This local environmental plan sets zoning, land-use rules and development controls for land in Guyra. It specifies which uses are permitted, which need consent, which are exempt or complying, subdivision and minimum lot-size rules, and heritage and environmental constraints, and it makes the Council the consent authority (cl 1.3; cl 1.6).
It matters to landowners, developers and public authorities because it determines what can be built or subdivided, what can proceed without consent, and the conditions and limits (environmental, heritage and infrastructure) that apply to development.
This instrument sets local environmental planning rules for the Guyra local government area by identifying zones, permitted uses, development consent requirements, exemptions and complying development, site-specific controls and schedules that apply to land within Guyra. Mechanically it:
Establishes the Plan’s commencement and territorial scope (the Plan commences on publication on the NSW legislation website; cl 1.1AA, cl 1.3). The Plan applies to the land shown on the Land Application and Land Zoning Maps (cl 1.1AA; cl 1.3; cl 2.2).
Declares the consent authority for the Plan to be the Council, subject to the Act (cl 1.6).
Repeals previous local environmental plans and deemed environmental planning instruments that applied only to the land covered by this Plan (cl 1.8).
Sets the zoning regime and objectives for each zone (Part 2, cll 2.1-2.3 and the Land Use Table). Zones include RU1 Primary Production, RU3 Forestry, RU5 Village, R1 General Residential, R5 Large Lot Residential, SP2 Infrastructure, RE1 and RE2 Recreation, C1 National Parks and Nature Reserves and C3 Environmental Management (cl 2.1).
Specifies for each zone what development is permitted without consent, permitted with consent, and prohibited through the Land Use Table (cl 2.3 and the schedules to Part 2).
Requires development consent for subdivision and demolition unless otherwise exempted by this or a State environmental planning policy (cl 2.6; cl 2.7).
Identifies exempt development (Schedule 2, cl 3.1) and complying development (Schedule 3, cl 3.2), and excludes certain environmentally sensitive areas from exempt or complying development (cl 3.3).
Sets principal development standards and mechanisms for exceptions, focussing on minimum lot sizes and rural subdivision rules (Part 4, notably cll 4.1-4.2C, and a range of related clauses added or amended by later notices).
Current sections
Direct links to the current provisions in Guyra Local Environmental Plan 2012.
State Environmental Planning Policy (Transport and Infrastructure) 2021, Chapter 2—relating to infrastructure facilities, including air transport, correction, education, electricity generating works and solar energy systems, health services, ports, railways, roads, waste management and water supply systems
Agritourism; Air transport facilities; Animal boarding or training establishments; Aquaculture; Boat launching ramps; Boat sheds; Camping grounds; Caravan parks; Cellar door premises; Cemeteries; Charter and tourism boating facilities; Community facilities; Correctional centres; Crematoria; Depots; Dual occupancies; Dwelling houses; Eco-tourist facilities; Educational establishments; Environmental facilities; Extractive industries; Farm buildings; Flood mitigation works; Function centres; Home businesses; Home industries; Industrial training facilities; Information and education facilities; Intensive livestock agriculture; Jetties; Landscaping material supplies; Marinas; Mooring pens; Moorings; Mortuaries; Open cut mining; Places of public worship; Plant nurseries; Recreation areas; Recreation facilities (outdoor); Research stations; Roadside stalls; Rural industries; Rural supplies; Rural workers’ dwellings; Service stations; Signage; Tourist and visitor accommodation; Transport depots; Truck depots; Turf farming; Veterinary hospitals; Water recreation structures; Water supply systems
4
Prohibited
4 Prohibited
4 Prohibited
Advertising structures; Hotel or motel accommodation; Serviced apartments; Any other development not specified in item 2 or 3
Part 3
Exempt and complying development
Part 3 Exempt and complying development
Part 3 Exempt and complying development
Part 4
Principal development standards
Part 4 Principal development standards
Part 4 Principal development standards
Part 5
Miscellaneous provisions
Part 5 Miscellaneous provisions
Part 5 Miscellaneous provisions
5
Relevant acquisition authority
5 Relevant acquisition authority
5.1 Relevant acquisition authority
(1) The objective of this clause is to identify, for the purposes of section 3.15 of the Act, the authority of the State that will be the relevant authority to acquire land reserved for certain public purposes if the land is required to be acquired under Division 3 of Part 2 of the Land Acquisition (Just Terms Compensation) Act 1991 (the owner-initiated acquisition provisions).
Note.
If the landholder will suffer hardship if there is any delay in the land being acquired by the relevant authority, section 23 of the Land Acquisition (Just Terms Compensation) Act 1991 requires the authority to acquire the land.
(2) The authority of the State that will be the relevant authority to acquire land, if the land is required to be acquired under the owner-initiated acquisition provisions, is the authority of the State specified below in relation to the land shown on the Land Reservation Acquisition Map (or, if an authority of the State is not specified in relation to land required to be so acquired, the authority designated or determined under those provisions).
| Type of land shown on Map | Authority of the State |
| Zone RE1 Public Recreation and marked “Local open space” | Council |
| Zone RE1 Public Recreation and marked “Regional open space” | The corporation constituted under section 2.5 of the Act |
| Zone SP2 Infrastructure and marked “Classified road” | Transport for NSW |
| Zone C1 National Parks and Nature Reserves and marked “National Park” | Minister administering the National Parks and Wildlife Act 1974 |
(3) Development on land acquired by an authority of the State under the owner-initiated acquisition provisions may, before it is used for the purpose for which it is reserved, be carried out, with development consent, for any purpose.
Part 6
Additional local provisions
Part 6 Additional local provisions
Part 6 Additional local provisions
6
Earthworks
6 Earthworks
6.1 Earthworks
(1) The objective of this clause is to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land.
(2) Development consent is required for earthworks unless—
(a) the earthworks are exempt development under this Plan or another applicable environmental planning instrument, or
(b) the earthworks are ancillary to development that is permitted without consent under this Plan or to development for which development consent has been given.
(3) Before granting development consent for earthworks (or for development involving ancillary earthworks), the consent authority must consider the following matters—
(a) the likely disruption of, or any detrimental effect on, drainage patterns and soil stability in the locality of the development,
(b) the effect of the development on the likely future use or redevelopment of the land,
(c) the quality of the fill or the soil to be excavated, or both,
(d) the effect of the development on the existing and likely amenity of adjoining properties,
(e) the source of any fill material and the destination of any excavated material,
(f) the likelihood of disturbing relics,
(g) the proximity to, and potential for adverse impacts on, any waterway, drinking water catchment or environmentally sensitive area,
(h) any appropriate measures proposed to avoid, minimise or mitigate the impacts of the development.
Exempt development may be carried out without the need for development consent under the Act. Such development is not exempt from any approval, licence, permit or authority that is required under any other Act and adjoining owners’ property rights and the common law still apply.
sch 2: Am 2013 No 47, Sch 2.13.
sch.2-sec
Cemeteries and burial grounds (other than those to which clause 5.10 applies)
sch.2-sec Cemeteries and burial grounds (other than those to which clause 5.10 applies)
Cemeteries and burial grounds (other than those to which clause 5.10 applies)
(1) Must only involve—
(a) the creation of a new grave or monument, or
(b) the excavation or disturbance of land for the purpose of carrying out the conservation or repair of a monument or grave marker.
(2) Must be within an existing cemetery or burial ground.
(3) Must not be undertaken in a site identified as a heritage item.
Note.
Clause 5.10 contains provisions that deal with the disturbance of human remains, relics in the form of grave goods or places of Aboriginal heritage significance.
sch.2-sec-oc.2
Lighting (external)
sch.2-sec-oc.2 Lighting (external)
Lighting (external)
(1) Must not be for lighting a tennis court or sports ground.
