, Beach Street, Bonny Hills
10 Use of certain land at Rainbow Beach, Beach Street, Bonny Hills
(1) This clause applies to land at Rainbow Beach, Beach Street, Bonny Hills, being part of Lot 2, DP 1171577 shown as “Item 10” on the Additional Permitted Uses Map.
(2) Development for the purposes of a restaurant or cafe is permitted with development consent.
11
Use of certain land at North Haven Beach, 128 The Parade, North Haven
11 Use of certain land at North Haven Beach, 128 The Parade, North Haven
11 Use of certain land at North Haven Beach, 128 The Parade, North Haven
(1) This clause applies to land at North Haven Beach, 128 The Parade, North Haven, being foreshore Crown land adjoining Lot 7006, DP 1026384, shown as “Item 11” on the Additional Permitted Uses Map.
(2) Development for the purposes of a restaurant or cafe is permitted with development consent.
12
Use of certain land at Oxley Highway, Sancrox
12 Use of certain land at Oxley Highway, Sancrox
12 Use of certain land at Oxley Highway, Sancrox
(1) This clause applies to Lot 1, DP 1261690, Oxley Highway, Sancrox, shown as “Item 12” on the Additional Permitted Uses Map.
(2) Development for the purposes of a highway service centre and ancillary hotel or motel accommodation is permitted with development consent.
13
Use of certain land at or near Port Macquarie Airport
13 Use of certain land at or near Port Macquarie Airport
13 Use of certain land at or near Port Macquarie Airport
(1) This clause applies to certain land at or near Port Macquarie Airport, shown as “Item 13” on the Additional Permitted Uses Map.
(2) Development for the purposes of sewerage systems is permitted without development consent.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
(b) the excavation or disturbance of land for the purpose of carrying out the conservation or repair of a monument or grave marker.
(2) Must be within an existing cemetery or burial ground.
(3) Must not disturb human remains, relics, Aboriginal objects in the form of grave goods, or an Aboriginal place of heritage significance.
(4) Must not involve the removal or pruning of a tree or other vegetation that requires a permit or development consent for removal or pruning, unless that removal or pruning is undertaken in accordance with a permit or development consent.
(5) Must not be on land shown as “Coastal erosion risk” on the Coastal Erosion Map.
sch.2-sec-oc.2
Dams (Zones RU1, RU2 and RU6)
sch.2-sec-oc.2 Dams (Zones RU1, RU2 and RU6)
Dams (Zones RU1, RU2 and RU6)
(1) Maximum embankment fill batter grades—1:2.5 (vertical:horizontal).
(2) Minimum distance from property boundary at closest point—10m.
(3) Minimum fill embankment crest width—3m.
(4) Minimum height difference between the embankment crest level and the spillway level—1m.
(5) Maximum fill embankment height, as measured from ground level (existing) immediately down slope of the embankment to the top of the embankment crest level—3m.
(9) Must not be within 40m of any part of an on-site effluent disposal system.
sch.2-sec-oc.3
Lighting (external)
sch.2-sec-oc.3 Lighting (external)
Lighting (external)
(1) Must not be for the lighting of tennis courts or sports grounds.
(2) Constructed and maintained so that light spill is contained within site and in accordance with AS 4282–1997, Control of the obtrusive effects of outdoor lighting.
(3) Construction and maintenance of lighting at or in vicinity of air transport facilities if consistent with Manual of Standards (MOS)—Part 139—Aerodromes published by the Civil Aviation Safety Authority (established under the Civil Aviation Act 1988 of the Commonwealth).
sch.2-sec-oc.4
Signage—sports field advertising
sch.2-sec-oc.4 Signage—sports field advertising
Signage—sports field advertising
(1) Must be facing the playing area on the inside of a fence around the playing surface.
(2) Must provide information about sponsors, or products of sponsors, of teams or organisations using the sporting facility.
(3) Must not be artificially illuminated.
(4) Maximum height above ground level (existing)—1.2m.
Consent of the appropriate roads authority to the signage under section 138 (1) of the Roads Act 1993 may still be required.
sch.2-sec-oc.6
Subdivision
sch.2-sec-oc.6 Subdivision
Subdivision
Must relate to land comprising a council public road proposed for closure under Division 3 of Part 4 of the Roads Act 1993.
sch.2-sec-oc.7
Wind energy generating works (other than in Zone RU1, RU2, RU3 or RU4)
sch.2-sec-oc.7 Wind energy generating works (other than in Zone RU1, RU2, RU3 or RU4)
Wind energy generating works (other than in Zone RU1, RU2, RU3 or RU4)
(1) Maximum height above ground level (existing)—2.7m, or the maximum height permitted for the Limitation or Operations Surface in clause 7.7, whichever is less.
(2) Must be located behind the building line.
(3) Maximum generating capacity for wind turbines—2Kw.
(4) Noise emissions must not be audible inside any adjoining dwelling between 10.00 pm and 7.00 am on weekdays, and between 10.00 pm and 8.00 am on Saturdays, Sundays and public holidays. At all other times, noise levels must not exceed 5dBA above ambient background noise level measured at the lot boundary.
(5) Must not involve the removal or pruning of a tree or other vegetation that requires a permit or development consent for removal or pruning, unless that removal or pruning is undertaken in accordance with a permit or development consent.
(6) Must not be carried out on land that is shown as “Coastal erosion risk” on the Coastal Erosion Map.
