This Local Environmental Plan sets the zoning, permitted and prohibited uses, consent rules and technical development standards for land in the Gwydir local government area. Mechanically it replaces earlier local LEPs and maps the land to specific zones, prescribes when development consent is needed and identifies exempt/complying development (cl 1.8, cl 2.2, cl 3.1).
Landowners seeking development pay application and compliance costs; the Council decides consents under the Act (cl 1.6). The Plan changes land-use rights through lot-size, heritage, environmental and flood constraints.
This instrument is a local environmental plan for the Gwydir local government area, expressed as the Gwydir Local Environmental Plan 2013 and commencing on publication on the NSW legislation website (cl 1.1AA, cl 1.1). It repeals prior local environmental plans and deemed environmental planning instruments that applied solely to the same land (cl 1.8), consolidates zoning and mapping (cl 1.3, cl 2.2), and sets the statutory framework for what development is permitted, what requires consent and what is prohibited across a series of named zones (Part 2, cl 2.1, cl 2.3 and the Land Use Table). The Plan establishes procedural and substantive development controls: for example, subdivision requires consent (cl 2.6), demolition of buildings generally requires consent (cl 2.7), exempt and complying development are identified and limited (Part 3, cl 3.1-3.3), and a set of principal development standards and local provisions is provided (Parts 4-6).
Mechanically the Plan:
Identifies the consent authority as the Council, subject to the Act (cl 1.6).
Adopts and references maps that locate zones, heritage items, lot sizes and other spatial controls and requires those maps be available for public access (cl 1.7, cl 2.2).
Sets zone objectives and a Land Use Table that specifies what is permitted without consent, permitted with consent and prohibited in each zone (cl 2.3 and the Land Use Table).
Establishes minimum lot sizes and subdivision rules, including exceptions and special rules for rural subdivisions, strata schemes and community title schemes (cl 4.1, cl 4.1AA, cl 4.2, cl 4.2A, cl 4.2C).
Regulates exempt and complying development via Schedules 2 and 3 and prohibits exempt/complying development in identified environmentally sensitive areas (cl 3.1-3.3).
Current sections
Direct links to the current provisions in Gwydir Local Environmental Plan 2013.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2022 (314), Sch 1; 2022 (832), Sch 1.9[2].
Zone RU1 Primary Production
Zone RU5 Village
Zone R5 Large Lot Residential
Zone E4 General Industrial
Zone RE1 Public Recreation
Zone RE2 Private Recreation
Zone C1 National Parks and Nature Reserves
3
Permitted with consent
3 Permitted with consent
3 Permitted with consent
Aquaculture; Cellar door premises; Dual occupancies (attached); Dwelling houses; Extractive industries; Funeral homes; Group homes; Home industries; Intensive livestock agriculture; Offensive industries; Open cut mining; Roadside stalls; Rural workers’ dwellings; Any other development not specified in item 2 or 3
4
Prohibited
4 Prohibited
4 Prohibited
Advertising structures; Amusement centres; Boat building and repair facilities; Car parks; Charter and tourism boating facilities; Centre-based child care facilities; Commercial premises; Correctional centres; Educational establishments; Entertainment facilities; Exhibition homes; Exhibition villages; Health services facilities; Highway service centres; Home occupations (sex services); Hotel or motel accommodation; Industrial retail outlets; Industrial training facilities; Industries; Local distribution premises; Marinas; Mooring pens; Moorings; Passenger transport facilities; Places of public worship; Public administration buildings; Recreation facilities (indoor); Registered clubs; Residential accommodation; Respite day care centres; Restricted premises; Service stations; Serviced apartments; Sex services premises; Storage premises; Vehicle body repair workshops; Vehicle repair stations; Warehouse or distribution centres; Wharf or boating facilities; Wholesale supplies
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
Note.
When this Plan was made it did not include all of these zones.
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) the proximity to and the potential for adverse impacts on any heritage item, archaeological site or heritage conservation area,
(i) the effect of the development on native fauna and flora, including threatened species, populations or ecological communities and their habitats,
(j) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2025 (615), Sch 1[1].
Part 7
Grain silos and grain bunkers
Part 7 Grain silos and grain bunkers
Part 7 Grain silos and grain bunkers
7
Specified development
7 Specified development
7.1 Specified development
(1) The construction or installation of a farm building that is a grain silo or grain bunker is development specified for this schedule if it is—
(a) not used for habitable purposes, and
(b) used for the storage of grain that has been produced on the landholding, and
(c) constructed or installed on land in Zone RU1, and
(d) complies with the standards in—
(i) for development for the purposes of grain silos—clauses 7.2 and 7.3, or
(ii) for development for the purposes of grain bunkers—clauses 7.2 and 7.4.