(2) Must be constructed so that light spill is contained within the site and in accordance with AS 4282—1997, Control of the obtrusive effects of outdoor lighting.
sch.2-sec-oc.3
Signage—generally
sch.2-sec-oc.3 Signage—generally
Signage—generally
All signs must comply with the following—
(a) must not be on a building or land that is a heritage item,
(b) must relate to the premises on which the sign is situated,
(c) must relate to a lawful use of, and carried out on, the land,
(d) must not cover a mechanical ventilation inlet or outlet vent,
(e) if fixed to a wall—must be securely fixed by rigid non-corroding metal supports.
sch.2-sec-oc.4
Signage—A-framed signs on private land
sch.2-sec-oc.4 Signage—A-framed signs on private land
Signage—A-framed signs on private land
A-framed signs on private land must comply with the following—
(a) must be on land in a business or industrial zone,
(b) only 1 per property,
(c) maximum display area (on each side)—0.5m2,
(d) must not obstruct access to the land or any adjacent land,
(e) must be secure and stable,
(f) must not require construction work,
(g) must not involve any live or recorded entertainment, including music, broadcast programs, flashing lights and the like,
(h) must be removed at the close of business each day.
sch.2-sec-oc.5
Signage—business identification signs in business zones
sch.2-sec-oc.5 Signage—business identification signs in business zones
Signage—business identification signs in business zones
(1) Under awning signs and projecting wall signs must comply with the following—
(a) maximum display area (on each side)—1.5m2,
(b) maximum length—2.5m,
(c) the underside must be 2.6m above the footpath and not less than 0.6m behind the kerb,
(d) only 1 per property.
(2) Top hamper signs must comply with the following—
(a) maximum size—1.5m2,
(b) must not extend below the lintel of door way or window over which the sign is attached,
(c) must not be fixed more than 3.5m above the existing ground level,
(d) only 1 per property.
(3) Fascia signs must comply with the following—
(a) must be attached to an existing fascia,
(b) must be fixed flush with the fascia,
(c) must not extend above or below the fascia or return end of the awning,
(d) must not be illuminated,
(e) only 1 per property.
(4) Flush wall signs must comply with the following—
(a) maximum area—2.5m2,
(b) must not occupy more than 50% of the wall on which the sign appears,
(c) maximum height—3.0m above existing ground level,
(d) must not extend above the top of the wall to which the sign is attached,
(e) must be securely fixed to an existing wall,
(f) must not be illuminated,
(g) only 1 per property.
sch.2-sec-oc.6
Signage—business identification signs in industrial zones
sch.2-sec-oc.6 Signage—business identification signs in industrial zones
Signage—business identification signs in industrial zones
Pole or pylon signs must comply with the following—
(a) maximum height—5m,
(b) maximum area (per side)—2.5m2,
(c) must be built in accordance with an engineer’s certification for the structure and footings,
(d) must be constructed at least 1m from the centreline of any sewer or water main,
(e) must not encroach on any registered easement,
(f) only 1 per property.
sch.2-sec-oc.7
Signage—business identification signs or building identification signs in residential zones
sch.2-sec-oc.7 Signage—business identification signs or building identification signs in residential zones
Signage—business identification signs or building identification signs in residential zones
Business identification signs or building identification signs in residential zones must comply with the following—
(a) maximum area—1m2,
(b) must be secure and stable,
(c) must not be illuminated,
(d) must not extend beyond property boundaries,
(e) only 1 per property.
sch.2-sec-oc.8
Signage—real estate signs
sch.2-sec-oc.8 Signage—real estate signs
Signage—real estate signs
Real estate signs must comply with the following—
(a) maximum size—
(i) single dwelling house—2.5m2,
(ii) multi dwelling housing of less than 10 dwellings—10m2,
(iii) commercial or industrial premises—5m2,
(iv) rural property—10m2,
(v) subdivision of 20 lots or less—10m2,
(vi) subdivision more than 20 lots—15m2,
(b) maximum width—4m.
(c) maximum height of signs—6m,
(d) must contain the words that the building or site to which it is affixed is for sale or lease,
(e) if the sign relates to a proposed building or subdivision—must not be erected until development consent for the building or subdivision has been approved,
(f) maximum of 2 signs per property,
(g) must not be illuminated,
(h) must be removed—
(i) within 14 days of the property being sold or leased, or
(ii) in the case of a subdivision—when 90% of the lots have been sold, or within 5 years, whichever occurs first,
(i) if a sign to direct people to a site or for auction purposes in Zone RU1 Primary Production—only 1 sign with a maximum area of 1m2 permitted,
(j) must not interfere with sight distances for vehicles approaching intersections.
Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
Schedule 4 Classification and reclassification of public land
(Clause 5.2)
sch 4: Am 2014 (361), cl 4 (1) (2).
Schedule 5
Environmental heritage
Schedule 5 Environmental heritage
Schedule 5 Environmental heritage
(Clause 5.10)
sch 5: Am 2023 (553), Sch 1[3] [4].
Maps: Am 2014 (628), cl 4. Entries discontinued from July 2021 when responsibility for map updates moved to Department of Planning, Industry and Environment.
Schedule 6
Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
Schedule 6 Pond-based and tank-based aquaculture
(Clause 5.19)
Division 1
Site location requirements
Division 1 Site location requirements
Division 1 Site location requirements
Division 2
Operational requirements
Division 2 Operational requirements
Division 2 Operational requirements
7
Conservation exclusion zones
7 Conservation exclusion zones
7 Conservation exclusion zones
(1) Must not be carried out on the following land, except to the extent necessary to gain access to water—
(c) land within a wetland of international significance declared under the Ramsar Convention on Wetlands.
Note.
Nothing in this clause affects any requirement under an Act relating to land specified in this clause to obtain a licence or other authority under that Act for development of the land.
8
Flood liability
8 Flood liability
8 Flood liability
Must be designed or constructed on land so that it will not be inundated by the discharge of a 1:100 ARI (average recurrent interval) flood event.
9
Species selection
9 Species selection
9 Species selection
Species of fish or marine vegetation cultivated or kept must be consistent with the relevant aquaculture industry development plan (within the meaning of clause 5.19).
10
Pond design
10 Pond design
10 Pond design
(1) Must not require the construction of new ponds, water storages, dams or buildings.
(2) Must not be located on permanent watercourses, creeks, billabongs or isolated outreaches of creeks or rivers.
(3) Must be capable of preventing the escape of stock into natural waterbodies or wetlands.
11
Culture water
11 Culture water
11 Culture water
Must use freshwater.
Source text: opening excerpt
Sourced from legislation.nsw.gov.au, CC BY 4.0.
Part 1 Preliminary
Part 1 Preliminary
Part 1 Preliminary
1 Name of Plan
1 Name of Plan
1.1 Name of Plan
This Plan is Guyra Local Environmental Plan 2012.
1 Commencement
1 Commencement
1.1AA Commencement
This Plan commences on the day on which it is published on the NSW legislation website.
1 Aims of Plan
1 Aims of Plan
1.2 Aims of Plan
(1) This Plan aims to make local environmental planning provisions for land in Guyra in accordance with the relevant standard environmental planning instrument under section 3.20 of the Act.
(2) The particular aims of this Plan are as follows—
(aa) to protect and promote the use and development of land for arts and cultural activity, including music and other performance arts,
(a) to encourage the orderly management, development and conservation of resources by protecting, enhancing and conserving—
(i) land of significance for agricultural production, and
(ii) timber, minerals, soils, water and other natural resources, and
(iii) areas of high scenic or recreational value, and
(iv) native plants and animals including threatened species, populations and ecological communities, and their habitats, and
(v) places and buildings of heritage significance,
(b) to provide a choice of living opportunities and types of settlements,
(c) to facilitate development for a range of business enterprises and employment opportunities,
(d) to ensure that development is sensitive to both the economic and social needs of the community, including the provision of community facilities and land for public purposes.
1 Land to which Plan applies
1 Land to which Plan applies
1.3 Land to which Plan applies
Provides local provisions on heritage controls, earthworks, essential services, bushfire hazard reduction, aquaculture, intensive livestock agriculture, temporary uses and other operational controls (Part 5 and Part 6; see cll 5.10, 5.11, 5.18-5.19, 5.21, 6.1, 6.4).
Allows, for the purpose of enabling development under the Plan, that private covenants, agreements and similar instruments that restrict development may be suspended to the extent necessary, subject to explicit exceptions (cl 1.9A).
Identifies specific public land classification or reclassification actions and which public land is operational or community land (cl 5.2 and Schedule 4).
Lists heritage items, archaeological sites and Aboriginal objects/places of heritage significance (Schedule 5).
Includes local technical schedules for aquaculture (Schedule 6) and prescribes conditions for complying certificates to follow the State Policy conditions (Schedule 3, Part 2).
