Several organising concepts structure the Plan and determine how proposals are assessed.
Zones and Land Use Table. The Plan uses conventional zone-based controls. Clause 2.1 lists the zone categories that apply (for example RU1 Primary Production, R1 General Residential, E4 General Industrial, MU1 Mixed Use, SP1 Special Activities, RE1 Public Recreation, C1 National Parks and Nature Reserves). The Land Use Table attached to Part 2 (the Land Use Table) specifies, for each zone, three core concepts: the zone objectives, development that may be carried out without development consent, and development that requires development consent, and identifies prohibited development (cl 2.3). The consent authority must have regard to the objectives for development in a zone when deciding development applications (cl 2.3(2)).
Maps. The Plan’s spatial effect is delivered by maps: the Land Application Map, Land Zoning Map, Lot Size Map, Heritage Map, Terrestrial Biodiversity Map, Groundwater Vulnerability Map, Watercourse Map, Wetlands Map, Parkes Township Buffer Map and Land Reservation Acquisition Map, among others. The Plan treats named maps as adopted maps that the local plan-making authority approved when adopted and may be amended or replaced (cl 1.7). Maps are to be kept and made available for public access on the NSW Planning Portal (cl 1.7).
Permitted, exempt and complying development. The Plan distinguishes development permitted without consent (local variants), exempt development (Schedule 2) and complying development (Schedule 3 and cross-reference to SEPP Exempt and Complying Development Codes 2008). Exempt development must meet the standards in Schedule 2 and the Building Code of Australia where relevant, and cannot be carried out in environmentally sensitive areas identified in cl 3.3 (cl 3.1-3.3).
Principal development standards and exceptions. The Plan imposes locally adopted standards, most notably minimum subdivision lot sizes (cl 4.1) and stratified-community-title rules (cl 4.1AA, 4.1A). It includes an exceptions clause that allows consent authorities to permit contraventions of development standards where the applicant satisfies the tests that compliance is unreasonable or unnecessary and there are sufficient environmental planning grounds, subject to record keeping and specific prohibitions (cl 4.6). That clause does not apply to certain categories of standards including standards for complying development and certain BASIX-related standards (cl 4.6(8)).
Localised environmental and use-specific controls. The Plan contains a multiplicity of locally tailored controls which function as assessment matters or gatekeepers. Examples include heritage consent triggers and notification obligations for archaeological and Aboriginal heritage (cl 5.10), earthworks assessment matters (cl 6.1), terrestrial biodiversity and groundwater vulnerability tests that require avoidance, minimisation or mitigation (cl 6.2-6.3), riparian lands protection within 40 metres of mapped watercourses (cl 6.4), wetlands protection (cl 6.5), flood planning obligations that require compatibility with flood function and evacuation capacity (cl 5.21), intensive livestock agriculture capacity thresholds and locational exclusion zones (cl 5.18), and aquaculture site and operational requirements (cl 5.19; Sch 6).
Specific protective layers. The Plan contains a number of bespoke protective layers designed to preserve particular public assets or policy priorities. Notable examples are the Parkes Radio Telescope buffer assessment clause requiring consent authorities to consider impacts and relocation options (cl 6.8), the Airspace Operations clause requiring consultation with the relevant Commonwealth body where development would penetrate airport surfaces for Parkes Airport (cl 6.6), and a music-venue protection clause preventing refusal of applications for licensed premises on many specified grounds connected to playing and performing music, subject to the proviso that noise can be managed to an acceptable level (cl 5.20).
Inter-Act interactions. The Plan is drafted to operate alongside, and to give effect to, a number of State and Commonwealth laws. It explicitly defers to SEPPs where they prevail (cl 1.9). Numerous clauses reference other Acts as sources of required approvals, exclusions or definitions, for example the Heritage Act 1977, Crown Land Management Act 2016, National Parks and Wildlife Act 1974, Rural Fires Act 1997, Fisheries legislation, the Local Government Act 1993 and the Land Acquisition (Just Terms Compensation) Act 1991.
Maps, schedules and exclusions are substantive. The Plan’s schedules and maps are not marginal matters. Minimum lot sizes are fixed by the Lot Size Map and apply to subdivisions requiring consent (cl 4.1(2)-(3)). The Plan enumerates particular site-by-site additional permitted uses (Sch 1) and lists heritage items (Sch 5). It identifies areas where exempt and complying development cannot be used (cl 3.3).
Mechanically oriented flexibility and constraints. The Plan mixes prescriptive limits (minimum lot sizes, capacity thresholds for intensive livestock, mapped conservation exclusion zones for aquaculture) with discretionary flexibility (exceptions to development standards, development-near-boundary provision allowing uses from the adjoining zone within 20 metres if compatible, cl 5.3). Procedural entitlements are layered: some development is permitted without consent but still subject to Part 5 approvals under the Act, and many matters require additional approvals from other statutory regimes.
Taken together, the Plan is a zoning-led regulatory instrument which uses maps, schedules and local clauses to allocate rights to use and develop land, impose bespoke environmental and heritage assessment obligations, and set both bright-line prohibitions and discretionary pathways for departures.