(2) Development specified in subclause (1) must not be constructed or installed—
(a) on or in a heritage item or a draft heritage item, or
(b) in an environmentally sensitive area, or
(c) on land shown on any relevant Procedures for Air Navigation Services—Aircraft Operations Map prepared by the operator of an aerodrome or airport operating within 2km of the proposed development, and for which a PANS-OPS surface is identified that may compromise the effective and on-going operation of the relevant aerodrome or airport.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
| Locality | Item name | Address | Property description | Significance | Item no |
| Bingara | Bridge over Halls Creek | Between Copeton Dam Road and Finch Street | | Local | I005 |
| Bingara | Former police station and residence | 32 Finch Street | Lot 701, DP 96134 | Local | I007 |
| Bingara | Bridge over the Gwydir River | Between Gwydir Street and Copeton Dam Road | | Local | I004 |
| Bingara | Stamper battery | All Nations Hill, Hill Street | Lot 15, DP 821211 | Local | I006 |
| Bingara | Bingara District Historical Society (formerly Salter’s Inn) | 16–18 Maitland Street | Lot 1, DP 135175 | Local | I001 |
| Bingara | Courthouse | 24 Maitland Street | Lot 332, DP 821249 | Local | I002 |
| Bingara | Area near Windsor, site of Myall Creek massacre | Whitlow Road | Lots 30–33 and 130–144, DP 754834; Lot 3, DP 113972 | State | I003 |
| Cobbadah | Isolated graves | 390 metres north of Horton Road | Lot 7009, DP 1119457 | Local | I009 |
| Cobbadah | Capel family private cemetery | Piedmont Station | Lot 1, DP 745320 | Local | I008 |
| Myall Creek | Myall Creek Massacre and Memorial site | Bingara/Delungra Road | Part Lot 7001, DP 1057987 | National | I026 |
| Upper Bingara | Chinese cemetery and European cemetery | Upper Bingara Road | Lot 23, DP 754848 | Local | I010 |
| Warialda | Cemetery | Apollo Avenue | Lot 7313, DP 1136164 | Local | I024 |
| Warialda | Yallambar Durkin residence | 22 Geddes Street | Lot 11, DP 759052 | Local | I011 |
| Warialda | Warialda Roman Catholic Convent School of St Joseph | 56 Geddes Street | Lots 1–3, DP 1173830; Lot 4, DP 759082; Lots 5A and 5B, DP 398887; Lot 1, DP 1151045; Lot 1, DP 1151087 | Local | I012 |
| Warialda | Courthouse, police residence and station, including palm trees in front of station | Corner of Hope and Stephen Streets | Lot 8, DP 759052 | Local | I013 |
| Warialda | Crithary’s Building | Hope Street | Lot 2, DP 778198 | Local | I018 |
| Warialda | Memorial hall | Hope Street | Lots 51 and 52, DP 1123410 | Local | I019 |
| Warialda | National Bank | Hope Street | Lot 1, DP 563119 | Local | I015 |
| Warialda | Post office | Hope Street | Lot 1, DP 776794 | Local | I014 |
| Warialda | Shire chambers | Hope Street | Lot 2, DP 759052 | Local | I016 |
| Warialda | Single storey shop | Hope Street | Lot 1, DP 778198 | Local | I017 |
| Warialda | Warialda Primary School | Hope Street | Lots 2–6 and 13–17, DP 759052; Lot 2, DP 216732; Lot 1, DP 795191; Lot 1, DP 795192; Lot 1, DP 219572 | Local | I025 |
| Warialda | Warialda Royal Hotel | Hope Street | Lot 1, DP 741182 | Local | I021 |
| Warialda | Warialda store | Hope Street | Lot 3, DP 834198 | Local | I020 |
| Warialda | Carinda House | Stephen Street | Lot 111, DP 152396 | Local | I023 |
| Warialda | Commercial Hotel | Stephen Street | Lot 9, DP 759052 | Local | I022 |
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Gwydir Local Environmental Plan 2013.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Gwydir in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the proper management, development and conservation of environmental, economic and social resources in Gwydir,
(b) to facilitate economic growth and development consistent with the aim specified in paragraph (a) and that—
(i) minimises the cost to the community of fragmented and isolated development, and
(ii) facilitates the efficient and effective delivery of amenities and services, and
(iii) facilitates stimulation of demand for a range of residential, enterprise and employment opportunities and promotes agricultural diversity, and
(iv) utilises, where feasible, existing infrastructure and roads when considering new development and future potential development,
(c) to facilitate development in accordance with flood management planning,
(d) to facilitate development that is compatible with adjoining and nearby uses,
(e) to facilitate development that is appropriate in scale and type to the characteristics of the zone,
Prescribes local controls for uses such as intensive livestock agriculture, pond/tank/oyster aquaculture, eco-tourist facilities, farm stay and farm gate premises, heritage conservation and flood planning (see cl 5.18, cl 5.19 and Schedule 6, cl 5.13, cl 5.24-5.25, cl 5.10, cl 5.21).
Provides special local schedules for exempt development, complying development, public land classification and heritage items (Schedules 2-6).
The Plan is explicitly subject to relevant State environmental planning policies that prevail over it under the Environmental Planning and Assessment Act, noted in the Plan as being subject to SEPPs (cl 1.9(1)). It also contains a savings provision for development applications made but not finally determined before the Plan commenced; those must be determined as if the Plan had not commenced (cl 1.8A). The Plan also includes a suspension mechanism for private covenants to the extent necessary to enable development in accordance with the Plan, while preserving specified exceptions and registered public authority rights (cl 1.9A).
The text of the Plan is the operative source for the controls described in this deep dive. Where the Plan refers to the Act, SEPPs or other statutes, those instruments supply the wider statutory architecture for consent, enforcement and legal remedies; the Plan itself sets local land use rules and procedural requirements, and defers to the Act and SEPPs for overarching regulatory effect (cl 1.9(1), cl 1.6).
Main concepts
The Plan organises land use regulation by zoning, mapping, procedural gates and local technical standards. Its core organising concepts are zoning, development consent, exempt and complying development, mapped controls (lot size, heritage, sensitive lands), and local development standards.
Zoning and the Land Use Table, cl 2.1 and cl 2.3
The Plan sets out zones (for example Zone RU1 Primary Production, Zone RU5 Village, Zone R5 Large Lot Residential, Zone E4 General Industrial, Zones RE1 and RE2 for recreation, and Zone C1 National Parks and Nature Reserves) and attaches objectives and permissibility rules to each zone (cl 2.1; Land Use Table). The consent authority must have regard to the objectives of a zone when determining applications (cl 2.3(2)).
Maps and spatial controls
The Plan operates by reference to adopted maps: the Land Application Map, Land Zoning Map, Lot Size Map, Heritage Map and other named maps (cl 1.3, cl 2.2, cl 1.7). Maps may be amended or combined and are to be publicly available (cl 1.7). Those maps are the legal basis for locating zone boundaries, heritage items and special constraints.
Development categories and procedural hierarchy
Development is sorted into: permitted without consent, permitted with consent, and prohibited, at the zone level via the Land Use Table (cl 2.3 and Land Use Table). Exempt development (Schedule 2) and complying development (Schedule 3 and cl 3.2) are identified and can be carried out without a development consent, subject to the environmental assessment and approval requirements of Part 5 of the Act where relevant (cl 2.3 note). Exempt and complying development are prohibited on environmentally sensitive areas defined by the Plan (cl 3.3).
