Major Infrastructure Development Approvals (North West Transmission Upgrades Project) Order 2020
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
Major Infrastructure Development Approvals (North West Transmission Upgrades Project) Order 2020
Start here
Turn the raw legal text into a practical explanation grounded in Major Infrastructure Development Approvals (North West Transmission Upgrades Project) Order 2020.
(1) In this order –
Act means the Major Infrastructure Development Approvals Act 1999 ;
ancillary facilities means facilities associated with the construction and operation of the electricity transmission line, transmission towers and electricity substations specified in clause 5(a) and (b) and includes, but is not limited to, facilities for the purposes of –
(a) storage; and
(b) communications; and
(c) conductor winching and braking; and
(d) concrete batching; and
(e) site administration;
Board means the Board of the Environment Protection Authority established by section 13 of the Environmental Management and Pollution Control Act 1994 ;
project means the major infrastructure project specified in clause 5 ;
[Clause 3 Subclause (1) amended by S.R. 2026, No. 8, Applied:03 Mar 2026] project proponent, in relation to the project, means the project proponent identified in clause 4;
[Clause 3 Subclause (1) amended by S.R. 2026, No. 8, Applied:03 Mar 2026] substitute line works means –
(a) the relocation of overhead transmission line towers to an adjacent alignment within the corridor specified in clause 5(a) ; and
(b) the substitution of those overhead transmission line towers with overhead transmission line poles.
(2) The Acts Interpretation Act 1931 applies to the interpretation of this order.