(7) Must not be carried out on a heritage item.
(8) Must be located at least 1m from a registered easement, sewer main or water main.
This Plan is Port Macquarie-Hastings Local Environmental Plan 2011.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Port Macquarie-Hastings in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to protect, conserve and sustainably manage the ecological biodiversity and natural environment of the Port Macquarie-Hastings area,
(b) to facilitate a strong and diverse local economy within the Port Macquarie-Hastings area,
(c) to manage and coordinate the orderly, equitable and economic use and development of land within the Port Macquarie-Hastings area,
(d) to facilitate the provision and coordination of community services and facilities within the Port Macquarie-Hastings area,
(e) to facilitate adaptive planning for natural hazards and risks, including flooding, erosion, inundation, land stability, bush fire risk and acid sulfate soils within the Port Macquarie-Hastings area,
(f) to reinforce the role of the Port Macquarie-Hastings area’s settlement hierarchy, centred on Port Macquarie and supported by its surrounding towns and villages,
(g) to ensure the effective management of public assets within the Port Macquarie-Hastings area,
(h) to provide a land use framework for development within the Port Macquarie-Hastings area that is safe, inclusive and equitable, and caters for the housing, employment, entertainment, cultural, welfare and recreational needs of residents and visitors,
Includes transitional and saving provisions for development applications made before commencement and for State environmental planning policy interactions (clauses 1.8A, 1.9) and a clause that, in limited terms, suspends private covenants that would prevent development authorised under the Plan (clause 1.9A).
Mechanically, the Plan is a standard local environmental plan: it allocates development rights by zone and by specific mapped controls, sets parameters and procedural pre‑conditions for consent, and establishes exempt/compliant classes. The consent authority for deciding development applications under the Plan is the Council, subject to the Environmental Planning and Assessment Act (clause 1.6). Maps are an integral, administrable element (clause 1.7) and the Plan contains numerous site‑specific mappings (Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Heritage Map, Koala Habitat Map, Coastal Erosion Map, Acoustic Controls Map, Land Reservation Acquisition Map, Additional Permitted Uses Map, Clause Application Map, etc.) which operationalise the uniform textual rules.
The Plan repeatedly cross‑references State instruments and guidance, for example SEPPs and standards (clause 1.9, various notes, clause 5.21(4)-(5)), so its operation is interdependent with State policy and the Act.
Main concepts
The Plan’s organising concepts are zoning, consent categories, mapped controls, development standards, exemptions/complying development and site‑specific schedules. Each concept is implemented by express clauses:
Zoning and permitted uses. The Plan defines a set of zones (R, RU, E, MU, SP, RE, C, W) (clause 2.1) and then implements those zones through the Land Use Table which sets objectives and lists development that is permitted with or without consent and prohibited uses for each zone (clause 2.3 and the Land Use Table). The consent authority must have regard to zone objectives when determining applications (clause 2.3(2)).
Consent categories and thresholds. The Plan distinguishes development that may be carried out without consent (subject to Part 5 approvals), development requiring development consent (the usual pathway), and development that is prohibited. Exempt development is defined in Schedule 2 and complying development in Schedule 3, with Plan‑specific conditions (Part 3, clauses 3.1-3.3). Exempt or complying development is excluded from environmentally sensitive areas (clause 3.3).
Mapped development standards. The Plan regularly delegates granular limits to maps: minimum lot sizes (Lot Size Map, clause 4.1), building heights (Height of Buildings Map, clause 4.3), floor space ratios (Floor Space Ratio Map, clause 4.4), and other site designations such as “Dwelling opportunity”, “Koala habitat area”, “Coastal Erosion Risk”, and “Significant Urban Area” (various clauses).
Calculations and anti‑double‑dipping. The Plan sets detailed calculation rules for floor space ratio and site area (clause 4.5), including exclusions, strata treatment and the power to require covenants to prevent “double dipping” where a site comprises multiple lots (clause 4.5(9)-(10)).
Local exceptions and the discretion to relax standards. Clause 4.6 imports the exceptions mechanism familiar from the Act, allowing development consent to be granted notwithstanding contravention of a development standard if the applicant demonstrates that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds; the clause preserves a series of express limits and restrictions (for example, it cannot be used to approve certain subdivisions in rural and conservation zones, clause 4.6(6); it excludes certain standards from being relaxed, clause 4.6(8)).
Environmental and hazard overlay controls. The Plan embeds procedural and substantive hurdles for development in sensitive or hazardous contexts: acid sulfate soils require management plans (clause 7.1), earthworks may require consent and the consent authority must consider impacts on drainage, soil stability, fill quality and erosion risk (clause 7.2), flood planning and special flood considerations set tests the consent authority must be satisfied of before granting consent (clauses 5.21-5.22), coastal erosion requires assessment against sea‑level benchmarks (clause 7.6).
Heritage and Aboriginal cultural heritage. The Plan lists heritage items, archaeological sites and Aboriginal places and requires consent for demolition, moving, exterior alteration or excavating where risk to heritage exists; it allows the consent authority to require heritage management documents and to notify the Heritage Council for archaeological work (clause 5.10 and Schedule 5).