Principal development standards and flexibility
Minimum lot sizes and subdivision standards are principal standards (Part 4). The Plan provides mechanisms for flexibility; clause 4.6 allows consent authorities to grant consent for development that contravenes development standards if the applicant demonstrates compliance is unreasonable or unnecessary and sufficient environmental planning grounds exist, subject to certain exclusions and safeguards (cl 4.6(2)-(3), (6), (8)).
Local technical controls and sectoral rules
The Plan contains locally specific controls that are performance and technical in nature: heritage conservation obligations and requirements for heritage management documents (cl 5.10), flood planning considerations and references to flood guidance documents (cl 5.21), intensive livestock thresholds and locational separations for farming operations (cl 5.18), aquaculture site and operational requirements set out in Schedule 6 (cl 5.19 and Schedule 6), and local limits for ancillary uses such as bed and breakfasts, home business area limits and retail floorspace caps (cl 5.4).
Interaction with State instruments and other statutes
The Plan repeatedly anchors local rules within the broader framework of State environmental planning policies and other Acts. It is subject to SEPPs that prevail over it (cl 1.9(1)), incorporates definitions and procedural references to the Act and regulations, and cross-references other statutes for specific functions such as classification of public land (Local Government Act 1993, cl 5.2), Crown land instruments (cl 1.9A(2)(b)), heritage law (Heritage Act 1977, cl 5.10), and rural fires provisions (cl 5.11).
Preservation, facilitation and limits
The Plan states express aims: protecting heritage and Aboriginal cultural significance, protecting natural assets, facilitating development consistent with efficient service delivery, and aligning with flood management planning (cl 1.2). Those stated aims should be read as the Plan’s declared purposes, while its specific clauses establish the practical constraints and permissions that implement those purposes.
Key administrative actors and decision points
The consent authority is the Council, subject to the Act (cl 1.6). The consent authority must make findings on matters such as heritage impact, flood compatibility and whether development complies with local technical standards. For certain special provisions, other State authorities are identified as the relevant acquisition authority (cl 5.1). The Governor’s approval is recorded for the clause that suspends covenants (cl 1.9A(4)).
In short, the Plan is a spatially keyed rulebook that allocates uses to zones, imposes local technical constraints, identifies exempt and complying categories, and integrates with State policy and procedural rules. The Plan balances permissive provisions (lists of permitted uses, exempt development schedules) with constraints targeted at heritage, biodiversity and flood risk, while offering limited flexibility through statutory exception mechanisms such as cl 4.6.
Who it affects
The Plan affects multiple groups, and its immediate legal effects are determined by the Plan text together with the Act and SEPPs it references.
Property owners and prospective developers
Owners of land within the Gwydir area are directly affected because the Plan determines whether their land is in a particular zone, the permitted uses for that zone, minimum lot sizes and the standards applicable to development and subdivision (cl 2.2, Land Use Table, cl 4.1). Subdivision cannot be carried out without consent (cl 2.6), and minimum subdivisions must meet the Lot Size Map unless an exception applies (cl 4.1, cl 4.2, cl 4.2A).
Prospective occupiers and business operators
Businesses and individuals seeking to operate licensed premises, agricultural enterprises, industrial uses, tourist accommodation, farm gate premises, or aquaculture must comply with zone permissibility and the Plan’s specific local controls. For example, intensive livestock agriculture is tightly controlled by capacity thresholds and locational exclusions (cl 5.18); pond- and tank-based aquaculture must satisfy site and operational requirements in Schedule 6 and additional considerations for oyster aquaculture (cl 5.19).
Local residents and adjoining landholders
Neighbouring owners are affected through setbacks, amenity protections, and locational controls. The Plan requires the consent authority to consider impacts on adjoining land uses and amenity when determining applications (cl 2.3(2), cl 2.4(2), cl 5.16). Intensive agricultural uses are subject to locational buffers to protect residences and sensitive areas (cl 5.18(4)). Temporary uses have strict time limits and restoration requirements to protect neighbourhood amenity (cl 2.8).
Council and local government officers
The Council, as the consent authority, is responsible for determining development applications, keeping records under cl 4.6(4), applying heritage notification and consultation requirements (cl 5.10(7)-(9)), and interpreting clauses such as development near zone boundaries (cl 5.3). The Plan also delegates to Council functions for classification and reclassification of public land (cl 5.2, Schedule 4).
State agencies and other authorities
State agencies are affected where the Plan identifies them as the relevant acquisition authority for certain reserved lands (cl 5.1(2)). The Plan defers in several places to other State instruments and agencies, for example for infrastructure development under SEPP (Transport and Infrastructure) (cl 5.12) and for aquaculture industry development plans and the NSW Oyster Industry Sustainable Aquaculture Strategy (cl 5.19). The Plan preserves rights of public authorities under registered instruments when covenants are suspended (cl 1.9A(3)).
Aboriginal communities and heritage stakeholders
The Plan requires special processes where Aboriginal places of heritage significance are concerned, including investigation and community notification and the taking into account of responses within 28 days (cl 5.10(8)). Aboriginal objects and places may require consent for works that would disturb them (cl 5.10(2)(c)-(d)).
Infrastructure and utility providers
Developers must show availability or arrangements to provide essential services such as water, electricity and sewage before consent will be granted (cl 6.4). Roadworks such as driveways and kerb crossings require consent from the relevant road authority under the Roads Act 1993, as referenced in multiple clauses (for example cl 4.2(1)(i), cl 6.2 Note 2).
Heritage owners and community groups
Owners of listed heritage items in Schedule 5, and parties seeking to alter such items, are affected by the heritage management and conservation plan requirements, mandatory notification to the Heritage Council for archaeological sites or State heritage items, and the consent process for demolition or alterations (cl 5.10).
Contractors, engineers and consultants
The Plan requires professional certification and engineering specifications in multiple places, for example for farm buildings, grain silos and carports where connections to fascias and structural specifications are required (cl 6.2(1)(h), cl 7.3(1)(d), cl 4.2(1)(i)). Applicants will commonly need expert input to show compliance with the Plan’s technical provisions.
