Medicines and Poisons (Pest Management Activities) Regulation 2021
sec.24Contents of activity risk management plan
Start here
Get a plain-English read of sec.24
Turn the raw legal text into a practical explanation grounded in Medicines and Poisons (Pest Management Activities) Regulation 2021.
sec.24 Contents of activity risk management plan
An activity risk management plan for a fumigation activity carried out for a customer at a fumigation site must state the following information— the name and licence number of the licensed technician carrying out the activity; the contact details and licence number of the licensed technician preparing the plan (the preparer ), if that technician is not carrying out the activity; the contact details of the customer; the contact details of the person responsible for controlling access to the site, if that person is not the customer; details about access to the site, including any procedures to be followed to obtain access; the day and time the activity is to be carried out; the address of the site; the details of the exposure area for the activity; details about the availability of water and power at the site; how the fumigant is to be introduced to the fumigation space for the activity; how the fumigation space is to be ventilated; the arrangements for securing or restricting access to the exposure area for the activity; the method to be used to establish that the exposure area is safe for entry; the estimated amount of time for completing the activity; the reason why the activity is to be carried out; the type of pests to be controlled; the type and concentration of the fumigant to be used for the activity, including the name and active constituent, and how the fumigant is to be used; any special considerations or precautions to be implemented due to the nature of the site; the hazards and risks associated with carrying out the activity and the measures to be implemented to control those hazards and risks; the roles and responsibilities of all persons involved in carrying out the activity; procedures for dealing with an emergency situation that may arise during the activity. The activity risk management plan must also include— a statement by the preparer of the plan that the matters mentioned in this section have all been considered; and the signature of the preparer. See section 31 for the requirement to comply with the activity risk management plan. s 24 amd 2023 SL No. 163 s 14 (sec.24-ssec.1) An activity risk management plan for a fumigation activity carried out for a customer at a fumigation site must state the following information— the name and licence number of the licensed technician carrying out the activity; the contact details and licence number of the licensed technician preparing the plan (the preparer ), if that technician is not carrying out the activity; the contact details of the customer; the contact details of the person responsible for controlling access to the site, if that person is not the customer; details about access to the site, including any procedures to be followed to obtain access; the day and time the activity is to be carried out; the address of the site; the details of the exposure area for the activity; details about the availability of water and power at the site; how the fumigant is to be introduced to the fumigation space for the activity; how the fumigation space is to be ventilated; the arrangements for securing or restricting access to the exposure area for the activity; the method to be used to establish that the exposure area is safe for entry; the estimated amount of time for completing the activity; the reason why the activity is to be carried out; the type of pests to be controlled; the type and concentration of the fumigant to be used for the activity, including the name and active constituent, and how the fumigant is to be used; any special considerations or precautions to be implemented due to the nature of the site; the hazards and risks associated with carrying out the activity and the measures to be implemented to control those hazards and risks; the roles and responsibilities of all persons involved in carrying out the activity; procedures for dealing with an emergency situation that may arise during the activity. (sec.24-ssec.2) The activity risk management plan must also include— a statement by the preparer of the plan that the matters mentioned in this section have all been considered; and the signature of the preparer. See section 31 for the requirement to comply with the activity risk management plan.