Use‑specific quantitative controls. Clause 5.4 places express quantitative caps on particular uses (for example bed and breakfast maximum four bedrooms, home business/home industry maximum 60 m2, neighbourhood shops maximum 200 m2, neighbourhood supermarkets 1,000 m2, industrial retail outlet cap numerics). Clause 5.5 and clause 5.5(10) regulate secondary dwellings’ floor area, and clause 7.11 and 7.19 place gross floor area caps to preserve centre hierarchies.
These concepts interact: maps convert policy objectives into parcel‑level rights/constraints; schedules and clauses insert bespoke local rules; the consent authority (Council) is the decision maker applying these tests (clause 1.6). The Plan is instrumentally designed to allocate development rights, limit certain uses by area or size, require environmental/habitat/heritage assessment in sensitive locations, and to channel larger development to identified centres through caps and additional permitted use rules (for example clauses 7.11, 7.19, Schedule 1).
Who it affects
The Plan distributes rights, obligations and compliance costs primarily among three groups: landowners and developers, the Council as the local consent authority, and public authorities involved in infrastructure or heritage oversight. The distribution is explicit in the text.
Landowners and developers. The Plan determines what owners may lawfully do with their land. Zoning, the Land Use Table and schedules govern whether a proposed use is permitted without consent (Schedule 2 exempt development), is subject to complying development pathways (Schedule 3), requires development consent (Land Use Table and various clauses), or is prohibited (Land Use Table entries and specific prohibitions such as clause 2.9 that expressly prohibits canal estate development). Owners proposing development in environmentally sensitive areas must satisfy additional requirements (clauses 3.3, 7.1, 5.10, 7.5, 5.21). Owners seeking to subdivide must meet minimum lot sizes or the specific exceptions in clauses 4.1, 4.1AA, 4.1A-4.1B. Owners of land with special mapped designations (e.g., “Area 2” in E1, “Area 1” near Port Macquarie Airport, Additional Permitted Uses Map) face site‑specific numeric limits or conditional permissions (clauses 7.11, 7.18, Schedule 1 items).
The Council (consent authority). Clause 1.6 names the Council as the consent authority for the Plan (subject to the Act). The Council must apply multiple substantive satisfaction tests in determining consent: whether a temporary use will prejudice future development (clause 2.8), whether flood risk is managed (clauses 5.21-5.22), whether heritage impacts are acceptable (clause 5.10), whether coastal hazards or aircraft noise implications are managed (clause 7.6, 7.8), and whether the infrastructure or staged development requirements for urban release areas have been satisfied (Part 6). The Council also maintains maps and public availability as required by clause 1.7.
State and Commonwealth bodies. The Plan defers to State environmental planning policies that prevail (clause 1.9). It expressly requires consultation with relevant Commonwealth bodies for development that would penetrate defined airport limitation surfaces (clause 7.7). For certain land acquisitions and infrastructure arrangements, the Plan specifies relevant State authorities in the Land Reservation Acquisition Map (clause 5.1).
Public service and emergency providers. The Plan contains provisions that affect emergency response, infrastructure providers and public authorities. For example, Part 6 requires certification by the Director‑General for provision of designated State public infrastructure before certain subdivisions (clause 6.1). The Plan also exempts some public authority works from consent in acid sulfate soils contexts (clause 7.1(5)) and allows certain development to be carried out by or on behalf of public authorities in connection with Port Macquarie Airport (clause 7.18(2)).
Who pays. The text shows that costs fall largely on developers and landowners: compliance with consent requirements (applications, heritage management documents, acid sulfate soils management plans clause 7.1(3)), the need to prepare environmental impact statements or statements of environmental effects (clause 5.18(3)(a)), infrastructure contributions and certification for urban release areas (clauses 6.1-6.3), the cost of meeting quantitative controls (design, smaller building footprints, or relocating to alternative sites). Council resources are required to assess and enforce consents, keep maps accessible (clause 1.7), and manage reclassification or discharge of reserves (clause 5.2).
Decision points and discretion. The consent authority is given significant evaluative discretion: it must be satisfied on multiple facts before granting consent (see flood, heritage, koala habitat, eco‑tourist and other clauses). Clause 4.6 gives scope for flexibility in development standards, but also lists explicit standards that cannot be relaxed. The Plan therefore centralises final decision‑making with the consent authority but binds it to tests and mapped parameters laid out in the instrument.
Key duties and rights
The Plan creates duties for the consent authority and rights (or constraints) for landowners, captured in the Plan text.
Duties of the consent authority (Council)
Apply zone objectives: The consent authority must have regard to zone objectives in the Land Use Table when determining applications (clause 2.3(2)).
Apply mapped limits and tests: The authority must ensure building heights, floor space ratios and lot sizes do not exceed mapped maxima (clauses 4.1, 4.3, 4.4), unless allowable exceptions are met (clause 4.6).
Check environmental and hazard compatibility: For development in flood planning areas (clause 5.21), coastal erosion risk areas (clause 7.6) and Special Flood Considerations (clause 5.22), the authority must be satisfied that a set of enumerated protections and evacuation/safety measures are in place. For acid sulfate soils, the authority must not grant consent unless an acid sulfate soils management plan has been prepared and provided (clause 7.1(3)); it may accept a preliminary assessment in limited circumstances (clause 7.1(4)).
Heritage and Aboriginal places: The authority must consider effects on heritage significance prior to granting consent and may require a heritage management document or a heritage conservation management plan (clause 5.10(4)-(6)). For archaeological sites and Aboriginal places the Plan requires notification of and consideration of advice from the Heritage Council and local Aboriginal communities (clause 5.10(7)-(8), (9)).