In summary: who pays? Property owners and developers bear the costs of complying with the Plan’s standards, procuring consents, preparing heritage and environmental assessments, and meeting infrastructure requirements. Who decides? The Council as consent authority makes the principal decisions, but State SEPPs and other State agencies, and in some cases the Heritage Council or road authorities, are decision points referenced in the Plan. What behaviour changes? Applicants must align proposed uses with zone permissibility, adhere to mapped minimum lot sizes, avoid environmentally sensitive areas for exempt development, meet technical standards for agricultural and aquaculture uses, secure heritage approvals where applicable, and ensure essential services are available; where standards cannot be met, applicants must use the exceptions and demonstration framework in cl 4.6.
Key duties and rights
The Plan creates duties for applicants and decision-makers, and preserves rights and exceptions under other legislation. The principal duties and rights under the Plan include the following.
Duty to obtain development consent where required
Many forms of development may be carried out only with development consent, for example subdivision (cl 2.6), demolition of buildings unless exempt under another instrument (cl 2.7 note), most development listed as "permitted with consent" in the Land Use Table (cl 2.3 and Land Use Table), and conversions of fire alarm monitoring where the clause requires consent although certain work may be complying development (cl 5.8(2)-(3)). Applicants bear the duty to ensure consent is obtained before carrying out those works.
Duty to show compliance or to provide information
For development that proposes to contravene a development standard, the applicant must satisfy the consent authority under cl 4.6(3) that compliance is unreasonable or unnecessary and that there are sufficient planning grounds to justify the contravention. The Regulation requires accompanying documentation for such applications; the Plan refers to that regulatory requirement (cl 4.6(3) note). For intensive livestock agriculture and aquaculture, the consent authority must be satisfied that certain operational and site requirements are met and must consider specified factors such as odour, water pollution risk and proposed mitigation measures (cl 5.18(3), cl 5.19(2)).
Duty to respect heritage and undertake consultation
The Plan requires development consent for demolition and alterations affecting heritage items, Aboriginal objects, or land within heritage conservation areas (cl 5.10(2)). The consent authority may require heritage management documents or heritage conservation management plans and must notify the Heritage Council or local Aboriginal communities and take account of any responses within given timeframes for archaeological sites or Aboriginal places (cl 5.10(5)-(9)).
Duty to restore after temporary use
Temporary uses are permitted by consent for up to 60 days in any 12 month period, subject to the consent authority being satisfied the temporary use will not prejudice future development and that at the end of the temporary use the land will, as far as practicable, be restored to its former condition (cl 2.8(2)-(3)(a),(d)). There is an exception for sales offices for new housing releases where the duration may exceed 60 days (cl 2.8(4)-(5)).
Duty to avoid exempt/compliant development in ESAs
Exempt and complying development categories do not apply to environmentally sensitive areas as defined in cl 3.3. The consent authority must therefore ensure that any development claimed as exempt or complying is not located in such areas.
Duty to provide essential services or arrangements
Before consent may be granted the consent authority must be satisfied that essential services will be available when required: water supply, electricity, sewage, stormwater and vehicular access (cl 6.4).
Rights preserved or created by the Plan
Right to apply under pre-commencement savings provision: an applicant whose development application was made before the Plan’s commencement and not finally determined must have that application determined as if the Plan had not commenced (cl 1.8A). That is a transitional right that preserves the legal regime in place at the time of lodging.
Right to seek complying development: certain development may be proceeded with as complying development under cl 3.2 where it meets the specified standards and requirements, subject to conditions in Schedule 3 and the broader State policy framework.
Right to request consent under exceptions to standards: cl 4.6 allows applicants to seek consent for development that would otherwise contravene a development standard, provided specified tests are satisfied and the consent authority records the assessment (cl 4.6(3)-(4)).
Rights of public authorities and registered instruments: cl 1.9A(3) preserves the rights or interests of a public authority under any registered instrument despite clause 1.9A’s suspension of private covenants.
Decision-maker duties and records
The consent authority must consider zone objectives (cl 2.3(2)), keep a record of assessments where a development standard is contravened (cl 4.6(4)), and undertake notifications and consultations required under the heritage provisions (cl 5.10(7)-(9)).
Limitations and exclusions expressed as duties for refusal
The Plan specifies absolute prohibitions. For example, clause 2.9 prohibits canal estate development (cl 2.9(1)-(2)). Clause 4.6(8) lists standards that cannot be varied via the exceptions mechanism, including development standards for complying development and BASIX-related standards (cl 4.6(8)(a),(b)).
Procedural duties tied to other statutes
The Plan repeatedly cross-references duties that stem from other statutes. For instance, driveway and road opening works require consent from relevant road authorities under the Roads Act 1993 (noted throughout e.g. cl 4.2(1)(i), cl 6.2 Note 2). The Plan does not itself set the procedural scheme for acquisition or compensation; it identifies the relevant State authorities for acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 (cl 5.1).
In sum, the Plan imposes on applicants a duty to respect zonings, seek consent where the Plan requires it, provide necessary technical and environmental evidence, and to comply with additional sectoral rules. The Council must apply the Plan’s tests and record certain decisions. Rights are both prescriptive and transitional; applicants have pathways to proceed without consent when exempt or complying conditions are met, and special exception and replacement rules protect some established uses and pre-commencement applications.
Penalties and enforcement
The Plan itself does not set out discrete monetary penalties or a detailed enforcement schedule; rather it operates within the enforcement and compliance architecture established by the Environmental Planning and Assessment Act 1979 (the Act) and associated regulations. The Plan repeatedly requires development consent for specified activities and references other legislation that carries enforcement mechanisms; enforcement therefore follows from non-compliance with the Act and relevant regulations as read with this Plan.
What the Plan specifies in relation to enforcement
The Plan establishes procedural prerequisites and consent gates, for example requiring development consent for subdivision (cl 2.6) and demolition (cl 2.7), and sets conditions for exempt and complying development (cl 3.1-3.3). Non-compliance with those gates will be actionable under the Act’s enforcement provisions, not by the Plan itself.
