The project proposed by the project proponent, known as the North West Transmission Upgrades Project and comprising the following uses and developments, is declared to be a major infrastructure project:
(a) the construction and operation of a double-circuit, extra-high-voltage 220kV overhead electricity transmission line and transmission towers, within a corridor 120 metres wide, to transmit electricity between the following locations:
(i) Palmerston and Sheffield;
(ii) Sheffield, Heybridge and Burnie;
(iii) Burnie and East Cam;
(iv) East Cam and Hampshire;
(v) Hampshire and Staverton;
(b) the construction and operation of an electricity substation at each of the following locations:
(i) [Clause 5 Amended by S.R. 2022, No. 6, Applied:09 Mar 2022] . . . . . . . .
(ii) [Clause 5 Amended by S.R. 2022, No. 6, Applied:09 Mar 2022] . . . . . . . .
(iii) Hampshire;
(iv) Staverton;
(c) the construction and operation of ancillary facilities to be located –
(i) within the corridor specified in paragraph (a) ; and
(ii) at the locations specified in paragraph (b) ; and
(iii) at Nietta; and
(iv) at South Nietta;
(v) [Clause 5 Amended by S.R. 2023, No. 58, Applied:16 Aug 2023] at Burnie; and
(vi) [Clause 5 Amended by S.R. 2023, No. 58, Applied:16 Aug 2023] at Deloraine; and