Infrastructure and urban release area prerequisites: For urban release areas, the consent authority must not grant subdivision consent unless the Director‑General certifies that arrangements for designated State public infrastructure are in place (clause 6.1(2)), and must ensure essential public utilities are available or will be provided (clause 6.2).
Rights and constraints for landowners and applicants
Rights to develop within zone permissions: Subject to the Plan and the Act, landowners have a statutory right to seek development consent for any development listed as permissible with consent in the Land Use Table (clause 2.3(1) and the Land Use Table).
Exempt and complying pathways: Certain low‑impact works are exempt (Schedule 2) or complying (Schedule 3) if they meet the Plan’s standards and other statutory requirements (clause 3.1-3.2). However, exempt/compliant development is not permitted in environmentally sensitive areas (clause 3.3).
Access to exception relief: An applicant may seek consent for development that contravenes a development standard under clause 4.6, provided the applicant demonstrates compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds, and subject to record‑keeping by the consent authority (clause 4.6(2)-(4)).
Site‑specific rights through Schedule 1: The Plan grants additional permitted uses for particular parcels (Schedule 1 and clause 2.5), e.g., specified additional uses at Homedale Road Kew, Thrumster, and several foreshore parcels (Schedule 1 items). These are rights exercisable subject to the specified conditions in each Schedule 1 item.
Rights of public authorities: The Plan preserves the Crown’s ability to carry out infrastructure development under State SEPPs (clause 5.12) and to use existing Crown buildings (clause 5.12(2)). Clause 1.9A suspends certain private covenants to the extent necessary to permit development authorised by the Plan, with enumerated exceptions (clause 1.9A(1)-(3)).
Other specific duties and limits
Quantitative caps: Clauses in Part 5 set precise numerical constraints that are effectively statutory duties (for instance clause 5.4,bed and breakfast maximum 4 bedrooms; home business 60 m2; neighbourhood shop 200 m2; clause 7.11,E1 Area 2 commercial premises gross floor area must not exceed 2,000 m2). The consent authority must enforce these caps when applicable.
Dual roles for consent authority: The authority must both evaluate substantive impacts and ensure compliance with procedural pre‑conditions (for example requiring supporting plans, heritage management documents or koala plans of management under clause 7.5(3)).
Procedural rights and constraints. The Plan contains transitional protections for pending development applications (clause 1.8A), requires maps to be publicly available (clause 1.7), and subjects many decisions to notification and consultation obligations where heritage, Aboriginal places or Commonwealth aviation surfaces are implicated (clauses 5.10, 7.7, 7.8).
Penalties and enforcement
The Plan text itself focuses on land use allocation, procedural prerequisites and substantive consent tests; it does not set out an enforcement regime of criminal penalties or administrative fines within the text provided. Relevant operative features in the Plan which affect enforcement capacity are:
Consent authority role and duties. Clause 1.6 identifies the Council as the consent authority (subject to the Act). That designation locates primary enforcement and compliance functions and the responsibility to ensure development conforms to consents and Plan conditions in the Council.
Conditioning of consents. The Plan explicitly contemplates conditions of consent as instruments to manage impacts and prevent certain post‑consent changes. For example, covenant registration to prevent double counting of floor space is an express condition contemplated by clause 4.5(9)-(10); many approvals are conditional on management plans (acid sulfate soils clause 7.1(3); eco‑tourist management strategy clause 5.13(3)(k)).
Limits on use of exceptions mechanism. Clause 4.6 sets thresholds under which exceptions to development standards cannot be used,for instance subdivisions creating multiple lots below the minimum in rural and certain conservation zones (clause 4.6(6)). These are substantive legal limits the consent authority must enforce.
Procedural notifications that support enforcement. Heritage and Aboriginal place provisions require notification and consultation with Heritage Council and local Aboriginal communities (clause 5.10(7)-(9)), placing process steps that can trigger review or objection that affect enforceability.
Maps and record‑keeping. Clause 1.7 mandates that designated maps be approved and kept available for public access, which enables public oversight and supports compliance monitoring.
What is not in the Plan text. The Plan does not itself enumerate monetary penalties, infringement notices or the specific enforcement powers of the consent authority. Those enforcement mechanisms (orders, fines, prosecutions, remedial powers, stop work notices, enforcement orders) are found in the Environmental Planning and Assessment Act 1979 and associated regulations, which are referenced by the Plan (for example clause 1.6 is expressly “subject to the Act”). For any enforcement action (for example for unauthorised development or breach of consent conditions), the statutory regime under the Act and regulations will apply rather than the Plan specifying separate penalty provisions.
Practical effect. Enforcement and penalty outcomes in practice therefore depend on the statutory enforcement architecture under the Act and the Council’s administrative practices and resourcing for compliance, monitoring and prosecution. The Plan supplies the substantive grounds and conditions that an enforcement case would rely on (e.g., development beyond a mapped height limit, failure to prepare an acid sulfate soils management plan where required, demolition of a heritage item without consent), but it does not list sanctions or enforcement procedures itself.
How it interacts with other laws
The Plan is expressly designed to operate within the broader hierarchy of planning and other statutory instruments. The Plan text makes numerous cross‑references and preserves precedence rules.