Statutory enforcement context referenced by the Plan
The Plan is subject to the Act and to relevant SEPPs that may prevail over it (cl 1.9(1)). Enforcement powers, penalties and remedial orders derive from the Act, its regulations and other statutes cited in the Plan, for example the Heritage Act 1977 where heritage offences may arise, and the Roads Act 1993 for unauthorised works on roads. The Plan references these statutes when prescribing procedural requirements for heritage, roads and other matters (see cl 5.10 heritage notifications, cl 4.2(1)(i) and Notes on cross-references to Roads Act).
Records, conditions and decision-making evidence
The Plan mandates that the consent authority keep a record of its assessment when granting consent that contravenes development standards (cl 4.6(4)). Those records may be relevant evidence in any enforcement or review process, and the Plan therefore creates an administrative duty whose breach could affect legal reviewability of a determination.
Enforcement triggers implicit in the Plan
Failure to obtain required development consent, carrying out development contrary to zone prohibitions or permitted-without-consent lists, failing to follow requirements for exempt or complying development, or not following heritage protection procedures are all situations that give rise to enforcement action under the Act. For example, carrying out development in an environmentally sensitive area as exempt development when cl 3.3 prohibits such exempt or complying development will engage enforcement under the Act.
No express local fines in the Plan
The Plan does not specify particular local civil penalties or fines. It does not contain express enforcement provisions such as infringement notice amounts, abatement notice forms, or specific penalty clauses. Consequently, enforcement relies on the Act and regulations, and on the application of general statutory remedies such as injunctions, abatement or penalty provisions available under the Act and other laws cited in the Plan.
Practical enforcement considerations for practitioners
Because the Plan depends on the Act for enforcement detail, practitioners must look to the Environmental Planning and Assessment Act 1979 and its Regulations for precise penalty regimes, timeframes for prosecutions, provisions for orders to remedy breaches, and appeal and review processes. The Plan’s requirements to notify other agencies for certain heritage or environmental matters (cl 5.10(7)-(9)) create administrative hooks that interested agencies may use to intervene or advise the consent authority, and those procedural steps are material in enforcement or judicial review.
In short, the Plan sets the substantive and procedural rules; enforcement and penalties arise through the broader statutory framework rather than the Plan itself. The Plan creates actionable breaches by setting consent requirements, prohibitions and conditions, but the mechanics of penalties and enforcement are located in the Act and other statutes the Plan references.
How it interacts with other laws
The Plan cross-references, complements and defers to multiple State instruments. Its operation must be read alongside the Environmental Planning and Assessment Act 1979 (the Act), relevant State environmental planning policies (SEPPs), and a range of other Acts that the Plan explicitly cites.
Primacy of the Act and SEPPs
The Plan is made under the Act and expressly notes that it is subject to any State environmental planning policy that prevails over it as provided by section 3.28 of the Act (cl 1.9(1)). The Plan therefore functions as a local environmental instrument within the hierarchical planning regime established by the Act and SEPPs. Practically this means where an SEPP applies and contains provisions that are inconsistent with the Plan, the SEPP will prevail.
Cross-references to specific SEPPs and policies
The Plan identifies State environmental planning policies that may be relevant or that contain rules that either interact with or override local provisions; examples listed include SEPP (Housing) 2021, SEPP (Transport and Infrastructure) 2021, SEPP (Resources and Energy) 2021, SEPP (Resilience and Hazards) 2021 (Chapter 3), SEPP (Industry and Employment) 2021, SEPP (Primary Production) 2021 and the SEPP (Exempt and Complying Development Codes) 2008 which has state-wide application and is used by the Plan for exempt and complying development rules (cl 3.1 note, Land Use Table note, and other cross-references). The Plan defers to SEPP (Transport and Infrastructure) 2021 Chapter 2 for development carried out by or on behalf of a public authority (cl 5.12).
Heritage law and other statutory overlays
Heritage is regulated by both the Plan and the Heritage Act 1977. The Plan requires consent for demolition, moving or altering heritage items and archaeological sites, and requires notification to the Heritage Council in specific cases (cl 5.10(2), (5), (7)). The Plan's heritage protections operate in parallel with the Heritage Act; applications affecting the State Heritage Register or sites under the Heritage Act will involve that Act as well.
Local Government Act and public land
The Plan enables the Council to classify or reclassify public land as operational or community land in accordance with the Local Government Act 1993 (cl 5.2). Clause 5.2(5) records that discharge of trusts by the Plan requires the Governor’s approval in some cases as required under the Local Government Act.
Crown land and conservation instruments
Clause 1.9A suspends private covenants to the extent necessary to enable development in accordance with the Plan, but excludes certain instruments such as relevant instruments under the Crown Land Management Act 2016 (cl 1.9A(2)(b)), conservation agreements under the National Parks and Wildlife Act 1974 (cl 1.9A(2)(c)), property vegetation plans under the Native Vegetation Act 2003 (cl 1.9A(2)(e)), biobanking agreements under the former Threatened Species Conservation Act 1995 (cl 1.9A(2)(f)), and planning agreements under the Act (cl 1.9A(2)(g)). The clause preserves rights of public authorities under registered instruments (cl 1.9A(3)). The Governor’s prior approval is recorded (cl 1.9A(4)).
Rural industries, agriculture and fisheries
The Plan incorporates agriculture and aquaculture rules while deferring to industry instruments. Intensive livestock agriculture controls refer to Department of Primary Industries guidelines and codes of practice and require consideration of the relevant industry development plans (cl 5.18(3)(g),(h)). Pond-based and tank-based aquaculture references the Fisheries Management Act 1994 and the NSW Oyster Industry Sustainable Aquaculture Strategy, and Schedule 6 provides site and operational requirements (cl 5.19 and Schedule 6).