The Plan repeatedly cross‑references and defers to State environmental planning policies and other Acts for matters that are outside its text. It therefore creates a local rule-set layered on top of State laws, where State instruments prevail if specified (cl 1.9). The Plan also contains amendment notes and saved provisions that affect transitional application of development applications lodged before commencement of the Plan (cl 1.8A).
Official rationale statements appear in the Plan’s headings and clause objectives (for example, to protect agricultural land, heritage, natural resources and to encourage arts and cultural activity; cl 1.2). Those statements identify aims but the operative provisions deliver the mechanics described above.
Main concepts
The Plan organises its regulatory regime around a small set of structural concepts that determine outcomes for land use and development.
Zoning and objectives
The Plan divides land into named zones and attaches objectives to each zone (cl 2.1; cl 2.3(1)(a); Land Use Table). The zone objectives signal what the consent authority must have regard to when deciding applications (cl 2.3(2)). Examples: RU1 is focused on sustaining primary industry production; R1 is focused on a variety of housing types suitable for communities.
Land Use Table
For each zone the Land Use Table identifies three categories: uses permitted without development consent, uses permitted only with development consent, and prohibited uses (cl 2.3(1)(b)-(d)). The consent authority must have regard to zone objectives in decision-making (cl 2.3(2)).
Consent regimes, exempt and complying development
The Plan distinguishes development requiring development consent, exempt development (Schedule 2; cl 3.1) and complying development (Schedule 3; cl 3.2). Exempt development must meet the standards in Schedule 2 and other conditions (cl 3.1(2)-(5)). Complying development must meet the standards in Schedule 3 and be permissible with consent in the zone (cl 3.2(2)-(3)).
Environmentally sensitive areas are excluded from exempt or complying development (cl 3.3). The Plan lists what constitutes such areas, including Ramsar sites, World Heritage areas, land identified as high Aboriginal or biodiversity significance and reserves under various Acts (cl 3.3(2)).
Development standards and flexibility
Minimum subdivision lot sizes and a series of rural subdivision rules are principal development standards (Part 4, cll 4.1-4.2C). The Plan explains objectives for these standards (cl 4.1(1)). The Lot Size Map sets minimum sizes and special rules exist for strata, community titles and split‑zone lots (cll 4.1, 4.1AA, 4.1A, 4.2B).
Clause 4.6 provides a local framework to allow exceptions to development standards where applicants demonstrate compliance with the two‑part test in the clause: compliance with a development standard is unreasonable or unnecessary in the circumstances and there are sufficient environmental planning grounds to justify the contravention (cl 4.6(3)). The consent authority must keep a record of its assessment (cl 4.6(4)). Clause 4.6 also preserves certain limits on subdivisions in rural and environmental zones (cl 4.6(6)).
Heritage and Aboriginal cultural heritage
Heritage items, archaeological sites and Aboriginal objects/places are listed in Schedule 5. Consent is required for demolition, exterior alteration, disturbance of archaeological sites or Aboriginal places and for subdividing or erecting buildings relating to heritage items or conservation areas, subject to limited exceptions for minor works and maintenance (cl 5.10(2)-(3)). The Plan requires notification of and consultation with the Heritage Council and local Aboriginal communities in specified circumstances (cl 5.10(7)-(9)).
Environmental protections and operational controls
The Plan includes specialised controls for intensive livestock agriculture (cl 5.18) and pond/tank/oyster aquaculture (cl 5.19 and Schedule 6) that impose site selection and operational standards, and in limited cases allow small‑scale intensive livestock uses without consent if thresholds and locational criteria are met (cl 5.18(4)-(5)).
Flood planning requirements require consent authorities to be satisfied that development in the flood planning area is compatible with flood function and will manage risks to life and property (cl 5.21).
Interaction with covenants and public authorities
The Plan allows suspension of private covenants and similar instruments to the extent necessary to enable development in accordance with the Plan, but explicitly excludes covenants imposed by the Council or certain Crown instruments and conservation agreements (cl 1.9A(1)-(2)). Rights of public authorities under registered instruments are preserved (cl 1.9A(3)).
Maps and external instruments
The Plan refers to several maps (Land Zoning Map, Lot Size Map, Heritage Map, Land Reservation Acquisition Map) and requires maps to be available to the public (cl 1.7; note). Many operational details rely on external State environmental planning policies and other Acts (cl 1.9 and throughout).
Transitional and administrative provisions
A savings clause requires development applications made before commencement and not finally determined to be determined as if the Plan had not commenced (cl 1.8A). The Plan sets which State environmental planning policies prevail and identifies policies or provisions that do not apply where specified (cl 1.9). The Plan identifies the authority for owner‑initiated land acquisitions for reserved land (cl 5.1 and Land Reservation Acquisition Map).
These core concepts combine: zoning shapes permitted uses; schedules and maps supply technical parameters; the consent, exempt and complying paths determine procedural burdens; local development standards (with an exceptions mechanism) bind land division; and heritage, environmental and utility/service requirements impose further preconditions on development.
Who it affects
The Plan allocates decision rights and regulatory burdens across a set of identifiable actors. The text itself identifies who decides and who must comply.
Primary decision-maker
Guyra Council is the consent authority for the Plan (cl 1.6). This places the Council at the centre of development approvals and its staff and elected members will be called on to interpret objectives, apply the Land Use Table and make judgement calls under discretionary clauses such as cl 4.6.
Landowners and applicants
Any person owning or proposing to develop land within the Plan boundaries is directly affected because the Plan defines permitted, prohibited and consented uses on that land (cl 2.2; cl 2.3). Subdivision, erection of dwellings, demolition and other works require development consent unless they are exempt or complying (cl 2.6; cl 2.7; cl 3.1; cl 3.2).
Developers, builders and certifiers
Builders and certifiers must ensure that works meet exempt or complying standards where those routes are pursued and must respect Building Code of Australia compatibility required for exempt or complying development (cl 3.1(3)(a); cl 3.2(3)(b)). Complying development certificates must include specified conditions drawn from State policies (Schedule 3, Part 2; sch.3-sec General conditions).
Owners or beneficiaries of private covenants, easements or agreements
Clause 1.9A grants a development pathway that can suspend the effect of private covenants, agreements and similar instruments to permit development under the Plan, except where the covenant was imposed by the Council or certain Crown and conservation instruments apply (cl 1.9A(1)-(2)). Persons who rely on those covenants to protect property interests may find their restrictions displaced in particular circumstances identified by the clause.
Crown and public authorities
The Plan preserves the rights and interests of public authorities under registered instruments (cl 1.9A(3)). Several clauses explicitly involve State agencies: owner‑initiated acquisition authority assignments (cl 5.1), infrastructure development exemptions for State infrastructure policy (cl 5.12), and the identification of which State authority acquires land in certain map categories (cl 5.1(2)).
Heritage stakeholders and Aboriginal communities
Owners of heritage items, applicants proposing works affecting heritage items or conservation areas, and local Aboriginal communities are affected by cl 5.10 which requires consent for works affecting heritage and imposes notification and consultation duties (cl 5.10(2), (7)-(9)). Heritage Council notification periods are specified (28 days; cl 5.10(7), (9)).
Agricultural, aquaculture and intensive livestock operators
Clause 5.18 sets requirements and thresholds for intensive livestock agriculture, including location limits for small operations that may proceed without consent (cl 5.18(4)-(5)). Clause 5.19 and Schedule 6 set site and operational requirements for pond‑based, tank‑based and oyster aquaculture. Operators will need to demonstrate compliance with the Plan’s site and operational criteria.
Licensed premises and the hospitality sector
Clause 5.20 prevents consent authorities from refusing development for licensed premises on subjective grounds related to the playing or performance of music, or dancing, provided noise can be managed to acceptable levels. Licensed‑premises operators therefore have statutory protection on those specific planning grounds (cl 5.20).
Providers of essential services, utilities and infrastructure
The Plan requires that essential services be available or adequate arrangements be in place before consent can be granted (cl 6.4). Authorities or private providers responsible for water supply, sewerage, electricity and stormwater therefore influence whether consents can be lawfully granted.
Councillors and administrators involved with public land management
Clause 5.2 authorises the Council to classify or reclassify public land as operational or community land and sets out the public lands to be classified in Schedule 4. That creates administrative responsibilities for local government and impacts the governance and permitted uses of those parcels.