Interaction with the Environmental Planning and Assessment Act (the Act). The Plan is made under the Act and frequently cross‑refers to it. Clause 1.6 states the consent authority is the Council “subject to the Act.” Clause 1.8A and other transitional provisions reference Division 3.5 of the Act. Clause 4.6 implements the exceptions to development standards mechanism that operates within the Act’s framework. In other words, the Plan creates local rules but those rules are to be applied and enforced within the procedural and judicial framework established under the Act.
State environmental planning policies (SEPPs). Clause 1.9(1) makes the Plan subject to any SEPP that prevails under section 3.28 of the Act. The Plan expressly lists certain SEPPs and SEPP provisions that apply or do not apply (for example clause 1.9(2) lists a provision of the State Environmental Planning Policy (Rural Lands) 2008 that does not apply). Various notes throughout the Plan flag relevant SEPPs and State policies (for example flood guidance and BASIX matters are cross‑referenced: clause 4.6(3) and clause 5.21).
Other State Acts and administrative instruments. The Plan cross‑references and defers to specialist legislation in many places:
Heritage Act 1977 under the heritage provisions (clause 5.10).
Fisheries Management Act 1994 and aquaculture regulations and plans under aquaculture clauses (clause 5.19).
Rural Fires Act 1997 for bush fire hazard reduction (clause 5.11).
Crown land management rules for relevant instruments excluded from clause 1.9A’s suspension of covenants (clause 1.9A(2)(b)); and the Crown’s rights and interests are preserved (clause 1.9A(3)).
Local Government Act 1993 for classification/reclassification of public land (clause 5.2).
Land Acquisition (Just Terms Compensation) Act 1991 for owner‑initiated acquisition provisions and the identification of relevant State authorities (clause 5.1).
Technical guidance and State guidelines. The Plan mandates consideration of specific State guidance documents as part of decision‑making: flood guidance (Considering Flooding in Land Use Planning Guideline and Flood Risk Management Manual referenced in clause 5.21 and clause 5.22), NSW Road Noise Policy and NSW Industrial Noise Policy for acoustic controls (clause 7.9), AS 2021-2000 for aircraft noise siting criteria (clause 7.8).
Conferral and limits on private instruments. Clause 1.9A allows the Plan to override private agreements, covenants or other instruments to the extent necessary to enable development authorised by the Plan, except for certain Crown or conservation instruments expressly excluded. That clause was approved by the Governor and evidences the Plan’s primacy over some private legal restrictions, but it also preserves the rights and interests of public authorities under registered instruments (clause 1.9A(2)-(3), and the Governor’s approval under section 3.16 of the Act).
Maps and GIS standards. Clause 1.7 requires maps to be approved by the local plan‑making authority and maintained for public access in accord with Ministerial arrangements; the Plan notes that maps are to be available on the NSW Planning Portal and refers to standard technical requirements for LEP maps and GIS data , tying local mapping to State mapping and data standards.
Net effect. The Plan operates as a local instrument layered beneath State SEPPs and the Act. It relies on State guidance for technical issues (flooding, noise), gives effect to other statutes where specialised regulation applies (heritage, fisheries, Crown land), and preserves State and Commonwealth decision points where relevant (e.g., Commonwealth aviation approvals under clause 7.7). The Plan also uses the Act’s mechanisms for exceptions, public notification, and for saving transitional development applications (clause 1.8A). Any conflict between the Plan and a SEPP will be resolved in favour of the SEPP per clause 1.9, and enforcement and appeals against decisions under the Plan will proceed through the statutory channels set out in the Act and its regulations.
Amendment history
The Plan text contains embedded amendment annotations after many clauses and schedule entries, which record the instrument history at the clause level. The Plan has undergone multiple amendments since its 2011 base text; the clause annotations show the timing and affected provisions. Representative changes and their locus in the Plan are:
Initial making and early amendments: the Plan was made in 2011 (numerous clauses have “Ins 2011 (363), Sch 17 …” or similar). The Plan’s schedules and initial mapping elements were established at that time (e.g., Schedule 3, Schedule 2, Schedule 5 entries marked 2011).
2012-2015 amendments: several clauses were amended or inserted in 2012-2015, including additions to the Land Use Table and to clauses concerning dwelling opportunities and map‑based changes (e.g., clause 1.8 amended 2014; clause 4.2A inserted 2012 and amended 2013; clause 4.2B ins 2011 and amended 2013 & 2016).
2018 and later: Local modifications to comply with State policy changes and to insert new controls are evident: clause 4.1 was amended in 2018; clause 5.4 had amendments in 2018 that added neighbourhood supermarket gross floor area (clause 5.4(7AA)); clauses addressing acoustic controls and design excellence were added or amended in 2011-2015 and later (clause 7.11A inserted 2014, amended 2015).
Flood and resilience related amendments: clause 5.21 and 5.22 on flood planning and special flood considerations show more recent updates (substituted 2023 (609) Sch 1.1[2]) that align with State flood guidance and the Flood Risk Management Manual (noting the Plan cites the 2023 manual).
Infrastructure and urban release updates: Part 6 shows amendments in 2019 and 2023 (clauses 6.1-6.4 noted Am 2019 (621), Sch 5[5]; 2023 (554), Sch 1). These reflect the insertion of certifying roles for the Director‑General and staged development control plan requirements.