Roads and works on public land
Multiple clauses note the need for approvals under the Roads Act 1993 for kerb crossings, driveways and other roadworks (see Notes and cl 4.2(1)(i), cl 5.2(d)(iii), cl 6.2 Note 2). Practical interaction therefore requires liaison with the relevant roads authority and compliance with section 138 of the Roads Act where relevant.
Building Code, BASIX and classification issues
Exempt and complying development must meet Building Code of Australia provisions and not cause the building to contravene the Building Code (cl 3.1(3)(a)-(b)). Clause 4.6(8)(b) expressly disallows using the exceptions mechanism to contravene development standards that arise from BASIX commitments imposed under the State Environmental Planning Policy (Building Sustainability Index: BASIX) 2004, where applicable.
Environmental, water and biosecurity laws
The Plan interacts with environmental protection statutes and regulations, for example by excluding exempt/compliant development from areas declared under the Biodiversity Conservation Act 2016, Marine Estate Management Act 2014, and Ramsar-designated wetlands (cl 3.3, Schedule 6 cl 1 and cl 7). Aquaculture clauses require that discharges to natural waterbodies be limited (Schedule 6 cl 4). The Plan also references the Protection of the Environment Operations Act in a note in cl 7.4 concerning waste.
Acquisition and compensation laws
The Plan identifies relevant State acquisition authorities for particular reserved land types for the purpose of owner-initiated acquisition under the Land Acquisition (Just Terms Compensation) Act 1991 and records that landholders may be entitled to acquisition by the designated authority where hardship exists (cl 5.1).
Interaction mechanics summarised
The Plan establishes the local rules and spatial mapping, but the legal effect of consents, enforcement and operational approvals depends on overlaying State SEPPs and other statutes. Practitioners must treat the Plan as a local instrument that modifies or clarifies local permissibility while always checking for prevailing SEPPs, cross-referenced statutory approvals (heritage approvals, roads approvals, Native Vegetation or Crown land instruments) and any other State-level policy instruments that may override a local rule (cl 1.9(1)). The Plan itself records many of these linkages by explicit references and by naming the other statutes, so the intended operational relationships are express.
Amendment history
The Plan includes recorded amendments and historical notes in its text. The Plan as provided contains specific amendment annotations in the clauses and schedules. Below are the amendments that are recorded in the Plan text itself.
Noted amendments and substitutions in the Plan text
Clause 1.8A, the savings provision for development applications, is annotated as amended in 2019: "cl 1.8A: Am 2019 (621), Sch 5[1]".
Clause 1.9A, suspension of covenants, is annotated as amended in 2019: "cl 1.9A: Am 2019 (621), Sch 5[2]-[4]".
Clause 2.1 (Land use zones) was amended in 2022: "cl 2.1: Am 2022 (832), Sch 1.9[1]".
The Land Use Table and related entries are annotated with multiple amendments across years: "Land Use tbl: Am 2016 (168), Sch 1 [2]; 2017 (493), Sch 1.1 [1]; 2022 (314), Sch 1; 2022 (832), Sch 1.9[2]". These note state instrument references to updates.
Clause 4.6 shows that some subclauses were repealed and has annotations about amendments; the text reports certain repeals within clause structure (cl 4.6(5) and (7) repealed).
Clause 5.4, "Controls relating to miscellaneous permissible uses", is annotated as amended in 2018: "cl 5.4: Am 2018 (406), Sch 1.61 [1] [2]". That amendment added or altered floorspace and area caps in the listed items.
Clause 6.2 was repealed in 2021: "cl 6.2: Rep 2021 (225), Sch 1."
Clause 5.24 and 5.25 (Farm stay accommodation and Farm gate premises) were substituted in 2023: "cl 5.24: Subst 2023 (458), Sch 1[4]." and "cl 5.25: Subst 2023 (458), Sch 1[4]."
Schedule 2 has amendment annotated in 2025: "sch 2: Am 2025 (615), Sch 1[1]."
Recorded "Not adopted" and "Not applicable" entries
Several clauses are shown in the Plan as not adopted or not applicable. For example cl 4.3 (Height of buildings), cl 4.4 (Floor space ratio), cl 4.5 (Calculation of floor space ratio and site area), cl 5.5 (Controls relating to secondary dwellings on land in a rural zone), cl 5.6 (Architectural roof features), cl 5.7 (Development below mean high water mark), cl 5.9 (Dwelling affected by natural disaster), cl 5.14 (Siding Spring Observatory,maintaining dark sky), cl 5.15 (Defence communications facility), cl 5.22 and cl 5.23, are indicated as "[Not adopted]" or "[Not applicable]" in the Plan text. Those entries reflect that the Plan does not include localised rules on those topics; they remain unadopted.
Transitional and repeal history
Clause 1.8A preserves pre-commencement applications by requiring them to be determined as if the Plan had not commenced (cl 1.8A). Clause 1.8 repealed prior local environmental plans applying to Barraba, Bingara and Yallaroi earlier planning instruments are listed as repealed under that provision (cl 1.8). The Plan thereby consolidated those earlier documents when made.
How to treat the amendment notes
The Plan’s bracketed amendment annotations are the Plan’s own record of the primary statutory amendments. They identify the amending instrument year and schedule references. Practitioners should consult the consolidated version on the NSW legislation website and the linked amending instruments for the full amending text, and verify map changes and schedule inserts as maps and schedules are often amended separately by environmental planning instruments or orders that may affect zoning, lot sizes and heritage mapping (cl 1.7).
In short, the Plan’s text carries internal amendment annotations indicating statutory updates in 2016, 2017, 2018, 2019, 2021, 2022, 2023 and 2025. To track the Plan’s current legal effect one must consult the consolidated instrument on the NSW legislation portal and review the amending instruments referenced in the bracketed amendment notes.
Litigation history
The Plan itself does not record any judicial decisions or litigation history. The text contains no citations to cases or judicial determinations. Consequently, there is no litigation history embedded in the Plan document provided.