Other stakeholders
The Plan references multiple State Acts for particular domains (Heritage Act 1977, Rural Fires Act 1997, Fisheries Management Act 1994, Crown Land Management Act 2016, etc.). Bodies administering those statutes will be stakeholders insofar as the Plan requires consultation or defers to their instruments (cl 1.9A(2); cl 5.11; cl 5.19).
Who bears costs and faces constraints
The Plan places transaction and compliance costs on applicants through development application processes, the need to prepare statements of environmental effects or environmental impact statements for designated development, heritage management documents or conservation management plans where required (cl 5.10(5)-(6); cl 5.18(3)). Conversely, some private restrictions (certain covenants) may be suspended to enable development, reducing constraints for developers in specified circumstances (cl 1.9A).
The instrument does not set out criminal penalties or an enforcement fine schedule in its text. Enforcement and sanctions will arise through the application of the Act and associated regulations and court remedies, and are administered in practice by the consent authority and relevant State agencies. The Plan defines who decides (the Council as consent authority) and who must satisfy preconditions for development (applicants, owners, operators and service providers).
Key duties and rights
This section organises the Plan’s operative duties and entitlements for landowners, applicants and decision-makers, with clause references.
Duties to obtain development consent
Subdivision and demolition generally require development consent (cl 2.6; cl 2.7). The Land Use Table specifies uses that are permitted with consent in each zone (cl 2.3(1)(c); Part 2 Land Use Table). Applicants must comply with the Act and the Plan when preparing an application.
Duties imposed at the application stage
Where development departs from a development standard, an applicant must provide the grounds to show compliance with the cl 4.6 test that compliance is unreasonable or unnecessary and that there are sufficient environmental planning grounds for the contravention; the consent authority must keep a record of its assessment (cl 4.6(3)-(4)). The Environmental Planning and Assessment Regulation 2021 requires such applications to be accompanied by a document setting out the grounds (cl 4.6 note).
For intensive livestock agriculture and pond/tank aquaculture, the consent authority must consider information in the statement of environmental effects or EIS and specific matters such as odour, water pollution risks, soil degradation and the applicant’s intention to comply with codes of practice (cl 5.18(3); cl 5.19(2)(a)). For oyster aquaculture, development applications must consider aquaculture industry development plans and the NSW Oyster Industry Strategy (cl 5.19(5)).
Heritage and cultural duty requirements
Consent is required for demolition, exterior alteration of heritage items, disturbance of archaeological sites or Aboriginal places, and for building/ subdivision on land with heritage items (cl 5.10(2)). The consent authority may require heritage management documents or a heritage conservation management plan when considering such proposals (cl 5.10(5)-(6)). Consent authorities must notify the Heritage Council or local Aboriginal communities and take submissions into account within 28 days for archaeological and Aboriginal place matters respectively (cl 5.10(7)-(8)).
Duties to ensure services and protect environmental values
Development consent must not be granted unless essential services are available or adequate arrangements have been made for water, electricity, sewage disposal and stormwater management and vehicular access (cl 6.4). The consent authority must be satisfied development in flood planning areas will be compatible with flood function and incorporate measures to manage risk to life (cl 5.21(2)-(3)).
Procedural and record-keeping duties of the consent authority
The consent authority must have regard to zone objectives when determining applications (cl 2.3(2)). For departures under cl 4.6 it must keep a record of its assessment (cl 4.6(4)). Heritage notifications and considering responses from Heritage Council or Aboriginal communities are mandatory procedural steps for the consent authority (cl 5.10(7)-(9)).
Rights and entitlements
Exempt development: landowners have a right to carry out development that meets Schedule 2 standards without development consent, provided it is not in an environmentally sensitive area and other Schedule conditions are met (cl 3.1(2); cl 3.3).
Complying development: where Part 1 of Schedule 3 specifies a type of complying development and the development meets the prescribed standards and conditions, an applicant may obtain a complying development certificate instead of development consent (cl 3.2(2)-(4)).
Temporary use: the Plan permits temporary use of any land in any zone for up to 52 days in any 12 months by development consent, subject to tests preventing prejudice to future development and adverse environmental or amenity impacts; sales office exceptions exist (cl 2.8(2)-(5)).
Suspension of private instruments: to the extent necessary for carrying out development under the Plan, private covenants and like instruments can be suspended, except where excluded by cl 1.9A(2) (cl 1.9A(1)-(3)). This is an entitlement that can reduce contractual constraints on development.
Limitations on rights
The Plan specifies that some State environmental planning policies prevail and that certain State policies or provisions may not apply to the land if specified (cl 1.9). It also lists restrictions where the Plan expressly does not operate (e.g. some clauses marked "Not adopted" are not operative locally, such as cl 4.3 height of buildings and cl 4.4 floor space ratio).
Clause 4.6 prevents the consent authority from using its flexibility to allow a contravention of certain classes of development standards, such as development standards for complying development or BASIX commitments (cl 4.6(8)).
The Plan limits subdivision where it would separate principal and secondary dwellings unless minimum lot sizes are met (cl 2.6(2)). Clause 4.2A restricts erection of new dwellings in certain rural and conservation zones to specified categories of lots and holdings and allows replacement dwellings where an existing lawful dwelling exists (cl 4.2A(3)-(4)).
Operational practicalities
Complying development certificates must be subject to conditions set out in State Policy schedules (Schedule 3, Part 2; sch.3-sec General conditions). Exempt development remains subject to other Acts and approvals even if no development consent is needed (cl 3.1(5) note).
In short, duties are largely procedural and evidentiary (prepare heritage assessments, statements of environmental effects, satisfy essential services and flood safety tests, document reasons for contravening standards where sought), while rights include the ability to carry out exempt/compliant works, pursue temporary use, and rely on cl 1.9A suspension of private instruments in certain circumstances. The Council is given both discretionary authority and procedural obligations in exercising decision-making powers.
Penalties and enforcement
The Plan itself does not set out a fines schedule or specific criminal or civil penalties within its text. Enforcement and sanctions are managed under the Environmental Planning and Assessment Act and related Acts, and are implemented in practice through consent authority decisions, refusal or grant of consents, and compliance action. The Plan, however, creates several mechanisms that shape enforcement pathways and administrative remedies.
Enforcement mechanisms and administrative levers contained or implied in the Plan
Development consent gate: The Plan requires development consent for specified forms of development (subdivision, demolition, many uses listed in the Land Use Table). Refusal or conditional grant of consent is the primary regulatory control implemented by the Council as consent authority (cl 2.6; cl 2.7; cl 2.3(1)(c)). The consent process is the principal enforcement point: unauthorised development may be subject to compliance action under the Act rather than the Plan text itself.
Exempt and complying development monitoring: Exempt development (Schedule 2) may be carried out without development consent but remains subject to other approvals and laws (cl 3.1 note). Complying development requires a complying development certificate issued under the Act and conditions specified in Schedule 3 (cl 3.2(4); sch.3-sec General conditions). Certifiers and applicants have duties to ensure compliance with these conditions; non-compliance would trigger enforcement under the Act and building laws.
Heritage procedural obligations with notification duties: The Plan imposes mandatory notification and consultation steps to the Heritage Council and to local Aboriginal communities before consent can be granted for certain heritage or archaeological matters (cl 5.10(7)-(9)). Failure to follow these procedures could render a consent decision procedurally unfair or susceptible to challenge under the Act.
Recording and transparency: For contraventions of development standards where an exceptions test is applied, the consent authority must keep a record of its assessment (cl 4.6(4)). That record creates administrative transparency and evidentiary material that can be reviewed in subsequent compliance or legal processes.
Suspension of private instruments with exceptions: Clause 1.9A enables development in accordance with the Plan to proceed despite conflicting private covenants to the extent necessary. However, the clause preserves the rights of public authorities under registered instruments (cl 1.9A(3)). The mechanism therefore moves enforcement away from private contractual remedies into statutory planning processes for some conflicts.
What the Plan does not do (and therefore how enforcement is limited)
The Plan contains no express penalty provisions, infringement notices or fines within its text. It does not itself prescribe enforcement sanctions such as on-the-spot fines or direct criminal offences. Enforcement options available against non-compliant development are therefore those in the Environmental Planning and Assessment Act and associated regulations, which are cited throughout the Plan but not reproduced.