Site‑specific modern insertions: There are very recent and specific insertions , for example clause 7.20 relating to Integrity Circuit, Thrumster is annotated “Ins 2025 (656), Sch 1” which is forward dated in the text provided; Schedule 1 and various Schedule entries show multiple year annotations up to 2022 and 2023 for updates in Additional Permitted Uses and Lot Size Map treatment.
Repeals and renumbering: Several clauses have been repealed and renumbered at different times (the Plan notes repeals: e.g., clause 1.3(1A) repealed, clause 1.7(1AA) repealed, clause 4.6(5) repealed). Some clauses were renumbered (for example clause 7.12 was renumbered as 7.15 in 2014).
The amendment annotations are clause‑specific and show an ongoing refinement to reflect State policy changes, local strategic directions (design excellence clause 7.11A, urban release area controls), hazard and biodiversity policy updates (koala habitat insertion 2015; flood planning substitution 2023) and parcel‑level rezoning or additional permitted uses. Users should consult the Plan’s amendment annotations per clause for the statutory lineage and the Land Zoning/Map materials on the NSW Planning Portal for the operative spatial changes.
Note on reliability. The Plan’s embedded amendment notes are the Plan’s internal record of changes; practitioners should cross‑check the consolidated Plan on the NSW legislation website and the Planning Portal for the current maps and any later instruments amending the Plan, and to trace explanatory materials or Ministerial instruments authorising Governor approvals (for example clause 1.9A required Governor approval under section 3.16 of the Act).
Litigation history
The Plan text supplied contains no case law or litigation history. It contains procedural and substantive rules but does not list or describe judicial review, appeal, or enforcement litigation outcomes. The Plan does include references to statutory processes that give rise to judicial review and merits appeal pathways under the Environmental Planning and Assessment Act and related State legislation (for example development applications, public notification and prescribed assessments), but the Plan itself does not document any adjudications, appeals or court decisions.
What the Plan records relevant to disputes:
Procedural safeguards that often generate disputes: the Plan sets out notification and consultation obligations (heritage, Aboriginal places, Commonwealth aviation bodies) and procedural pre‑conditions (infrastructure certification for urban release areas, heritage management documents) which can be grounds for administrative review or merits appeals under the Act’s processes.
The exceptions to standards mechanism and record‑keeping: clause 4.6 requires the consent authority to keep a record of its assessment where an applicant seeks to contravene a development standard; that record is a typical object of review in applications or appeals concerning development standards.
Transition and savings provisions: clause 1.8A may be invoked as the legal basis for continuing to decide earlier lodged applications under previous rules; such transitional applications can be the subject of dispute if the facts are contested.
If litigation history is required, the Plan itself does not supply it; practitioners should query court and tribunal databases, the Land and Environment Court records, or Council records for contested decisions made under this Plan. Any legal analysis of precedent must be supported by external case law research because the Plan text does not name any cases.
Gotchas
Several provisions create traps for applicants and landowners because they either impose nonobvious constraints, require pre‑application evidence, or alter private legal relations. The Plan’s text emphasises numeric thresholds, mapping dependencies and procedural pre‑conditions that are common sources of error.
Maps control more than the text suggests. Many permissions and prohibitions are determined by maps that are separate instruments under clauses 1.3 and 1.7 (the Land Application Map, Land Zoning Map, Lot Size Map, Height of Buildings Map, Floor Space Ratio Map, Koala Habitat Map, Coastal Erosion Map, Acoustic Controls Map and others). Practitioners must check the current maps on the NSW Planning Portal because a textual reading that ignores maps will miss key constraints such as minimum lot sizes (clause 4.1), height caps (clause 4.3), or mapped “Dwelling opportunity” sites (clause 4.2A(3)(e)).
Exempt/compliant development exclusions. Even if a development is nominally exempt or complying (Schedules 2 and 3), clause 3.3 excludes environmentally sensitive areas from those pathways. The Plan defines environmentally sensitive areas broadly (clause 3.3(2)), including coastal waters, wetlands, mapped high Aboriginal or biodiversity significance, reserves, and lands within 100 metres of those areas. Don’t assume exempt/compliant applies without checking the overlay mapping.
Private covenants can be displaced but not always. Clause 1.9A suspends private covenants to enable Plan‑authorised development but expressly excludes covenants imposed by Council, certain Crown instruments, conservation agreements and planning agreements (clause 1.9A(2)). Practitioners should not presume a covenant is nullified; check clause 1.9A’s exceptions and the registered instruments to see if the covenant is one of the preserved categories.
Quantitative caps and their practical consequences. Many domestic or commercial uses have tight local caps: bed and breakfast limited to four bedrooms (clause 5.4(1)), home business or industry 60 m2 (clause 5.4(2)-(3)), neighbourhood shops 200 m2 (clause 5.4(7)), neighbourhood supermarket 1,000 m2 (clause 5.4(7AA)), MU1 shop cap 250 m2 (clause 7.12), E3 office cap 300 m2 (clause 7.19), and E1 Area 2 commercial cap 2,000 m2 (clause 7.11(2)). These local size caps are stricter than State or market expectations in some contexts and can shift where a developer locates a project or how it is configured.
Heritage and archaeology procedural pre‑conditions are detailed. For development affecting heritage items, the consent authority can require heritage management documents and conservation plans; it must also notify the Heritage Council for archaeological sites and consider responses within 28 days (clause 5.10(5)-(7)). Failure to follow the notification/consultation steps can invalidate approvals or lead to delays.