What this means for practitioners
There is no precedent or annotated case law in the Plan to guide interpretation of its provisions. Interpretative questions about application of the Plan,such as the proper application of cl 4.6 (exceptions to development standards), the scope of cl 1.9A (suspension of covenants), or the meaning of “environmentally sensitive area” as used in cl 3.3,would be resolved by reference to the Act, relevant SEPPs, regulations and case law developed under those instruments. Practitioners must therefore consult the Environmental Planning and Assessment Act 1979, relevant SEPPs, the Regulations and the NSW planning decision body and court jurisprudence where contested determinations are appealed.
Practical approach where litigation risk exists
Because the Plan sets local rules that interact with higher-level instruments, grounds for merit or judicial review commonly hinge on procedural fairness, failure to have regard to mandatory considerations (for example, zone objectives under cl 2.3(2) or heritage consultation duties under cl 5.10), or misapplication of cl 4.6 in contravention cases. Where a development decision raises substantial legal or factual issues, applicants and objectors should expect that matters could be the subject of merits review to the Land and Environment Court or judicial review under general administrative law, but those procedures and relevant precedents are found outside the Plan text.
Absence of Plan-cited cases
The Plan names Acts, SEPPs and guidelines but not judicial authorities. Any litigation or case law that applies must be identified from external legal databases and cross-checked against the Plan, the Act and applicable SEPPs.
In summary: the Plan contains no litigation history in its text. Legal disputes that arise in the application of the Plan will be resolved by reference to broader planning law and relevant case law, which practitioners must source independently of the Plan.
Gotchas
This section highlights traps, counter-intuitive effects and implementation risks that are evident from the Plan text and that practitioners must check carefully against the maps and schedules.
Exempt and complying development can be refused by location, not just by activity
Even where a development fits an exempt or complying class, cl 3.3 excludes environmentally sensitive areas from exempt or complying development. Practitioners should never assume a State-wide exempt/compliant code applies without checking the Plan’s "environmentally sensitive area" definition and the Plan’s maps. Schedule 6, cl 1 and cl 7 mirror this for aquaculture.
Pre-commencement applications are preserved
cl 1.8A preserves development applications made before the Plan’s commencement, requiring they be determined as if the Plan had not commenced. That can create situations where two adjacent lots are governed by different instruments for the same stage of assessment. Check application lodgement dates carefully to determine whether the new Plan or the prior plan applies.
Suspension of covenants has limits and public authority protections
Clause 1.9A suspends private covenants to the extent necessary to enable development under the Plan, but it excludes covenants imposed by the Council, certain Crown and conservation instruments, property vegetation plans and biobanking agreements, and planning agreements (cl 1.9A(2)). Subclause (3) preserves rights of public authorities under registered instruments. Practitioners must check title encumbrances and registered instruments because not all private restrictions are suspended.
Not adopted items create regulatory gaps
Multiple provisions are expressly "[Not adopted]" or "[Not applicable]" in the Plan (for example cl 4.3 height, cl 4.4 floor space ratio, cl 5.5 secondary dwellings on rural land). The absence of an adopted local height or FSR standard means those controls are either unset locally or addressed by other instruments; confirm whether a SEPP, development control plan or the State regulation provides the relevant standard. Do not assume default local standards apply.
The exceptions mechanism is constrained for subdivisions and certain standards
While cl 4.6 allows contravening standards in some cases, cl 4.6(6) prevents granting consent under the clause where a subdivision will create two or more lots below the minimum size or where any resultant lot is less than 90% of the minimum area in specified zones. Also cl 4.6(8) expressly disallows applying the clause to development standards for complying development and BASIX-related standards, meaning some standards are off-limits to the flexibility test. If seeking to vary a lot size or BASIX commitment, plan to rely on other statutory avenues or amendment of the LEP.
Zone boundary flexibility has a tight radius and exclusions
Clause 5.3 allows development within 60 metres of a zone boundary to be assessed for permissibility of the adjoining zone, but the clause excludes RE1, C1, C2, C3, W1 and coastal zone land among others. The practical effect is a modest buffer where cross-boundary uses can be supported; however exclusions mean the clause is not a universal workaround for mismatched zoning.
Intensive livestock agriculture thresholds are capacity-based and location-based
cl 5.18 permits certain intensive livestock development to proceed without consent below capacity thresholds, provided locational exclusions are satisfied (for example, not within 100 metres of a natural watercourse, not within 500m of a residence for many farms, and more stringent buffers for poultry and pig farms). Capacity definitions are explicit (cl 5.18(5)). Failure to heed both the capacity numbers and the locational tests risks triggering the need for consent and more extensive environmental assessment.
Aquaculture rules combine plan mapping and external strategies
cl 5.19 and Schedule 6 require compliance with Part 1 site location and operational requirements and refer applicants to the NSW Oyster Industry Sustainable Aquaculture Strategy maps and to Department of Primary Industries aquaculture industry development plans. Applicants must therefore consult spatial maps held by other agencies, not just the LEP maps.
Heritage process can impose additional documentary obligations
cl 5.10 allows the consent authority to require heritage management documents or conservation management plans and mandates notice to the Heritage Council for archaeological sites and nominated State heritage item demolitions. These are pre-determination obligations that can delay or condition approvals and typically require archaeological or heritage consultancy.
Essential services and external approvals are gating conditions
cl 6.4 requires the consent authority to be satisfied that essential services are available or that arrangements are in place. Multiple clauses note that approval under the Roads Act 1993 is required for kerb crossings and access works. Failure to secure these external approvals can be fatal to a consent.
Local caps and definitions matter
cl 5.4 contains numerical limits for bed and breakfast bedrooms, home industry floor area, industrial retail outlet retail floorspace, farm stay accommodation rooms and kiosk size. Practitioners should base proposals on these numeric caps rather than relying on broader permissibility statements in the Land Use Table.
The Plan contains specific absolute prohibitions of certain development types
For example, cl 2.9 prohibits canal estate development and defines it narrowly. If a proposal includes excavation to create waterways together with residential development, it may be prohibited regardless of other permissions.
"Not adopted" clauses may shift risk to other instruments
Where the Plan does not adopt local standards for height or FSR, an applicant cannot conclusively rely on the Plan for that standard. Check whether SEPPs, DCPs, or the Building Code and BASIX fill that gap.