The Plan does not lay out the enforcement powers or prosecution procedure for breaches; those procedures, including time limits, penalty levels and remedies, will be governed by the Act and regulations, or other relevant statutes such as the Heritage Act 1977, Crown Land Management Act or Local Government Act where relevant.
Practical consequences for practitioners
Because the Plan places substantive preconditions on consent (heritage assessment, essential services availability, flood safety considerations, site operational requirements for aquaculture and intensive livestock), enforcement is often preventative: a well-prepared DA that addresses the Plan’s checklists reduces the risk of refusal and subsequent enforcement actions.
Administrative review risk: Decisions made by the consent authority (for example, under cl 4.6 to permit a contravention of a development standard) require record-keeping and reasoned assessment; those decisions are open to administrative review or judicial challenge on procedural or merits grounds under the Act. The Plan’s procedural prescriptions support such review but do not specify appeal routes or penalties.
In summary, compliance and enforcement under this Plan operate through the Act’s development control machinery (consent grants, certifiers, conditions, notices), procedural obligations (heritage consultations, record-keeping of exceptions) and the usual State enforcement framework. The Plan creates the substantive rules and procedural checkpoints; sanctions are those provided elsewhere in statute and practice and are not detailed in the Plan text.
How it interacts with other laws
The Plan expressly cross-references and defers to State environmental policies and other statutes. Its operation is therefore embedded within a hierarchy.
State environmental planning policies and the EP&A Act
The Plan is subject to the provisions of any State environmental planning policy that prevails over it under section 3.28 of the Environmental Planning and Assessment Act (cl 1.9(1)). It also refers to State policies and Chapters that may be relevant to particular uses (Part 2 Land Use Table note listing several SEPPs). Where a SEPP is stated to prevail, its provisions will modify or supplant the Plan’s rules.
References to and interfacing with other Acts
Heritage Act 1977: Heritage items listed in Schedule 5 are to be managed in accordance with cl 5.10, which also references notification requirements and interim heritage protections under the Heritage Act (cl 5.10 notes and cll 5.10(7), (9)). The Plan requires Heritage Council notification for archaeological sites and nominated State heritage demolition proposals (cl 5.10(7), (9)), engaging obligations under the Heritage Act.
Crown and Crown land instruments: Clause 1.9A(2) excludes suspension of covenants or instruments that are relevant instruments under the Crown Land Management Act 2016, conservation agreements under the National Parks and Wildlife Act 1974, Trust agreements under the Nature Conservation Trust Act 2001, biobanking agreements under the Threatened Species Conservation Act 1995, property vegetation plans under the Native Vegetation Act 2003, and planning agreements under the Act (cl 1.9A(2)(a)-(g)). That list preserves the operation of these Acts and instruments where environmental protections or Crown controls are in play.
Rural Fires Act 1997: The Plan confirms bush fire hazard reduction work authorised by that Act may be carried out without development consent (cl 5.11). The Plan notes the Rural Fires Act also makes provisions relating to development on bush fire prone land.
Fisheries Management Act 1994 and Marine Estate Management Act 2014: The aquaculture clauses and Schedule 6 reference aquaculture industry development plans under the Fisheries Management Act and declare exclusion zones for aquaculture on certain marine protected lands (cl 5.19; Schedule 6 Div 1 and Div 2).
Local Government Act 1993: The Plan enables classification and reclassification of public land under Part 2, Chapter 6 of the Local Government Act and records that such classification may discharge trusts; Governor approvals are referenced where required (cl 5.2 and notes).
Land Acquisition (Just Terms Compensation) Act 1991: Clause 5.1 identifies the relevant State authority for owner‑initiated acquisition under that Act and maps which authority acquires land reserved for specified public purposes.
Strata and community titles legislation: The Plan’s subdivision standards carve out exceptions for strata subdivisions under the Strata Schemes Development Act 2015 and subdivisions under the Community Land Development Act 2021 (cl 4.1(4); cl 4.1AA(2)-(4)).
Operational dependence on regulations and guidelines
The Plan depends on other instruments, technical documents and guidelines for detail: Lot Size Map, Land Zoning Map, Heritage Map, the Considering Flooding in Land Use Planning Guideline, the Flood Risk Management Manual and the Standard technical requirements for LEP maps (cl 1.7 note; cl 5.21(4)-(5)). Those documents influence interpretation and implementation though they are external to the Plan text.
Priority and conflict
Where an inconsistency arises between the Plan and a State environmental planning policy that is stated to prevail, the policy will prevail pursuant to cl 1.9(1) and the Act’s provisions on instrument hierarchy. Clause 1.9(2) allows the Plan to specify SEPPs or provisions that do not apply, though the particular list in the extract is blank.
Practical effects of cross-reference architecture
Many of the Plan’s operative rules are implemented by reference to criteria in other Acts or State policies. For example, exempt/compliant development criteria require compliance with the Building Code of Australia and possibly BASIX commitments; exceptions to development standards must be supported by material required by the regulations (cl 3.1(3)(a); cl 4.6 note). Heritage procedures require engagement with statutory bodies under the Heritage Act, which can affect timing and conditions for consents (cl 5.10(7)-(9)).
In short, the Plan is designed as a local layering of land-use controls that assumes and defers to a web of State instruments and Acts for procedural, technical and protective detail. Practitioners must read the Plan alongside the EP&A Act, relevant SEPPs, the Building Code of Australia, the cited environmental protection Acts and the maps and guidelines it references.
Amendment history
The Plan’s text contains embedded amendment annotations. The following summarises the amendments and legislative notes supplied within the instrument itself; each entry cites the clause(s) where the amendment note appears.
2013 amendments: Schedule 2 amended (sch 2: Am 2013 No 47, Sch 2.13) as noted in the Schedule 2 header.
2014 amendments: Schedule 4 was amended (sch 4: Am 2014 (361), cl 4 (1) (2)), and maps update responsibility changed in 2014 (Schedule 5 note: Maps,Am 2014 (628), cl 4).
2015 amendments: The Land Use Table has multiple amendments referenced (Land Use tbl: Am 2015 (825), Sch 1 [1]; Part 4 boundary adjustment clause 4.2C was inserted in 2015 (cl 4.2C: Ins 2015 (825), Sch 1 [2]). Clause 6.2 was later repealed in 2021 but was present prior to that (cl 6.2: Rep 2021 (225), Sch 1).
2016 amendments: Land Use Table amended (Land Use tbl: 2016 (168), Sch 1 [2] [5]).
2017 amendments: Land Use Table and sex services location rules amended in 2017 (Land Use tbl: 2017 (493), Sch 1.1 [1]; cl 6.5: Am 2017 (493), Sch 1.2 [1]). Part of Schedule 3 amendments noted 2017.
2018 amendments: Land Use Table and controls relating to artisan food/drink were amended in 2018 (Land Use tbl: 2018 (488), Sch 1.1 [1]; cl 5.4: Am 2018 (406), Sch 1.60 [1] [2]).
2019 amendments: Savings provision for pre-commencement development applications (cl 1.8A) was amended in 2019 (cl 1.8A: Am 2019 (621), Sch 5[1]). Clause 1.9A (suspension of covenants) was amended in 2019 (cl 1.9A: Am 2019 (621), Sch 5[2]-[4]). Land Use Table amended 2019 (Land Use tbl: 2019 (137), Sch 6 [1]).
2020 amendments: Land Use Table amended (Land Use tbl: 2020 (291), cl 4).
2021 amendments and repeals: Clause 6.2 was repealed in 2021 (cl 6.2: Rep 2021 (225), Sch 1). Note at Schedule 5 indicates map updates responsibility changed from July 2021.
2022 amendments: Land Use Table amended in 2022 (Land Use tbl: 2022 (314), Sch 1).
2023 amendments: Schedule 1 (additional permitted uses) and Schedule 5 amended in 2023 (sch 1: Am 2023 (553), Sch 1[1] [2]; sch 5: Am 2023 (553), Sch 1[3] [4]). Land Use Table amended 2023 (Land Use tbl: 2023 (458), Sch 2.39).
2024 amendments: Multiple additions and amendments in 2024 are flagged:
Insertion of cl 4.1AA Minimum subdivision lot size for community title schemes (cl 4.1AA: Am 2024 (42), Sch 1.21[1]).