Flood, coastal and special flood rules impose substantive “satisfied” tests. Clause 5.21 and clause 5.22 require the consent authority to be satisfied of a range of safety and environmental outcomes. These are not mere checklists , they must be demonstrably met by applicants in technical studies, and the Plan cites State guidance (Considering Flooding in Land Use Planning Guideline, Flood Risk Management Manual) that must be followed. Applicants who rely on out‑of‑date flood modelling or inadequate evacuation planning will be resisted.
Agricultural and intensive livestock exemptions limited by proximity rules. Clause 5.18(4) permits some intensive livestock development without consent up to specific capacity thresholds but subjects them to location restrictions (environmentally sensitive areas, distances to watercourses and dwellings, separation distances between certain livestock operations). The specified capacities are small and the proximity rules are detailed (clause 5.18(4)-(5)); misreading these can lead to unauthorised operations.
Airspace and aircraft noise interactions. Clause 7.7 requires the consent authority to consult relevant Commonwealth bodies where a development penetrates airport Limitation or Operations Surfaces. Clause 7.8 requires compliance with AS 2021,2000 in designated ANEF contours. Developers near the airport must factor in Commonwealth aviation approvals and acoustic building performance requirements.
Design excellence and DCP cross‑reference. Clause 7.11A requires “design excellence” for development in areas mapped as Significant Urban Area and requires the consent authority to have regard to DCP 2013. Applicants who ignore DCP controls or assume design outcomes only need to meet simple envelope tests risk refusal.
Infrastructure and urban release staging. In urban release areas (Part 6), subdivision creating smaller lots than previously permitted requires Director‑General certification that designated State public infrastructure arrangements are in place (clause 6.1(2)) and a DCP must be prepared for land prior to most development consents (clause 6.3). These institutional certification steps are easily overlooked in project timelines and can stall subdivision and staging.
In short, the Plan mixes parcel‑level maps, quantified caps and process pre‑conditions that allocate risk to applicants. Common practical mistakes are failing to consult the maps; failing to identify whether a site is in an excluded environmentally sensitive area; under‑estimating heritage, acid sulfate soil or flood requirements; and misreading the Plan’s interaction with State SEPPs and Commonwealth aviation approvals.
How to comply
Compliance requires a mapped, staged and evidence‑based approach. Below are practical steps, mapped to the Plan provisions and the likely information and process requirements the Plan demands.
Check the maps first
Confirm the parcel’s zoning on the Land Zoning Map and the Land Application Map (clauses 1.3 and 2.2). Identify whether the site is within any specialist overlays: Lot Size Map (minimum lot size, clause 4.1), Height of Buildings Map (clause 4.3), Floor Space Ratio Map (clause 4.4), Koala Habitat Map (clause 7.5), Coastal Erosion Map (clause 7.6), Acoustic Controls Map (clause 7.9), Heritage Map (Schedule 5 and clause 5.10), Land Reservation Acquisition Map (clause 5.1) and any Additional Permitted Uses Map (Schedule 1). Maps are part of the Plan and are to be accessed through the NSW Planning Portal as required by clause 1.7.
Identify the applicable permission pathway
Determine whether the intended development is permitted without consent, complying development, requires development consent, or is prohibited by consulting the Land Use Table (clause 2.3 and the Land Use Table) and Schedules 2 and 3. If the use is not listed, it is prohibited (see the “Any development not specified” entries in many zone tables).
For exempt or complying development, confirm overlay exclusions
Even if a use appears exempt or complying, check clause 3.3: environmentally sensitive areas (e.g., coastal waters, mapped high Aboriginal or biodiversity significance areas) exclude those pathways. If the site is within an excluded area, a full development application is likely required.
Prepare required technical studies and management plans
Acid sulfate soils: if works are in mapped classes requiring consent (clause 7.1(2)), prepare an acid sulfate soils management plan consistent with the Acid Sulfate Soils Manual and provide it with the application (clause 7.1(3)). If a preliminary assessment indicates a plan is not required, obtain confirmation in writing from the consent authority (clause 7.1(4)).
Flood and coastal risk: where the site is in a flood planning area or coastal erosion risk area, prepare flood impact assessments and designs that respond to the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual (clauses 5.21-5.22). Show evacuation strategy, design measures and adaptability for projected climate change impacts (clause 5.21(3), 5.22(3)).
Heritage and archaeology: if a heritage item, heritage conservation area, archaeological site or Aboriginal place is relevant, prepare a heritage management document and/or heritage conservation management plan as required by clause 5.10(5)-(6). For archaeological sites, be prepared to notify the Heritage Council and to accommodate a 28‑day consultation window (clause 5.10(7)). For Aboriginal places, notify and consult local Aboriginal communities (clause 5.10(8)).
Koala habitat: if the land is shown as “Koala habitat area,” ensure development is consistent with an approved koala plan of management under SEPP (clause 7.5(3)). For subdivisions, ensure building envelopes are provided (clause 7.5(4)).
Acoustics and aircraft noise: prepare acoustic reports in accordance with NSW Road Noise Policy and NSW Industrial Noise Policy for land subject to acoustic controls (clause 7.9). For sites in ANEF contours of 20 or greater, demonstrate compliance with AS 2021,2000 for interior noise levels for specified uses (clause 7.8(2)(c)).