These are concrete operational risks arising directly from the Plan text. Practitioners must cross-check the Plan’s maps, schedules and the amending instrument history, and identify any relevant SEPPs and external spatial data that are referenced by the Plan.
How to comply
This practical checklist directs applicants, their advisors and Council officers to the primary steps and documentary checks required to comply with the Plan’s controls as they are set out in the Plan text.
Confirm land zoning and mapped constraints
Consult the Land Zoning Map and Land Application Map referenced in cl 1.3 and cl 2.2 to identify the zone, the Lot Size Map for minimum lot sizes (cl 4.1), the Heritage Map for Schedule 5 items (cl 5.10 note) and the Sensitive Lands Map for the “Sensitive” designation under cl 6.3. Maps are publicly available via the NSW Planning Portal as required by cl 1.7.
Determine whether the development is permitted, permitted with consent, or prohibited
Use the Land Use Table in Part 2 to check whether the proposed use is listed as permitted without consent, permitted with consent, or prohibited in the relevant zone (cl 2.3). Remember that the consent authority must consider the zone objectives when deciding (cl 2.3(2)).
Check exempt and complying development pathways
Consult Schedule 2 for exempt development and Schedule 3 and cl 3.2 for complying development. Ensure the proposal meets the schedule’s size, siting and technical standards (cl 3.1(2)-(5), cl 3.2(2)-(4)). Verify the site is not within an environmentally sensitive area, because cl 3.3 excludes such areas from exempt or complying development.
For development requiring consent, prepare the documentation the Council will expect
For applications involving potential heritage impacts prepare heritage management documents or conservation management plans if requested (cl 5.10(5)-(6)). For developments that propose to contravene a development standard, prepare the statutory justification documentation demonstrating why compliance is unreasonable or unnecessary and set out environmental planning grounds as required by cl 4.6(3) and the Regulation noted in the Plan. For intensive livestock or aquaculture, include odour, water quality and mitigation assessments per cl 5.18 and cl 5.19 and Schedule 6.
Check minimum lot size and subdivision rules
For subdivisions ensure compliance with the Lot Size Map (cl 4.1). If you seek a smaller lot in a rural zone use cl 4.2 or cl 4.2A pathways but be aware of the limits on creating lots with existing dwellings or creating additional dwelling entitlements (cl 4.2(3)-(5), cl 4.2A(2)-(3)). For community title schemes check cl 4.1AA and strata plan rules (cl 4.1AA(2)-(3), cl 4.2C).
Heritage and Aboriginal heritage
If the property is listed in Schedule 5 or within a heritage conservation area, obtain consent for demolition, external alteration or disturbance (cl 5.10(2)). Prepare a heritage impact statement and notify the Heritage Council or local Aboriginal communities where the Plan mandates consultation (cl 5.10(7)-(9)).
Address flood risk and other hazard planning
If land is in a flood planning area, satisfy the tests in cl 5.21, including compatibility with flood function, risk to life, evacuation capacity and potential cumulative flood impacts. Refer to the “Considering Flooding in Land Use Planning Guideline” and the Flood Risk Management Manual as the Plan requires (cl 5.21(4)-(5)).
Satisfy essential services and external approvals
Provide evidence that essential services will be available as required by cl 6.4. Obtain any necessary roads approval under the Roads Act 1993 for kerb crossings or new driveways as required in multiple clauses (cl 4.2(1)(i), cl 5.2(d)(iii), cl 6.2 Note 2).
For specialised uses follow the sectoral rules
For intensive livestock follow cl 5.18 capacity and locational tests and provide statements of environmental effects addressing odour, water pollution, soil degradation, mitigation and codes of practice adherence (cl 5.18(3)-(5)). For pond/tank/oyster aquaculture follow cl 5.19 and Schedule 6 site and operational requirements and check external maps and strategies referenced in cl 5.19(5)-(6).
Use the exceptions route only where permitted and prepare the necessary record
Where a development standard must be contravened, prepare the cl 4.6 justification material addressing why compliance is unreasonable or unnecessary and environmental planning grounds to justify the contravention. Note the consent authority must keep an assessment record (cl 4.6(3)-(4)). Do not use cl 4.6 to attempt to contravene standards expressly excluded under cl 4.6(8), such as standards for complying development or BASIX commitments.
Temporary use, sales offices and restoration obligations
For temporary uses obtain consent for the period up to 60 days in any 12 month period per cl 2.8(2). Ensure the application demonstrates the temporary use will not prejudice subsequent development and that land will be restored after the use concludes, where applicable (cl 2.8(3)-(5)).
Check for mapped exclusions, conserved land, and Crown or trust interests
Before relying on any suspension of covenants under cl 1.9A check for excluded instruments and rights, including Crown land instruments, conservation agreements and planning agreements. Also verify any public authority registered interests that cl 1.9A(3) preserves.
Consult other instruments and agencies
Identify relevant SEPPs, the Building Code and BASIX, Departmental industry development plans, the NSW Oyster Strategy maps and the Department’s maps and guidelines that the Plan references. Liaise early with the Council, the relevant road authority and any State agencies such as the Heritage Council where mandatory notification is required.
Keep accurate administrative records
Ensure the consent authority and applicant keep the records required by cl 4.6(4) and other clauses, and document consultations with the Heritage Council and local Aboriginal communities within the 28 day consideration periods where the Plan prescribes them (cl 5.10(7)-(9)).
Applying this sequence will help practitioners identify whether consent is required, what evidence is needed, which external approvals must be obtained and where the Plan’s local rules interact with State instruments. Always verify the current consolidated Plan text and any amending instruments and maps on the NSW legislation and planning portals before finalising an application.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Barraba Local Environmental Plan 1990
Bingara Local Environmental Plan 1994
Yallaroi Local Environmental Plan 1991
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU5 Village
Residential Zones
R5 Large Lot Residential
Employment Zones
E4 General Industrial
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
cl 2.1: Am 2022 (832), Sch 1.9[1].
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 60 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that
This is an opening excerpt, not the complete document.