Insertion of cl 4.1A Minimum lot size for certain split lot zones (cl 4.1A: Am 2024 (42), Sch 1.21[1]).
Amendments to cl 4.2A Erection of dwelling houses in certain zones (cl 4.2A: Am 2024 (42), Sch 1.21[1] [2]).
Amendments to cl 4.2B Minimum subdivision lot size for strata plan schemes (cl 4.2B: Am 2024 (42), Sch 1.21[1] [2]).
Amendments to cl 4.6 Exceptions to development standards (cl 4.6: Am 2024 (42), Sch 1.21[3]).
Amendments to cl 5.3 Development near zone boundaries (cl 5.3: Am 2024 (42), Sch 1.21[3]).
The Plan’s internal notes identify the legislative instruments that effected these amendments by year and schedule clause. Practitioners must therefore consult the formal consolidated Plan on the NSW legislation website and the Planning Portal maps to ensure they are working with the operative text and the current maps. The Plan itself instructs that maps and GIS data are held and kept available in accordance with Ministerially approved arrangements (cl 1.7(3)-(4) note).
The Plan does not include an exhaustive amendment table within its text beyond the inline amendment notes. For a complete, time‑sequenced record practitioners should consult the NSW legislation website and Gazette notices cited in the amendment annotations.
Litigation history
The Plan’s text does not record any judicial decisions or litigation history. It names no cases and contains no annexed judicial determinations. Where the Plan requires or contemplates interaction with third‑party decision-makers or statutory bodies (for example, the Heritage Council notifications at cl 5.10(7) and (9), or the requirement to consider an EIS for designated development under the Act), those processes are governed by the Environmental Planning and Assessment Act and regulations and may give rise to litigation in practice, but no such cases are referenced or provided in the Plan.
Implications for practitioners
Because the Plan itself contains no reported decisions, precedent, or case law within its text, legal research on discretionary issues (for example, the interpretation of cl 4.6 exceptions to development standards or the practical application of cl 1.9A suspension of covenants) must be conducted in the wider statutory and case law context that sits outside the Plan. The Plan repeatedly cross-references the Act, SEPPs and other Statutes, indicating that judicial interpretation will likely arise under those Acts as well as under the Plan.
For administrative review or judicial review of Council decisions under the Plan, reliance will be on external case law and the administrative law framework created by the Act and general administrative law principles rather than any Plan‑specific litigation history contained in the instrument.
In short, no litigation history is recorded in the instrument. Any contested interpretation or enforcement will need to be traced in external case law, decision records of consent authorities, and appeal or review decisions under the EP&A Act and related statutes.
Gotchas
The Plan contains multiple provisions that can catch practitioners and applicants if not carefully navigated. The following are concrete traps, procedural tight spots and interpretative friction points grounded in the Plan text.
Savings rule for existing DAs
If a development application was lodged before the Plan’s commencement and not finally determined, it must be determined as if this Plan had not commenced (cl 1.8A). That can be counter‑intuitive: a later Plan may not apply to an extant application. Practitioners must check the DA lodgement and final determination dates against the Plan commencement date. The cl 1.8A note flags that under Division 3.5 of the Act an application may be made for development that requires amendment of the instrument, but the primary effect is to preserve the pre‑commencement regulatory regime for pending applications.
Suspension of covenants with narrow exceptions
Clause 1.9A allows covenants and similar private instruments to be disregarded to the extent necessary to enable development under the Plan (cl 1.9A(1)). However, it expressly excludes covenants imposed by the Council and a list of Crown and conservation instruments (cl 1.9A(2)(a)-(g)). Practitioners should not assume private covenant protection will always survive; conversely, relying on covenants to block development may fail in specific instances. Always check whether the covenant falls into the exclusions list or protects public authority interests (cl 1.9A(3)).
Exempt/complying development exclusions and heritage
Exempt development rules exclude works that affect State Heritage Register items or sites subject to interim heritage orders (cl 3.1(3)(d)). Even development that appears exempt under Schedule 2 may require consent if the land contains heritage items or is in an environmentally sensitive area (cl 3.1(3)(d), cl 3.3). Practitioners must check the heritage map and Schedule 5 before assuming exempt status.
Environmentally sensitive area exclusions
Exempt or complying development cannot be carried out on environmentally sensitive areas as defined in cl 3.3(2). The list is extensive and includes coastal waters, Ramsar sites, World Heritage areas, areas of high Aboriginal cultural significance, and land within 100 metres of those areas. Failure to identify such areas will nullify exempt/compliant pathways.
Temporary use limitations
Temporary use consent is limited to a maximum of 52 days in any 12 months unless the use is a sales office for a new release area (cl 2.8(2)-(5)). Applicants seeking repeated short-term uses must structure those uses within that cap or seek alternative arrangements.
Minimum lot size complexity and exceptions
The Plan’s minimum lot size regime is layered and contains several overlapping exceptions and special rules: there are general minimum sizes (cl 4.1), strata and community title carve-outs (cl 4.1(4); cl 4.1AA), split‑zone lot rules (cl 4.1A), exceptions allowing rural subdivision for non‑dwelling uses (cl 4.1B) and boundary adjustment provisions in RU1 (cl 4.2C). Practitioners must consult the Lot Size Map and the specific clause that applies; an incorrect reading can lead to an invalid subdivision proposal, such as creating a lot with a secondary dwelling separated from the principal dwelling contrary to cl 2.6(2).
Height, floor space and FSR not adopted
Clauses relating to height of buildings (cl 4.3), floor space ratio (cl 4.4) and calculation of FSR (cl 4.5) are not adopted or not applicable. That means there may be no local numeric limit in the Plan for those measures; practitioners must rely on other instruments or the Act for constraints. Absence of local limits is not a free pass: State policies, building standards and design controls may still apply.
Music and licensed premises protection
Clause 5.20 prevents consent authorities from refusing licensed‑premises development on the grounds of music genre, live versus amplified music, number of performers, dancing or stage orientation, provided noise may be managed to an acceptable level (cl 5.20(1)-(2)). Applicants and councils should record how noise will be managed to avoid later challenges. The clause protects certain cultural uses from subjective refusal but anticipates an objective noise management test.
Heritage procedural deadlines
When a consent authority must notify the Heritage Council or local Aboriginal communities, the Plan prescribes 28 days within which to receive and take into account responses (cl 5.10(7)-(9)). Failure to comply with these notification and consultation procedures may invalidate a consent or create grounds for administrative review.
Development near zone boundaries
Clause 5.3 allows development of land within 50 metres of a zone boundary to be assessed for compatibility with uses in the adjoining zone (cl 5.3(2)-(4)). However, the clause excludes certain zones and coastal zones (cl 5.3(3)). Applicants should identify boundary adjacency early, because cross‑zone proposals rely on the consent authority being convinced the proposed use is compatible with both zone objectives and infrastructure capacity.
Aquaculture and intensive livestock thresholds and locational limits
Clauses 5.18 and 5.19 and Schedule 6 set operational and locational requirements for intensive livestock operations and aquaculture, and specify small‑scale thresholds that may permit development without consent only if not in sensitive areas and meeting distance buffers (cl 5.18(4)-(5); cl 5.19(4)-(6); Schedule 6). Practitioners should not assume small capacity equals free development without checking environmental sensitivity and proximity to sensitive receptors.
Essential services precondition
The Plan forbids granting consent unless essential services are available or arrangements are in place (cl 6.4). A DA that neglects to confirm water, electricity, sewage and stormwater arrangements is at risk of refusal on that ground.
Maps and external references
The Plan relies on external maps and technical requirements for LEP maps, GIS data and the Lot Size Map (cl 1.7). Those external documents may change over time and are necessary to determine permitted uses and minimum lot sizes. Practitioners must consult the authoritative maps on the NSW Planning Portal.
Record-keeping for development standard exceptions
Where an exception under cl 4.6 is sought, the consent authority must keep a record of its assessment (cl 4.6(4)). Applicants should therefore provide the detailed evidence required by the EP&A Regulation to support the cl 4.6 test to ensure a robust administrative record.
In sum, the Plan’s layered exceptions, external map reliance, procedural notification windows, and cross-reference to other legislation create multiple operational pitfalls that require early and thorough technical scanning and documentation.