Address numerical caps and design controls
Check and design to the Plan’s numeric limits (bed and breakfast rooms, home business area, retail floor area caps in E1/E3/MU1, industrial retail outlet ratios, secondary dwelling sizes and locations) in clause 5.4, clause 5.5 and clauses 7.11, 7.19 and 7.12. For floor space ratio calculations, apply clause 4.5 rules carefully, notably exclusions for community land, provisions about strata subdivision inclusion and the possibility of covenants to prevent “double dipping” (clause 4.5(4)-(11)).
For subdivisions, check minimum lot size and exceptions
Apply clause 4.1 and the Lot Size Map to ensure any subdivision meets the mapped minimums. If proposing community title schemes, check clause 4.1AA. For split‑lot situations, clause 4.1B provides a method for subdivision where lots straddle different zones. For boundary adjustments where lots would fall below minimums, check clause 4.2C and the consent criteria there.
For urban release areas and major subdivisions
In urban release areas (Part 6), secure the necessary Director‑General certification that satisfactory arrangements for designated State public infrastructure have been made before seeking subdivision consent that reduces lot size (clause 6.1(2)). Prepare a development control plan (DCP) meeting clause 6.3 requirements if the development is not excluded from the DCP requirement (clause 6.3(4)).
Heritage, design excellence and DCP alignment
For sites within Significant Urban Areas (clause 7.11A), expect the consent authority to require demonstration of design excellence, reference DCP 2013 area provisions and assess design performance against the detailed list in clause 7.11A(5). Early engagement with Council urban design officers and prelodgement design review will reduce refusal risk.
Check for ancillary State or Commonwealth approvals
For airspace penetrations consult early with the Commonwealth aviation body as mandated by clause 7.7. For aquaculture or fisheries impacts consult the relevant State industry development plans (clause 5.19).
Use procedural flows and recordkeeping to support exceptions
If an applicant seeks an exception to a development standard under clause 4.6, prepare the evidence required by the Environmental Planning and Assessment Regulation 2021 (referenced in clause 4.6(3) note) and be prepared for the consent authority to record its assessment (clause 4.6(4)). Ensure arguments address both unreasonable/unnecessary nature of compliance and sufficient environmental planning grounds.
Address private covenant issues early
If private covenants are a constraint, consider clause 1.9A and whether the covenant is one of the excluded categories. If the covenant is not excluded, document why it should not prevent development; if it is excluded, alternative pathways (amendment of the covenant, negotiation with covenantor) must be pursued.
Allow time and budget for consultation and staged approvals
Several clauses mandate consultation or impose mandatory waiting periods for advice (heritage, Aboriginal place consultation) or certification (urban release Director‑General). Build those timelines into the project program and budget for required management plans.
Consider sequencing of approvals and enforcement risk
Where a development involves multiple approvals (SEPPs, State agency approvals, Council consents), sequence and coordinate them to avoid invalid consents. Ensure that any conditions of consent (for example required covenants to prevent double dipping, or required infrastructure arrangements) are implementable and that finance and contractual arrangements anticipate those conditions.
In sum, comply by reading the applicable maps, confirming the correct consent pathway, preparing the tailored technical and management documents required by the Plan (heritage, acid sulfate soils, flood, koala, acoustic), designing to numeric caps and calculation rules, engaging early with Council and relevant State/Commonwealth bodies, and recording sound grounds where an exceptions mechanism is sought.
(i) to ensure that development does not conflict with the hierarchy of business and retail centres in the Port Macquarie-Hastings area and the role of the Greater Port Macquarie Central Business District as the focal point for subregional functions and service delivery,
(j) to identify and protect features of environmental, cultural or visual importance within the Port Macquarie-Hastings area,
(k) to ensure that new urban development makes a positive contribution to the public domain and streetscape,
(l) to facilitate efficient use of urban land and infrastructure by appropriate staging of development and ensuring appropriate density of development,
(m) to provide effective and efficient connectivity and movement corridors within and between subdivisions.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed—
Hastings Local Environmental Plan 1987
Hastings Local Environmental Plan 2001
Port Macquarie-Hastings (Area 13 Thrumster) Local Environmental Plan 2008
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
cl 1.8: Am 2014 (545), Sch 1 [2].
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
(1) If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
(2) A development application made, but not finally determined, before the commencement of State Environmental Planning Policy Amendment (Flood Planning) 2023 must be determined as if that policy had not commenced.
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
Clause 9 of State Environmental Planning Policy (Rural Lands) 2008
cl 1.9: Am 2016 (310), Sch 4.20.
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU2 Rural Landscape
RU3 Forestry
RU5 Village
RU6 Transition
Residential Zones
R1 General Residential
R2 Low Density Residential
R3 Medium Density Residential
R4 High Density Residential
R5 Large Lot Residential
Employment Zones
E1 Local Centre
E2 Commercial Centre
E3 Productivity Support
E4 General Industrial
E5 Heavy Industrial
Mixed Use Zones
MU1 Mixed Use
Special Purpose Zones
SP1 Special Activities
SP2 Infrastructure
SP3 Tourist
SP4 Enterprise
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C2 Environmental Conservation
C3 Environmental Management
C4 Environmental Living
Waterway Zones
W1 Natural Waterways
W2 Recreational Waterways
W3 Working Waterways
W4 Working Waterfront
cl 2.1: Am 2022 (828), Sch 1.17[1]–[3].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of [State Environmental Planning Policy (Exempt and Complying Development Co
This is an opening excerpt, not the complete document.