How to comply
This is a practical compliance checklist drawn from the Plan to use when preparing or assessing development in Guyra. Each step cites the operative clause(s) that create the relevant requirement.
Confirm the Plan applies to the land (cl 1.3)
Check the Land Application Map and Land Zoning Map on the NSW Planning Portal to confirm the land is inside the Plan’s area and identify its zone (cl 1.3; cl 2.2).
Identify the zone objectives and permitted status (cl 2.3; Land Use Table)
Read the Land Use Table entries for the applicable zone to determine whether the proposed use is permitted without consent, permitted with consent or prohibited (cl 2.3(1); Part 2 Land Use Table). Have the zone objectives at hand for DA justification and assessment (cl 2.3(1)(a), (2)).
Determine if the development is exempt or complying (cl 3.1-3.2; Schedule 2 and Schedule 3)
Check Schedule 2 for exempt development that may be carried out without development consent but subject to conditions; verify the development is not in an environmentally sensitive area (cl 3.1(2)-(5); cl 3.3).
If considering the complying development pathway, ensure the development is the type specified in Part 1 of Schedule 3 and that it meets the development standards and conditions in Part 2 (cl 3.2(2)-(4); sch.3-sec General conditions).
For development requiring consent, prepare application documentation aligned with Plan tests
Provide a statement of environmental effects or an EIS where required, addressing the matters the Plan requires be considered: heritage impacts (cl 5.10(4)-(6)), intensive livestock considerations (cl 5.18(3)), aquaculture site and operational matters (cl 5.19(2)-(3) and Schedule 6), flood planning (cl 5.21(2)-(3)), and earthworks impact assessment (cl 6.1(3)(a)-(h)).
Check for heritage constraints and consultation obligations (cl 5.10)
If the land is a heritage item, in a heritage conservation area, or contains archaeological sites or Aboriginal places listed in Schedule 5, prepare a heritage management document or conservation management plan if requested (cl 5.10(5)-(6)).
Where archaeological sites or nominated State heritage items are affected, give the required notices to the Heritage Council and allow 28 days for response (cl 5.10(7), (9)). For Aboriginal places of heritage significance, notify relevant local Aboriginal communities and consider responses within 28 days (cl 5.10(8)).
Verify essential services and flood safety (cl 6.4; cl 5.21)
Confirm availability or arrangements for water supply, electricity, sewage disposal, stormwater and vehicular access (cl 6.4). For development in the flood planning area, show compatibility with flood function, risk management and evacuation requirements and consider projected climate‑change impacts (cl 5.21(2)-(3)).
For subdivision, verify minimum lot size rules and exceptions (cl 4.1, 4.1AA, 4.1A, 4.1B, 4.2B, 4.2C)
Consult the Lot Size Map for the minimum lot size and apply special clauses for community title schemes (cl 4.1AA), split‑zone lots (cl 4.1A), rural subdivision exceptions for non‑dwelling uses (cl 4.1B), strata plan minimums (cl 4.2B) and boundary adjustments for RU1 (cl 4.2C). For subdivisions creating lots with secondary dwellings, ensure the principal and secondary dwellings remain on the same lot or minimum sizes are met (cl 2.6(2)).
Where a proposed development would contravene a development standard, prepare a cl 4.6 justification (cl 4.6)
Demonstrate why compliance is unreasonable or unnecessary and supply sufficient environmental planning grounds to justify the contravention. Prepare the document required by the EP&A Regulation to support the application, and expect the consent authority to record its assessment (cl 4.6(3)-(4) and cl 4.6 note).
For intensive livestock and aquaculture, meet site and operational requirements (cl 5.18; cl 5.19; Schedule 6)
Ensure locational buffers, capacity thresholds and operational protections against odour, water pollution, soil degradation and escapes are addressed. For intensive livestock uses claiming exemption from consent under cl 5.18(4), verify the development type and that it is not located in environmentally sensitive areas or within specified distances of other farms or dwellings.
For works involving fire alarm conversions and other minor internal works, check complying development pathways and timing conditions (cl 5.8)
Converting alarm monitoring systems may be development requiring consent but is complying development if limited to internal alterations or specified antenna mounting, with timing conditions for works (cl 5.8(2)-(4)).
Be mindful of special rights and prohibitions for licensed premises (cl 5.20)
For licensed premises, the consent authority cannot refuse on grounds related to the playing or performance of music or dancing if noise can be managed to an acceptable level; include noise management plans and measurable controls in the DA (cl 5.20(1)-(2)).
Check for public land classification and acquisition mapping (cl 5.1; cl 5.2; Schedule 4)
If the land is on the Land Reservation Acquisition Map or Schedule 4, review the relevant authority for acquisition and classification changes. For community or operational land reclassification, identify any trusts or reservations that continue to bind the land (cl 5.1(2); cl 5.2(2)-(5)).
Consult maps and external guidelines referenced by the Plan (cl 1.7; cl 5.21(4))
Access the Land Zoning Map, Lot Size Map and Heritage Map on the NSW Planning Portal. Use the Considering Flooding in Land Use Planning Guideline and the Flood Risk Management Manual where flood matters arise (cl 5.21(4)-(5)).
Prepare for procedural notification and timing constraints
Allow time for Heritage Council or Aboriginal community notifications (28 days where required; cl 5.10(7)-(9)). If applying for a cl 4.6 exception or for works in special contexts, provide the documents the EP&A Regulation requires.
Where private covenants appear to block proposed development, assess applicability of cl 1.9A
Determine whether the covenant is one that the Plan allows to be suspended (cl 1.9A(1)). Check if the covenant was imposed by the Council or is one of the excluded instruments listed in cl 1.9A(2); if so, suspension is not available.
Record-keeping and anticipating review
Keep detailed records of the planning grounds and the consent authority’s reasons (cl 4.6(4)). Anticipate that discretionary decisions may be the subject of merits review or legal challenge; build the administrative record accordingly.
Documents to prepare and attach with a DA (as indicated by the Plan)
Statement of environmental effects or Environmental Impact Statement where required (cl 5.18(3); note under cl 3.1).
Heritage management document or heritage conservation management plan if requested (cl 5.10(5)-(6)).
Plans showing compliance with Schedule 6 for aquaculture or documentation of species and outlet controls (cl 5.19; Schedule 6).
Evidence of essential services availability or arrangements (cl 6.4).
If seeking a cl 4.6 exception, the document required by the regulations explaining why compliance is unreasonable or unnecessary and articulating environmental planning grounds.
Final practical notes
Always check the current consolidated Plan and the Planning Portal maps since the Plan depends on maps and has a history of amendment (cl 1.7 note; amendment notes). If in doubt about the status of an external instrument referenced in the Plan (SEPPs, heritage orders, aquaculture industry development plans), seek confirmation from the relevant State authority or the Council because the Plan defers to those instruments.
Following this checklist ensures the application aligns with the Plan’s substantive tests and procedural requirements and produces the documentation the consent authority expects under the Plan’s operative clauses.
The Dictionary at the end of this Plan defines words and expressions for the purposes of this Plan.
1 Notes
1 Notes
1.5 Notes
Notes in this Plan are provided for guidance and do not form part of this Plan.
1 Consent authority
1 Consent authority
1.6 Consent authority
The consent authority for the purposes of this Plan is (subject to the Act) the Council.
1 Maps
1 Maps
1.7 Maps
(1) A reference in this Plan to a named map adopted by this Plan is a reference to a map by that name—
(a) approved by the local plan-making authority when the map is adopted, and
(b) as amended or replaced from time to time by maps declared by environmental planning instruments to amend or replace that map, and approved by the local plan-making authority when the instruments are made.
(1AA) (Repealed)
(2) Any 2 or more named maps may be combined into a single map. In that case, a reference in this Plan to any such named map is a reference to the relevant part or aspect of the single map.
(3) Any such maps are to be kept and made available for public access in accordance with arrangements approved by the Minister.
(4) For the purposes of this Plan, a map may be in, and may be kept and made available in, electronic or paper form, or both.
Note.
The maps adopted by this Plan are to be made available on the NSW Planning Portal. Requirements relating to the maps are set out in the documents entitled Standard technical requirements for LEP maps and Standard requirements for LEP GIS data which are available on the website of the Department of Planning and Environment.
1 Repeal of planning instruments applying to land
1 Repeal of planning instruments applying to land
1.8 Repeal of planning instruments applying to land
(1) All local environmental plans and deemed environmental planning instruments applying only to the land to which this Plan applies are repealed.
Note.
The following local environmental plans are repealed under this provision—
Guyra Local Environmental Plan 1988
(2) All local environmental plans and deemed environmental planning instruments applying to the land to which this Plan applies and to other land cease to apply to the land to which this Plan applies.
1 Savings provision relating to development applications
1 Savings provision relating to development applications
1.8A Savings provision relating to development applications
If a development application has been made before the commencement of this Plan in relation to land to which this Plan applies and the application has not been finally determined before that commencement, the application must be determined as if this Plan had not commenced.
Note.
However, under Division 3.5 of the Act, a development application may be made for consent to carry out development that may only be carried out if the environmental planning instrument applying to the relevant development is appropriately amended or if a new instrument, including an appropriate principal environmental planning instrument, is made, and the consent authority may consider the application. The Division requires public notice of the development application and the draft environmental planning instrument allowing the development at the same time, or as closely together as is practicable.
cl 1.8A: Am 2019 (621), Sch 5[1].
1 Application of SEPPs
1 Application of SEPPs
1.9 Application of SEPPs
(1) This Plan is subject to the provisions of any State environmental planning policy that prevails over this Plan as provided by section 3.28 of the Act.
(2) The following State environmental planning policies (or provisions) do not apply to the land to which this Plan applies—
1 Suspension of covenants, agreements and instruments
1 Suspension of covenants, agreements and instruments
1.9A Suspension of covenants, agreements and instruments
(1) For the purpose of enabling development on land in any zone to be carried out in accordance with this Plan or with a consent granted under the Act, any agreement, covenant or other similar instrument that restricts the carrying out of that development does not apply to the extent necessary to serve that purpose.
(2) This clause does not apply—
(a) to a covenant imposed by the Council or that the Council requires to be imposed, or
(b) to any relevant instrument within the meaning of section 13.4 of the Crown Land Management Act 2016, or
(c) to any conservation agreement within the meaning of the National Parks and Wildlife Act 1974, or
(d) to any Trust agreement within the meaning of the Nature Conservation Trust Act 2001, or
(e) to any property vegetation plan within the meaning of the Native Vegetation Act 2003, or
(f) to any biobanking agreement within the meaning of Part 7A of the Threatened Species Conservation Act 1995, or
(g) to any planning agreement within the meaning of Subdivision 2 of Division 7.1 of the Act.
(3) This clause does not affect the rights or interests of any public authority under any registered instrument.
(4) Under section 3.16 of the Act, the Governor, before the making of this clause, approved of subclauses (1)–(3).
cl 1.9A: Am 2019 (621), Sch 5[2]–[4].
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
Part 2 Permitted or prohibited development
2 Land use zones
2 Land use zones
2.1 Land use zones
The land use zones under this Plan are as follows—
Rural Zones
RU1 Primary Production
RU3 Forestry
RU5 Village
Residential Zones
R1 General Residential
R5 Large Lot Residential
Special Purpose Zones
SP2 Infrastructure
Recreation Zones
RE1 Public Recreation
RE2 Private Recreation
Conservation Zones
C1 National Parks and Nature Reserves
C3 Environmental Management
2 Zoning of land to which Plan applies
2 Zoning of land to which Plan applies
2.2 Zoning of land to which Plan applies
For the purposes of this Plan, land is within the zones shown on the Land Zoning Map.
2 Zone objectives and Land Use Table
2 Zone objectives and Land Use Table
2.3 Zone objectives and Land Use Table
(1) The Land Use Table at the end of this Part specifies for each zone—
(a) the objectives for development, and
(b) development that may be carried out without development consent, and
(c) development that may be carried out only with development consent, and
(d) development that is prohibited.
(2) The consent authority must have regard to the objectives for development in a zone when determining a development application in respect of land within the zone.
(3) In the Land Use Table at the end of this Part—
(a) a reference to a type of building or other thing is a reference to development for the purposes of that type of building or other thing, and
(b) a reference to a type of building or other thing does not include (despite any definition in this Plan) a reference to a type of building or other thing referred to separately in the Land Use Table in relation to the same zone.
(4) This clause is subject to the other provisions of this Plan.
Notes.
2
1
Schedule 1 sets out additional permitted uses for particular land.
2
2
Schedule 2 sets out exempt development (which is generally exempt from both Parts 4 and 5 of the Act). Development in the land use table that may be carried out without consent is nevertheless subject to the environmental assessment and approval requirements of Part 5 of the Act.
2
3
Schedule 3 sets out complying development (for which a complying development certificate may be issued as an alternative to obtaining development consent).
2
4
Clause 2.6 requires consent for subdivision of land.
2
5
Part 5 contains other provisions which require consent for particular development.
2 Unzoned land
2 Unzoned land
2.4 Unzoned land
(1) Development may be carried out on unzoned land only with development consent.
(2) In deciding whether to grant development consent, the consent authority—
(a) must consider whether the development will impact on adjoining zoned land and, if so, consider the objectives for development in the zones of the adjoining land, and
(b) must be satisfied that the development is appropriate and is compatible with permissible land uses in any such adjoining land.
2 Additional permitted uses for particular land
2 Additional permitted uses for particular land
2.5 Additional permitted uses for particular land
(1) Development on particular land that is described or referred to in Schedule 1 may be carried out—
(a) with development consent, or
(b) if the Schedule so provides—without development consent,
in accordance with the conditions (if any) specified in that Schedule in relation to that development.
(2) This clause has effect despite anything to the contrary in the Land Use Table or other provision of this Plan.
2 Subdivision—consent requirements
2 Subdivision—consent requirements
2.6 Subdivision—consent requirements
(1) Land to which this Plan applies may be subdivided, but only with development consent.
Notes.
(2) Development consent must not be granted for the subdivision of land on which a secondary dwelling is situated if the subdivision would result in the principal dwelling and the secondary dwelling being situated on separate lots, unless the resulting lots are not less than the minimum size shown on the Lot Size Map in relation to that land.
Note.
The definition of secondary dwelling in the Dictionary requires the dwelling to be on the same lot of land as the principal dwelling.
2
1
If a subdivision is specified as exempt development in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, the Act enables it to be carried out without development consent.
2
2
Part 6 of State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 provides that the strata subdivision of a building in certain circumstances is complying development.
2 Demolition requires development consent
2 Demolition requires development consent
2.7 Demolition requires development consent
The demolition of a building or work may be carried out only with development consent.
Note.
If the demolition of a building or work is identified in an applicable environmental planning instrument, such as this Plan or State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, as exempt development, the Act enables it to be carried out without development consent.
2 Temporary use of land
2 Temporary use of land
2.8 Temporary use of land
(1) The objective of this clause is to provide for the temporary use of land if the use does not compromise future development of the land, or have detrimental economic, social, amenity or environmental effects on the land.
(2) Despite any other provision of this Plan, development consent may be granted for development on land in any zone for a temporary use for a maximum period of 52 days (whether or not consecutive days) in any period of 12 months.
(3) Development consent must not be granted unless the consent authority is satisfied that—
(a) the temporary use will not prejudice the subsequent carrying out of development on the land in accordance with this Plan and any other applicable environmental planning instrument, and
(b) the temporary use will not adversely impact on any adjoining land or the amenity of the neighbourhood, and
(c) the temporary use and location of any structures related to the use will not adversely impact on environmental attributes or features of the land, or increase the risk of natural hazards that may affect the land, and
(d) at the end of the temporary use period the land will, as far as is practicable, be restored to the condition in which it was before the commencement of the use.
(4) Despite subclause (2), the temporary use of a dwelling as a sales office for a new release area or a new housing estate may exceed the maximum number of days specified in that subclause.
(5) Subclause (3)(d) does not apply to the temporary use of a dwelling as a sales office mentioned in subclause (4).
2 Canal estate development prohibited
2 Canal estate development prohibited
2.9 Canal estate development prohibited
(1) Canal estate development is prohibited on land to which this Plan applies.
(2) In this Plan, canal estate development means development that involves—
(a) a constructed canal, or other waterwa
This is an opening excerpt, not the complete document.